About this file

This document is a Request for Proposals (RFP) issued by the Maryland Stadium Authority (MSA) to select a qualified design-build firm to provide services related to improvements at Regency Furniture Stadium located in Waldorf, Maryland. The stadium is home to the Southern Maryland Blue Crabs, an Atlantic League Professional Baseball team. The selected firm will provide design, preconstruction, and construction services for the improvements, which have a Guaranteed Maximum Price (GMP) limit of $17.5 million. The RFP outlines the required qualifications, proposal submission and evaluation process, including technical and financial proposal requirements. Proposals are due on April 30, 2024, and the selected firm will be required to attend oral presentations on May 14 or May 16, 2024. The contract term will be for the duration necessary to complete the scope of work.

The RFP includes Minority Business Enterprise (MBE) participation goals of 10% for design services and 15% for preconstruction services. Offerors must submit MBE utilization documentation with their proposals. MSA will evaluate proposals based on technical merit, which is weighted more heavily than financial criteria, and will recommend the Offeror that provides the best value to the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals

Design-Build Services

Regency Furniture Stadium Improvements

Issue Date: April 04, 2024

NOTICE: A prospective Offeror that has received this document from a source other than eMaryland Marketplace Advantage (eMMA) https://procurement.maryland.gov should register on eMMA. See Section 1.8.

MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO

RESPOND TO THIS SOLICITATION.

https://procurement.maryland.gov/

KEY INFORMATION SUMMARY SHEET

MARYLAND STADIUM AUTHORITY

Request for Proposals

Design-Build Services

Regency Furniture Stadium Improvements

RFP Issue Date: April 04, 2024

Procurement Officer: Christian Kramer Maryland Stadium Authority 351 West Camden Street, Suite 300 Baltimore, Maryland 21201 Phone: 443-202-3885 E-mail: ckramer@maryland.gov

Procurement Method: Competitive Sealed Proposals

MBE Participation Goal: Design Services: Overall Goal: 10% Pre-Construction Services: Overall Goal: 15%

Pre-Proposal Conference: April 11, 2024 at 12:00pm Local Time Web Conference Registration link:

https://us02web.zoom.us/meeting/register/tZck c-CurDgtG9TcXp0XxkA6434yM_0IT4Nv

Site Visit: April 18, 2024 at 10:30am Local Time Regency Furniture Stadium 11765 St. Linus Drive Waldorf, MD 20602

Registration link:

https://www.eventbrite.com/e/site-visit-rfp-db-services-regency-furniture-stadium-improvements-tickets- 876713923947?aff=oddtdtcreator

Questions Due: April 19, 2024 at 10:00am Local Time Submission link:

https://mdstad.sharefile.com/r-r03770eed0ae542f8983f068ed193da41

Proposals Due: April 30, 2024 at 1:00pm Local Time Technical Proposal Submission link:

https://mdstad.sharefile.com/r-rf2359ff804ec4590b2911b20048650d8

Financial Proposal Submission link:

https://mdstad.sharefile.com/r-r3d80a35caae44fe39371c4e70ea5797b mailto:ckramer@maryland.gov https://us02web.zoom.us/meeting/register/tZckc-CurDgtG9TcXp0XxkA6434yM_0IT4Nv https://us02web.zoom.us/meeting/register/tZckc-CurDgtG9TcXp0XxkA6434yM_0IT4Nv https://www.eventbrite.com/e/site-visit-rfp-db-services-regency-furniture-stadium-improvements-tickets-876713923947?aff=oddtdtcreator https://www.eventbrite.com/e/site-visit-rfp-db-services-regency-furniture-stadium-improvements-tickets-876713923947?aff=oddtdtcreator https://www.eventbrite.com/e/site-visit-rfp-db-services-regency-furniture-stadium-improvements-tickets-876713923947?aff=oddtdtcreator https://www.eventbrite.com/e/site-visit-rfp-db-services-regency-furniture-stadium-improvements-tickets-876713923947?aff=oddtdtcreator https://mdstad.sharefile.com/r-r03770eed0ae542f8983f068ed193da41 https://mdstad.sharefile.com/r-r03770eed0ae542f8983f068ed193da41 https://mdstad.sharefile.com/r-rf2359ff804ec4590b2911b20048650d8 https://mdstad.sharefile.com/r-rf2359ff804ec4590b2911b20048650d8 https://mdstad.sharefile.com/r-r3d80a35caae44fe39371c4e70ea5797b https://mdstad.sharefile.com/r-r3d80a35caae44fe39371c4e70ea5797b

TABLE OF CONTENTS

SECTION 1………… GENERAL INFORMATION

SECTION 2………… OFFEROR’S QUALIFICATIONS

SECTION 3………… PURPOSE AND SCOPE OF WORK

SECTION 4 ………...PROPOSAL SUBMISSION AND REQUIREMENTS

SECTION 5………… EVALUATION CRITERIA AND SELECTION

PROCEDURE

ATTACHMENTS

SECTION 1

GENERAL INFORMATION

1.1 Summary Statement

Chapter 61 of the Acts of 2022 as codified in ED §§ 10-601, 10-646.4, and 10-

657.6 authorizes the Maryland Stadium Authority (the “MSA”) to finance up to $200,000,000 for site acquisition and the planning, design, and construction of sports and entertainment facilities. On September 6, 2023, MSA and Charles County entered into a Memorandum of Agreement that formalizes the relationship and role of each in the execution of necessary improvements to Regency Furniture Stadium to ensure compliance with the Professional Development League (“PDL”) Standards recently adopted by Major League Baseball (“MLB”) (hereinafter the “Project”).

MSA is issuing this solicitation to select a highly qualified firm to provide design/build services related to the improvements for Regency Furniture Stadium. The stadium is located in Waldorf, MD and is the home of the Southern Maryland Blue Crabs (an Atlantic League Professional Baseball team).

1.2 Abbreviations and Definitions

For purposes of this RFP, the following abbreviations and terms have the meanings indicated below:

a. Agreement – The written contract entered into by MSA and the selected

Offeror responding to this RFP. The Agreement will include all general MSA terms and conditions, and will incorporate the entire RFP, including any addenda, and all or indicated portions of the selected Offeror’s proposal. A sample of the Agreement is attached hereto as Design-Build Contract Agreement, Attachment J.

b. Architect/Engineer (“A/E”) – The Design-Builder’s design team responsible for providing professional engineering, architectural, and design services for the Project.

c. Client – County Commissioners of Charles County.

d. COMAR - Code of Maryland Regulations (available at http://www.dsd.state.md.us).

e. Design-Build Contract Agreement – The contract entered into between the Maryland Stadium Authority and the Design-Builder for the execution of the Project. The Agreement is attached hereto as Attachment J and includes all general MSA terms and conditions, the http://www.dsd.state.md.us/ entire RFP, any amendment(s), and all or indicated portions of the Offeror’s Proposal.

f. Design-Builder – The design/build Offeror selected for Contract award under this RFP. Also referred to as the “Contractor”.

g. eMMA - eMaryland Marketplace Advantage (https://emma.maryland.gov).

h. Local Time – Time in the Eastern Time Zone as observed by the State.

i. MBE –Minority Business Enterprise certified by the Maryland

Department of Transportation (“MDOT”).

j. MSA – Maryland Stadium Authority (http://www.mdstad.com).

k. MSA Business Hours – 8:30 A.M. to 5:00 P.M., local time, Monday through Friday, excluding State holidays and official State closures.

l. MSA Procurement Policies – MSA procurement policies and procedures (available at http://www.mdstad.com).

m. Notice to Proceed (hereinafter “NTP”) – A formal notification issued by the Procurement Officer that directs the successful Offeror to perform work and establishes the date on which the work is to commence on the Project.

n. Offeror - An individual or entity, regardless of legal status or organization, that submits a Proposal in response to this RFP. The Offeror is the individual or entity that will be executing the Contract with

MSA.

o. Owner – Maryland Stadium Authority.

p. Procurement Officer (“PO”) – The MSA representative responsible for this RFP. MSA may change the Procurement Officer at any time and will provide written notice to the Offerors of any such change.

q. Project – The design and construction of the Regency Furniture Stadium Improvements.

r. Project Manager (“PM”) – The MSA representative primarily responsible for monitoring the daily activities associated with, and providing technical guidance for, the Project. The Project Manager is the point of contact, post-award, who will assign work and to whom invoices will be submitted. MSA may change the PM at any time by written notice to the Design-Builder.

https://emma.maryland.gov/ http://www.mdstad.com/

s. Project Team – The Design-Builder, MSA, Southern Maryland Blue Crabs, and Client.

t. Proposal - The submission provided by Offerors in response to this RFP.

u. Request for Proposals (“RFP”) - This RFP for the execution of the Project.

v. Selection Committee- The persons responsible for selecting the successful Offeror.

w. State - The State of Maryland.

1.3 Contract Type

The contract that results from this RFP will include a fixed fee for design and preconstruction services.

1.4 Contract Duration

The term of the contract will be for a period necessary to complete the scope of work and as agreed upon by MSA and the Design-Builder.

1.5 Procurement Officer

The sole point-of-contact for purposes of this RFP is the Procurement Officer listed below:

Christian Kramer Maryland Stadium Authority 351 West Camden Street, Suite 300 Baltimore, Maryland 21201 Telephone: 443-202-3885 Email: ckramer@mdstad.com

MSA may change the Procurement Officer at any time and will provide written notice to the Offerors if any such change occurs.

1.6 Pre-Proposal Conference and Site Visit

Virtual Pre-Proposal Conference

A virtual pre-proposal conference (“Conference”) will be held on the date and indicated on the Key Information Summary Sheet. Please click on the registration link stated in the Key Information Summary Sheet for details regarding the Conference and to RSVP to the event.

Consistent with the Americans with Disabilities Act, the Annotated Code of mailto:ckramer@mdstad.com

Maryland State Personnel and Pensions Article, Title 2-302 and Title 5-2.

State Government Article, Title 20, it is the policy of the Maryland Stadium Authority to provide reasonable accommodation when requested by a procurement event participant with a disability, unless such accommodation would cause an undue hardship. The policy regarding requests for reasonable accommodation applies to all aspects of employment and includes the procurement process. If reasonable accommodation is needed, please contact the Procurement Officer at your earliest convenience.

Site Visit

A Site Visit will take place on the date and indicated on the Key Information Summary Sheet. Please click on the registration link stated in the Key Information Summary Sheet for details regarding the Site-Visit and to RSVP to the event.

1.7 The Project Manager

The Project Manager is:

Christopher Deremeik Maryland Stadium Authority 351 West Camden Street, Suite 300 Baltimore, Maryland 21201

Prior to contract award, MSA may change the Project Manager at any time and will provide written notice to the Offerors. After Contract award, MSA may change the Project Manager at any time by written notice to the Contractor.

1.8 eMaryland Marketplace Advantage (“eMMA”)

In order to receive a contract award, a vendor must be registered on eMMA.

Registration is free. You can register at: https://emma.maryland.gov/ Click on “New Vendor? Register Now” to begin the process and follow the prompts.

1.9 Questions

Questions regarding this RFP shall be submitted electronically, in Word or PDF format, via the submission link no later than the date and indicated on the Key Information Summary Sheet.

Please include information regarding the name of the firm, representative’s name, and contact information. Based on the availability of time to research and communicate an answer, the Procurement Officer will decide whether an answer can be given before the proposal closing date. Answers to all substantive questions that have not previously been answered, and are not https://emma.maryland.gov/ clearly specific to the requestor, will be provided via addendum.

1.10 Proposal Closing Date and Time - Technical and Financial Proposals

To be considered, both technical and financial Proposals must be uploaded to the submission links no later than on the date and time indicated on the Key Information Summary Sheet.

Requests for an extension of this date and/or time will not be granted.

Offerors should allow sufficient electronic transmission time to ensure timely receipt of their proposals. Proposals received by MSA after the Proposal Closing Date and Time will not be considered. Proposals will not be reviewed publicly.

1.11 Oral Presentations

Short-listed Offerors will be required to attend oral presentations to the Selection Committee. MSA will make a determination in the near future whether to hold in person or virtual oral presentations. Significant representations made by an Offeror during their oral presentation must be confirmed in writing. All such representations will become part of the Offeror’s Proposal and are binding if a contract is awarded as a result of this RFP. Oral Presentations are to be held on May 14 or May 16, 2024. In your Technical Proposal, please state your availability for the dates provided. Typically, oral presentations will follow a specified format and generally be limited to 90 minutes [60 minutes for the presentation and 30 minutes for questions]. The Procurement Officer will notify the short-listed Offerors with details and instructions prior to the presentation. The presentation must consist of, but not be limited to, a discussion of the Offeror’s specific approach to the project and understanding of the scope of work.

1.12 Duration of Offer

Proposals submitted in response to this RFP are irrevocable for 180 days following the closing date for proposals. This period may be extended at the Procurement Officer's request only with the Offeror's written agreement.

1.13 Proposal Affidavit

A completed Bid/Proposal Affidavit must accompany the Proposal submitted by an Offeror. A copy of this Affidavit is included as Attachment A of this RFP.

1.14 Contract Affidavit

All Offerors are advised that if a contract is awarded as a result of this RFP, the successful Offeror will be required to complete a Contract Affidavit. A copy of this Affidavit is included for informational purposes only as Attachment K of this RFP. This Affidavit must be provided within five business days after notification of proposed contract award. For purposes of completing Section B of the affidavit (Certification of Registration or Qualification with the State Department of Assessments and Taxation), a business entity that is organized outside of the State of Maryland is considered a “foreign” business.

1.15 Procurement Method

The contract resulting from this RFP will be awarded in accordance with the Competitive Sealed Proposals process under Section 3 (C) of MSA’s Procurement Policies. MSA’s Procurement Policies are available for review on MSA’s website (www.mdstad.com) or may be obtained by contacting the Procurement Officer.

1.16 Arrearages

By submitting a response to this RFP, an Offeror represents that it is not in arrears in the payment of any obligations due and owing the State of Maryland, including, by way of example only, the payment of taxes and employee benefits, and that it will not become so in arrears during the term of the Agreement if selected for contract award.

1.17 Revisions to the RFP

If it becomes necessary to revise this RFP before the closing date for proposals, an addendum/addenda will be posted on eMMA and MSA’s website. Addenda issued after the closing date for proposals will be sent only to those Offerors who submitted a responsive and timely proposal, or, if applicable, Offerors that were short-listed to participate in the next phase of the procurement process. Acknowledgment of the receipt of all addenda to this RFP issued before the proposal closing date must accompany the Offeror’s Proposal as identified in Section 4. Acknowledgement of receipt of addenda to the RFP issued after the proposal closing date shall be in the manner specified in the addendum notice. Failure to acknowledge receipt of addenda does not relieve the Offeror from complying with all terms of any such document.

1.18 Cancellations; Discussions

MSA reserves the right to cancel this RFP, to accept or reject any and all proposals, in whole or in part, received in response to this RFP, to waive or permit cure of minor irregularities, and to conduct discussions with any or all qualified or potentially qualified Offerors in any manner necessary to serve the best interests of MSA. This may be followed by submission of Offeror-revised Proposals and best and final offers (hereinafter “BAFO”).

MSA also reserves the right, in its sole discretion, to award a contract based upon written proposals received, without prior discussions or negotiations.

1.19 False Statements

MSA incorporates by reference the provisions of Section 11-205.1 of the State Finance and Procurement Article of the Annotated Code of Maryland regarding truthfulness in the information included in the contract documents. Offeror shall comply with the obligations set forth therein, including, without limitation, the following:

a. In connection with a procurement contract, a person may not willfully:

1. Falsify, conceal, or suppress a material fact by any scheme or device;

2. Make a false or fraudulent statement or representation of a material fact; or

3. Use a false writing or document that contains a false or fraudulent statement or entry of a material fact.

b. A person may not aid or conspire with another person to commit an act under subsection of this section.

c. A person who violates any provision of this section is guilty of a felony and on conviction is subject to a fine not exceeding $20,000 or imprisonment not exceeding five years or both.

1.20 Minority Business Enterprise

Minority Business Enterprises are encouraged to respond to this solicitation. The Offeror shall submit a D-1A form for design services, and a D-1A form for construction services with its technical proposal. Please refer to the Key Information Summary Sheet of this RFP.

a. An overall MBE subcontractor participation goal as identified in the Key

Information Summary Sheet has been established for this procurement, representing a percentage of the total Contract dollar value, including all renewal option terms, if any.

b. Notwithstanding any subgoals established for this RFP, the Design-

Builder is encouraged to use a diverse group of subcontractors and suppliers from any/all of the various MBE classifications to meet the remainder of the overall MBE participation goal.

c. By submitting a response to this solicitation, the Offeror acknowledges the overall MBE subcontractor participation goal and subgoals, and commits to achieving the overall goal and subgoals by utilizing certified minority business enterprises, or requests a full or partial waiver of the overall goal and subgoals.

d. An Offeror that does not commit to meeting the entire MBE participation goal(s) stated in this RFP must submit a request for waiver with its proposal submission that is supported by good faith efforts documentation to meet the MBE goal made prior to submission of its proposal as outlined in Attachment D-1B, Waiver Guidance. Failure of an Offeror to properly complete, sign, and submit Attachment D-1A at the time it submits its Technical Proposal to the RFP will result in the State’s rejection of the Offeror’s Proposal. This failure is not curable.

e. Attachments

1. Minority Business Enterprise instructions, and forms are provided in

Attachment D to assist Offerors.

2. The Offeror shall include with its technical Proposal a completed

MBE Utilization and Fair Solicitation Affidavit (Attachment D-1A) whereby:

a) The Offeror acknowledges the certified MBE participation goal and commits to make a good faith effort to achieve the goal and any applicable subgoals, or requests a waiver, and affirms that MBE subcontractors were treated fairly in the solicitation process; and

b) The Offeror responds to the expected degree of MBE participation, as stated in the solicitation, by identifying the specific commitment of certified MBEs at the time of Proposal submission. The Offeror shall specify the percentage of total contract value associated with each MBE subcontractor identified on the MBE participation schedule, including any work performed by the MBE prime (including a prime participating as a joint venture) to be counted towards meeting the MBE participation goals.

c) An Offeror requesting a waiver should review Attachment D- 1B (Waiver Guidance) and D-1C (Good Faith Efforts Documentation to Support Waiver Request) prior to submitting its request.

d) If the Offeror fails to submit a completed Attachment D-1A with the technical Proposal, as required, the Procurement Officer shall determine that the Proposal is not reasonably susceptible of being selected for award.

f. Offerors are responsible for verifying that each MBE (including any MBE prime and MBE prime participating in a joint venture) selected to meet the goal and any subgoals and subsequently identified in Attachment D-1A is appropriately certified by the Maryland Department of Transportation and has the correct NAICS codes allowing it to perform the committed work.

g. Within ten (10) Business Days from notification that it is the recommended awardee or from the date of the actual award, whichever is earlier, the Offeror must provide the following documentation to the Procurement Officer:

1. Outreach Efforts Compliance Statement (Attachment D-2);

2. MBE Subcontractor/Prime Project Participation Certification

(Attachment D-3A/3B);

3. A copy of each subcontract agreement, between the apparent awardee and any proposed MBE subcontractor, that the parties intend to enter into contingent upon the MSA’s award of the prime contract. The subcontract agreement must contain all necessary terms, including pricing, required for the MBE to perform its proposed work and for the apparent awardee to pay the MBE for its work during the term of the agreement; and

4. Any other documentation required by the Procurement Officer to ascertain Offeror responsibility in connection with the certified MBE subcontractor participation goal or any applicable subgoals.

5. Further, if the recommended awardee believes a waiver (in whole or in part) of the overall MBE goal or of any applicable subgoal is necessary, the recommended awardee must submit a fully-documented waiver request that complies with COMAR 21.11.03.11. If the recommended awardee fails to return each completed document within the required time, the Procurement Officer may determine that the recommended awardee is not responsible and, therefore, not eligible for Contract award. If the contract has already been awarded, the award is voidable.

h. A current directory of certified MBEs is available through the Maryland

State Department of Transportation (MDOT), Office of Minority Business Enterprise, 7201 Corporate Center Drive, Hanover, Maryland 21076. The phone numbers are (410) 865-1269, 1-800-544-6056, or TTY

(410) 865-1342. The directory is also available on the MDOT website at http://mbe.mdot.maryland.gov/directory/. The most current and up-to-date information on MBEs is available via this website. Only MDOT-certified MBEs may be used to meet the MBE subcontracting goals.

i. An Offeror that requests a waiver of the goal or any of the applicable subgoals will be responsible for submitting the Good Faith Efforts Documentation to Support Waiver Request (Attachment D-1C) and all documentation within ten (10) Business Days from notification that it is the recommended awardee or from the date of the actual award, whichever is earlier, as required in COMAR 21.11.03.11.

j. All documents, including the MBE Utilization and Fair Solicitation

Affidavit & MBE Participation Schedule (Attachment D-1A), completed and submitted by the Offeror in connection with its certified http://mbe.mdot.maryland.gov/directory/

MBE participation commitment shall be considered a part of the Agreement and are hereby expressly incorporated into the Agreement by reference thereto. All of the referenced documents will be considered a part of the Proposal for order of precedence purposes (see Design- Build Contract Agreement – Attachment J).

k. The Offeror is advised that liquidated damages will apply in the event the

Design-Builder fails to comply in good faith with the requirements of the MBE program and pertinent Contract.

1.21 Incurred Expenses; Economy of Preparation

MSA will not be responsible for any costs incurred by an Offeror in preparing and submitting a proposal, making an oral presentation, providing a demonstration or performing any other activities relative to this RFP. Proposals should be prepared simply and economically, providing a straightforward, concise description of how the Offeror proposes to meet the requirements of this RFP.

1.22 Protests/Disputes

Any protest or dispute related to this RFP or a resulting award will be subject to Section 10 of MSA’s Procurement Policies and Procedures and the relevant provisions of the Agreement. MSA’s Procurement Policies are available for review on MSA’s website at www.mdstad.com or may be obtained by contacting the Procurement Officer.

1.23 Access to Public Records Act Notice

An Offeror should give specific attention to the clear identification of those portions of the Proposal that it considers confidential, proprietary commercial information or trade secrets, and provide written justification why such materials, upon request, should not be disclosed by the State under the Public Information Act, Title 4 of the General Provisions Article of the Annotated Code of Maryland. Offerors are advised that, upon request for this information from a third party, the Procurement Officer is required to make an independent determination whether the information may be disclosed.

1.24 Offeror Responsibilities

The Offeror shall be responsible for all products and services required by this RFP. Subcontractors must be identified, and a complete description of their roles relative to the Proposal must be included in the Proposal. The Offeror retains responsibility for all work to be performed by and any deliverable submitted by a subcontractor. If an Offeror that seeks to perform or provide the services required by this RFP is the subsidiary of another entity, all information submitted by the Offeror such as, but not limited to, references and financial reports, shall pertain exclusively to the Offeror, unless the parent organization will guarantee the performance of the subsidiary. If applicable, the Offeror’s proposal must contain an explicit statement that the parent organization will guarantee the performance of the subsidiary.

1.25 Patents, Copyrights, and Intellectual Property

a. If the Design-Builder furnishes any design, device, material, process or other item that is covered by a patent or copyright or that is proprietary to or a trade secret of another, it shall obtain the necessary permission or license to permit MSA to use such item.

b. The Design-Builder will defend or settle, at its own expense, any claim or suit against MSA alleging that any such item furnished by the Design- Builder infringes any patent, trademark, copyright, or trade secret. If a third-party claim that a product infringes that party’s patent, trademark, copyright or trade secret, the Design-Builder will defend MSA against that claim at the Design-Builder’s expense and will pay all damages, costs, and attorney’s fees that a court finally awards, provided MSA: (i) promptly notifies Design-Builder in writing of the claim; and (ii) allows the Design-Builder to control and cooperates with the Design-Builder in, the defense and any related settlement negotiations. The obligations of this paragraph are in addition to those stated in the next paragraph.

c. If any products furnished by the Design-Builder become, or in the

Design-Builder's opinion are likely to become, the subject of a claim of infringement, the Design-Builder will, at its option and expense: (i) procure for MSA the right to continue using the applicable item; (ii) replace the product with a non-infringing product substantially complying with the item's specifications; or (iii) modify the item so that it becomes non-infringing and performs in a substantially similar manner to the original item.

1.26 Non-Availability of Funding

If the General Assembly fails to appropriate funds or if funds are not otherwise made available for continued performance for any fiscal period of a contract succeeding the first fiscal period, the contract shall be canceled automatically as of the beginning of the fiscal year for which funds were not appropriated or otherwise made available; provided, however, that this will not affect the rights of the Design-Builder and MSA under any termination clause in the contract. The effect of termination of the contract hereunder will be to discharge the Design-Builder and MSA from future performance of the contract, but not from their rights and obligations existing at the time of termination. The Design-Builder shall be reimbursed for the reasonable value of any nonrecurring costs incurred but not amortized in the price of the contract. MSA shall notify the Design-Builder as soon as it has knowledge that funds may not be available for the continuation of the contract for each succeeding fiscal period beyond the first.

1.27 Financial Disclosure

The Design-Builder shall comply with Section §13-221 of the State Finance and Procurement Article of the Annotated Code of Maryland, which requires that every person that enters into contracts, leases, or other agreements with the State or its agencies during a calendar year under which the business is to receive in the aggregate, $100,000 or more, shall, within 30 days after the aggregate value of these contracts, leases or other agreements reaches $100,000, file with the Secretary of the State of Maryland certain specified information to include disclosure of beneficial ownership of the business.

1.28 Non-Exclusive Use

Neither this RFP nor any resulting Agreement shall be construed to require MSA to use any Offeror or exclusively use the Design-Builder for the services described in this RFP. MSA reserves the right to obtain services of any nature from other sources when it is in the best interest of MSA to do so and without notice to any party. MSA makes no guarantees that it will purchase any products or services from the Design-Builder resulting from this RFP.

1.29 Sustainability Policies

MSA is committed to procuring all supplies, services, maintenance, construction, and architectural/engineering services in a manner consistent with the promotion of sound environmental practices.

1.30 Payments by Electronic Fund Transfer

By submitting a response to this RFP, the Offeror agrees to accept payments by electronic funds transfer (EFT). A form will be provided to the selected Offeror.

1.31 Confidentiality

Subject to the Maryland Public Information Act and any other applicable laws, all confidential or proprietary information and documentation relating to either party to an Agreement resulting from this RFP (including without limitation any information or data stored within the Design-Builder’s computer systems) shall be held in absolute confidence by the other party.

Each party shall, however, be permitted to disclose relevant confidential information to its officers, agents, and employees to the extent that such disclosure is necessary for the performance of their duties under the Agreement, provided that the data may be collected, used, disclosed, stored, and disseminated only as provided by and consistent with the law. The provisions of this section shall not apply to information that (a) is lawfully in the public domain; (b) has been independently developed by the other party without violation of the Agreement; (c) was already in the possession of such party; (d) was supplied to such party by a third-party lawfully in possession thereof and legally permitted to further disclose the information; or (e) such party is required to disclose by law.

1.32 Loss of Data

In the event of loss of any MSA data or records where such loss is due to the intentional act or omission or negligence of the Design-Builder or any of its subcontractors or agents, the Design-Builder shall be responsible for recreating such lost data in the manner and on the schedule set by the Project Manager. The Design-Builder shall ensure that all data is backed up and recoverable by the Design-Builder.

1.33 Non-Hiring of Employees

No official or employee of the State, as defined in State Government Article, §15-102, Annotated Code of Maryland, whose duties as such official or employee include matters relating to or affecting the subject matter of this procurement, shall, during the pendency and term of a resulting Agreement, and while serving as an official or employee of the State, become or be an employee of the Design-Builder or any entity that is a subcontractor on said Agreement.

1.34 Nondiscrimination in Employment

The Design-Builder agrees: (a) not to discriminate in any manner against an employee or applicant for employment because of race, color, religion, creed, age, sex, marital status, sexual orientation, national origin, ancestry, or disability of a qualified individual with a disability; (b) to include a provision similar to that contained in subsection (a) above in any subcontract except a subcontract for standard commercial supplies or raw materials; and (c) to post, and to cause subcontractor to post, in conspicuous places available to employees and applicants for employment, notices setting forth the substance of this clause.

1.35 Contingent Fee Prohibition

The Design-Builder warrants that it has not employed or retained any person, partnership, corporation, or other entity, other than a bona fide employee, bona fide agent, bona fide salesperson or commercial selling agency working for the Design-Builder, to solicit or secure an Agreement, and that it has not paid or agreed to pay any person, partnership, corporation, or other entity, other than a bona fide employee, bona fide agent, bona fide salesperson or commercial selling agency, any fee or other consideration contingent on the making of an Agreement.

1.36 Political Contribution Disclosure

The Design-Builder shall comply with Election Law Article, §§14-101 to 14- 108, Annotated Code of Maryland, which requires that every person that enters into contracts, leases, or other agreements with the State, a county, or an incorporated municipality, or their agencies, during a calendar year in which the person receives in the aggregate $100,000 or more, shall file with the State Board of Elections a statement disclosing contributions in excess of $500 made during the reporting period to a candidate for elective office in any primary or general election. The statement shall be filed with the State Board of Elections (1) before a purchase or execution of a lease or contract by the State, a county, an incorporated municipality, or their agencies, and shall cover the preceding two calendar years; and (2) if the contribution is made after the execution of a lease or contract, then twice a year, throughout the contract term, on: (a) February 5, to cover the 6-month period ending January 31; and (b) August 5, to cover the 6-month period ending July 31.

1.37 Verification of Registration and Tax Payment

Before a corporation can do business in the State, it must be registered with the Department of Assessments and Taxation, State Office Building, Room 803, 301 West Preston Street, Baltimore, Maryland 21201. It is strongly recommended that any potential Offeror complete registration prior to the closing date for receipt of Proposals. An Offeror’s failure to complete registration with the Department of Assessments and Taxation may disqualify an otherwise successful Offeror from final consideration and recommendation for Agreement award.

1.38 MBE and Prevailing Wage Compliance System

As part of MSA’s commitment to assist firms in complying with legal and contractual requirements, MSA maintains a web-based MBE and prevailing wage compliance system. The system was designed to provide various work-flow automation features that improve the project reporting process. This system will monitor contract compliance for all Program contracts. The prime firm, its first-tier consultants, and all MBE participation subcontractors awarded contracts will be required to use the web-based system to submit project information including, but not limited to, certification of payments made and received and certified payroll records (if the contract includes prevailing wage and/or workforce development requirements). MSA may require additional information related to the contract to be provided electronically through the system at any time before, during, or after Agreement award.

1.39 Bonding

The Offerors are required to submit, at the time of submitting a response to this RFP, a letter from a surety identifying the CM’s free bonding capacity.

The Contractor shall have bonding capacity (i.e., performance and payment) no less than $17.5 million.

1.40 Maryland Law

This RFP and any subsequent RFPs or Agreements shall be construed, interpreted, and enforced according to the laws of the State of Maryland.

1.41 Acceptance of Terms and Conditions

By submitting a Proposal, the Offeror accepts all of the terms and conditions set forth in this RFP including all attachments, and addenda.

1.42 Procurement Regulations

The RFP and any Agreements entered into as a result hereof is not subject to the provisions of Division II of the State Finance and Procurement Article of the Maryland Annotated Code (the "Procurement Article") except as set forth in MSA’s procurement policies available online at www.mdstad.com.

1.43 Multiple Proposals

MSA will not accept multiple or alternative proposals from a single Offeror.

1.44 Corporate Diversity Affidavit and Addendum

Offerors shall complete, sign and submit the Corporate Diversity Affidavit and Addendum included as Attachment L to this RFP.

SECTION 2

OFFEROR’S MINIMUM QUALIFICATIONS

2.1 Offeror Minimum Qualifications

At a minimum, the Offeror shall meet the following qualifications to be considered for award:

a. Has at least five (5) years of experience in managing design-build projects of similar size, scope, and complexity;

b. Is licensed to operate in the State of Maryland;

c. Has experience providing the following services during both preconstruction and construction phases: quality assurance/quality control, estimating and budget control, CPM scheduling, value engineering, and evaluation and implementation of innovative construction techniques;

d. Has ability to meet the insurance requirements set forth in the sample Design-Build Contract Agreement, Attachment J to this RFP; and

e. Has ability to meet the bonding requirements set forth in Section 1.39 of the RFP.

2.2 Key Personnel Qualifications

a. Project Executive: Served in a similar role on three (3) projects. One of the three projects shall have had a construction cost of approximately $15 million.

b. Project Manager(s) for design and construction: Served in a similar role on three (3) projects; one of which shall have a construction cost of approximately $15 million.

c. Project Superintendent: Served in a similar role on three (3) projects;

one of which shall have a construction cost of approximately $15 million.

d. Cost Estimator: Served in a similar role during the preconstruction/design phase on three (3) projects utilizing the construction management at risk or Design-Build delivery method; three

(3) of which shall be approximately $15 million in construction cost.

Explain specific experience estimating early design concepts and value engineering.

e. Lead Scheduler: Served in a similar role on three (3) projects; one of which shall have a construction cost of approximately $15 million

NOTE: An Offeror meeting these requirements does not guarantee that the Offeror will be deemed responsible or have its Technical Proposal deemed acceptable.

SECTION 3

PURPOSE AND SCOPE OF WORK

3.1 Purpose

The MSA is issuing this RFP to enter into an Agreement with a qualified Design-Build firm to provide design and preconstruction services related to the Regency Furniture Stadium Improvements.

3.2 Overview

The Project will be executed under the Design-Build with Guaranteed Maximum Price delivery method. The obligations of the Design-Builder are set forth in the Design-Build Contract Agreement attached hereto as Attachment J as well as other parts of the RFP.

Generally, the Design-Builder will provide the following:

a. Design and Preconstruction Services including, but not limited to, design and engineering, scheduling, cost estimating, constructability analysis, logistics planning, value engineering, and preparation and submission of a GMP Proposal for the execution of the Project.

b. Construction Services Pursuant to Section 3.6 of the Design-Build Contract Agreement, if MSA accepts the GMP the Design-Builder will provide Construction Services as outlined in Article 4 of the Design- Build Agreement, including, but not limited to, construction administration through its design team, project management and field supervision, construction, safety and quality control.

The Guaranteed Maximum Price Limit (the “GMP Limit”) for the Project is Seventeen Million Five Hundred Thousand Dollars ($17,500,000).

SECTION 4

PROPOSAL SUBMISSION AND REQUIREMENTS

4.1 Solicitation Process

The solicitation will follow a multi-step process to select the successful Offeror.

a. Step 1– Submission of Technical and Financial Proposals

Offerors will submit Proposals in two separate volumes:

Volume I – Technical Proposal; and Volume II – Financial Proposal. Offerors shall refer to Section 1.10 of this RFP for submission links details. Volume II, Financial Proposal, shall be password protected, per the requirements in Section 4.3 of this RFP.

After the Proposal Closing Date, technical proposals will be reviewed and those deemed responsible and reasonably susceptible of being selected for award will be reviewed by the Selection Committee. Offerors must respond to all requirements of the RFP. Offerors that fail to do so will be deemed not reasonably susceptible of being selected for award.

b. Step 2 – Review of Technical Proposals

The Selection Committee will review technical Proposals and rank the Proposals according to technical merit. Based on their achieved technical rankings, selected Offerors will be “short-listed” to participate in the oral presentation phase of the procurement.

c. Step 3 – Short-list and Oral Presentations

Short-listed Offerors will be asked to attend an oral presentation.

Offerors that are not short-listed will be notified that they are not reasonably susceptible of being selected for award.

d. Step 4 – Short-listing – Financial Proposal Phase

After Oral Presentations, and based on achieved ranking, the Selection Committee will short-list firms to participate in the Financial Proposal phase of the procurement. Short-listed firms will be requested provide the password to their financial Proposal.

Offerors that are not short-listed will be notified that they are not reasonably susceptible of being selected for award.

e. Step 5 – Recommendation for Award

The Offeror deemed to provide the best value (technical and financial) to the Project by the Selection Committee will be recommended for award.

4.2 Instruction for Submission of Proposals – General Requirements

Offerors shall submit proposals labeled “Request for Proposals – Design-Build Services – Regency Furniture Stadium Improvements” and labeled either “Volume I - Technical Proposal” or “Volume II – Financial Proposal”. All pages of each proposal volume must be consecutively numbered from beginning (Page 1) to end (Page “x”). The final page shall state “Final Page.”

Proposals shall be uploaded electronically to the links provided in Section

1.10 of the RFP. The electronic submissions (formatted as PDF-file) shall include the firm’s name in the file name and shall be formatted so each page can be legibly printed in 8 ½” x 11” format.

4.3 Volume I - Technical Proposal

This section provides specific instructions for submission of the Offeror’s technical Proposal. The technical Proposal shall follow the format provided below.

a. Transmittal Letter

A transmittal letter must accompany the technical Proposal. The purpose of this letter is to transmit the proposal to the Procurement Officer. The transmittal letter should be brief, and signed by an individual who is authorized to commit the Offeror to the services and requirements as stated in this RFP.

b. Title and Table of Contents

The Technical Proposal shall begin with a title page bearing the legal name and address of the Offeror, point of contact information for two (2) people (including e-mail address), and the title of this RFP. A table of contents for the Proposal should follow the title page. Information that is claimed to be confidential shall be clearly identified. Unless there is a compelling case, an entire proposal should not be labeled confidential; only those portions that can reasonably be shown to be proprietary or confidential should be so labeled.

c. Executive Summary

The Offeror shall condense and highlight the contents of the Technical Proposal in a separate section titled “Executive Summary.” The Executive Summary shall not exceed two (2) pages and shall:

1. acknowledge the receipt of any amendments or addenda associated with this RFP;

2. provide the Offeror’s tax identification number;

3. state the Offeror’s legal name. The legal name is the full name of the entity that, if selected as the successful Offeror, will be awarded the contract Agreement;

4. identify joint ventures at the time of submission, if any, and the roles these relationships will have in the performance of the Contract Agreement. Upon MSA’s request, Offerors shall make available within 24 hours the joint venture scope of work documents and/or agreement;

5. cross reference each minimum qualification requirement, identified in Section 2 of the RFP, with the location in the submission (section or page number) where the Offeror has demonstrated or documented that it meets the requirement;

6. provide the Offeror’s availability for oral presentations; and

7. list any exceptions the Offeror has taken to the requirements of this RFP, the sample contract Agreement, or any other exhibits or attachments. If an Offeror takes no exception, the Executive Summary should so state.

Warning: A general statement that qualifications/exceptions will be discussed at a later date is not acceptable. Offeror must provide specific information regarding any requested changes. Exceptions to terms and conditions may result in having the proposal deemed unacceptable or classified as not reasonably susceptible of being

d. Experience and Qualifications

1. Corporate Qualifications

a. Corporate Profile and References: Provide a completed Corporate

Profile Form included herein as Attachment E, including three (3) references. The form must be completed by the Offeror and all joint venture partners, if applicable.

b. Insurance: Provide proof of insurance certifying the Offeror’s ability to comply with the insurance requirements outlined in the Agreement.

c. Bonding: Provide a letter from the Offeror’s Bonding Company certifying the Offeror’s ability to comply with the bonding requirements contained in Section 1.39.

d. Provide a copy of its Maryland business license.

2. Corporate Experience

a. Submit information regarding five (5) relevant projects, valued at approximately $15 million or greater, that have achieved Substantial Completion within the past ten (10) years, and which demonstrate the Offeror’s experience and any of its proposed subcontractors as outlined in Attachment F for each of the listed services:

1. Design-Building Services; and

2. Prime Architect/Engineering Services.

b. The project examples shall include the following information:

1. Identification of project, role of Offeror (preconstruction, construction, etc.), project location, project gross square footage, project type, and building type.

2. Method of delivery such as: D/B with GMP, D/B, CM at Risk, GC, CM Agency.

3. Original project construction cost at time of award, final project cost and percentage change; explain variance.

4. Original completion date at time of award and actual completion date; explain variances.

5. Describe similarities of the project example to this Project. If performed within an occupied environment, provide details regarding the level of occupancy and major events hosted during construction operations, and any measures taken to accommodate ongoing operations during the construction process.

6. Project owner’s name, email address, and telephone number.

7. Identify the Project Executive, Project Manager, Project

Superintendent, and Project Scheduler for the Project.

8. Identify any of the proposed Key Personnel who were involved in the project example, including their role and responsibilities.

9. Provide color photographs of the project.

10. Summary of the projects must be submitted on the Project

Experience Form, included in this RFP as Attachment F.

3. Key Personnel Experience and Past Performance

a. Provide an Organizational Chart identifying the Key Personnel that will be assigned to the Project. At a minimum, the Key Personnel shall include the positions listed in subsections (e) and (f) herein. Identify the person(s) responsible for overall management of the Project, and the key person proposed to be responsible for each of the following activities:

1. Design and Preconstruction: Management of the Design Process, Interdisciplinary Construction Documents review; constructability reviews; cost models and estimates; schedule; value engineering;

BIM, procurement; and MBE requirements.

2. Construction: Coordination of Trade Contractors, Subcontractors, Suppliers; vendors, suppliers, safety; quality control/ inspections;

submittal review; construction waste monitoring; Contract Modification review; claims resolution; schedule control; BIM, payment approval; and MBE compliance.

b. Clearly identify the individual(s) that will attend design meetings and serve as the day-to-day contact for the Project Team.

c. Clearly identify the individual(s) that will attend construction progress meetings and serve as the day-to-day contact for the Project Team.

d. Provide a brief narrative outlining the anticipated roles and responsibilities of the Key Personnel during preconstruction and construction.

e. Utilizing Standard Form (SF) 330, provide resumes for the Design- Builder’s design professionals and key consultants Key Personnel listed below.

• Principal in Charge

• Project Manager

• Project Superintendent

• Project Designer

• Lead Scheduler

• Lead Cost Estimator

• Civil Engineer

• Structural Engineer

• Geotechnical Engineer

• Mechanical Engineer

• Electrical Engineer

• Plumbing Engineer

• Fire Protection Engineer

• Landscape Architect

f. The resumes for the Key Personnel in section (e) above, proposed to be assigned to the preconstruction and construction phases, must include all information required below regarding Key Personnel with each…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .