Addendum No. 3_RFP DB Regency Furniture_20240501.pdf
PDF 940 KB Posted
- Attached to
- Request for Proposals - Design-Build Services â Regency Furniture Stadium Improvements
- Solicitation number
- BPM043422
- Issued by
- Charles County, Walker Mill CDP, Maryland
About this file
This document is Addendum No. 3 to a Request for Proposals (RFP) issued by the Maryland Stadium Authority (MSA) for Design-Build Services related to the Regency Furniture Stadium Improvements in Waldorf, Maryland. The addendum incorporates a second Questions and Answers document, the Site-Visit attendance list, and Attachment M - MBE Goal Setting Factors, which can be accessed via a provided link. Offerors must acknowledge all addenda in their Technical Proposal. The project involves improvements to the home stadium of the Southern Maryland Blue Crabs, an Atlantic League Professional Baseball team. The RFP was originally issued on April 4, 2024, with subsequent amendments on April 12, April 25, and this latest on May 1, 2024.
The MBE Goal Setting Factors document details the expected degree of Minority Business Enterprise (MBE) and Veteran-owned Small Business Enterprise (VSBE) participation for the procurement, including relevant NAICS codes and the number of certified firms in those industries. It also addresses the potential for designating a portion of the contract as a Small Business Reserve (SBR). Pricing terms, funding sources, and other financial details are not explicitly covered in this addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 3
To Offerors: Request for Proposals Design-Build Services Regency Furniture Stadium Improvements
Date Issued: May 1, 2024
This addendum is hereby made part of the Request for Proposals dated April 4, 2024, on the subject work as though originally included therein. The following amendments, additions, and/or corrections shall govern this solicitation.
This addendum incorporates the following items:
1. A second Questions and Answers document is attached hereto;
2. The Site-Visit attendance list is attached hereto; and
3. Attachment M – MBE Goal Setting Factors is attached hereto, can now be accessed, following the link:
https://mdstad.sharefile.com/d-s27f59fc11ea846ce9460306d69eef8c2 .
Note: All addenda must be acknowledged by the Offeror in the Technical Proposal.
Christian Kramer Procurement Officer
Attachments https://mdstad.sharefile.com/d-s27f59fc11ea846ce9460306d69eef8c2
Addendum No. 3 - Line Item 01
Request for Proposals Design-Build Services
Regency Furniture Stadium Improvements Questions & Answers No.2
Question Answer
1. Are CA costs by architect and engineers to be included in costs?
Yes.
2. Is a Planning Commission hearing required?
No.
End of Addendum No. 03 - Line Item 01
Attachment M: MBE Research Factors
Attachment M for Maryland Stadium Authority Page 1 of 2
Solicitation Title: Design-Build - MiLB Regency Furniture Stadium Improvements eMMA Solicitation No. BPM043422
This exhibit serves as a summary of the factors the State used, in conjunction with guidance from the Governor’s Office of Small, Minority, and Women’s Business Affairs, to determine:
1. The expected degree of Minority Business Enterprise (MBE) participation for the procurement contract, including subcontracting opportunities identified for the project, any applicable North American Industry Classification System (NAICS) codes linked to the subcontracting opportunities, and the number of certified MBEs in those industries;
2. The expected degree of Veteran-owned Small Business Enterprise (VSBE) participation for the procurement contract, including subcontracting opportunities identified for the project, any applicable United Nations Standard Products and Services Codes (UNSPSC) [identified in eMaryland Marketplace Advantage (eMMA) as Categories] linked to the subcontracting opportunities, and the number of certified VSBEs in those industries; and
3. If this procurement is for a Statewide Master Contract where secondary competition may occur, the expected degree of Small Business Reserve (SBR) participation for the secondary competition agreement (such as a task order agreement or purchase order agreement) to be designated as an SBR, including opportunities identified for the secondary competition agreement, any applicable UNSPSCs linked to the subcontracting opportunities, and the number of certified SBRs in those industries.
Disclaimer: This summary’s research results are not all inclusive and do not exclude any other subcontracting opportunities that the Bidder/Offeror may identify in preparing a Bid/Proposal to submit in response to the solicitation.
Attachment M: MBE Research Factors
Attachment M for Maryland Stadium Authority Page 2 of 2
MBE Research by NAICS Code NAICS Codes Description # MBEs in MDOT
Directory 236220, 237990 Cost Estimating 16
541310 Architectural 165 541330 Mechanical Engineering 55 541330 Structural Engineering 59
541330/238210 Electrical Engineering 33 541330, 237990 (civil)
541320,561730 Civil/Landscaping Engineering 602
541330/541380 Geotechnical Engineering 36 541310 Architecture 164
236220 (Construction Management) Construction Management 287
332311 Prefabricated Metal Buildings 2 238350 / 238130 Carpentry / Framing 162
238220 Plumbing / Sprinkler 187 238210 Electrical 483
238910 (Site Preparation Contractors)
Earthwork 375
238910 (Demolition) Demolition 156 237110 (Water and
Sewer Line) Utilities 201
541320, 561730 Landscaping 284 238110, 238120 Concrete 303
MBE Research by Keywords Keywords # MBEs in MDOT
Directory
Request for Proposals
Design-Build Services
Regency Furniture Stadium Improvements
Issue Date: April 04, 2024 Amended: April 12, 2024 Amended: April 25, 2024
Amended: May 1, 2024
NOTICE: A prospective Offeror that has received this document from a source other than eMaryland Marketplace Advantage (eMMA) https://procurement.maryland.gov should register on eMMA. See Section 1.8.
MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO
RESPOND TO THIS SOLICITATION.
https://procurement.maryland.gov/
Attachment M
MBE GOAL SETTING FACTORS
See link at:
| Add03Line00_CoverPage_20240501.pdf |
| Add03Line01_Q&A2 - DB MiLB RFS Improvements_20240501 |
| Add03Line02_SVattendance_20240418 |
| Add03Line03_AttachmentM_20240501 |
| Add03LineX_RFP DB Regency Furniture_20240501 |
| Attachment M |
File details come from the government source that posted it. Updated .