RFP - Baraga Co Rdsd Park Janitorial & Lawn Maintenance proposal instruct question worksheet schedule A - standard terms.docx

DOCX document 161 KB Posted

Attached to
Baraga County Roadside Parks-Janitorial and Lawn Maintenance
Solicitation number
RFP-591-210000001361-1
Issued by
Arenac County, Lansing City, Michigan

About this file

This is a Request for Proposal (RFP) issued by the Michigan Department of Transportation (MDOT) for janitorial and lawn maintenance services at three roadside parks in Baraga County: Baraga Cliff, Canyon Falls, and Tioga Creek. The services include cleaning toilet buildings, toilet vaults, grounds maintenance, map cases, well shelters, sidewalks, trash removal, and spring/fall cleanup during the operational season from April 30 to October 31. The RFP was issued on March 12, 2021, with a pre-bid meeting scheduled for March 18, 2021, and proposals due March 26, 2021. The anticipated contract start date is April 30, 2021, for an initial three-year term with two one-year renewal options. Daily cleaning cycles must be completed by 10:00 a.m.

The contract will be awarded to the lowest-price responsive and responsible bidder who meets all specifications. Contractors must maintain specific insurance requirements including commercial general liability, automobile liability, workers' compensation, and employers liability insurance. The State requires performance monitoring and may assess liquidated damages of $500 plus $100 per day for late or improper completion of work. The contractor must be clearly identifiable while on State property and comply with all State physical and IT security policies. Pricing must remain firm for the initial contract term, with adjustments possible during renewal periods.

View the file

Other files

File Type Posted
Tioga Creek LSS with Pricing.xlsx XLSX spreadsheet
Baraga Cliff LSS with Pricing.xlsx XLSX spreadsheet
Schedule B1 - Janitorial Specifications.docx DOCX document
Tioga Creek_Map.docx DOCX document
Baraga Cliff_Map.docx DOCX document
Canyon Falls_Map.docx DOCX document
Canyon Falls LSS with Pricing.xlsx XLSX spreadsheet
Schedule B2 - Grounds Maintenance Specifications.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement

STANDARD CONTRACT TERMS

Department of Transportation Baraga County Roadside Parks – Janitorial and Lawn Maintenance Services Request for Proposal No. 210000001361 Solicitation Manager Name: Mark Morrison Direct Phone: 517-241-2343 Email: morrisonm@michigan.gov

This is a Request for Proposal (RFP) for:

janitorial and lawn maintenance at three (3) roadside parks in Baraga County for the Michigan Department of Transportation (MDOT).

RFP Timeline

Event
Time
Date
RFP issue date
N/A
Friday, March 12, 2021
Prebid Meeting
10:00 a.m. Eastern
Thursday March 18, 2021
Deadline for bidders to submit questions about this RFP
3:00 p.m. Eastern
Tuesday, March 23, 2021
Anticipated date the State will post answers to bidder questions on www.michigan.gov/SIGMAVSS
3:00 p.m. Eastern
Wednesday, March 24, 2021
Proposal deadline*
3:00 p.m. Eastern
Friday, March 26, 2021
Anticipated Contract begin date
N/A
Friday, April 30, 2021

*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.

This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.

proposal instructions

Version 11(5/2020)

RFP: 210000001361 2

1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal.

RFP Structure and Documentation

Document
Description
Bidder Response Instructions
Cover Page
Provides RFP title and number, important dates, and contact information for Solicitation Manager
Informational
Proposal Instructions
Provides RFP instructions to bidders
Informational
Confidential Treatment Form
Required verification on whether bidder’s proposal contains confidential information
Bidder to complete and submit by proposal deadline
Vendor Questions Worksheet
Questions to bidders on background and experience
Bidder to complete and submit by proposal deadline
Schedule A – Statement of Work
Statement of work
Bidder to complete and submit by proposal deadline
Schedule B1 – Janitorial Specifications
Janitorial Specifications
Informational
Baraga Cliffs Roadside Park LSS
Location Specification Sheet – Provides detailed requirements and pricing
Bidder to complete and submit by proposal deadline
Canyon Falls Roadside Park LSS
Location Specification Sheet – Provides detailed requirements and pricing
Bidder to complete and submit by proposal deadline
Falls River Roadside Park LSS
Location Specification Sheet – Provides detailed requirements and pricing
Bidder to complete and submit by proposal deadline
Schedule B2 – Grounds Maintenance Specifications
Grounds Maintenance Specifications
Informational
Contract Terms
Provides legal terms for a contract awarded through this RFP
Deemed accepted by bidder unless information required in the Evaluation Process section of this document is submitted by proposal deadline

2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.

3. PRE-PROPOSAL MEETING.

A pre-proposal meeting will be held on March 18, 2021 at 10:00 a.m. EST. via Microsoft Teams.

Microsoft Teams meeting Join on your computer or mobile app Click here to join the meeting Or call in (audio only) +1 248-509-0316,,316535862# United States, Pontiac Phone Conference ID: 316 535 862# Find a local number | Reset PIN Learn More | Meeting options

Statements made by the Solicitation Manager or designee at a pre-proposal meeting are not considered modifications to the RFP. If, however, the Solicitation Manager determines modifications to the RFP are warranted after the meeting, modifications will be posted in writing on www.michigan.gov/SIGMAVSS as explained in the Modifications section of this document.

Attendance at the pre-proposal meeting is limited to 1 person per bidder. If the pre-proposal meeting is mandatory, a bidder may be disqualified by being late. Subcontractor sign-in is permitted in lieu of the bidder as evidence of attendance. Accessibility requests for reasonable accommodations at the pre-proposal meeting should be made with the Solicitation Manager at least 10 business days before the date of the meeting. Accommodation requests received outside this time cannot be guaranteed.

4. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS. This is the only method by which the RFP may be modified.

5. QUESTIONS. Bidder questions about this RFP must be emailed to the Solicitation Manager or posted on www.michigan.gov/SIGMAVSS no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.

Q #
Document and Section
Page #
Bidder Question

6. DELIVERY OF PROPOSAL.

Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder.

7. RESERVED.

8. EVALUATION PROCESS.

The Contract will be awarded to the bidder who meets the specifications as determined by the State and offers the lowest price to the State.

The State may utilize all bidder information, without regard to a proposal’s technical score, to determine fair market value for goods or services sought. The State is not obligated to accept the lowest price proposal. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business(QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: Michigan.gov/SDVOB.

The State strongly encourages strict adherence to the Contract Terms. The State reserves the right to deem a bid non-responsive for failure to accept the Contract Terms. Nevertheless, the bidder may submit proposed changes to the Contract Terms in track changes (i.e., visible edits) with an explanation of the bidder’s need for each proposed change. Failure to include track changes with an explanation of the bidder’s need for the proposed change constitutes the bidder’s acceptance of the Contract Terms. General statements, such as that the bidder reserves the right to negotiate the terms and conditions, may be considered non-responsive.

The State may but is not required to conduct an on-site visit to tour and inspect the bidder’s facilities; require an oral presentation of the bidder's proposal; conduct interviews, research, reference checks, and background checks; and request additional price concessions at any point during the evaluation process.

9. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous. Failure to respond to a Notice of Deficiency timely may be cause for disqualification.

10. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.

11. RESERVATIONS. The State reserves the right to:

a. Disqualify a bidder for failure to follow these instructions.

b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.

c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.

d. Consider an otherwise disqualified proposal if no other proposals are received.

e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.

f. Consider prior performance with the State in making its award decision.

g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.

h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.

i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.

j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.

k. Award multiple, optional-use contracts, or award by Contract Activity.

l. Evaluate the proposal outside the scope identified in the Evaluation Process section of this document if the State receives only one proposal.

12. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who receives a PASS for each criterion and offers the lowest price. The State will post an Award Recommendation and Evaluation Synopsis on www.michigan.gov/SIGMAVSS.

13. DEBRIEF MEETING AND BID PROTEST. The State will post an Award Recommendation and Evaluation Synopsis which will provide instructions on how to request a debrief meeting.

If you wish to initiate a protest of the award, you must submit your written protest to RademacherC@michigan.gov no later than 3:00 p.m. EST, 3 calendar days after posting the Award Recommendation and Evaluation Synopsis or by 3:00 p.m. EST the next business day if that date falls on a state holiday or weekend. The State reserves the right to adjust this timing and will publish any change on the SIGMA VSS system.

Additional information about the protest process is available at www.michigan.gov/micontractconnect under the “Programs and Policies” link.

14. STATE ADMINISTRATIVE BOARD. Contracts equal to $250,000 or greater than require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.

15. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of 180 calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment or contain all matters upon which agreement must be reached. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.

16. CONFIDENTIAL TREATMENT FORM AND THE FREEDOM OF INFORMATION ACT. All portions of the bidder’s proposal and resulting contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), MCL 15.231, et seq. However, some information may be exempt from disclosure. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902,” are exempt from disclosure under FOIA. In addition, “financial or proprietary information” submitted with a bidder’s proposal is exempt from disclosure under FOIA. A bidder’s failure to comply with this Section is grounds for rejecting a bidder’s proposal as non-responsive. As a part of its proposal, each bidder must follow the procedure below.

SUBMIT A COMPLETED “CONFIDENTIAL TREATMENT FORM” (CT FORM) WITH YOUR BID. Completion and submission of the CT Form is required regardless of whether the bidder seeks confidential treatment of information. Failure to submit a completed CT Form may be cause for disqualification from the solicitation process.

Complete and sign Section 1 of the CT Form if the bidder does NOT request confidential treatment of information contained in its proposal; or

i. Complete and sign Section 2 of the CT Form if the bidder requests confidential treatment of certain information. Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy.”

b. FOIA REQUESTS. If a FOIA request is made for a bidder’s proposal, the Public Copy may be distributed to the public along with the bidder’s CT Form. The CT Form is a public document and serves as an explanation for the redactions to the Public Copy. Do not put any trade secret, financial, or proprietary information in the CT Form. Do not redact the CT Form itself.

c. NO ADVICE. The State will not advise a bidder as to the nature or content of documents entitled to protection from disclosure under FOIA or other laws, as to the interpretation of such laws, or as to the definition of trade secret or financial or proprietary information. Nothing contained in this provision will modify or amend requirements and obligations imposed on the State by FOIA or other applicable law.

d. FAILURE TO REQUEST CONFIDENTIAL TREATMENT. Failure to request material be treated as confidential as specified herein relieves the State, its agencies, and personnel from any responsibility for maintaining material in confidence.

e. Bids containing a request to maintain an entire proposal as confidential may be rejected as non-responsive. Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials. The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions. If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.

f. Bidder forever releases the State, its departments, subdivisions, officers, and employees from all claims, rights, actions, demands, damages, liabilities, expenses and fees, which arise out of or relate to the disclosure of all or a portion of bidder’s proposal submitted under this RFP. Bidder must defend, indemnify and hold the State, its departments, subdivisions, officers, and employees harmless, without limitation, from and against all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to any FOIA request, including potential litigation and appeals, related to the portion of bidder’s proposal submitted under this RFP that bidder has identified as a trade secret, or financial or proprietary information. The State will notify bidder in writing if indemnification is sought. The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, or any portion thereof, if the State deems necessary. Bidder will not, without the State’s written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding. If a State employee, official, or law is involved or challenged, the State may control the defense of that portion of the claim. Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.

INSTRUCTIONS. Complete either Section 1 or Section 2 of this CT Form and sign where indicated. This CT Form must be signed by the individual who signed the bidder’s proposal. A completed CT Form must be submitted with your proposal, regardless of whether your proposal contains confidential information.

Failure to submit a completed CT Form with your bid is grounds for rejecting the proposal as non-responsive. See the Confidential Treatment Form and The Freedom of Information Act (FOIA) sections of the Proposal Instructions for additional information.

Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED This section must be completed, signed, and submitted with the proposal if the bidder does not request confidential treatment of any material contained in the proposal.

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is not requested.

RFP Number

RFP Title

Signature

Date

Printed Name, Title, Company confidential treatment form

Section 2. CONFIDENTIAL TREATMENT IS REQUESTED This section must be completed, signed, and submitted with the proposal if bidder requests confidential treatment of any material contained in the proposal. Submission of a completed CT Form is required to request confidential treatment.

Provide the information in the table below. Bidder may add rows or additional pages using the same format shown in the table. Bidder must specifically identify the information to be protected as confidential and state the reasons why protection is necessary.

The CT Form will not be considered fully complete unless, for each confidentiality request, the bidder: (1) Identifies the Proposal Page #, Section #, and Paragraph #, (2) Identifies whether the material is a Trade Secret (TS), Proprietary Financial Information (FI), or Proprietary Information (PI), (3) Explains the specific legal grounds that support treatment of the material as TS, FI, or PI. Bidders must provide a complete justification as to how the material falls within the scope of an applicable FOIA Exemption or relevant case law. Bidders must not simply cite to an applicable exemption or case name, and (4) Provides the contact information for the person at Bidder’s organization authorized to respond to inquiries by the State concerning the material.

(1) Proposal Page #, Section #, Paragraph # (2) Material is Trade Secret (TS), Proprietary Financial Information (FI), Proprietary Information (PI) (3) Applicable FOIA Exemption with Written Justification (4) Bidder Contact Information

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is requested and has attached to this form a redacted “Public Copy” of the bidder’s proposal.

RFP Number

RFP Title

Signature

Date

Printed Name, Title, Company confidential treatment form

Provide a detailed response to each question. “You” and “company” refers to the bidder.

Information Sought
Bidder Response

1. Contact Information

Bidder’s sole contact person during the RFP process. Include name, title, address, email, and phone number.

Person authorized to receive and sign a resulting contract. Include name, title, address, email, phone number and vendor customer code in SIGMA VSS.

2. Company Background Information

Legal business name and address. Include business entity designation, e.g., sole proprietor, Inc., LLC, or LLP.

What state was the company formed in?

Phone number.

Website address.

Number of years in business and number of employees.

Legal business name and address of parent company, if any.

Has there been a recent change in organizational structure (e.g., management team) or control (e.g., merger or acquisition) of your company? If the answer is yes: (a) explain why the change occurred and (b) how this change has affected your company.

Discuss your company’s history. Has growth been organic, through mergers and acquisitions, or both?

Has bidder ever been debarred, suspended, or disqualified from bidding or contracting with any entity, including the State of Michigan? If yes, provide the date, the entity, and details about the situation.

Has your company been a party to litigation against the State of Michigan? If the answer is yes, then state the date of initial filing, case name and court number, and jurisdiction.

Within the last 5 years, has your company or any of its related business entities defaulted on a contract or had a contract terminated for cause? If yes, provide the date, contracting entity, type of contract, and details about the termination or default.

State your gross annual sales for each of the last 5 years.

If receiving a contract under this RFP will increase your gross revenue by more than 25% from last year’s sales, explain how the company will scale-up to manage this increase.

Describe partnerships and strategic relationships you think will bring significant value to the State.

State the physical address of the place of business that would have primary responsibility for this account if bidder is awarded a contract under this RFP.

3. Qualified Disabled Veteran/Service-Disabled Veteran-Owned Business Program

Under MCL 18.1261, a “qualified disabled veteran” means a business entity that is 51% or more owned by 1 or more veterans with a service-connected disability. A “service-connected disability” means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16). Are you a qualified disabled veteran?
Enter YES or NO.

To demonstrate qualification as a qualified disabled veteran, you must provide:

(a) Proof of service and conditions of discharge (DD214 or equivalent);

(b) Proof of service-connected disability (DD214 if the disability was documented at discharge or Veterans Administration Rating Decision Letter or equivalent if the disability was documented after discharge); and

(c) Legal documents setting forth the ownership of the business entity.

In lieu of the documentation identified above, you may provide proof of certification by the National Veterans Business Development Council.

Enter the names of documents submitted with your proposal to demonstrate status as a qualified disabled veteran.

4. Participation in RFP Development or Evaluation

Did your company, an employee, agent, or representative of your company, or any affiliated entity participate in developing any component of this solicitation? For purposes of this question, business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly: (1) either one controls or has power to control the other or (2) a third-party controls or has the power to control both. Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities or equipment, and common use of employees.
Enter YES or NO.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

If you are awarded a contract under this solicitation, in order to provide the goods or services required under a resulting contract, do you intend to partner or subcontract with a person or entity that assisted in the development of this solicitation?
Enter YES or NO.

If you enter “YES,” you are not eligible for contract award. An awarded vendor may not partner or subcontract with anyone to provide goods and services required under a resulting contract if that subcontractor or partner assisted in the development of this solicitation.

Will your company, or an employee, agent, or representative of your company, participate in the evaluation of the proposals received in response to this RFP?
Enter YES or NO.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

5. State of Michigan Experience and Prior Experience

Does your company have experience working with the State of Michigan? If so, please provide a list (including the contract number) of the contracts you hold or have held with the State for the last 10 years.

Describe at least 3 relevant experiences from the last 5 years supporting your ability to successfully manage a contract of similar size and scope for the work described in this RFP.

Experience 1

Company name.

Contact name.

Contact role at time of project.

Contact phone.

Contact email.

City.

State.

Zip.

1. Project name and description of the scope of the project.

2. What role did your company play?

3. How is this project experience relevant to the subject of this RFP?

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 2

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 3

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

6. Standard Contract Terms

Bidder must affirm agreement with the attached Contract Terms. If not in agreement, written exceptions in accordance with the Evaluation Process section of the Proposal Instructions must be provided with Bidder’s proposal.

7. Michigan Economic Impact

Number of employees currently employed at locations within the State of Michigan.

Number of additional employees to be employed at locations within the State of Michigan if awarded this Contract (if any)

Minimum wage paid to employees employed at locations within the State of Michigan.

Average wage paid to employees employed at locations within the State of Michigan.

Percentage of employees employed at locations within the State of Michigan that are covered by employer-provided health insurance.

8. Other

Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude.
Enter YES or NO.
Certification of Michigan Business- Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury.
Enter YES or NO.
Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012.
Enter YES or NO.
Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451.
Enter YES or NO.
Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies.
Enter YES or NO.
SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan.
Enter YES or NO.
Authorization to Verify Information Provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate.
Enter YES or NO.

vendor questions worksheet

Contractor must enter company name here.

Request for Proposal (RFP) No. 210000001361 Baraga County Roadside Parks – Janitorial and Lawn Maintenance Services

This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

IMPORTANT NOTE TO CONTRACTORS/BIDDERS: There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click one checkbox and complete the entries as identified.

BACKGROUND

To provide janitorial and lawn maintenance for three roadside parks in Baraga County (Baraga Cliff, Canyon Falls and Tioga Creek), for the Michigan Department of Transportation (MDOT) for spring, summer and fall seasons (April 30th to October 31st).

The result of this RFP is a three (3) year contract, with two (2), 1-year options to renew/extend. Renewal is at the sole discretion of the State and will automatically extend the Term of this Contract. The State will document its exercise of renewal options via Contract Change Notice.

SCOPE

The Contractor shall provide janitorial and grounds maintenance services at the following roadside parks located in Baraga County:

· Baraga Cliff Roadside Park

· Canyon Falls Roadside Park

· Tioga Creek Roadside Park Contract Activities shall be performed during the period roadside parks are open (the “season”) – typically May through October. MDOT roadside parks are closed during the winter season, typically between November and April.

Contract Activities, “cleaning cycles” must be complete by 10:00 a.m. each day.

The State reserves the right to modify the services required under the Contract to meet future needs, including adding locations within the Region.

REQUIREMENTS

The Contractor must provide all personnel, equipment, tools, materials, supervision, and any other items and/or services necessary to perform the Contract Activities as specified herein. The objective is to maintain the facilities in such a manner that the location provides a clean, healthy, and safe environment for motorists and visitors. To provide janitorial services, which includes, toilet buildings, toilet vaults, grounds, map cases, well shelters, sidewalks, trash removal, spring/fall cleanup and lawn maintenance. Refer to the attached Location Specification Sheet (LSS) for full details.

1. General Requirements

1.1. Janitorial Specifications

The Contractor must provide the following:

The Contractor must provide janitorial services that meet the specifications as stated in Schedule B1 – Janitorial Specifications.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

1.2. Grounds Maintenance Specifications

The Contractor must provide grounds maintenance services and equipment that meet the specifications as stated in Schedule B2 – Grounds Maintenance Specifications.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

1.3. Damages

A. Damage to Grounds

1) Prior to the beginning of each mowing season, the Contractor and the Program Manager may review the grounds to identify any existing damages to landscape items.

2) The Contractor will be held liable for all damage done, as a result of grounds maintenance operations, to fixed objects such as signs, posts, buildings, sprinkling system and all vegetation including turf, trees, shrubs, flower beds and desirable natural growth. Damage shall include among other things; skinning, scraping, breaking of tree limbs, or gouging of trees or shrubs and rutting, scalping, or tearing turf.

3) Costs associated with damages caused by the Contractor to plant material will be assessed based on current Michigan Forestry and Park Association's Michigan Tree Evaluation Guidelines.

4) The Contractor shall make all turf damage repairs.

a. Seed shall meet purity and germination requirements as specified by the Program Manager.

b. Only friable topsoil shall be used to fill any depressions, ruts, etc., prior to seeding.

c. Seeding will only be allowed from April 30 through May 31, and August 15 through September 30, unless otherwise directed by the Program Manager.

5) All other property damage will be assessed for actual replacement costs including labor, materials, and equipment.

6) The Contractor will be billed for all costs related to the damages caused by his/her operation or be required to repair the damages as directed by the Program Manager.

B. Damage to State-owned or Leased or Citizen-owned Property

1) In all instances where State-owned or leased, or Citizen-owned property or equipment is damaged, the Contractor must notify the Program Manager or designee of the facts and extent of the damage.

a. Verbal notification within one hour of the damage or discovery of damage, AND

b. Written notification within 24 hours of the damage or discovery of damage.

2) Contractor shall be responsible for repair, replacement, or cleanup as necessary to any State-owned or leased or Citizen-owned property due to carelessness, misuse, or neglect of the Contractor or any of the Contractor’s personnel or subcontractors.

3) In the event of Contractor liability for damages, the Contractor agrees:

a. The State will repair, replace or cleanup the damage.

b. The State will provide the Contractor with documentary evidence (e.g., invoices, etc.) of the costs associated with the repair, replacement, or cleanup, and

c. The Contractor will reimburse the State for the full amount of the repair, replacement, or cleanup either by:

i. Forwarding payment in full within 45 days of receipt of documentary evidence, or

ii. By agreeing in writing, to allow the State to hold back contractual payments until the cost for the repair, replacement or cleanup has been fully reimbursed to the State.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

1.4. Health, Safety and Environmental Protection

A. The Contractor shall conform to all applicable federal, state, and local laws and to the requirements of the Contract.

B. In performing the Contract Activities, the Contractor shall:

1) Take all reasonable precautions to prevent the release of hazardous chemicals into the environment.

2) Take all additional precautions the Program Manager or designee requires.

C. Any violation of the health, safety and environmental rules may be grounds for termination of the Contract.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

1.5. Other Requirements

A. The Contractor and/or Contractor employees DO NOT have the authority to permit any use of the facility. The Contractor and/or employee shall report any activity of which they were not previously aware to the Program Manager upon discovery of the unauthorized activity.

B. Contractor’s vehicle(s) are not allowed on sidewalk and lawn areas. Parking area will be designated by MDOT.

C. Any requests for information by any news media organization (newspapers, TV stations, radio, etc.) shall immediately be directed to the Program Manager. The Contractor and/or his/her employees shall not speak on behalf of MDOT.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

1.6. MDOT General Responsibilities

The Contractor shall notify the Program Manager immediately of needed repairs and/or replacements to the following:

1.Building structures and fixtures
2.Water pump
3.Fences - including rustic type within the grounds
4.Picnic tables such a refinishing, repair, removal
5.Trash barrels
6.Trees and parking lot deficiencies
☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

1.7. Warranties

Describe any warranties included in the bid. Explain the process for reporting warranty issues and how the Contractor will handle any repairs or replacements.

The State reserves the right to require additional warranties other than those identified by the Contractor in its response to this RFP.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

1.8. Call Backs

The Contractor is expected to respond to “call back” from the Program Manager, or designated representative, to site specific complaints (graffiti, messy conditions, etc.) at the roadside parks, outside of the normal hours detailed in this contract. The “call back” is expected to be infrequent in nature and shall be considered incidental to the contract unit price for JANITORIAL/GROUNDS MAINTENANCE.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

1.9. Transition

A. Contract Execution: The Contractor must sign and date the Contract by the estimated Contract Start Date and provide a current certificate of liability insurance with the required coverage and limits of liability as stated in Section 6 of the Standard Contract Terms.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

B. Post-Contract Transition: Invoices must be sent withing 45 days after expiration of contract. Any invoices received after 45 days will result in a non-payment of invoice.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

2. Service Requirements

2.1. Timeframes

All Contract Activities must be delivered within the timeframes specified in each LSS and agreed between the Contractor and Program Manager. If additional vault pumping is requested by the Program Manager, pumping must be completed within five business days. The Contractor is expected to begin being responsible for the contract activities on the Contract Begin Date (April 30, 2021). The receipt of order date is pursuant to the Notices section of the Standard Contract Terms.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

2.2. Training

The Contractor must provide the following training: Contractor must explain its training capabilities and any training that is included in its proposal. The contractor is responsible for training all employees on the MDOT contract specifications and required cleaning procedures, as well as the vendor’s company policies and requirements. Any new employees shall be trained before being allowed to work at these specified locations.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

The Contractor must explain training that is included in its proposal, as well as any additional training capabilities available and related costs, if any.

Bidder must provide detailed information as required above – either in this response box or identified here as an attachment to this RFP labelled as “Training”.

2.3. Reporting

Monthly Schedule. The Contractor must submit a schedule of the date(s) the Monthly Janitorial Tasks will be performed, and the mowing schedule. The schedules shall be submitted to the Program Manager by the first day of each month.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

The Contractor must explain any reporting that is included in its proposal and any additional reporting capabilities:

2.4. Meetings

The Contractor must meet with the Program Manager prior to the beginning of each mowing season to review the grounds and identify any existing damages to landscape items.

The State may request other meetings as it deems appropriate.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

3. Staffing

3.1. Contractor Representative

The Contractor must appoint one individual specifically assigned to State of Michigan accounts who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Representative”).

The Contractor must notify the Contract Administrator at least 10 calendar days before removing or assigning a new Contractor Representative.

1) Contractor Representative:

2) Physical Location of Contractor Representative:

3) Phone Number:

4) Email Address:

5) Days/Times Available:

6) Functions Contractor Representative will perform:

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

3.2. Key Personnel

The Contractor must appoint at least one individual who will be directly responsible for the day-to-day operations of the Contract (“Key Personnel”). Key Personnel must be specifically assigned to the State account, be knowledgeable on the contractual requirements, and respond to State inquiries within eight business hours.

The State reserves the right to require the Contractor to employ more than one Key Personnel to adequately supervise the day-to-day Contract Activities. General employees or attendants are not acceptable as Key Personnel.

The Contractor may not remove or assign Key Personnel without the prior consent of the State. Prior consent is not required for reassignment for reasons beyond the Contractor’s control, including illness, disability, death, leave of absence, personal emergency circumstances, resignation, or termination for cause. The State may request a résumé and conduct an interview before approving a change. The State may require a 30-calendar day training period for replacement personnel.

1) Key Personnel:

2) Physical Location of Key Personnel:

3) Phone Number:

4) Email Address:

5) Organizational Role:

6) Functions Key Personnel will perform:

7) Qualifications:

8) Relevant Experience:

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

3.3. Non-Key Personnel

The Contractor must provide adequate site staff (Non-key Personnel), during the hours specified and for the duration of the Contract term, to perform Contract Activities in an expeditious and professional manner. Non-key Personnel shall be able to understand and speak the English language.

The State reserves the right to approve Non-key Personnel and to require replacement of any Non-key Personnel found to be unacceptable at any time during the Contract term.

The Contractor must notify the Contract Administrator at least 10-calendar days before removing or assigning non-key personnel.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

3.4. Customer Service Toll-Free Number

The Contractor must specify its toll-free number for the State to contact the Contractor Representative who must be available for calls during the hours of 8 am to 5 pm EST Monday through Friday, at a minimum. Identify customer service availability for this proposal by hours and days of the week.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

The Bidder must specify its toll-free number for the State to contact the Contractor Representative.

Identify customer service availability for this proposal by hours and days of the week.

3.5. Disclosure of Subcontractors

If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:

· The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.

· The relationship of the subcontractor to the Contractor. Of the total bid, the price of the subcontractor’s work. Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.

· A complete description of the Contract Activities that will be performed or provided by the subcontractor.

SUBCONTRACTED WORK IS LIMITED TO THE LAWN MAINTENANCE, LAWN AERATION, VAULT PUMPING, AND/OR SPRING AND FALL CLEANUP ITEMS ONLY.

Bidder must provide detailed information as requested in the requirement(s):

The legal business name, address, telephone number of the subcontractor(s):

A description of subcontractor’s organization and the services it will provide and information concerning subcontractor’s ability to provide the Contract Activities:

The relationship of the subcontractor to the Bidder:

Whether the Bidder has a previous working experience with the subcontractor.

If yes, provide the details of that previous relationship:

A complete description of the Contract Activities that will be performed or provided by the subcontractor:

Of the total bid, the price of the subcontractor’s work:

4. Pricing

4.1. Price Term

Pricing is firm for the initial term of the Contract. Adjustments may be requested, in writing, by either party at the time a renewal option is requested.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

4.2. Price Changes

Adjustments will be based on changes in actual Contractor costs. Any request must be supported by written evidence documenting the change in costs. The State may consider sources, such as the Consumer Price Index; Producer Price Index; other pricing indices as needed; economic and industry data; manufacturer or supplier letters noting the increase in pricing; and any other data the State deems relevant.

Following the presentation of supporting documentation, both parties will have 30 days to review the information and prepare a written response. If the review reveals no need for modifications, pricing will remain unchanged unless mutually agreed to by the parties.