RFP Attachment 04 - Downselect Cost Model.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- Mobile Aircraft Arresting System- DRAFT RFP
- Solicitation number
- FA8534-21-R-0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| USAF Approved Test Matrix for All AAS at NAVAIR.pdf | ||
| USG- Ktr QA_2- Responses.pdf | ||
| AFMC Form 260_FAT.pdf | ||
| SOW_09-Jul-2021.pdf | ||
| 7545764 Rev B.pdf | ||
| 515053 Rev J.pdf | ||
| 66D1751 Rev K.pdf | ||
| Section L- Attchment B- Past Performance Questionnaire.doc | DOC document | |
| AFMC Form 260_FAT.pdf | ||
| AFMC Form 158- Packaging.pdf | ||
| MIL-STD-3035.pdf | ||
| DD Form 1653-Transportation.pdf | ||
| Section L - Downselect_5.4_FINAL.docx | DOCX document | |
| RFP Attachment 03 - Initial Cost Model.xlsx | XLSX spreadsheet | |
| Section M - Downselect_5.4- FINAL.docx | DOCX document | |
| RFP Attachment 01- SOW.pdf | ||
| Section M - Initial_6.4 FINAL.docx | DOCX document | |
| CDRLS Portfolio.pdf | ||
| Section L - Initial_6.4- FINAL.docx | DOCX document | |
| RFP Attachment 02 - Cross Reference Matrix.doc | DOC document | |
| DRAFT- FA8534-21-R-0009.pdf | ||
| MIL-STD-3036.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Attch 4)
| RFP Attachment 04 | |
| MAAS Cost/Price Matrix | |
| "Offeror shall enter data in yellow highlighted fields only" | |
| "The Total Price for Total Quantity field will only be calculated by the Government" | |
| Solicitation Number: | FA8534-21-R-0009 |
| Enter Offeror's Business Name: | |
| Enter Offeror's CAGE code: |
| Downselect Award (XX months) | Unit Price (FFP) | Total | Total Price for Total Quantity | |
| Est Unit Price (CRNF) | QTY | |||
| CLIN 1001 * | Production Units (FFP) | 21 | $0.00 | |
| CLIN 1002 | T.O. (IPB Update) (FFP) | 1 | $0.00 | |
| CLIN 1003 | Provisioning (FFP) | 1 | $0.00 | |
| CLIN 1004 | Travel (CRNF) | 1 | $0.00 | |
| CLIN 1005 | Training (FFP) | 1 | $0.00 | |
| Government Estimate | Proposed Rate | |||
| CLIN 1006 * | DATA - Enginering Change Proposal (ECP) (FFP) | Senior Engineer | $ - 0 | |
| Junior Engineer | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| CAD Operator | $ - 0 | |||
| CLIN 1007 | DATA: | |||
| CLIN 1007AA | Monthly Status Report (NSP) | NSP | 1 | NSP |
| CLIN 1007AB | Managemetn Plan - IMP (NSP) | NSP | 1 | NSP |
| CLIN 1007AC | Technical Review Data Package (NSP) | NSP | 1 | NSP |
| CLIN 1007AD | Conferrence Agenda (NSP) | NSP | 1 | NSP |
| CLIN 1007AE | Cofnerence Minutes (NSP) | NSP | 1 | NSP |
| CLIN 1007AF | System Safety Program Plan (NSP) | NSP | 1 | NSP |
| CLIN 1007AG | System Safety Hazard Analysis Report (NSP) | NSP | 1 | NSP |
| CLIN 1007AH | Corrosion Prevention Control Plan (NSP) | NSP | 1 | NSP |
| CLIN 1007AJ | Product Base Line Index (NSP) | NSP | 1 | NSP |
| CLIN 1007AK | Engineering Change proposal (NSP) | NSP | 1 | NSP |
| CLIN 1007AM | Notice of Revision (NOR) (NSP) | NSP | 1 | NSP |
| CLIN 1007AN | Request for Varience (NSP) | NSP | 1 | NSP |
| CLIN 2001 ** | Production Units (FFP) | 21 | $0.00 | |
| CLIN 3001 ** | Production Units (FFP) | 21 | $0.00 | |
| CLIN 4001 ** | Production Units (FFP) | 21 | $0.00 | |
| CLIN 5001 ** | Production Units (FFP) | 21 | $0.00 |
| * Labor Category requirements and description are on separate sheet provided |
| ** If Contractor is proposing Ranged Pricing, use the separate sheet provided |
SOURCE SELECTION INFORMATION--SEE FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
Labor Categories
| Categories: | Description/ Qualifications: | Proposed Rate: |
| Senior Engineer | Minimum Experience: 14 years. |
Education: Bachelor's degree in applicable field (Electrical, Mechanical, Civil, and Chemical). MS degree in a scientific area with five years of experience is considered equivalent.
Functional Responsibility: Applies advanced technical principles, theories, and concepts. Contributes to the development of new principles and concepts. Works on unusually complex technical problems and provides solutions that are highly innovative and ingenious. Works toward predetermined long-range goals and objectives. Determines and pursues courses of action necessary to obtain desired results. Develops advanced technological ideas and guides their development into a final product.
Junior Engineer Minimum Experience: 9 years.
Education: Bachelor's degree in related technical discipline.- Experience may be substituted at the rate of two years of directly related experience for each year of education.
Functional Responsibility: Design, manufacture, evaluation, or test of military avionics and electronic subsystems, test equipment or installation of this equipment in military systems such as fixed and rotary wing aircraft. Capable of system conceptualization, system-level requirements definition, and system test and evaluation. Familiar with probability, reliability, statistical analysis methods, sampling and test and evaluation techniques, data collection, and applicable regulations and standards.
Technical Writer Minimum Experience: 10 years.
Education: Bachelor's degree in relevant technical or academic field. Experience may be substituted at the rate of two years of directly related experience for each year of education.
Functional Responsibility: Prepares, in clear and concise language, technical documents such as procedure manuals, service manuals, operational specifications, bulletins, and related technical publications concerned with the installation, operation, and maintenance of electronic, electrical, CAD Operator Minimum Experience: 6 years.
Education: Bachelor's degree in applicable field. Experience may be substituted at the rate of two years of directly related experience for each year of education.
Functional responsibility: Works closely with design originators, preparing drawings of unusual, complex or original design that require a high degree of precision. Must be capable of preparing drawings of electrical circuits, machined parts, wiring diagrams and schematics from interpreting draft layouts, sketches or other sources. Ensures that anticipated problems during manufacture, assembly, installation, and operation are resolved by the drawing produced. Independent judgement required in selecting and interpreting data based on knowledge of the design.
Range Pricing Note: Contractors may fill out this sheet for (FFP) ranged pricing of MAAS Production units
| CLIN | Description | Unit Price | Qty Range | |
| 1001 | Production Units (FFP) | |||
| 1001AA | Production Units (FFP) | |||
| 1001AB | Production Units (FFP) | |||
| 1001AC | Production Units (FFP) | |||
| 1001AD | Production Units (FFP) | * Rows may be inserted to account for all ranges |
| CLIN | Description | Unit Price | Qty Range |
| 2001 | Production Units (FFP) | ||
| 2001AA | Production Units (FFP) | ||
| 2001AB | Production Units (FFP) | ||
| 2001AC | Production Units (FFP) | ||
| 2001AD | Production Units (FFP) |
| CLIN | Description | Unit Price | Qty Range |
| 3001 | Production Units (FFP) | ||
| 3001AA | Production Units (FFP) | ||
| 3001AB | Production Units (FFP) | ||
| 3001AC | Production Units (FFP) | ||
| 3001AD | Production Units (FFP) |
| CLIN | Description | Unit Price | Qty Range |
| 4001 | Production Units (FFP) | ||
| 4001AA | Production Units (FFP) | ||
| 4001AB | Production Units (FFP) | ||
| 4001AC | Production Units (FFP) | ||
| 4001AD | Production Units (FFP) |
| CLIN | Description | Unit Price | Qty Range |
| 5001 | Production Units (FFP) | ||
| 5001AA | Production Units (FFP) | ||
| 5001AB | Production Units (FFP) | ||
| 5001AC | Production Units (FFP) | ||
| 5001AD | Production Units (FFP) |
File details come from the government source that posted it. Updated .