CDRLS Portfolio.pdf

PDF 1 MB Posted

Attached to
Mobile Aircraft Arresting System- DRAFT RFP
Solicitation number
FA8534-21-R-0009
Issued by

View the file

Other files

File Type Posted
USAF Approved Test Matrix for All AAS at NAVAIR.pdf PDF
USG- Ktr QA_2- Responses.pdf PDF
AFMC Form 260_FAT.pdf PDF
SOW_09-Jul-2021.pdf PDF
7545764 Rev B.pdf PDF
515053 Rev J.pdf PDF
66D1751 Rev K.pdf PDF
RFP Attachment 04 - Downselect Cost Model.xlsx XLSX spreadsheet
Section L- Attchment B- Past Performance Questionnaire.doc DOC document
AFMC Form 260_FAT.pdf PDF
AFMC Form 158- Packaging.pdf PDF
MIL-STD-3035.pdf PDF
DD Form 1653-Transportation.pdf PDF
Section L - Downselect_5.4_FINAL.docx DOCX document
RFP Attachment 03 - Initial Cost Model.xlsx XLSX spreadsheet
Section M - Downselect_5.4- FINAL.docx DOCX document
RFP Attachment 01- SOW.pdf PDF
Section M - Initial_6.4 FINAL.docx DOCX document
Section L - Initial_6.4- FINAL.docx DOCX document
RFP Attachment 02 - Cross Reference Matrix.doc DOC document
DRAFT- FA8534-21-R-0009.pdf PDF
MIL-STD-3036.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MOBILE AIRCRAFT ARRESTING

SYSTEM

FD2060-19-33161

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

Corrosion Prevention and Control Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MFFP-81403A SOW para 3.3.2 AFLCMC/WNZEB

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD 2TIME 120 DAC b. COPIES

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

A N/A 180 DAC Reg Repr o

16. REMARKS AFLCMC/

WNZEB 1 2 0

BLK 8: The Government will have 30 days after receipt of plan for approval or disapproval. The contractor shall have 10 days after receipt of the Government comments to resubmit the plan.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors. Critical Technology Determination Date 04-23-2020. Other requests for this document shall be referred to

AFLCMC/WNZEB.

BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications. Both hard copies and CD-ROM or DVD shall be submitted to:

Support Equipment & Vehicles Division ATTN: AFLCMC/ WNZEB Christopher S. Peisher 235 Byron Street, Suite 19A Robins AFB GA 31098-1813 e-mail: Christopher.Peisher@us.af.mil

Notification of submission shall be provided to the PCO via e-mail.

e-mail to: kristen.campbell.2@us.af.mil

15. Total 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages

120 DAC

2020-04-24T14:02:41-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:44:32-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Test Procedure MAAS Test Procedure

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80603A SOW para 3.5.2.1 AFLCMC/WNZEB

DD 1TIME 180 DAC b. COPIES

A N/A N/A Reg Repr

BLK 8: The Government will have 45 days after receipt of the test procedures for approval or disapproval. The contractor shall have 21 days after receipt of the Government comments to resubmit the procedures.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors. Critical Technology Determination Date 04-23-2020. Other requests for this document shall be referred to

AFLCMC/WNZEB.

BLK 14: Documents shall be provided via electronic media utilizing standard

235 Byron Street, Suite 19A

180 DAC

2020-04-24T14:05:41-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:45:23-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Test/Inspection Report MAAS First Article Test Report

DI-NDTI-80809B SOW para 3.5.2.4 AFLCMC/WNZEB

SD 1TIME BLK 16 b. COPIES

BLK 8: The Government will have 45 days after receipt of the test report to approve or disapprove. The contractor shall have 21 days after receipt of the Government comments to resubmit the report.

BLK 12: 30 days after the completion of First Article Testing at NAVAIR.

235 Byron Street, Suite 19A

BLK 16

2020-04-24T14:07:22-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:46:01-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Product Base Line Index Configuration Management and Control

DI-CMAN-81218 SOW para 3.6.1.1.2 AFLCMC/WNZEB

SD ASREQ BLK 16 b. COPIES

A N/A BLK 16 Reg Repr

BLK 8: The Government will have 30 days after receipt of the data for approval or comments to resubmit the data.

BLK 10, 12, & 13: Product base line index shall be submitted within 30 days after the acceptance of the MAAS First Article test report. Any subsequent changes shall be submitted within 30 days after change approval.

submitted via to:

235 Byron Street, Suite 19A

BLK 16

2020-04-24T14:18:07-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:47:06-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Engineering Change Proposal

DI-SESS-80639D SOW para 3.6.2 AFLCMC/WNZEB

SD ASREQ ASREQ b. COPIES

235 Byron Street, Suite 19A

ASREQ

2020-04-24T14:12:39-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:48:05-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Notice of Revision (NOR)

DI-SESS-80642E SOW para 3.6.2 AFLCMC/WNZEB

235 Byron Street, Suite 19A

ASREQ

2020-04-24T14:16:40-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:49:08-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Request for Variance

DI-SESS-80640E SOW para 3.6.3 AFLCMC/WNZEB

235 Byron Street, Suite 19A

ASREQ

2020-04-24T14:19:12-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:50:07-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Contractor’s Progress, Status, and Management Report Monthly Status Report

DI-MGMT-81928 SOW para 3.1.3, 3.5.2.3 AFLCMC/ WNZEB

DD Mthly 5th of First Month ARO b. COPIES

A BLK 13 5th of the Month Reg Repr

BLK 4: Contractor format acceptable. Shall be submitted by the 5th of the first month after receipt of order for approval. Approval required for first submittal only.

Microsoft Office applications. Documents shall be submitted via e-mail to:

235 Byron Street, Suite 19A

5th of First Month ARO

2020-04-24T13:39:33-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:33:04-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Management Plan Integrated Master Plan (IMP)

DI-MGMT-80004A SOW para 3.1.4 AFLCMC/ WNZEB

DD ONE/R 15 DAC b. COPIES

BLK 8: The Government will have 30 days after receipt of plan to review and provide comments. The contractor shall have 10 days after receipt of the Government comments to resubmit the plan.

Date 04-23-2020.Other requests for this document shall be referred to AFLCMC/

WNZEB.

235 Byron Street, Suite 19A

15 DAC

2020-04-24T13:43:50-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:31:47-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Technical Report-Study Services Technical Review Data Package

DI-MISC-80508B SOW para 3.2.2.3 AFLCMC/ WNZEB

DD 3TIME 180 DAC b. COPIES

BLK 8: The Government will have 30 days after receipt of data package to review and provide comments. The contractor shall have 10 days after receipt of the Government comments to resubmit the data package.

BLK 13: Second submission due 360 DAC. Third (final) submission due 540 DAC.

Microsoft Office applications. Slides shall be in Microsoft PowerPoint format; hard copies of slides shall be printed single-sided, in color, in landscape format, one slide per page. Both hard copies and CD-ROM or DVD shall be submitted to:

235 Byron Street, Suite 19A

180 DAC

2020-04-24T13:47:19-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:34:03-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Conference Agenda

DI-ADMN-81249B SOW para 3.2.5, 3.6.4.1, 3.6.4.2 AFLCMC/ WNZEB

LT ASREQ BLK 16 b. COPIES

BLK 4: Contractor format acceptable.

Date 04-23-2020. Other requests for this document shall be referred to AFLCMC/

WNZEB.

BLK 10, 12, & 13: Agenda shall be provided within 5 working days prior to the meeting.

235 Byron Street, Suite 19A

ATTN: AFLCMC/WNKAC

235 Byron Street, Suite 19A e-mail: kristen.campbell.2@us.af.mil

AFLCMC/

WNKAC 1 1 0

15. Total 3

BLK 16

2020-04-24T13:53:19-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:34:54-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

Conference Minutes

DI-ADMN-81250A SOW para 3.2.6, 3.6.4.1, 3.6.4.2 AFLCMC/WNZEB

LT ASREQ BLK 16 b. COPIES

N/A N/A BLK 16 Reg Repr

WNZEB 0 2 0

BLK 4: Contractor format acceptable.

BLK 10, 12, & 13: Minutes shall be provided no later than 10 days after the meeting. Minutes shall include presentation material.

235 Byron Street, Suite 19A

BLK 16

2020-04-24T13:56:04-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:35:52-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

System Safety Program Plan

DI-SAFT-81626 SOW para 3.3.1.1 AFLCMC/WNZEB

DD ONE/R 90 DAC b. COPIES

BLK 8: The Government will have 30 days after receipt of plan for approval or comments to resubmit the plan.

235 Byron Street, Suite 19A

90 DAC

2020-04-24T13:57:39-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:41:16-0400

PEISHER.CHRISTOPHER.S.1384906806

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

System Safety Hazard Analysis Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-80101C SOW para 3.3.1.1 AFLCMC/WNZEB

DD 4TIME/R 120 DAC b. COPIES

BLK 8: The Government will have 30 days after receipt of report for approval or comments to resubmit the report.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors. Critical Technology Determination Date 04-23-2020. Other requests for this document shall be referred to

AFLCMC/WNZEB.

BLK 13: Second submission due 120 DAC. Third submission due 180 DAC.

Fourth (final) submission due 240 DAC.

BLK 14: Documents shall be provided via electronic media utilizing standard

235 Byron Street, Suite 19A

120 DAC

2020-04-24T13:59:32-0400

GRIEPENBURG.DEIDRE.H.1289435464

2020-04-27T06:43:34-0400

PEISHER.CHRISTOPHER.S.1384906806

File details come from the government source that posted it. Updated .