This is Amendment 2 to Request for Proposals IH-26-004, issued by the Alaska Department of Fish and Gas, Division of Administrative Services, for engineering and design services at the Whiskey Gulch Boating Access Site in Anchor Point. The amendment corrects the evaluation criteria in Section 8, renaming it from "Freshwater/Anadromous Waterbody Structures" to "Boating Access/Recreational Facilities." Responses must demonstrate the proposed team's experience with the design, permitting, and construction of boating access sites and recreational facilities similar in design and location to the proposed project, with relevant experience limited to boat launch ramps and floating structures intended for small recreational boats not exceeding 26 feet in length. Proposals are due by March 9, 2026, at 2:00 PM Alaska Standard Time, with submission to dfg.contracting@alaska.gov or by mail/hand delivery to the Juneau office. Site visits may be coordinated with Tim Blackmon at dfg.dsf.r2access@alaska.gov or 907-335-8191, extension 1730.
The estimated contract value ranges between $200,000 and $500,000, with Phase 1 services compensated using a Firm Fixed Price methodology and Phase 2 costs subject to negotiation following technical evaluation. Pricing is not an evaluation criterion due to federal funding restrictions, though labor billing rates and total price proposals will be negotiated after technical evaluation is completed. The project is federally assisted under the U.S. Department of Transportation and subject to federal non-discrimination provisions and Disadvantaged Business Enterprise requirements under a Race-Neutral DBE program. All materials must comply with Build America, Buy America Act specifications. An Alaska Business License is required at time of award. The contract commences upon signature with Phase 1 services due by September 30, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Amendment 3.pdf | ||
| RFP Amendment 1.pdf | ||
| RFP IH-26-004 - Whiskey Gulch Boating Access Site Improvements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF ALASKA
Department of Fish and Game Division of Administrative Services
Whiskey Gulch Boating Access Site Improvements
IH-26-004
Amendment # 2
ISSUE DATE 2/26/2026
This amendment is being issued to make corrections to the RFP evaluation criteria section 8.
Changes to the RFP:
Change 1: Evaluation criteria section 8 Freshwater / Anadromous Waterbody Structures is corrected to
8. Boating Access / Recreational Facilities Response must demonstrate the proposed team's experience with the design, permitting and construction of Boating Access Sites / Recreational Facilities similar in design and location to the proposed project. Only experience with boat launch ramps and floating structures intended for use by small recreational boats (i.e. less than 26 feet in length) is relevant to this project.
Procurement Officer Eric Verrelli Phone: (907) 465-6178 Email: eric.verrelli@alaska.gov mailto:eric.verrelli@alaska.go