RFP_9132_Reliable_Plaza_Glazing.pdf

PDF 7 MB Posted

Attached to
Reliable Plaza Glazing
Solicitation number
PR9132
Issued by
Orange County, Orlando City, Florida

About this file

This is a Request for Proposal (RFP) issued by the Orlando Utilities Commission (OUC) for wet glazing services on the exterior curtain wall and window systems of a ten-story office building located at 100 West Anderson Street, Orlando, Florida. The project scope encompasses all labor, materials, equipment, and services necessary to perform wet glazing to improve air and water infiltration performance by installing a continuous, properly bonded sealant system at all glazing joints. The mandatory pre-response conference is scheduled for April 20, 2026, at 10:00 AM EST, with attendance required for proposal submission. Questions and comments are due by April 28, 2026, with addenda issued by May 12, 2026. Proposals must be submitted electronically through VendorLink by 2:00 PM EST on the proposal due date, with public opening at 2:30 PM EST. The contract term remains in effect until all work is fully completed and formally accepted by the OUC-designated representative. Bidders must demonstrate a minimum of seven years of experience in the same scope of work and provide at least three references from completed projects of similar scope and size.

Pricing must remain firm throughout the contract period, with bidders required to submit detailed cost breakdowns covering labor, materials, equipment, access and logistics, testing and quality assurance, and overhead. Bidders must include a 10-year workmanship warranty and provide proof of manufacturer's warranty for sealant materials with a minimum 20-year coverage. Insurance requirements include Workers' Compensation, Comprehensive Automobile Liability, and Commercial General Liability with limits of $2,000,000 per occurrence. Bidders must comply with OUC's Alcohol and Controlled Substance Abuse Policy and provide a project-specific safety plan for swing stage and lift operations. All work must be performed during normal business hours (Monday-Friday, 7:00 AM-3:30 PM), with prior approval required for off-hours work. Bidders must submit executed compliance forms including a Sworn Statement on Public Entity Crimes and a Dispute Disclosure form, along with current state and local licenses, proof of insurance, and a W-9 form. No set-asides or incumbent preferences are identified in the solicitation.

View the file

Other files

File Type Posted
Compliance_forms.pdf PDF
Copy_of_Pricing_Sheet_5.xlsx XLSX spreadsheet
Supplier_Information_Qualifications.xlsx XLSX spreadsheet
Procurement_procure_general_services_3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 9132

For

Reliable Plaza Glazing

Issue Date:

Pre-response Conference:

April 6, 2026

Mandatory Attendance

Pre-response Conference Date: April 20, 2026, 10:00 AM EST

April 28, 2026, 2:00 PM EST Questions/Comments Due Date:

Addendum Due Date:

Proposal Due Date:

April 30, 2026

May 12, 2026 by 2:00 PM EST

Direct all inquiries to Buyer of Record:

Cindy Luttfring, CPPB, NIGP-CPP

407-325-6311 cluttfring@ouc.com

Orlando Utilities Commission RFP 9132 – Reliable Plaza Glazing

SCM-RFP-T-01 – Request for Proposal Template v5.0 – 5/22/25

Orlando Utilities Commission Orlando, Florida

RFP 9132 for Reliable Plaza Glazing

Table of Contents 1 Introduction

1.1 Scope of Work Summary

1.2 Pre-Response Conference

1.3 Term of Contract

1.4 Minimum Bidder Qualifications

1.5 Price and Costs

1.6 Terms and Conditions

1.7 Contract Sample

1.8 Proposal Evaluation Criteria

2 Bidder Requirements and Qualifications

2.1 Detailed Scope, Requirements, & Drawings

2.2 Bidder Information & Required Bidder Qualifications

2.2.1 Bidder Information

2.2.2 Required Bidder Qualifications

3 Instructions to Bidders

3.1 Legal and Public Record Statement

3.2 Confidentiality Notice to Bidders

3.2.1 Exemptions

3.3 Acknowledgement

3.3.1 Statement of No Bid

3.4 General Information

3.4.1 Common Terms

3.4.2 Submittal

3.4.2.1 Alternate Proposals

3.4.3 Signatures

3.4.4 Withdrawal

3.5 Electronic Submittal of the Proposal

3.6 Compliance Forms

SCM-RFP-T-01 – Request for Proposal Template v5.0 – 5/22/25

3.6.1 Public Entity Crimes

3.6.2 Dispute Disclosure

3.7 RESERVED

3.8 Proposal Preparation Costs

3.9 Exceptions

3.10 Clarifications

3.11 Local Conditions

3.12 Opening

3.13 Solicitation Selection Schedule

3.14 Proposal Acceptance and Rejection

3.15 Proposal Evaluation Criteria

3.16 Cancelation

3.17 Freight (If Applicable)

3.18 Bid Bond (If Applicable)

3.19 Payment and Performance Bond (If Applicable)

3.20 Contract Execution

3.21 Award

3.22 Taxes, Permits, and Licenses

3.23 Error and Omissions

3.24 Proposal Submittal Format

3.24.1 OUC Policies and Procedures for Bidders

3.25 Signatures

4 Proposal Submittal Format & Checklist

5 Attachments

SCM-RFP-T-01 – Request for Proposal Template v5.0– 5/22/25

Re qu es t f or P ro po sa l (

RF

P)

Orlando Utilities Commission Orlando, Florida

RFP 9132 for Reliable Plaza Glazing

Direct all inquiries to the Buyer of Record: Cindy Luttfring, CPPB, NIGP-CPP

407-325-6311 cluttfring@ouc.com

Proposal Opening Location:

Orlando Utilities Commission Reliable Plaza 100 West Anderson Street Orlando, Florida 32801

1. Instructions are located in the Instruction to Bidders section of this document; or, may be provided during a Pre-Conference Meeting.

2. Electronic proposal submittals, described in the Electronic Submittal of the Proposal section of this document, will be accepted. Email or other means will not be accepted.

3. VendorLink help can be accessed by calling 407-222-1885, or by emailing support@evendorlink.com.

mailto:support@evendorlink.com

1 INTRODUCTION

The Orlando Utilities Commission (OUC) is an electric and water municipal utility serving Orlando, Florida and portions of surrounding Orange County. OUC also has an Inter-local agreement with the City of St.

Cloud, Florida for the management of its electric utility. Currently, OUC serves more than 380,000 customers. To obtain general information about OUC, access www.ouc.com.

1.1 SCOPE OF WORK SUMMARY

This scope includes all labor, materials, equipment, and services necessary to perform wet glazing of the exterior curtain wall and window systems on the ten-story OUC office building located at 100 West Anderson Street, Orlando, FL 32801.

Refer to Section 2.1, Detailed Scope, Requirements, & Drawings for more information.

1.2 PRE-RESPONSE CONFERENCE

To comply with security requirements, email names of attendees and company affiliations to the Buyer of Record at least 48 hours in advance of the meeting. Please bring government issued photo identification the day of the Pre-Response Conference.

If applicable, refer to Attachment C: Invitation to Pre-Response Conference

1.3 TERM OF CONTRACT

The term of this Contract shall remain in effect until all Work has been fully completed and formally accepted by the OUC-designated representative.

1.4 MINIMUM BIDDER QUALIFICATIONS

Refer to Attachment E

1.5 PRICE AND COSTS

Prices documented in the submitted Proposal must remain firm throughout the contract period (including additional extensions, if applicable). Refer to Attachment B: Price Schedule.

1.6 TERMS AND CONDITIONS

Refer to Attachment F

1.7 CONTRACT SAMPLE

Click here to view an OUC contract sample.

1.8 PROPOSAL EVALUATION CRITERIA

Refer to the Instructions to Bidders section of this document.

http://www.ouc.com/ http://www.ouc.com/docs/procurement/proc_contract_agreement.pdf?sfvrsn=2

2 BIDDER REQUIREMENTS AND QUALIFICATIONS

2.1 DETAILED SCOPE, REQUIREMENTS, & DRAWINGS

Refer to Attachment A

Bidder Information & Required Bidder Qualifications

2.1.1 Bidder Information

On company letterhead Bidder to provide a response cover page with the following information:

1. Firm Name

2. Name of Parent Company if applicable

3. Complete Business Address

4. State of Incorporation

5. Number of years in business

6. Name(s) and contact information of key personnel

7. Dun & Bradstreet number

8. Licenses obtained to conduct business with OUC

2.1.2 Required Bidder Qualifications

Refer to Section 1.4 Minimum Bidder Qualifications for more information.

1. List the number of projects (with similar scope and size) that the bidding organization has completed and are in progress.

2. Provide at least three (3) references with contact information related to completed projects with the similar scope and size project.

a. If deemed pertinent, OUC will request to do site visits to customers provided as references by selected Bidder or Bidder’s affiliates.

3. Provide a complete list of all the subcontractors that may be part of the project, with the following information:

a. Company name

b. Contact information

c. Number of years in business

d. Proof of the necessary licenses for the job (if applicable)

e. List of project that they had participated with similar scope and size to this RFP

Should bidder be awarded the work in this RFP, please provide information on any Economic Development Opportunities that Bidder may bring, such as the creation of new jobs or purchasing or leasing of new building space, which could benefit the local Orlando Area or the State of Florida.

3 INSTRUCTIONS TO BIDDERS

3.1 LEGAL AND PUBLIC RECORD STATEMENT

As required by Florida’s Public Records Law, information provided to OUC in the course of business will be made available for public inspection and copying unless a specific statutory exemption applies.

3.2 CONFIDENTIALITY NOTICE TO BIDDERS

By submitting a proposal to OUC, each Bidder acknowledges and understands that OUC is a public agency subject to Chapter 119 Florida Statutes (“Public Records Law”). Any Proposal document the Bidder submits will become a public record when OUC provides notice of an intended decision or 30 days after opening the bids, proposals, or final replies, whichever is earlier. Trade Secrets, certain background financial information, and other items, may constitute exemptions to disclosure under the Public Records law.

3.2.1 Exemptions

If during the Proposal or Negotiation Phase a Bidder wishes to claim an exemption on any portion of its Proposal to OUC, the Bidder must identify the specific statutory exemption and do the following:

1. Submit a redacted version. Redact (black out) only those portions of the Proposal put forward for exemption.

2. Submit an un-redacted version of the same documents marked, “Confidential –Trade Secret/ Proprietary Information”. Both versions are to be submitted at the same time.

3.3 ACKNOWLEDGEMENT

1. From the issue date of this solicitation packet until a selection decision is made, no unauthorized contact related to this solicitation will be allowed between a Bidder, their employees or subcontractors and any OUC commissioner, officer, director, or staff, with the exception of the Buyer of Record. Any unauthorized contact will disqualify the Bidder from further consideration

2. The selected Bidder agrees to obtain, prior to award, Worker's Compensation, General Liability, Automotive, and other insurance requirements in accordance to the requirements in the terms and conditions specified in section 1.7.

3. All policies shall be subject to approval by OUC, and issued by companies authorized by the State of Florida’s Department of Insurance to conduct business in the State of Florida.

4. The selected Bidder agrees that it and its subcontractors have a Drug-Free Workplace Program that complies with Florida Statute §§ 287.087 and 440.101 et. seq., the Omnibus Employee Testing Act of 1991, 49 Code of Federal Regulation § 391 and 40 (operation of commercial motor vehicles).

a. In addition, all subcontractors must implement a controlled substance and alcohol testing policy for safety sensitive positions as defined by the Commission’s Alcohol and Controlled Substance Testing Policy for Safety Sensitive Positions.

5. The selected Bidder’s employees and its subcontractors’ employees are further prohibited from being under the influence or impairment of alcohol on OUC property or work sites or at any time or place while conducting business with or on behalf of OUC.

6. The selected Bidder shall submit only one proposal/bid in response to this solicitation packet, and shall have no financial interest in other entities submitting proposals/bid responses for the same solicitation packet.

7. Neither the selected Bidder, nor its affiliates, nor anyone associated with them shall have any potential conflict of interest due to any other clients, contracts, business relationships or property interests for this solicitation packet’s scope of work.

8. The selected Bidder shall disclose to OUC the name(s) of any OUC employee, contractor, or OUC Board Member who has a direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction. A direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction exists if the OUC employee, contractor, or Board Member:

a. Presently, or in the preceding twelve (12) months, has an ownership interest in the selected Bidder’s organization (other than as owner of less than 1% of the stock of a publicly traded corporation).

b. Works for, is a partner, officer, director, trustee, or consultant to the selected Bidder.

c. Has received grant, travel, honoraria, or other similar support from the selected Bidder

d. Has a right to receive royalties from the selected Bidder.

9. No member of the selected Bidder’s ownership, management, or staff shall have a vested interest in any aspect of OUC, nor any business or other relationship with any of OUC’s employees, officers, directors, or Board Members that creates a conflict of interest or the appearance of a conflict of interest.

10. No member of the selected Bidder’s ownership or management is presently applying for an employee position or actively seeking an appointment within OUC.

11. The selected Bidder, or authorized signatory, shall provide written notice to OUC in the event that a conflict of interest is identified at any time.

3.3.1 Statement of No Bid

The OUC Procurement Department is committed to continuously improving its processes to receive maximum participation from the industry/market. OUC is requesting that organizations, who do not wish to bid on this RFP, send the Buyer of Record an email briefly explaining their “no bid” decision. This response will help to improve the solicitation process and any future communications.

3.4 GENERAL INFORMATION

Bidders shall prepare Proposals in accordance with the requirements of these Instructions to Bidders. Not preparing a Proposal, in accordance with such instructions, implies that the Bidder does not intend to comply with all of the proposed contract conditions. Such proposals will be considered irregular and may be rejected.

OUC will receive Proposals through the VendorLink system for goods, equipment, materials, and related services set forth in the included specifications and documents.

http://www.myvendorlink.com/

3.4.1 Common Terms

OUC and Bidders (the parties) agree that the following phrases each shall have the meaning provided here and may be used interchangeably:

1. “Bidder(s)”, “Supplier(s)”, and “Proposer(s)” shall mean the organization, party, person, firm, company, corporation, partnership, joint venture, or other type of entity responding to this solicitation.

2. “Solicitation” shall mean , “Request for Proposal(s)”, “RFP”, “Request for Quote”, “RFQ”, “Invitation to Bid”, “ITB”, “Solicitation Package” or, “Solicitation Packet”, to which the Bidder is responding.

3. “Bid(s)”, “Proposal(s)”, or “Quote(s)” shall mean the documents formally submitted to OUC by each of the Bidders responding to this solicitation packet.

3.4.2 Submittal

Bidders shall submit Proposals in accordance with the instructions and schedule included in the solicitation containing these specifications and documents. Refer to Section 4: Proposal Submittal Format & Checklist and submit Proposal with all applicable content.

3.4.2.1 Alternate Proposals

If the Bidder submits an alternate proposal, they shall identify clearly the proposal as an “Alternate Proposal”. OUC may consider alternate proposals a blanket exception to the solicitation and reject the Proposal.

3.4.3 Signatures

An authorized representative of each Bidder shall:

1. Sign or e-sign the Proposal, give their full name and title, and provide the Bidder’s business name and address.

2. Enter the organization’s exact legal name on the Proposal.

3. Sign or e-sign compliance forms, if applicable.

3.4.4 Withdrawal

Bidders may withdraw, alter, and resubmit their Proposals through VendorLink at any time prior to the Proposal due date and time. Proposals may not be withdrawn, altered, or resubmitted after the Proposal due date and time. OUC may request clarifications and additional information after proposal submission.

3.5 ELECTRONIC SUBMITTAL OF THE PROPOSAL

To ensure correct Proposal formatting, Bidders shall:

1. Submit Proposals electronically through VendorLink.

2. Upload files only in MS Word (.doc or .docx), Excel (.xls or .xlsx), and PowerPoint (.ppt or .pptx); Adobe Portable Document Format (.pdf); Compressed File (ZIP) formats.

3. Enable printing on files submitted.

4. Clearly identify the RFP Number, Name, Submission Date, and Bidder Name on the Response Cover Page on Bidder’s letterhead.

5. Separate and identify each part of the submission (i.e. document type, form type, content type) with a divider/separation page.

6. Contact VendorLink technical support at support@evendorlink.com, if technical difficulties arise during proposal submission.

7. Follow all instructions outlined in this RFP and provide all requested information.

OUC may ask the selected Bidder to supply one hard copy set with original, written signatures and original compliance forms, prior to the contract execution. Do not submit following both methods unless otherwise instructed.

3.6 COMPLIANCE FORMS

3.6.1 Public Entity Crimes

Each Bidder shall submit copies of an executed and notarized Sworn Statement under Section

287.133 (3)(a) and 287.135, Florida Statutes, on Public Entity Crimes and Scrutinized Companies.

3.6.2 Dispute Disclosure

Each Bidder shall submit copies of an executed Dispute Disclosure form.

3.7 RESERVED

3.8 PROPOSAL PREPARATION COSTS

OUC shall provide, without charge, one set of the specifications and documents to prospective Bidders for preparation of proposals. Addenda documents will be issued only to prospective Bidders registered in VendorLink.

This solicitation does not commit OUC to pay any costs incurred in the preparation and submission of the Proposal or to pay any other costs incurred prior to award.

3.9 EXCEPTIONS

OUC is seeking proposals that meet all technical and commercial requirements as outlined in this solicitation. If a Bidder takes exception to any solicitation requirement or condition, the exception must be specifically stated on the Exception Form provided within the solicitation document. OUC shall consider only those exceptions written on the form at the time the Proposal is submitted. The Bidder acknowledges that any exception taken to the solicitation criteria (including submitting an alternate proposal) may result in OUC determining the Proposal to be nonresponsive.

3.10 CLARIFICATIONS

If a prospective Bidder has doubt as to the true meaning of any part of the solicitation, they may submit a written request for clarification through email to the Buyer of Record; verbal requests will not be accepted. The Bidder must reference the Solicitation Package page number and section heading on any clarification requests

Failure of the Bidder to request information or make inquiries will not relieve them of any responsibility to perform under the terms of any contract awarded for the work in accordance with subsequent clarifications.

OUC shall issue an addendum to all Bidders, via VendorLink, once an inquiry is clarified and/or answered. Verbal responses will not be provided and are not binding on OUC.

mailto:support@evendorlink.com http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2 http://www.myvendorlink.com/ http://www.ouc.com/docs/procurement/proc_exceptions_form.pdf?sfvrsn=2

3.11 LOCAL CONDITIONS

Each Bidder shall have thorough knowledge of conditions, factors, and scope of work, which would affect the execution and completion of the requested work. If required, site visits will be held the day of the Pre-Response Conference unless otherwise arranged.

Bidders shall investigate properly and consider all such factors in the preparation of every Proposal submitted. OUC shall not permit claims for financial adjustment based on the lack of prior information or its effect on the cost of the work.

3.12 OPENING

OUC shall open Proposals on the RFP Due Date at 2:30 p.m. EST at 100 West Anderson Street, Orlando, Florida. If required, at a public opening, OUC shall read only the Bidder name and if they have provided all the required information. OUC shall not share any other information at this time, with the exception of solicitations for construction or repairs on public works projects in which the price is submitted. Proposals not meeting the requirements may be rejected.

All questions concerning this solicitation must reference the document page number, and section heading. OUC shall answer questions and post them to VendorLink as an addenda to the solicitation.

3.13 SOLICITATION SELECTION SCHEDULE

OUC shall adhere to the stated schedule during the solicitation process, unless a change notice is issued to the Bidders via a written addendum. OUC reserves the right to postpone the date and time announced for the opening of proposals at any time.

OUC expects Proposals to address all of the information requested in the solicitation and subsequent clarifications, and to reflect the capabilities of the Bidder.

Bidders shall submit any supplemental information, and list any variations on the Exceptions form, in accordance with Section 4, Proposal Submittal Format & Checklist.

3.14 PROPOSAL ACCEPTANCE AND REJECTION

OUC reserves the right to accept the Proposal which, in its judgment, is the most responsive and responsible Proposal and to reject any and all proposals; as well as waive irregularities and formalities in any proposal that is submitted.

Without limiting the generality of the foregoing, OUC may reject any proposals which are incomplete or irregular; Proposals which omit any one or more items for which the solicitation requires, any Proposals which omit unit prices if unit prices are required, any Proposals from Bidders who have previously failed to satisfactorily complete contractual obligations.

1. The following shall cause an automatic rejection of the proposal:

a. Proposals delivered/submitted after the 2:00 p.m. due date

b. Failure to submit a Bid Bond (if required)

c. Failure to attend a mandatory Pre-Response Conference and/or any mandatory presentation (if required)

d. Failure to submit a signed Payment and Performance Bond Compliance Form when (a) a Payment and Performance Bond is required or (b) alternate payment and performance security permissible under Section 255.05, Florida Statutes is required http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2

SCM-RFP-T-01 – Request for Proposal Template v5.0– 5/22/25

2. The following items may cause a rejection of the proposal:

a. Failure to submit copies of any of the signed & notarized (where required) forms:

i. Statement on Public Entity Crimes form

ii. Dispute Disclosure

3.15 PROPOSAL EVALUATION CRITERIA

OUC shall evaluate the Proposals based on the information provided by each of the Bidders. OUC’s review may include, but may not be limited to the following categories:

1. Qualifications and Experience, including past performance for OUC

2. Responsiveness to Requirements

3. Safety and Quality Programs

4. Financial Soundness of Organization

5. Price

OUC reserves the right to negotiate with Bidders who submitted responsive and responsible Proposals in the best interest of the OUC Commission. This negotiation process may occur prior to OUC Commission approval. Each Bidder acknowledges that OUC shall evaluate all Proposals and may initiate clarification discussions or seek additional information from all or some of the Bidders to fully understand any unclear elements of their proposals. Following clarification, OUC may initiate negotiations with the Bidder considered to be the most responsive and responsible. If no agreement is reached with the highest ranked Bidder, OUC may reject all Proposals or continue negotiations with each subsequently ranked Bidder until an acceptable deal is reached. A final contract award may be contingent upon OUC Commission and legal approval.

OUC reserves the right to consider historic information and facts, whether gained from the Bidder’s Proposal, question and answer conferences, references, and/or other sources during the evaluation process. OUC may conduct such investigations to assist with the evaluation of any Proposal. The investigation also serves to establish the Bidders’, subcontractors’, and other related entities’ responsibility, qualifications, and financial ability to fulfill the Proposal requirements to the Commission’s satisfaction, within the prescribed time.

The Bidder solely is responsible to submit information related to the evaluation categories. OUC is under no obligation to solicit such information. Failure of the Bidder to submit information may cause an adverse impact on the Proposal’s evaluation.

3.16 CANCELATION

Prior to the final execution of a Contract or full Notice to Proceed, OUC reserves the right to rescind said award without prior notice to Bidders. In addition, OUC may reject all Proposals, reissue the solicitation packet, or re-award the contract.

3.17 FREIGHT (IF APPLICABLE)

The selected Bidder shall coordinate with OUC’s freight contractor for shipping unless OUC determines that the selected Bidder can obtain freight/shipping rates or methods that are more advantageous to OUC. The selected Bidder shall submit an alternate shipping proposal based on delivery to OUC’s Free On Board (FOB) carrier at the designated OUC facility or location. The alternate proposal must include the:

http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2

1. Carrier name

2. Insurance coverage

3. Firm price freight quote

The Bidder must include any alternate proposal in the bid response to this solicitation. OUC may accept or reject the proposed alternate shipping arrangement.

OUC’s freight/shipping supplier and contact information is:

Nexterus

1-888-867-5952 (Monday – Friday, 8:00 a.m. – 7:00 p.m. EST) dcs@nexterus.com

3.18 BID BOND (IF APPLICABLE)

Bidder may be required to submit a certified check or cashier’s check drawn on an acceptable bank, or an acceptable Bidder’s bond executed by the Bidder and a surety company authorized to do business in the State of Florida. The value of the bid bond shall be five percent (5%) of the proposal price schedule. When submitting a Proposal through VendorLink, the Bidder shall provide a copy of the check and express mail the original check to the delivery location provided on the first page of the Solicitation Packet Form.

The bid bond guarantee shall be made payable without condition to OUC. The amount of the check or bond may be retained by and forfeited to OUC as liquidated damages if the Proposal results in a contract award and the Bidder fails to honor the accepted terms.

OUC shall return the selected Bidder’s bid bond when that Bidder executes the contract and files a satisfactory payment and/or performance bond, if required. OUC may retain the bid bond of the second highest ranked Bidder for a period not to exceed thirty (30) days, pending the execution of the contract by the selected Bidder. OUC shall return the bid bond of each unsuccessful Bidder upon request, after the contract is awarded or when the Proposal is rejected.

3.19 PAYMENT AND PERFORMANCE BOND (IF APPLICABLE)

The selected Bidder may be required to furnish a Payment and Performance Bond to OUC per Florida Statutes; Section 255.05 equal to 100 percent of the contract price. The cost of such bonds shall be stated as a separate line item in the Proposal.

A surety company, authorized to do business in the State of Florida and acceptable to OUC, shall sign the bond. The Performance Bond and Payment Bond shall be dated with the actual execution date. With these bonds, the responsible party shall file certified copies of the power of attorney of such attorney-in-fact signing the bond on behalf of the surety, and such certificates shall be certified to show that such power of attorney was in effect to and including the date of the actual execution of the bonds. Any bonds submitted by a surety or its agent shall be conclusively presumed to have been authorized by and binding upon the surety company irrespective of the date shown on the power of attorney.

If bonds are required, they shall remain in full force and effect until satisfactory completion of any specified performance guarantee tests, or satisfactory completion of all other contractual requirements, whichever shall occur last. Upon recording of the performance and payment bond (if applicable) Bidder shall provide OUC three (3) copies.

OUC shall furnish a copy of the selected Bidder’s bond to any lienor demanding that bond under the provisions of Florida Statute 713.23.

3.20 CONTRACT EXECUTION

The selected Bidder shall execute the necessary contractual forms, and return the executed forms within ten (10) business days of receipt of forms for execution.

3.21 AWARD

OUC reserves the right to award a single or multiple contracts for all proposal items, or to award separate contracts for single proposal items or any combination of such items; or to make no contract award.

OUC shall be the sole judge of its own best interests, the proposals, and the resulting contract. An award may be made to the most responsive and responsible organization whose proposal is determined to be the most advantageous to OUC. The Commission’s decision shall be final and OUC’s rights include the ability to:

1. Reject any or all proposals or parts thereof

2. Issue subsequent solicitations

3. Cancel the entire solicitation

4. Remedy technical errors on the solicitation

5. Negotiate with any, all or none of the Bidders

6. Award a contract to one or more Bidders or none at all

7. Accept other than the lowest price

8. Waive informalities and irregularities in proposals

3.22 TAXES, PERMITS, AND LICENSES

The Bidder's attention is directed to the General Terms and Conditions and the Florida Statutes regarding taxes, permits, and licenses. It shall be the Bidder's responsibility to determine the applicable taxes, permits, and licenses. If the Bidder has doubt as to whether or not a tax, permit, or license is applicable, they shall state in their proposal whether this item has been included in their proposal price and the amount of the applicable tax, permit, or license in question.

3.23 ERROR AND OMISSIONS

Bidders or their authorized representatives are expected to be fully informed as to the conditions, requirements and specifications before submitting proposals; failure to do so will be at the Bidder’s own risk. Neither law nor regulations make allowance for errors either of omission or commission on the part of Bidders. In case of error of extension of prices in the proposal, the unit price shall govern.

3.24 PROPOSAL SUBMITTAL FORMAT

Bidders shall complete all required forms, and include them in the proposal submittal package with any other required information. Refer to Section 4, Proposal Submittal Format & Checklist for more information.

3.24.1 OUC Policies and Procedures for Bidders

The Bidder shall read and comply with OUC’s policies and procedures before submitting this Proposal:

1. Contractor Security Policy

2. Bid Protest Guidance

3. Generic Contractor Orientation

4. Drug and Alcohol-Free Workplace and Testing Policy

5. OUC Travel and Expense Guidelines

6. All policies – OUC Procurement Services Department website

These policies and any supplemental policies provided at contractor orientation are hereby fully incorporated into this contract by reference and to the extent applicable to the supplier in the performance of their work. Supplier and its subcontractors, suppliers, agents, and employees shall fully comply with all such policies as amended from time to time.

3.25 SIGNATURES

By submitting this proposal with the authorized electronic signature, the Bidder hereby declares that, in all respects for and in good faith, without collusion or fraud:

1. Only the individuals or organizations interested in this proposal/bid response as principal or principals are named in this Proposal.

2. No other individuals or organizations than mentioned in this Proposal have any interest in this Proposal/Bid Response or in the subsequent contract.

3. This Proposal/Bid Response is made without connection with any other person, company, or parties likewise submitting a Proposal/Bid Response.

Bidders shall prepare Proposals in accordance with the Instructions to Bidder’s document. Failure to submit the necessary forms may cause a rejection of the proposal. The Bidder hereby agrees to provide the services and/or items specified in the solicitation packet at the prices quoted pursuant to the requirements of this document.

https://www.ouc.com/wp-content/uploads/2024/12/Procurement_procure_contractor_sec_pol.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_bid_protest.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_procure_contractor_orientation_stanton.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_proc_alc_cont_subs_testing_pol.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_supplier_business_expense_guidelines.pdf https://www.ouc.com/doing-business-with-ouc/

SCM-RFP-T-01 – Request for Proposal Template v4.2– 10/21/19

4 PROPOSAL SUBMITTAL FORMAT & CHECKLIST

A checkmark (✓) on the items below indicates these are applicable items and the terms and conditions stated in earlier sections are applicable. Bidders shall complete all the forms checked (✓) below, and include them in the proposal submittal package in order with any other information.

Provide a written signature on all original forms and, when required, a notary stamp. Scan & upload these forms with the Proposal.

Technical Response File (checked if applicable)

Tab 1 – Cover Page

Proposal Cover Page on Bidders Letterhead

Bidder Information as listed in Section 2.2.1

Tab 2 – Bidder Background and Qualifications

References and Qualifications as listed in Section 2.2

Tab 3 – Response to Requirements

Response to all Requirements as listed in Section 2 and any applicable Attachments

Tab 4 – Compliance Forms (Refer to Attachment G)

Submit at time of proposal

Exceptions

Sworn Statement on Public Entity Crimes and Scrutinized Companies Under Florida Statutes, Section 287.133 (3) (a) and 287.135

Dispute Disclosure

Addenda (If Applicable)

Provided at time of award

Copy of Company’s Business License

Copy of Insurance Certificate

W-9 Form http://www.ouc.com/docs/procurement/proc_exceptions_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_addenda_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_w9_form.pdf?sfvrsn=2

SCM-RFP-T-01 – Request for Proposal Template v5.0 - 5/22/25

5 ATTACHMENTS

Attachment A: Detailed Scope of Work & Requirements

Attachment B: Price Schedule

Attachment C: Invitation to Pre-Response Conference

Attachment D: Drawings

Attachment E: Supplier Information Form

Attachment F: Terms and Conditions

Attachment G: Compliance Forms

SCM-RFP-T-01 – Request for Proposal Template v5.0 - 5/22/25

DETAILED SCOPE OF WORK & REQUIREMENTS

Orlando Utilities Commission Reliable Plaza Glazing Project Job No.

SECTION 01

SCOPE OF WORK

PART 1 Project Overview:

1.1 This scope covers the labor, materials, equipment, and services required to perform wet glazing of the exterior curtain wall and window systems on the ten story OUC office building located at 100 West Anderson Street, Orlando Fl.

32801. The intent is to improve air and water infiltration performance by installing a continuous, properly bonded sealant system at all glazing joints.

PART 2 Work Included

2.1 The contractor shall provide all necessary means to complete the following:

2.1.1 Pre‑Construction Activities

2.1.1.1 Conduct a site walk with the Owner to verify existing conditions.

2.1.1.2 Review drawings, specifications, and any available façade reports.

2.1.1.3 Consult with an authorized manufacturer representative on sealant recommendations for different applications specifically for the project building

2.1.1.4 Submit product data sheets, sealant compatibility documentation, and installation procedures for approval.

2.1.1.5 Provide a detailed work plan including access methods, sequencing, and safety measures.

2.1.1.6 Perform adhesion and compatibility testing as required by the sealant manufacturer.

2.1.2 Surface Preparation

2.1.2.1 Clean all glazing pockets, frame surfaces, and substrates to remove dirt, debris, failed sealant, coatings, or contaminants.

2.1.2.2 Remove loose, deteriorated, or incompatible sealants without damaging the existing system.

2.1.2.3 Prime substrates required by the sealant manufacturer.

2.1.2.4 Ensure all surfaces are dry, structurally sound, and ready to receive new sealant.

2.1.3 Wet Glazing Installation

2.1.3.1 Install approved backer rod or bond‑breaker tape where required to achieve proper joint geometry use a product recommended by the sealant manufacturer.

2.1.3.2 Apply sealant continuously around the perimeter of each lite of glass or designated glazing joint.

2.1.3.3 Tool sealant to ensure full contact, proper adhesion, and a uniform finish.

2.1.3.4 Maintain manufacturers recommended sealant thickness, width, and cure conditions.

2.1.3.5 Ensure transitions, corners, and terminations are fully sealed and watertight.

2.1.4 Quality Control

2.1.4.1 Provide inspection of installed sealant for continuity, adhesion, and finish.

2.1.4.2 Repair or replace any sealant that is improperly installed, contaminated, or damaged.

2.1.4.3 Submit photographic documentation of completed areas.

2.1.4.4 OUC shall engage a third party for testing and Supplier shall Coordinate third‑party testing (e.g., water testing, adhesion pull tests).

2.1.5 2.5 Cleanup and Protection

2.1.5.1 Remove all debris, masking, and excess sealant from the work area.

2.1.5.2 Protect adjacent surfaces from damage during installation.

2.1.5.3 Leave all glazing and frames clean and free of residue.

2.1.5.4 Restore any areas disturbed by access equipment.

2.1.5.5 Remove access equipment.

PART 3 Work Excluded

3.1 Unless specifically noted otherwise, the following are excluded:

3.1.1 Replacement of glass, gaskets, pressure plates, or curtain wall components.

3.1.2 Structural repairs to frames, anchors, or mullions.

3.1.3 Interior sealant work unless identified in the bid documents.

3.1.4 Access equipment provided by Supplier.

PART 4 Materials

4.1 Sealant: DOWSIL high‑performance silicone sealant suitable for structural and weather-seal applications.

4.2 The Supplier shall provide submittals for each product used and the application for this project.

4.3 The product utilized shall have a 20-year Manufacturer warranty

4.4 Backer rod: Closed‑cell, non‑gassing polyethylene foam.

4.5 Primers: As required by sealant manufacturer.

4.6 Cleaning agents: Non‑residue, manufacturer‑approved cleaners.

4.7 All materials must be new, compatible with existing substrates, and installed per manufacturers’ recommendations.

PART 5 Access & Logistics

5.1 Contractor is responsible for providing swing stages, bosun chairs, manlifts, or other approved access methods.

5.2 All access equipment must comply with OSHA and local regulations.

5.3 Work sequencing must minimize disruption to building occupants.

5.4 The Supplier shall coordinate staging, loading zones, and after‑hours work as required, which will require forecasting, 2 weeks in advance so that OUC can notify occupants within the building.

PART 6 Safety Requirements

6.1 Comply with OSHA 1926 Subpart L (Scaffolding), Subpart M (Fall Protection), and all applicable regulations.

6.2 Provide site‑specific safety plan and fall‑protection plan upon bid submittal.

6.3 Ensure all workers are trained and certified for high‑rise access equipment.

6.4 Maintain secure work zones to protect pedestrians and building occupants.

PART 7 Warranty

7.1 Provide a minimum 10‑year workmanship warranty on sealant installation.

7.2 Provide manufacturer’s warranty for sealant materials.

7.3 Warranty shall cover adhesion failure, cracking, splitting, or loss of watertightness due to installation defects.

PART 8 Submittals Required

8.1 Product data sheets and safety data sheets.

8.2 Sealant compatibility and adhesion test results.

8.3 Work plan and access plan.

8.4 Weekly progress reports.

8.5 Weekly updated Schedule.

8.6 Final closeout package including warranty documents and photo documentation. SECTION 02

END OF SECTION

RESPONSIBILITIES

PART 2 - GENERAL

2.1. “OUC” Responsibilities:

2.1.1. Provide laydown area for materials and equipment on site.

2.2. “Supplier” Responsibilities:

2.2.1. All employees will be required to check in with security, provide a government issued ID to gain access to the property.

2.2.2. Long pants, sleeved shirts, steel toe boots, hard hat and safety glasses shall be always worn while on property.

2.2.3. All permitting required to complete the project.

2.2.4. All change orders must be approved prior to any work being completed or materials being ordered.

1.2.4.1. Contractor shall verify all quantities during the site visit.

1.2.4.2. No additional compensation will be provided for conditions reasonably foreseeable during the pre‑bid walkthrough.

2.2.5. All work performed by the “Supplier” shall meet all current Local, State and Florida Building Codes.

2.2.6. Supplier shall be responsible for any facilities damage caused due to work being performed on the project.

2.2.7. Work shall be performed during normal business hours (M – F 7:00 am – 3:30 pm), Work outside of this period shall be reflected in the schedule and approved by the OUC Representative.

2.2.8. Provide roof protection from damage.

2.2.9. Clean and remove all debris from job site upon completion of project.

END OF SECTION

PRICE SCHEDULE

[Reference the completed Price Schedule (MS Excel file) here and upload to VendorLink. In the Excel worksheet, provide options for the Supplier to provide payment discounts, such as: 1% 20, net 30; 3% 10, net 30; non offered; or, other.]

Item Qty (hrs) Rate Total Prep (cleaning, removal, masking) $0.00 Wet glazing application $0.00 Detail work / cap beads $0.00 QA / punch $0.00 Foreman / supervision $0.00 Mobilization / demobilization $0.00 Labor Subtotal $0.00

Item Qty Unit Cost Total

Sealant (type/color) $0.00 Primer $0.00 Backer rod $0.00 Setting blocks / shims $0.00 Cleaning agents / solvents $0.00 Masking materials $0.00 Consumables (blades, rags, nozzles) $0.00 Materials Subtotal $0.00

Item Qty

(days/wee ks)

Rate Total

Swing stages $0.00 Bosun chairs $0.00 Manlifts / boom lifts $0.00 Rigging / hoisting $0.00 Safety equipment $0.00 Delivery / pickup $0.00 Equipment Subtotal $0.00

Item Qty Rate Total

RELIABLE PLAZA GLAZING

Labor

Materials

Equipment

Access & Logistics

Building access coordination $0.00 Staging / hoisting $0.00 Off hours premiums $0.00 Weather contingency (allowance) $0.00 Access & Logistics Subtotal $0.00

Item Qty Rate Total Adhesion tests $0.00 Water testing (AAMA 501.2) $0.00 Manufacturer inspections $0.00 Documentation / submittals $0.00 Testing Subtotal $0.00

Item % or Qty Rate Total Project management $0.00 Insurance/Bonds $0.00 Admin / reporting $0.00 Permits $0.00 Overhead Subtotal $0.00

Category Amount Labor Subtotal $0.00 Materials Subtotal $0.00 Equipment Subtotal $0.00 Access & Logistics Subtotal $0.00 Testing Subtotal $0.00 Overhead Subtotal $0.00 Grand Total $0.00

Grand Total

Testing & QA

Overhead & General Conditions

INVITATION TO PRE-RESPONSE CONFERENCE

Attendance is MANDATORY to submit a proposal

Time: 10:00 AM Eastern Standard Time (EST)

Orlando Utilities Commission (OUC) 100 W. Anderson Street, Orlando, FL 32801

Date: April 20, 2026

Location:

Attendance is: Mandatory Not Mandatory ☐

RSVP: Please RSVP via email to the Buyer of Record at least 48 hours in advance of the meeting, and bring the RFP containing the specifications and government issued photo identification when you attend. Also, please email any questions two days prior to the meeting.

Questions/Directions:

Objective: Agenda:

Special Instructions:

If you have any questions about the Pre-Response Conference, or if you need driving directions, please contact:

cluttfring@ouc.com

To allow the supplier access to the rooftop and curtain walls so they can see how the swing/stage rigging will have to be completed.

The meeting will last approx. 1 hour. The topics to be covered will be OUC policies for safety, staging, schedules for working, and supplier requirements.

All suppliers will meet in the first floor lobby at the security desk, a government issued photo ID is required. The Buyer and OUC Project Manager will meet all suppliers. THIS IS A MANDATORY MEETING to submit a proposal. No Exceptions.

mailto:cluttfring@ouc.com

DRAWINGS

westr192 Line westr192 Line westr192 Line westr192 Line westr192 Line westr192 Rectangle westr192 Rectangle

SUPPLIER INFORMATION FORM

Responses 1 Supplier Name

2 Name of Parent Company (if applicable)

3 Complete Business Address

4 State of Incorporation

5 Contact Name Contact Phone Number

Contact Email Address

6 Dun & Bradstreet number

7 Supplier shall supply copies current state and local licences required to complete the project Must be included in proposal

Supplier must be in business with the same scope for more than 7 years. How many years has your firm been in business prividing the same scope?

9A Supplier shall provide references of at least 3 projects of the same scope and size. 9A

9B 9B

9C 9C

10 Supplier shall provide a project specific safety plan for this project for swing stage and lifts Must be included in proposal

11 Supplier shall be present at a mandatory pre-bid meeting in order for a proposal to be accepted. notify buyer, cluttfring@ouc.com to confirm attendance

BIDDERS INFORMATION

Instructions: Each Prospective Bidder shall provide the following informaton with the submitted proposal

BIDDER QUALIFICATIONS

TERMS AND CONDITIONS

(ALL FORMS MUST BE PROPERLY FILLED OUT/SIGNED AND RETURNED WITH PROPOSAL)

TABLE OF CONTENTS

GENERAL CONDITIONS FOR SERVICES

LEGAL REVISION – 5-12-23

GC 1.0 ENTIRE CONTRACT

GC 2.0 SCOPE

GC 3.0 INSPECTION, ACCEPTANCE OR REJECTION OF SERVICES

GC 4.0 TITLE TO MATERIALS

GC 5.0 SITE ACCESS CONDITIONS

GC 6.0 DRUG-FREE WORKPLACE

GC 7.0 PROTECTION OF PROPERTY AND PUBLIC LIABILITY

GC 8.0 INSURANCE

GC 9.0 WARRANTY

GC 10.0 PAYMENT OF INVOICES

GC 11.0 INDEMNIFICATION

GC 12.0 TERMINATION FOR DEFAULT

GC 13.0 TERMINATION FOR OUC’S CONVENIENCE

GC 14.0 LAWS AND REGULATIONS

GC 15.0 COMPLIANCE WITH CRITICAL INFRASTRUCTURE COMPLIANCE

GC 16.0 TAXES AND PERMITS

GC 17.0 INDEPENDENT CONTRACTOR

GC 18.0 HAZARDOUS MATERIALS

GC 19.0 REGULATORY COMPLIANCE

GC 20.0 PROJECTS REQUIRING NOTIFICATION OF ENVIRONMENTAL DEPARTMENT

GC 21.0 WAIVERS

GC 22.0 NO-THIRD PARTY BENEFICIARIES

TABLE OF CONTENTS

Continued

GC 23.0 SEVERABILITY

GC 24.0 ASSIGNMENT AND SUBLETTING OF CONTRACT

GC 25.0 FINAL PAYMENT/WAIVER

GC 26.0 CLAIMS FOR LABOR

GC 27.0 BINDING EFFECT

GC 28.0 TIME IS OF THE ESSENCE

GC 29.0 RIGHT TO INSPECT/AUDIT DOCUMENTS

GC 30.0 GOVERNING LAW

GC 31.0 FORCE MAJEURE

GC 32.0 DISPUTE PROCESS

GC 33.0 OUC’S EQUIPMENT

GC 34.0 CONDITIONS FOR EMERGENCY/HURRICANE OR DISASTER

GC 35.0 INFRINGEMENT OF PATENTS, COPYRIGHTS AND TRADE SECRETS

GC 36.0 PUBLIC R E C O R D S NOTICE

GC 37.0 E-VERIFY REQUIREMENTS

GC 1.0 ENTIRE CONTRACT.

These General Terms and Conditions and the Contract for which they are being provided (including attachments thereto) (the “Contract”) constitute the entire Contract between the Orlando Utilities Commission (“OUC”) and the Party providing Services under the Contract (the “Supplier”).

GC 2.0 SCOPE.

Supplier shall provide those services and related materials set forth in the specifications attached to this Contract or those in the bid package, if applicable bid package, if any, (the “Services”) on or before the agreed dates (if applicable) scheduled for the performance of the Services.

GC 3.0 INSPECTION, ACCEPTANCE OR REJECTION OF SERVICES.

All Services shall be subject to OUC’s final acceptance at the time of completion.

OUC may accept or reject Services within a reasonable time after receipt by OUC.

The making or failure to make any inspection of, or payment for or acceptance of the Services shall in no way impair OUC’s right to reject or revoke its acceptance of nonconforming Services, or to avail itself of any other remedies to which OUC may be entitled, notwithstanding OUC’s knowledge of the nonconformity, its substantiality or ease of discovery.

GC 4.0 TITLE TO MATERIALS.

Title, free of any and all liens and encumbrances, and risk of loss or damage to materials provided by Supplier as part of the Services shall pass to OUC upon installation at the OUC designated facility at which the Services are to be performed (the “Facility”).

GC 5.0 SITE ACCESS CONDITIONS.

OUC shall provide Supplier access to the Facility as necessary to perform the Services. Access shall be subject to Supplier’s obligation to comply with the following conditions:

5.1 Supplier shall confine its activities to only those portions of the Facility necessary for performance of the Services.

5.2 Supplier shall take all safety measures reasonably necessary to protect OUC, its permitees and licensees and the property of each, from injury or damage caused by or resulting from the performance of Services. Supplier shall follow any and all safety and security procedures established by OUC for the Facility.

In the event of a security emergency, OUC may deny Supplier access to a Facility or request that Supplier leave the Facility.

5.3 Supplier’s performance of Services shall not interfere with the use, occupancy or enjoyment of the Facility by OUC.

5.4 No work or activity performed as part of the Services shall cause OUC to be in violation of any requirement of law nor shall Supplier or any agent, employee or representative violate any federal, state or local laws while performing Services.

GC 6.0 DRUG FREE WORKPLACE.

The Supplier’s and subcontractor’s personnel who perform the work in connection with this Contract shall conform to the Orlando Utilities Commission (OUC) Alcohol and Controlled Substance Abuse Policy. This policy may be found on the Orlando Utilities Commission’s website, www.ouc.com under “Supplier Information”.

GC 7.0 PROTECTION OF PROPERTY AND PUBLIC LIABILITY.

The Supplier shall be accountable for any damages resulting from his operations. He shall be fully responsible for the protection of all persons including members of the public, employees of OUC, and employees of other Suppliers or Subcontractors, and all public and private property including structures, sewers, and utilities, above and below ground.

GC 8.0 INSURANCE.

Except as otherwise specified in this Contract, the Supplier and his subcontractors of any tier will be required at their own expense to maintain in effect at all times during the performance of the work insurance coverages with limits not less than those set forth below with insurers and under forms of policies satisfactory to OUC. It shall be the responsibility of the Supplier to maintain adequate insurance coverage and to assure that subcontractors are adequately insured at all times. Failure of the Supplier to maintain adequate coverage shall not relieve him of any contractual responsibility or obligation.

The requirements specified herein as to types, limits, and OUC's approval of insurance coverage to be maintained by the Supplier and his subcontractors are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by the Supplier and his subcontractors under this Contract.

Any insurance carried by OUC that may be applicable shall be deemed to be excess insurance and the Supplier's insurance primary for all purposes despite any conflicting provision in the Supplier's policies to the contrary.

8.1 Certificates of Insurance.

At the time of execution of this Contract and each subcontract, but in any event prior to commencing work at the jobsite, and as a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .