This is a pricing sheet for wet glazing services at Reliable Plaza, a project involving the State of Florida and the City of Orlando. The project requires the performance of wet glazing on the exterior curtain wall and window systems of a ten-story OUC office building located at 100 West Anderson Street, Orlando, Florida 32801. The scope of work is designed to improve air and water infiltration performance by installing a continuous, properly bonded sealant system at all glazing joints.

The pricing sheet is structured as a detailed cost estimate template organized into six primary cost categories: Labor, Materials, Equipment, Access & Logistics, Testing & Quality Assurance, and Overhead & General Conditions. Labor costs include prep work, wet glazing application, detail work, quality assurance, foreman supervision, and mobilization/demobilization. Materials encompass sealants, primers, backer rods, setting blocks, cleaning agents, masking materials, and consumables. Equipment costs cover swing stages, bosun chairs, manlifts, rigging, safety equipment, and delivery services. Access & Logistics includes building coordination, staging, offhours premiums, and weather contingency allowances. Testing & QA covers adhesion tests, water testing per AAMA 501.2 standards, manufacturer inspections, and documentation. All line items currently show $0.00 values, indicating this is a blank template awaiting completion with actual pricing data from the contractor.

View the file

Other files

File Type Posted
Compliance_forms.pdf PDF
RFP_9132_Reliable_Plaza_Glazing.pdf PDF
Procurement_procure_general_services_3.pdf PDF
Supplier_Information_Qualifications.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RELIABLE PLAZA GLAZING
Labor
ItemQty (hrs)RateTotal
Prep (cleaning, removal, masking)$0.00
Wet glazing application$0.00
Detail work / cap beads$0.00
QA / punch$0.00
Foreman / supervision$0.00
Mobilization / demobilization$0.00
Labor Subtotal$0.00
Materials
ItemQtyUnit CostTotal
Sealant (type/color)$0.00
Primer$0.00
Backer rod$0.00
Setting blocks / shims$0.00
Cleaning agents / solvents$0.00
Masking materials$0.00
Consumables (blades, rags, nozzles)$0.00
Materials Subtotal$0.00
Equipment
ItemQty (days/weeks)RateTotal
Swing stages$0.00
Bosun chairs$0.00
Manlifts / boom lifts$0.00
Rigging / hoisting$0.00
Safety equipment$0.00
Delivery / pickup$0.00
Equipment Subtotal$0.00
Access & Logistics
ItemQtyRateTotal
Building access coordination$0.00
Staging / hoisting$0.00
Off‑hours premiums$0.00
Weather contingency (allowance)$0.00
Access & Logistics Subtotal$0.00
Testing & QA
ItemQtyRateTotal
Adhesion tests$0.00
Water testing (AAMA 501.2)$0.00
Manufacturer inspections$0.00
Documentation / submittals$0.00
Testing Subtotal$0.00
Overhead & General Conditions
Item% or QtyRateTotal
Project management$0.00
Insurance/Bonds$0.00
Admin / reporting$0.00
Permits$0.00
Overhead Subtotal$0.00
Grand Total
CategoryAmount
Labor Subtotal$0.00
Materials Subtotal$0.00
Equipment Subtotal$0.00
Access & Logistics Subtotal$0.00
Testing Subtotal$0.00
Overhead Subtotal$0.00
Grand Total$0.00