RFP 6314 AttD PRICE PROPOSAL FORM Revised by Addendum 1 final.docx
DOCX document 36 KB Posted
- Solicitation number
- S-44300-00018189
- Issued by
- Multnomah County, Oregon
About this file
This is a Price Proposal Form (Attachment D) for RFP 6314, issued by the Oregon Health Authority, Public Health Division, for panel survey services supporting the Oregon Behavioral Risk Factor Surveillance System State Supplemental Panel Survey. The solicitation, posted through OregonBuys (Bid # S-44300-00018189), requires proposers to conduct probability and non-probability panel surveys across two waves in Spring 2027 and Fall 2027, with an anticipated 1,000 respondents per wave per panel type. Work includes recruiting and managing panels, programming and testing questionnaires provided by the Oregon Health Authority, administering online surveys over a minimum two-week window per wave, sending reminders, and providing respondent incentives such as gift cards or charitable donations based on a 15-minute survey length. Deliverables include preliminary datasets within two weeks of Wave 1 completion, final weighted datasets within 30 days of Wave 2 completion, and a methods report. The contract term runs January 1, 2027 through December 31, 2028, with options to extend to a cumulative maximum of five years.
The Price Proposal Form requires proposers to submit detailed costs organized by task: Kick-off Meeting, Task 1 (Survey Panels), Task 2 (Program and Test Questionnaire), and Task 3 (Survey Administration for Waves 1 and 2). For each task, proposers must provide the name and title of key personnel, estimated hours, fully loaded hourly rates (with salary and fringe listed separately), and cost amounts for both English and Spanish language surveys. Proposers must also provide price and recommended incentives per completed interview for both probability and non-probability panels. The solicitation carries no set-aside. Oregon's Pay Equity Certificate applies if the proposer employs 50 or more full-time workers and the contract exceeds $500,000. Contracts anticipated at $150,000 or more require a sexual harassment prevention policy. At least one key person must have a minimum of five years of direct probability and non-probability panel experience, and the proposer must currently employ or subcontract programmers, recruiters, supervisors, monitors, a data manager, and a project manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 6314 AttC PROPOSER INFORMATION AND CERTIFICATION SHEET.docx | DOCX document | |
| RFP 6314 AttE CERTIFIED DISADVANTAGED BUSINESS OUTREACH PLAN.docx | DOCX document | |
| RFP 6314 AttB DISCLOSURE EXEMPTION AFFIDAVIT.docx | DOCX document | |
| RFP 6314 AttA SAMPLE CONTRACT.pdf | ||
| RFP 6314 FINAL.pdf | ||
| Questions and Answers Set 1 for RFP 6314 final.pdf | ||
| Addendum 1 to RFP 6314 final.pdf | ||
| RFP 6314 AttF RESPONSIBILITY INQUIRY.docx | DOCX document | |
| RFP 6314 AttD PRICE PROPOSAL FORM.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 6314: Panel Survey Services for the Oregon BRFSS State Supplemental Panel Survey AttD (OregonBuys Bid # S-44300-00018189)
ATTACHMENT D – PRICE PRopOSAL Instructions to Proposers from Section 3.3.4 Price Proposal Requirements:
Submit a detailed Price Proposal (Attachment D) electronically through OregonBuys for the 2-year period of approximately January 1, 2027 through December 31, 2028 that includes the following:
· For each of the Tasks described in Section 2.4 Scope of Work, the Price Proposal must include identifiable costs, time estimates and Fully Loaded Hourly Rates for each Key Person for completing each task and any related deliverables required by Section 2.4.2, and Total Proposed Cost for the required services and any required deliverables.
· For all fully loaded personnel costs, the Price Proposal must include the name and title of all positions for each individual Key Person who will perform the Work and list the Fully Loaded Hourly Rate for each such individual.
· The Cost of completing Tasks 1, 2 and 3 for a Spanish language survey using a translation provided by OHA must be included in the Price Proposal on the applicable line items in Attachment D – Price Proposal revised bv Addendum 1, but costs of such other (non-Spanish) language surveys should not be included in the Price Proposal.
· Price and recommended incentives for each completed interview for the Probability panels and Non-probability panels, assuming a survey length of 15 minutes.
· Proposer’s Total Price for all Work described in Section 2.4.
Proposer Name:
Proposed Costs for the initial Contract term of January 1, 2027 – December 31, 2028
Kick-off meeting Instructions: In the table below, list Name and Title of each Key Person who will perform the above Services for an English language survey, Estimated Hours and Fully Loaded Hourly Rate from the Key Persons Table below:
| Key Person Name and Title |
| Estimated Hours |
| Fully Loaded Hourly Rate |
| Cost |
Total Proposed Costs for the KICK-OFF MEETING (Sum of Above Costs):
Task 1 Survey Panels
Instructions: In the table below, list Name and Title of each Key Person who will perform the above Services for an English language survey, Estimated Hours, Fully Loaded Hourly Rate from the Key Person Table below, Cost Amounts; Total Costs for (A) English language survey and (B) Spanish language survey; and the Total Proposed Costs for Task 1 Survey Panels.
| Key Person Name and Title |
| Estimated Hours |
| Fully Loaded Hourly Rate |
| Cost Amount |
| (A) Total Key Person Costs for Completing Task 1 for an English language survey (the sum of above costs): |
| $ |
| (B) Total Additional Costs for completing Task 1 for a Spanish language survey, as described in Section 2.4.1.1 as amended by Addendum 1: |
| $ |
Total Proposed Costs for Task 1 SURVEY PANELS (Sum of (A) + (B) above):
Task 2 Program and Test questionnaire
Instructions: In the table below, list Name and Title of each Key Person who will perform the above Services for an English language survey, Estimated Hours, Fully Loaded Hourly Rate from the Key Person Table below, Cost Amounts; Total Costs for (A) English language survey and
(B) Spanish language survey; and the Total Proposed Costs for Task 2 Program and Test Questionnaire.
| Key Person Name and Title |
| Estimated Hours |
| Fully Loaded Hourly Rate |
| Cost Amount |
| (A) Total Key Person Costs for Completing Task 2 for an English language survey: |
| $ |
| (B) Total Additional Costs for Programming and testing Spanish language survey using a translation provided by OHA: |
| $ |
| TOTAL PROPOSED COSTS FOR TASK 2 Program and Test questionnaire (Sum of (A) + (B) above): |
| $ |
Task 3 Survey administration for Waves 1 and 2 and all REQUIRED deliverables in Section 2.4.2
Instructions: In the table below, list Name and Title of each Key Person who will perform the above Services for an English language survey, Estimated Hours, Fully Loaded Hourly Rate from the Key Person Table below, Cost Amounts; Total Costs for Items (A) through (I) below; and the Total Proposed Costs for Task 3 and All Required Deliverables in Section 2.4.2.
| Key Person Name and Title |
| Estimated Hours |
| Fully Loaded Hourly Rate |
| Cost Amount |
| (A) Total Key Person Costs for Completing Task 3 for an English language survey: |
| $ |
| (B) Total Panel Sample Costs for English language surveys: |
| $ |
| (C) Total Respondent Incentive Costs for English language survey: |
| $ |
| (D) Total Cost of providing a preliminary dataset after Wave 1, and Wave 2 (including both Wave 1 and Wave 2) for English language surveys. |
| $ |
| (E) Total Cost of providing Methods Report for English language surveys. |
| $ |
| (F) Total Panel Sample Costs for Spanish language surveys: |
| $ |
| (G) Total Respondent Incentive Costs for Spanish language surveys: |
| $ |
| (H) Total Cost of providing a preliminary dataset after Wave 1, and Wave 2 (including both Wave 1 and Wave 2) for Spanish language surveys. |
| $ |
| (I) Total Cost of providing Methods Report for Spanish language surveys. |
| $ |
PROPOSER’S TOTAL PRICE FOR TASK 3 SURVEY ADMINISTRATION FOR WAVES 1 AND 2
AND ALL REQUIRED DELIVERABLES IN SECTION 2.4.2 (SUM OF TOTALS (A) THROUGH (I)):
Instructions: In the table below provide Proposer’s Total Price for all Work described in Section 2.4, the sum of the above Total Prices.
| PROPOSER’S TOTAL PRICE FOR ALL WORK DESCRIBED IN SECTION 2.4 |
| $ |
Instructions: complete the following table.
KEY PERSONS TABLE
| Key Person Name |
| Role / Position |
| Fully Loaded Hourly Rate |
Instructions: complete the following table.
Price and recommended incentives for each completed interview for the Probability panels and Non-probability panels, assuming a survey length of 15 minutes:
English language surveys:
Spanish language surveys:
File details come from the government source that posted it. Updated .