RFP_510573_Attachment_D_Cost_table_Terracon.xlsx

XLSX spreadsheet 72 KB Posted

Attached to
Environmental Services-Hazardous Materials and Asbestos-Investigation and Remediation Services
Contract number
395002-O24-0510573-000
Issued by
Wisconsin

About this file

This document is a cost proposal spreadsheet (RFP 510573 Attachment D) submitted by Terracon Consultants, Inc. for state and local environmental consulting services. The spreadsheet contains detailed pricing structures across multiple service categories including asbestos and bat inspections for bridge structures, environmental assessments, residential lead sampling, and program management assistance. Terracon has provided comprehensive hourly rates for 28 different staff classifications ranging from field technicians to contract managers, with rates spanning from $22.00 for Field Technician II to $81.75 for Project Supervisor II.

The contract covers diverse environmental services with specific pricing tiers based on project scale. Bridge asbestos inspections range from $750-$850 per structure depending on quantity, while combined bat and asbestos inspections cost $800-$900 per structure. Confined space inspections requiring two-person teams are priced at $1,100-$1,500 per structure. The proposal includes detailed cost breakdowns for fueling system removal, Phase 2 site assessments, construction dewatering, and pre-acquisition assessments, with total environmental assessment costs of $2,390,595. Residential lead sampling services range from $7.60-$16.03 per sample depending on type and turnaround time. The company applies a 200.86% overhead rate and 8% profit margin on labor costs, with direct expenses and subcontractor costs billed at actual cost without markup. The total market basket cost across all services amounts to $3,252,600.

View the file

Other files

File Type Posted
6_Cost_Proposal_Attachment_D_Cost_table_AECOM.xlsx XLSX spreadsheet
RFP_510573_Attachment_D_Cost_table_TRC.xlsx XLSX spreadsheet
RFP_510573_Attachment_D_Cost_table_Ramboll.xlsx XLSX spreadsheet
GEI__Attachment_D_Cost_table_510573.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Contract Cost Worksheets RFP 510573 Attachment E
INSTRUCTIONS Return as Excel Spreadsheet! Do not reformat.
Fill in only those cells highlighted in blue. Cells in green are calculated.
Tab 1 Hourly Rates and CostsCell #
1. Fill in firm nameB2
2. Fill in asbestos inspection costs per bridge structure, cellsB5, C5, D5, E5
3. Fill in combined bat and asbestos inspection cost per bridge structure, cellsB6, C6, D6, E6
4. Fill in confined space combined bat and asbestos inspection cost per bridge structure, cellsB7 C7 D7 E7
5. Fill in standalone bat inspections cost per bridge structure, cellsB8, C8, D8, E8
6. Fill in confined space standalone bat inspection cost per bridge structure, cellsB9, C9, D9, E9
7. Fill in proposed overhead rateB42
8. Fill in proposed profit percentage as a whole number, field is formatted as a percentageB45
Tab 2 Classifications in titlesCell #
1. Please fit each of your current employee classifications into one of the Twenty Eight contract Rate titlesB4 through AC13
2. Put no more than ten classifications into each rate category.
3. Leave unused cells blank
Tab 3 Average Wage Rate CalcCell #
1. Enter the direct hourly wage rate (without overhead or profit) for each classification entered in Tab 2Columns D,F,H,J,L,N,P,R,T,V, Cells 4 through 31
2. Put a zero in any unused cell in column D
3. Leave all other unused cells blank
Tab 4 Fueling System Removal
1. Enter the number of hours for each classification for each task in columns C through F GColumns C, D, E, F, G rows 4 through 31
2. Enter direct expenses in columns J K through M NColumns J K, L, M, N rows 4 through 31
3. Enter subcontract costs in columns P Q through R SColumns P, Q, R S rows 4 through 31
Tab 5 Phase 2 Site Assessment
1. Enter the tasks from the project scope document in Cells C3 through J3Columns C, D, E, F, G, H, I, J row 3
2. Enter the number of hours for each classification for each task in Columns C through JColumns C, D, E, F, G, H, I, J rows 4-31
3. Enter the direct expenses in columns N through QColumns N, O, P, Q, rows 4-31
5. Enter the subcontract costs in columns T through VColumns T, U, V rows 4-31
Tab 6 Construction Dewatering
1. Enter the tasks from the project scope document in Cells C3 through J3
2. Enter the number of hours for each classification for each task in Columns C through J
3. Enter the direct expenses in columns N through Q
5. Enter the subcontract costs in columns T through V
Tab 7 Pre-Acquisition Site Assessment
1. Enter the tasks from the project scope document in Cells C3 through J3
2. Enter the number of hours for each classification for each task in Columns C through J
3. Enter the direct expenses in columns N through Q
5. Enter the subcontract costs in columns T through V
Tab 8 Residential Lead Sampling
1. Fill in the price per sample in Column B
2.Fill in the price per expedited sample in Column C

Tab 1 Hourly Rates and Costs

Contract Cost Package 2024Fill in only those cells highlighted in blue. Cells in green are calculated.
FIRM NAME:Terracon Consultants, Inc.
Asbestos Inspections - BridgesTerms: Lump Sum
Cost per single structureTwo to four structures, cost per structureFive to nine structures, cost per structureTen or more structures, cost per structure
Asbestos inspection, per bridge structure (Terms: Lump Sum)$ 850.00$ 800.00$ 800.00$ 750.00
Combined Bat and Asbestos inspection, per bridge structure (Terms:Lump Sum)$ 900.00$ 850.00$ 850.00$ 800.00
Asbestos and Bat inspection - Confined Space or Two Person project (for traffic control, water entry or other safety considerations)# Terms: Lump Sum$ 1,500.00$ 1,450.00$ 1,450.00$ 1,400.00# The determination of need for confined space entry, or two person team for traffic control, water entry, or other safety considerations will be made by the consultant.
Bat inspection of bridges without asbestos inspection (Terms: lump sum)$ 600.00$ 550.00$ 550.00$ 500.00
Bat inspection of bridges without asbestos inspection - Confined space # (Terms: lump sum)$ 1,200.00$ 1,150.00$ 1,150.00$ 1,100.00
NOTE: Structures requrested at the same time in the same spreadsheet constitute a single request, number of structures for pricing is determined by number of structures in request, not number of project IDs. Prices for long, multiple-section structures such as the Hoan Bridge, Wisconsin River bridges, St Croix river bridges, and Mississippi River bridges, will be negotiated separately at the time of request.
Asbestos inspection, buildings, bridge tender houses, other structuresTerms: average direct hourly rate*
Asbestos abatementTerms: average direct hourly rate*
Project StaffTerms: average direct hourly rate**the average direct hourly rate for each classification shall be the rate charged for the contract
Contract Manager$58.41Average Hourly Rate
Project Supervisor I$53.10Average Hourly Rate
Project Supervisor II$81.75Average Hourly Rate
Engineer I$25.43Average Hourly Rate
Engineer II$45.10Average Hourly Rate
Engineer III$0.00Average Hourly Rate
Hydrogeologist I$33.12Average Hourly Rate
Hydrogeologist II$41.83Average Hourly Rate
Hydrogeologist III$0.00Average Hourly Rate
Scientist I$27.47Average Hourly Rate
Scientist II$31.79Average Hourly Rate
Scientist III$41.17Average Hourly Rate
Field Technician I$0.00Average Hourly Rate
Field Technician II$22.00Average Hourly Rate
Field Technician III$0.00Average Hourly Rate
CADD/GIS I$29.45Average Hourly Rate
CADD/GIS II$0.00Average Hourly Rate
Accounting I$0.00Average Hourly Rate
Accounting II$0.00Average Hourly Rate
Administrative Support I$27.83Average Hourly Rate
Administrative Support II$0.00Average Hourly Rate
Asbestos Inspector$34.93Average Hourly Rate
Exterior Abatement Worker$0.00Average Hourly Rate
Exterior Asbestos Supervisor$0.00Average Hourly Rate
Asbestos Worker$25.98Average Hourly Rate
Asbestos Supervisor$41.92Average Hourly Rate
Asbestos Project Designer$41.35Average Hourly Rate
Asbestos Management Planner$41.35Average Hourly Rate
Equipment and suppliesTerms: direct expense, no markup
Subcontractor CostsTerms: actual cost, no markup
MileageTerms: current state reimbursement rate
Per mile, personal vehicle rate$0.51/mile
MealsTerms: current state reimbursement rate
Breakfast$ 10.00
Lunch$ 12.00
Dinner$ 23.00
LodgingTerms: current state reimbursement rate, excluding taxes
Per night$98.00
Per night, Milwaukee, Racine and Kenosha counties$103.00
Asbestos inspection, buildings, bridge tender houses, other structuresTerms: average direct hourly rate*
Overhead
Proposed rate200.860%Percentage of Direct Labor
ProfitTerms: percentage of labor and overhead, no profit on subcontractors or direct expenses
Proposed Rate8%Percentage of Direct Labor + Labor Overhead, NO PROFIT ON SUBCONTRACTORS OR DIRECT EXPENSES

Tab 2 Classifications in Titles

Classifications included in average wage rate: (list each classification on a separate line, do not insert or delete rows, do not leave blank rows between classifications.)
Terracon Consultants, Inc.Please fill in the actual titles of your staff. Limit 10 titles per classification
Rate Title:Contract ManagerProject Supervisor IProject Supervisor IIEngineer IEngineer IIEngineer IIIHydrogeologist IHydrogeologist IIHydrogeologist IIIScientist IScientist IIScientist IIIField Technician IField Technician IIField Technician IIICADD/GIS ICADD/GIS IIAccounting IAccounting IIAdministrative Support IAdministrative Support IIAsbestos InspectorExterior Abatement WorkerExterior Asbestos SupervisorAsbestos WorkerAsbestos SupervisorAsbestos Project DesignerAsbestos Management Planner
Classifications included in Rate Titles:Department Manager IIGroup ManagerSenior Environmental EngineerField Environmental EngineerSenior Staff Environmental EngineereIII1Senior Staff GeologistProject GeologisthIII1Field ScientistField GeologistProject ManagerftI1Engineering Technician IftIII1Senior Cad OperatorcadII1accI1accII1Administrative ManageradmII1Group Managereaw1eas1Assistant ScientistSenior Staff ScientistGroup ManagerGroup Manager
cm2Project GeologistNational Director IeI2eII2eIII2Senior Staff GeologisthII2hIII2Field ScientistStaff ScientistGroup ManagerftI2ftII2ftIII2cadI2cadII2accI2accII2Administrative Staff IadmII2Project Managereaw2eas2Assistant ScientistSenior Scientistapd2amp2
cm3Senior GeologistSenior Environmental Engineering ConsultanteI3eII3eIII3Staff GeologisthII3hIII3Field GeologistStaff GeologistProject ManagerftI3ftII3ftIII3cadI3cadII3accI3accII3admI3admII3Staff Scientisteaw3eas3aw3as3apd3amp3
cm4Senior GeologistNational Director IeI4eII4eIII4hI4hII4hIII4sI4Group Manager (Part Time)Senior Staff ScientistftI4ftII4ftIII4cadI4cadII4accI4accII4admI4admII4Senior Staff Scientisteaw4eas4aw4as4apd4amp4
cm5Department Manager IDepartment Manager IeI5eII5eIII5hI5hII5hIII5sI5Field GeologistsIII5ftI5ftII5ftIII5cadI5cadII5accI5accII5admI5admII5Project Geologisteaw5eas5aw5as5apd5amp5
cm6Senior Environmental EngineerpsII6eI6eII6eIII6hI6hII6hIII6sI6Staff ScientistsIII6ftI6ftII6ftIII6cadI6cadII6accI6accII6admI6admII6Environmental Technician IVeaw6eas6aw6as6apd6amp6
cm7psI7psII7eI7eII7eIII7hI7hII7hIII7sI7sII7sIII7ftI7ftII7ftIII7cadI7cadII7accI7accII7admI7admII7Senior Staff Scientisteaw7eas7aw7as7apd7amp7
cm8psI8psII8eI8eII8eIII8hI8hII8hIII8sI8sII8sIII8ftI8ftII8ftIII8cadI8cadII8accI8accII8admI8admII8ai8eaw8eas8aw8as8apd8amp8
cm9psI9psII9eI9eII9eIII9hI9hII9hIII9sI9sII9sIII9ftI9ftII9ftIII9cadI9cadII9accI9accII9admI9admII9ai9eaw9eas9aw9as9apd9amp9
cm10psI10psII10eI10eII10eIII10hI10hII10hIII10sI10sII10sIII10ftI10ftII10ftIII10cadI10cadII10accI10accII10admI10admII10ai10eaw10eas10aw10as10apd10amp10
EXAMPLE:0
Rate Title: Scientist I
Classifications included in title: Staff scientist 1
Arborist
Geologist 1
Geologist 2
Senior Project Technical 1
Senior Project Technical 2

Tab 3 Average Wage Rate Calc

Terracon Consultants, Inc.Fill in only those cells highlighted in blue. Cells in green are calculated.Do not alter or change the formulas.
Enter the hourly rate for each classification shown
TitleAverage Hourly RateClassification 1Hourly rate 1Classification 2Hourly Rate 2Classification 3Hourly Rate 3Classification 4Hourly Rate 4Classification 5Hourly Rate 5Classification 6Hourly Rate 6Classification 7Hourly Rate 7Classification 8Hourly Rate 8Classification 9Hourly Rate 9Classification 10Hourly Rate 10
Contract Manager$58.41Department Manager II$ 58.41cm2cm3cm4cm5cm6cm7cm8cm9cm10
Project Supervisor I$53.10Group Manager$ 38.08Project Geologist$ 37.98Senior Geologist$ 53.61Senior Geologist$ 46.88Department Manager I$ 60.34Senior Environmental Engineer$ 81.73psI7psI8psI9psI10
Project Supervisor II$81.75Senior Environmental Engineer$ 68.03National Director I$ 87.02Senior Environmental Engineering Consultant$ 93.26National Director I$ 94.09Department Manager I$ 66.35psII6psII7psII8psII9psII10
Engineer I$25.43Field Environmental Engineer$ 25.43eI2eI3eI4eI5eI6eI7eI8eI9eI10
Engineer II$45.10Senior Staff Environmental Engineer$ 45.10eII2eII3eII4eII5eII6eII7eII8eII9eII10
Engineer III$0.00eIII1$ - 0eIII2eIII3eIII4eIII5eIII6eIII7eIII8eIII9eIII10
Hydrogeologist I$33.12Senior Staff Geologist$ 34.62Senior Staff Geologist$ 32.66Staff Geologist$ 32.07hI4hI5hI6hI7hI8hI9hI10
Hydrogeologist II$41.83Project Geologist$ 41.83hII2hII3hII4hII5hII6hII7hII8hII9hII10
Hydrogeologist III$0.00hIII1$ - 0hIII2hIII3hIII4hIII5hIII6hIII7hIII8hIII9hIII10
Scientist I$27.47Field Scientist$ 28.08Field Scientist$ 27.40Field Geologist$ 26.92sI4sI5sI6sI7sI8sI9sI10
Scientist II$31.79Field Geologist$ 26.92Staff Scientist$ 28.85Staff Geologist$ 32.07Group Manager (Part Time)$ 43.00Field Geologist$ 26.92Staff Scientist$ 33.00sII7sII8sII9sII10
Scientist III$41.17Project Manager$ 39.09Group Manager$ 40.26Project Manager$ 48.56Senior Staff Scientist$ 36.78sIII5sIII6sIII7sIII8sIII9sIII10
Field Technician I$0.00ftI1$ - 0ftI2ftI3ftI4ftI5ftI6ftI7ftI8ftI9ftI10
Field Technician II$22.00Engineering Technician I$ 22.00ftII2ftII3ftII4ftII5ftII6ftII7ftII8ftII9ftII10
Field Technician III$0.00ftIII1$ - 0ftIII2ftIII3ftIII4ftIII5ftIII6ftIII7ftIII8ftIII9ftIII10
CADD/GIS I$29.45Senior Cad Operator$ 29.45cadI2cadI3cadI4cadI5cadI6cadI7cadI8cadI9cadI10
CADD/GIS II$0.00cadII1$ - 0cadII2cadII3cadII4cadII5cadII6cadII7cadII8cadII9cadII10
Accounting I$0.00accI1$ - 0accI2accI3accI4accI5accI6accI7accI8accI9accI10
Accounting II$0.00accII1$ - 0accII2accII3accII4accII5accII6accII7accII8accII9accII10
Administrative Support I$27.83Administrative Manager$ 33.65Administrative Staff I$ 22.00admI3admI4admI5admI6admI7admI8admI9admI10
Administrative Support II$0.00admII1$ - 0admII2admII3admII4admII5admII6admII7admII8admII9admII10
Asbestos Inspector$34.93Group Manager$ 38.08Project Manager$ 39.09Staff Scientist$ 28.85Senior Staff Scientist$ 31.68Project Geologist$ 41.83Environmental Technician IV$ 28.23Senior Staff Scientist$ 36.78ai8ai9ai10
Exterior Abatement Worker$0.00eaw1$ - 0eaw2eaw3eaw4eaw5eaw6eaw7eaw8eaw9eaw10
Exterior Asbestos Supervisor$0.00eas1$ - 0eas2eas3eas4eas5eas6eas7eas8eas9eas10
Asbestos Worker$25.98Assistant Scientist$ 26.25Assistant Scientist$ 25.70aw3aw4aw5aw6aw7aw8aw9aw10
Asbestos Supervisor$41.92Senior Staff Scientist$ 35.58Senior Scientist$ 48.26as3as4as5as6as7as8as9as10
Asbestos Project Designer$41.35Group Manager$ 41.35apd2apd3apd4apd5apd6apd7apd8apd9apd10
Asbestos Management Planner$41.35Group Manager$ 41.35amp2amp3amp4amp5amp6amp7amp8amp9amp10
Example:Average Hourly RateClassification 1Hourly rate 1Classification 2Hourly Rate 2Classification 3Hourly Rate 3Classification 4Hourly Rate 4Classification 5Hourly Rate 5Classification 6Hourly Rate 6
Scientist$30.57Staff Scientist 1$ 21.20Staff Scientist 2$ 23.70Staff Scientist 3$ 27.50Geologist 1$ 32.50Geologist 2$ 37.50Senior Project Technical$ 41.00

Tab 4 Fueling System Removal

Terracon Consultants, Inc.Fueling System Removal
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateTask 1: Project PlanningTask 2: Field Work (Groundwater Sampling for Dewatering Permit)Task 3: Field Work (Tank Removal)Task 4: ReportsTask 5: Project Management (Quality Control)Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotalSubcontractorTaskTotal
Contract Manager$58.4110.51114.5$ 262.84GPS1day50$ 50.00Earth Retention ContractorTask 3$ 2,000.00
Project Supervisor I$53.100$ - 0PID0.5day95$ 47.50Tank Removal/CleanerTask 3$ 2,750.00
Project Supervisor II$81.750$ - 0Expendables1day20$ 20.00Lab GW PVOC+N (1 sample)Task 2$ 35.00
Engineer I$25.430$ - 0$ - 0Lab GW PFAS (1 sample)Task 2$ 285.00
Engineer II$45.100$ - 0$ - 0Lab Soil PVOC+N (7 samples)Task 3$ 287.00
Engineer III$0.000$ - 0$ - 0$ - 0
Hydrogeologist I$33.120$ - 0$ - 0$ - 0
Hydrogeologist II$41.830.511.5$ 62.75$ - 0$ - 0
Hydrogeologist III$0.000$ - 0$ - 0$ - 0
Scientist I$27.470$ - 0$ - 0$ - 0
Scientist II$31.7988$ 254.35$ - 0$ - 0
Scientist III$41.170$ - 0$ - 0$ - 0
Field Technician I$0.000$ - 0$ - 0$ - 0
Field Technician II$22.001269$ 198.00$ - 0$ - 0
Field Technician III$0.000$ - 0$ - 0$ - 0
CADD/GIS I$29.4511$ 29.45$ - 0$ - 0
CADD/GIS II$0.000$ - 0$ - 0$ - 0
Accounting I$0.000$ - 0$ - 0$ - 0
Accounting II$0.000$ - 0$ - 0$ - 0
Administrative Support I$27.830$ - 0$ - 0$ - 0
Administrative Support II$0.000$ - 0$ - 0$ - 0
Asbestos Inspector$34.930$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$25.980$ - 0$ - 0$ - 0
Asbestos Supervisor$41.920$ - 0$ - 0$ - 0
Asbestos Project Designer$41.350$ - 0$ - 0$ - 0
Asbestos Management Planner$41.350$ - 0$ - 0$ - 0

Total Staff Labor $ 807.39 Total Direct Expenses $ 117.50 Total Subcontracts $ 5,357.00

Tab 5 Phase 2 Site Assessment

Terracon Consultants, Inc.Phase 2 Site Assessment
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateTask 1: Project PlanningTask 2: Safety PlanTask 3: Field WorkTask 4: ReportingTask 5: Project Management (Quality Control)Task 6Task 7Task 8Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotal costSubcontractorTaskTotal cost
Contract Manager$58.4110.50.52$ 116.82GPS1day50$ 50.00DrillingTask 3$ 2,200.00
Project Supervisor I$53.1011$ 53.10PID0.75day95$ 71.25Lab Soil VOCs (5 samples)$ 400.00
Project Supervisor II$81.750$ - 0Expendables1day20$ 20.00Lab Soil PAHs (5 samples)$ 395.00
Engineer I$25.430$ - 0$ - 0Lab Soil PCBs (5 samples)$ 330.00
Engineer II$45.100$ - 0$ - 0Lab Soil Metals (5 samples)$ 440.00
Engineer III$0.000$ - 0$ - 0Lab Groundwater VOCs (3 samples)$ 222.00
Hydrogeologist I$33.120$ - 0$ - 0Lab Groundwater PAHs (3 samples)$ 237.00
Hydrogeologist II$41.830.5112.5$ 104.57$ - 0Lab Groundwater PCBs (3 samples)$ 198.00
Hydrogeologist III$0.000$ - 0$ - 0Lab Groundwater Metals (3 samples)$ 264.00
Scientist I$27.470$ - 0$ - 0$ - 0
Scientist II$31.7988$ 254.35$ - 0$ - 0
Scientist III$41.170$ - 0$ - 0$ - 0
Field Technician I$0.000$ - 0$ - 0$ - 0
Field Technician II$22.00189$ 198.00$ - 0$ - 0
Field Technician III$0.000$ - 0$ - 0$ - 0
CADD/GIS I$29.4511$ 29.45$ - 0$ - 0
CADD/GIS II$0.000$ - 0$ - 0$ - 0
Accounting I$0.000$ - 0$ - 0$ - 0
Accounting II$0.000$ - 0$ - 0$ - 0
Administrative Support I$27.830.50.5$ 13.91$ - 0$ - 0
Administrative Support II$0.000$ - 0$ - 0$ - 0
Asbestos Inspector$34.930$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$25.980$ - 0$ - 0$ - 0
Asbestos Supervisor$41.920$ - 0$ - 0$ - 0
Asbestos Project Designer$41.350$ - 0$ - 0$ - 0
Asbestos Management Planner$41.350$ - 0$ - 0$ - 0
Total Staff Labor$ 770.21Total Direct Expenses$ 141.25Total Subcontracts$ 4,686.00

Tab 6 Construction Dewatering

Terracon Consultants, Inc.Construction Dewatering
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly ratetask 1: Project PlanningTask 2: Safety PlanTask 3: Field WorkTask 4: ReportingTask 5: Project Management (Quality Control)Task 6Task 7Task 8Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotal costSubcontractorTaskTotal cost
Contract Manager$58.4111.52.5$ 146.02GPS1day50$ 50.00DrillerTask 3$ 1,450.00
Project Supervisor I$53.100$ - 0PID0.5day95$ 47.50Lab Soil VOCs (1 samples)Task 3$ 80.00
Project Supervisor II$81.750$ - 0Expendables1day20$ 20.00Lab Soil PFAS (1 samples)Task 3$ 291.00
Engineer I$25.430$ - 0$ - 0Lab GW VOCs (1 samples)Task 3$ 74.00
Engineer II$45.1011$ 45.10$ - 0Lab GW PFAS (1 samples)Task 3$ 285.00
Engineer III$0.000$ - 0$ - 0$ - 0
Hydrogeologist I$33.120$ - 0$ - 0$ - 0
Hydrogeologist II$41.83314$ 167.32$ - 0$ - 0
Hydrogeologist III$0.000$ - 0$ - 0$ - 0
Scientist I$27.470$ - 0$ - 0$ - 0
Scientist II$31.7966$ 190.76$ - 0$ - 0
Scientist III$41.170$ - 0$ - 0$ - 0
Field Technician I$0.000$ - 0$ - 0$ - 0
Field Technician II$22.001146$ 132.00$ - 0$ - 0
Field Technician III$0.000$ - 0$ - 0$ - 0
CADD/GIS I$29.4511$ 29.45$ - 0$ - 0
CADD/GIS II$0.000$ - 0$ - 0$ - 0
Accounting I$0.000$ - 0$ - 0$ - 0
Accounting II$0.000$ - 0$ - 0$ - 0
Administrative Support I$27.8311$ 27.83$ - 0$ - 0
Administrative Support II$0.000$ - 0$ - 0$ - 0
Asbestos Inspector$34.930$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$25.980$ - 0$ - 0$ - 0
Asbestos Supervisor$41.920$ - 0$ - 0$ - 0
Asbestos Project Designer$41.350$ - 0$ - 0$ - 0
Asbestos Management Planner$41.350$ - 0$ - 0$ - 0

Total Staff Labor $ 738.48 Total Direct Expenses $ 117.50 Total Subcontracts $ 2,180.00

Tab 7 Pre-Acquisition Assessmen

Terracon Consultants, Inc.Pre- Acquisition Site Assessment
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly ratetask 1: Project PlanningTask 2: Safety PlanTask 3: Field WorkTask 4: ReportingTask 5: Project Management (Quality Control)Task 6Task 7Task 8Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotal costSubcontractorTaskTotal cost
Contract Manager$58.41134$ 233.64GPS3day50$ 150.00DrillerTask 3$ 7,000.00
Project Supervisor I$53.1011$ 53.10PID3day95$ 285.00Lab Soil VOCs (21 samples)Task 3$ 1,680.00
Project Supervisor II$81.750$ - 0Expendables3day20$ 60.00Lab Soil PAHs (19 samples)Task 3$ 1,501.00
Engineer I$25.430$ - 0Lodging2day98$ 196.00Lab Soil PCBs (10 samples)Task 3$ 660.00
Engineer II$45.100$ - 0Breakfast2day10$ 20.00Lab Soil Metals (17 samples)Task 3$ 1,496.00
Engineer III$0.000$ - 0Lunch2day12$ 24.00Lab Groundwater VOCs (6 samples)Task 3$ 444.00
Hydrogeologist I$33.120$ - 0Dinner2day23$ 46.00Lab Groundwater PAHs (6 samples)Task 3$ 474.00
Hydrogeologist II$41.831337$ 292.81$ - 0Lab Groundwater PCBs (6 samples)Task 3$ 396.00
Hydrogeologist III$0.000$ - 0$ - 0Lab Groundwater Metals (6 samples)Task 3$ 528.00
Scientist I$27.470$ - 0$ - 0Lab Groundwater Nitrogen (1 sample)Task 3$ 28.00
Scientist II$31.791212$ 381.52$ - 0Lab private well Nitrate (1 sample)Task 3$ 28.00
Scientist III$41.170$ - 0$ - 0Lab private well Arsenic (1 sample)Task 3$ 22.00
Field Technician I$0.000$ - 0$ - 0Lab private well Bacteria (1 sample)Task 3$ 55.00
Field Technician II$22.00112426$ 572.00$ - 0Lab private well VOCs (1 sample)Task 3$ 80.00
Field Technician III$0.000$ - 0$ - 0$ - 0
CADD/GIS I$29.4522$ 58.90$ - 0$ - 0
CADD/GIS II$0.000$ - 0$ - 0$ - 0
Accounting I$0.000$ - 0$ - 0$ - 0
Accounting II$0.000$ - 0$ - 0$ - 0
Administrative Support I$27.8322$ 55.65$ - 0$ - 0
Administrative Support II$0.000$ - 0$ - 0$ - 0
Asbestos Inspector$34.930$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$25.980$ - 0$ - 0$ - 0
Asbestos Supervisor$41.920$ - 0$ - 0$ - 0
Asbestos Project Designer$41.350$ - 0$ - 0$ - 0
Asbestos Management Planner$41.350$ - 0$ - 0$ - 0

Total Staff Labor $ 1,647.62 Total Direct Expenses $ 781.00 Total Subcontracts $ 14,392.00

Tab 8 Residential Lead Sampling

Terracon Consultants, Inc.Residential Lead Sampling
Sample TypePrice per SampleExpedited Turnaround Price per Sample
Paint chips7.616.03
Bulk Lead Sampling9.4116.03
Wipe Sampling7.616.03

Total Cost Score

CategoryMarket BasketTotal Cost
Environmental Assessment{(Labor + Labor*overhead)*profit +(Labor + Labor*overhead)+Direct Expenses + Subcontractor}* Market Basket
Fueling system Removal22178154.49976192
Phase 2 Site Assessment1571150790.52999982
Construction Dewatering25117425.855056
Pre-Acquisition Assessment46944223.72537392
Total Environmental Assessment COST2390594.61019166
Residential Lead SamplingMarket basket
Paint Chips5$ 38.00
Bulk Lead100$ 941.00
Wipe1250$ 9,500.00
Paint chips expedited0$ - 0
Bulk Lead expedited10$ 160.30
Wipe Expedited3000$ 48,090.00

Total Residential Lead Sampling Cost $ 58,729.30

Program Management AssistanceNumber of HoursStaff classificationtotal
1040Admin Support 1$ 28,938.00
40Project supervisor 2$ 3,270.00
20Contract Manager$ 1,168.20
40CADD/GIS 2$ - 0
Total Program Management Assistance Cost$ 33,376.20
Market Basket
Asbestos inspection
Normal one person844$ 717,400.00
Asbestos plus bats
confined space, two people35$ 52,500.00
Total Asbestos Inspection cost$ 769,900.00

Total Cost 3252600.11019166

File details come from the government source that posted it. Updated .