GEI__Attachment_D_Cost_table_510573.xlsx

XLSX spreadsheet 77 KB Posted

Attached to
Environmental Services-Hazardous Materials and Asbestos-Investigation and Remediation Services
Contract number
395002-O24-0510573-000
Issued by
Wisconsin

About this file

This document is a cost proposal spreadsheet (Attachment D) for RFP 510573 submitted by GEI Consultants, Inc., an environmental consulting firm bidding on a Wisconsin state contract for environmental assessment services. The document serves as a comprehensive pricing structure for multiple environmental services including asbestos and bat inspections of bridges, environmental site assessments, fueling system removal, construction dewatering, and residential lead sampling services.

The contract covers a broad range of environmental services with specific pricing tiers. Bridge asbestos inspections are priced from $594-$694 per structure depending on quantity, while combined bat and asbestos inspections range from $1,140-$1,334 per structure. Professional staff hourly rates span from $26.74 for Administrative Support to $76.09 for Project Supervisor II positions. The proposal includes market basket totals of $4,143,411 for environmental assessments, $52,148 for residential lead sampling, $33,951 for program management assistance, and $632,412 for asbestos inspections, culminating in a total contract value of approximately $4.86 million. The company applies a 177.99% overhead rate and 7% profit margin on labor and overhead costs, with direct expenses and subcontractor costs billed at actual cost without markup. Mileage is reimbursed at the current state rate of $0.51 per mile, and lodging rates are set at $98-$103 per night depending on county location.

View the file

Other files

File Type Posted
6_Cost_Proposal_Attachment_D_Cost_table_AECOM.xlsx XLSX spreadsheet
RFP_510573_Attachment_D_Cost_table_TRC.xlsx XLSX spreadsheet
RFP_510573_Attachment_D_Cost_table_Ramboll.xlsx XLSX spreadsheet
RFP_510573_Attachment_D_Cost_table_Terracon.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Contract Cost Worksheets RFP 510573 Attachment E
INSTRUCTIONS Return as Excel Spreadsheet! Do not reformat.
Fill in only those cells highlighted in blue. Cells in green are calculated.
Tab 1 Hourly Rates and CostsCell #
1. Fill in firm nameB2
2. Fill in asbestos inspection costs per bridge structure, cellsB5, C5, D5, E5
3. Fill in combined bat and asbestos inspection cost per bridge structure, cellsB6, C6, D6, E6
4. Fill in confined space combined bat and asbestos inspection cost per bridge structure, cellsB7 C7 D7 E7
5. Fill in standalone bat inspections cost per bridge structure, cellsB8, C8, D8, E8
6. Fill in confined space standalone bat inspection cost per bridge structure, cellsB9, C9, D9, E9
7. Fill in proposed overhead rateB42
8. Fill in proposed profit percentage as a whole number, field is formatted as a percentageB45
Tab 2 Classifications in titlesCell #
1. Please fit each of your current employee classifications into one of the Twenty Eight contract Rate titlesB4 through AC13
2. Put no more than ten classifications into each rate category.
3. Leave unused cells blank
Tab 3 Average Wage Rate CalcCell #
1. Enter the direct hourly wage rate (without overhead or profit) for each classification entered in Tab 2Columns D,F,H,J,L,N,P,R,T,V, Cells 4 through 31
2. Put a zero in any unused cell in column D
3. Leave all other unused cells blank
Tab 4 Fueling System Removal
1. Enter the number of hours for each classification for each task in columns C through F GColumns C, D, E, F, G rows 4 through 31
2. Enter direct expenses in columns J K through M NColumns J K, L, M, N rows 4 through 31
3. Enter subcontract costs in columns P Q through R SColumns P, Q, R S rows 4 through 31
Tab 5 Phase 2 Site Assessment
1. Enter the tasks from the project scope document in Cells C3 through J3Columns C, D, E, F, G, H, I, J row 3
2. Enter the number of hours for each classification for each task in Columns C through JColumns C, D, E, F, G, H, I, J rows 4-31
3. Enter the direct expenses in columns N through QColumns N, O, P, Q, rows 4-31
5. Enter the subcontract costs in columns T through VColumns T, U, V rows 4-31
Tab 6 Construction Dewatering
1. Enter the tasks from the project scope document in Cells C3 through J3
2. Enter the number of hours for each classification for each task in Columns C through J
3. Enter the direct expenses in columns N through Q
5. Enter the subcontract costs in columns T through V
Tab 7 Pre-Acquisition Site Assessment
1. Enter the tasks from the project scope document in Cells C3 through J3
2. Enter the number of hours for each classification for each task in Columns C through J
3. Enter the direct expenses in columns N through Q
5. Enter the subcontract costs in columns T through V
Tab 8 Residential Lead Sampling
1. Fill in the price per sample in Column B
2.Fill in the price per expedited sample in Column C

Tab 1 Hourly Rates and Costs

Contract Cost Package 2024Fill in only those cells highlighted in blue. Cells in green are calculated.
FIRM NAME:GEI Consultants, Inc.
Asbestos Inspections - BridgesTerms: Lump Sum
Cost per single structureTwo to four structures, cost per structureFive to nine structures, cost per structureTen or more structures, cost per structure
Asbestos inspection, per bridge structure (Terms: Lump Sum)$ 694.00$ 644.00$ 638.00$ 594.00
Combined Bat and Asbestos inspection, per bridge structure (Terms:Lump Sum)$ 1,333.60$ 1,236.80$ 1,225.60$ 1,140.00
Asbestos and Bat inspection - Confined Space or Two Person project (for traffic control, water entry or other safety considerations)# Terms: Lump Sum$ 1,333.60$ 1,236.80$ 1,225.60$ 1,140.00# The determination of need for confined space entry, or two person team for traffic control, water entry, or other safety considerations will be made by the consultant.
Bat inspection of bridges without asbestos inspection (Terms: lump sum)$ 990.00$ 970.00$ 962.00$ 885.00
Bat inspection of bridges without asbestos inspection - Confined space # (Terms: lump sum)$ 1,333.60$ 1,236.00$ 1,225.00$ 1,140.00
NOTE: Structures requrested at the same time in the same spreadsheet constitute a single request, number of structures for pricing is determined by number of structures in request, not number of project IDs. Prices for long, multiple-section structures such as the Hoan Bridge, Wisconsin River bridges, St Croix river bridges, and Mississippi River bridges, will be negotiated separately at the time of request.
Asbestos inspection, buildings, bridge tender houses, other structuresTerms: average direct hourly rate*
Asbestos abatementTerms: average direct hourly rate*
Project StaffTerms: average direct hourly rate**the average direct hourly rate for each classification shall be the rate charged for the contract
Contract Manager$64.77Average Hourly Rate
Project Supervisor I$49.88Average Hourly Rate
Project Supervisor II$76.09Average Hourly Rate
Engineer I$36.31Average Hourly Rate
Engineer II$43.44Average Hourly Rate
Engineer III$63.22Average Hourly Rate
Hydrogeologist I$38.85Average Hourly Rate
Hydrogeologist II$48.88Average Hourly Rate
Hydrogeologist III$66.56Average Hourly Rate
Scientist I$32.57Average Hourly Rate
Scientist II$42.50Average Hourly Rate
Scientist III$57.23Average Hourly Rate
Field Technician I$27.21Average Hourly Rate
Field Technician II$32.45Average Hourly Rate
Field Technician III$38.99Average Hourly Rate
CADD/GIS I$36.67Average Hourly Rate
CADD/GIS II$45.06Average Hourly Rate
Accounting I$37.36Average Hourly Rate
Accounting II$0.00Average Hourly Rate
Administrative Support I$26.74Average Hourly Rate
Administrative Support II$33.65Average Hourly Rate
Asbestos Inspector$44.57Average Hourly Rate
Exterior Abatement Worker$0.00Average Hourly Rate
Exterior Asbestos Supervisor$0.00Average Hourly Rate
Asbestos Worker$0.00Average Hourly Rate
Asbestos Supervisor$47.00Average Hourly Rate
Asbestos Project Designer$0.00Average Hourly Rate
Asbestos Management Planner$0.00Average Hourly Rate
Equipment and suppliesTerms: direct expense, no markup
Subcontractor CostsTerms: actual cost, no markup
MileageTerms: current state reimbursement rate
Per mile, personal vehicle rate$0.51/mile
MealsTerms: current state reimbursement rate
Breakfast$ 10.00
Lunch$ 12.00
Dinner$ 23.00
LodgingTerms: current state reimbursement rate, excluding taxes
Per night$98.00
Per night, Milwaukee, Racine and Kenosha counties$103.00
Asbestos inspection, buildings, bridge tender houses, other structuresTerms: average direct hourly rate*
Overhead
Proposed rate177.990%Percentage of Direct Labor
ProfitTerms: percentage of labor and overhead, no profit on subcontractors or direct expenses
Proposed Rate7%Percentage of Direct Labor + Labor Overhead, NO PROFIT ON SUBCONTRACTORS OR DIRECT EXPENSES

Tab 2 Classifications in Titles

Classifications included in average wage rate: (list each classification on a separate line, do not insert or delete rows, do not leave blank rows between classifications.)
GEI Consultants, Inc.Please fill in the actual titles of your staff. Limit 10 titles per classification
Rate Title:Contract ManagerProject Supervisor IProject Supervisor IIEngineer IEngineer IIEngineer IIIHydrogeologist IHydrogeologist IIHydrogeologist IIIScientist IScientist IIScientist IIIField Technician IField Technician IIField Technician IIICADD/GIS ICADD/GIS IIAccounting IAccounting IIAdministrative Support IAdministrative Support IIAsbestos InspectorExterior Abatement WorkerExterior Asbestos SupervisorAsbestos WorkerAsbestos SupervisorAsbestos Project DesignerAsbestos Management Planner
Classifications included in Rate Titles:Project ManagerStaff ProfessionalSenior EngineerStaff EngineerEngineerSenior EngineerProject GeologistStaff ProfessionalProfessional GeologistStaff ProfessionalEnvironmental Project ManagerSenior Environmental ScientistInternStaff ProfessionalCAD Drafter/SurveyorStaff ProfessionalEcologistBilling SpecialistaccII1Administrative AssistantRegional Safety ManagerStaff Professionaleaw1eas1aw1Environmental Scientistapd1amp1
Senior EngineerEcologistSenior ProfessionalStaff ProfessionalSenior EngineerSenior EngineerGeological EngineerSenior HydrogeologistSenior GeologistEnvironmental ScientistStaff ProfessionalSenior Project ScientistStaff ProfessionalEnvironmental ScientistRestoration EcologistEnvironmental Project ManagerSenior Design DrafterBilling Team LeadaccII2Administrative AssistantRegional Administrative ManagerEnvironmental Scientisteaw2eas2aw2as2apd2amp2
Senior HydrogeologistSenior Natural Resources ManagerSenior ConsultantProject ProfessionalProject ProfessionalProject ManagerProject ProfessionalhII3Senior HydrogeologistEnvironmental ScientistProject ProfessionalSenior HydrogeologistStaff EngineerRegional Safety ManagerStaff ProfessionalGIS DesignerProject ProfessionalaccI3accII3admI3Administrative AssistantEnvironmental Scientisteaw3eas3aw3as3apd3amp3
cm4Senior Environmental ScientistSenior HydrogeologistStaff ProfessionalEngineerSenior ProfessionalProject ProfessionalhII4hIII4Regional Safety ManagerEnvironmental ScientistRegional Safety ManagerWetland and Aquatic EcologistStaff ProfessionalAquatic Ecologist 2/Env PMCAD DrafterSenior Natural Resources ManageraccI4accII4admI4Administrative AssistantStaff Professionaleaw4eas4aw4as4apd4amp4
cm5Project ManagerVice PresidentStaff ProfessionaleII5Structural EngineerhI5hII5hIII5Environmental ScientistEngineerProfessional GeologistEnvironmental EngineerStaff ProfessionalProject ProfessionalEnvironmental ScientistEnvironmental ScientistaccI5accII5admI5admII5Senior Project Scientisteaw5eas5aw5as5apd5amp5
cm6Regulatory SpecialistSenior Project ScientistGeological EngineereII6Senior ConsultanthI6hII6hIII6Staff ProfessionalProject ProfessionalProject ManagerEnvironmental ScientistEnvironmental ScientistEnvironmental ScientistStaff ProfessionalSenior Environmental ScientistaccI6accII6admI6admII6Environmental Engineereaw6eas6aw6as6apd6amp6
cm7Senior Environmental ScientistpsII7Project Environmental EngineereII7eIII7hI7hII7hIII7Environmental ScientistEcologistRegulatory SpecialistftI7Environmental ScientistConstruction ManagercadI7cadII7accI7accII7admI7admII7ai7eaw7eas7aw7as7apd7amp7
cm8psI8psII8eI8eII8eIII8hI8hII8hIII8Project GeologistSenior ProfessionalSenior Environmental ScientistftI8ftII8ftIII8cadI8cadII8accI8accII8admI8admII8ai8eaw8eas8aw8as8apd8amp8
cm9psI9psII9eI9eII9eIII9hI9hII9hIII9Environmental ScientistSenior Natural Resources ManagerSenior GeologistftI9ftII9ftIII9cadI9cadII9accI9accII9admI9admII9ai9eaw9eas9aw9as9apd9amp9
cm10psI10psII10eI10eII10eIII10hI10hII10hIII10Wetland EcologistStaff ProfessionalSenior HydrogeologistftI10ftII10ftIII10cadI10cadII10accI10accII10admI10admII10ai10eaw10eas10aw10as10apd10amp10
EXAMPLE:0
Rate Title: Scientist I
Classifications included in title: Staff scientist 1
Arborist
Geologist 1
Geologist 2
Senior Project Technical 1
Senior Project Technical 2

Tab 3 Average Wage Rate Calc

GEI Consultants, Inc.Fill in only those cells highlighted in blue. Cells in green are calculated.Do not alter or change the formulas.
Enter the hourly rate for each classification shown
TitleAverage Hourly RateClassification 1Hourly rate 1Classification 2Hourly Rate 2Classification 3Hourly Rate 3Classification 4Hourly Rate 4Classification 5Hourly Rate 5Classification 6Hourly Rate 6Classification 7Hourly Rate 7Classification 8Hourly Rate 8Classification 9Hourly Rate 9Classification 10Hourly Rate 10
Contract Manager$64.77Project Manager$ 57.92Senior Engineer$ 59.84Senior Hydrogeologist$ 76.56cm4cm5cm6cm7cm8cm9cm10
Project Supervisor I$49.88Staff Professional$ 38.88Ecologist$ 43.68Senior Natural Resources Manager$ 45.04Senior Environmental Scientist$ 47.20Project Manager$ 57.92Regulatory Specialist$ 58.00Senior Environmental Scientist$ 58.44psI8psI9psI10
Project Supervisor II$76.09Senior Engineer$ 59.84Senior Professional$ 63.96Senior Consultant$ 72.12Senior Hydrogeologist$ 76.56Vice President$ 91.92Senior Project Scientist$ 92.12psII7psII8psII9psII10
Engineer I$36.31Staff Engineer$ 32.64Staff Professional$ 32.80Project Professional$ 36.16Staff Professional$ 36.36Staff Professional$ 37.24Geological Engineer$ 38.20Project Environmental Engineer$ 40.76eI8eI9eI10
Engineer II$43.44Engineer$ 42.24Senior Engineer$ 42.32Project Professional$ 43.80Engineer$ 45.40eII5eII6eII7eII8eII9eII10
Engineer III$63.22Senior Engineer$ 58.92Senior Engineer$ 59.84Project Manager$ 59.88Senior Professional$ 63.96Structural Engineer$ 64.60Senior Consultant$ 72.12eIII7eIII8eIII9eIII10
Hydrogeologist I$38.85Project Geologist$ 34.40Geological Engineer$ 38.20Project Professional$ 40.32Project Professional$ 42.48hI5hI6hI7hI8hI9hI10
Hydrogeologist II$48.88Staff Professional$ 47.68Senior Hydrogeologist$ 50.08hII3hII4hII5hII6hII7hII8hII9hII10
Hydrogeologist III$66.56Professional Geologist$ 56.08Senior Geologist$ 67.04Senior Hydrogeologist$ 76.56hIII4hIII5hIII6hIII7hIII8hIII9hIII10
Scientist I$32.57Staff Professional$ 27.20Environmental Scientist$ 29.72Environmental Scientist$ 30.32Regional Safety Manager$ 32.20Environmental Scientist$ 32.88Staff Professional$ 33.88Environmental Scientist$ 33.88Project Geologist$ 34.40Environmental Scientist$ 34.60Wetland Ecologist$ 36.64
Scientist II$42.50Environmental Project Manager$ 38.84Staff Professional$ 38.88Project Professional$ 40.32Environmental Scientist$ 40.64Engineer$ 42.24Project Professional$ 43.44Ecologist$ 43.68Senior Professional$ 44.24Senior Natural Resources Manager$ 45.04Staff Professional$ 47.68
Scientist III$57.23Senior Environmental Scientist$ 47.20Senior Project Scientist$ 48.60Senior Hydrogeologist$ 50.08Regional Safety Manager$ 52.36Professional Geologist$ 56.08Project Manager$ 57.92Regulatory Specialist$ 58.00Senior Environmental Scientist$ 58.44Senior Geologist$ 67.04Senior Hydrogeologist$ 76.56
Field Technician I$27.21Intern$ 23.00Staff Professional$ 27.20Staff Engineer$ 28.08Wetland and Aquatic Ecologist$ 28.12Environmental Engineer$ 28.32Environmental Scientist$ 28.52ftI7ftI8ftI9ftI10
Field Technician II$32.45Staff Professional$ 30.04Environmental Scientist$ 30.64Regional Safety Manager$ 32.20Staff Professional$ 32.80Staff Professional$ 33.00Environmental Scientist$ 33.88Environmental Scientist$ 34.60ftII8ftII9ftII10
Field Technician III$38.99CAD Drafter/Surveyor$ 35.96Restoration Ecologist$ 37.20Staff Professional$ 37.24Aquatic Ecologist 2/Env PM$ 38.84Project Professional$ 40.32Environmental Scientist$ 41.60Construction Manager$ 41.76ftIII8ftIII9ftIII10
CADD/GIS I$36.67Staff Professional$ 30.04Environmental Project Manager$ 38.84GIS Designer$ 31.68CAD Drafter$ 35.96Environmental Scientist$ 41.60Staff Professional$ 41.92cadI7cadI8cadI9cadI10
CADD/GIS II$45.06Ecologist$ 43.68Senior Design Drafter$ 44.00Project Professional$ 43.44Senior Natural Resources Manager$ 45.04Environmental Scientist$ 47.00Senior Environmental Scientist$ 47.20cadII7cadII8cadII9cadII10
Accounting I$37.36Billing Specialist$ 32.48Billing Team Lead$ 42.24accI3accI4accI5accI6accI7accI8accI9accI10
Accounting II$0.00accII1$ - 0accII2accII3accII4accII5accII6accII7accII8accII9accII10
Administrative Support I$26.74Administrative Assistant$ 26.36Administrative Assistant$ 27.12admI3admI4admI5admI6admI7admI8admI9admI10
Administrative Support II$33.65Regional Safety Manager$ 32.20Regional Administrative Manager$ 37.44Administrative Assistant$ 27.88Administrative Assistant$ 37.08admII5admII6admII7admII8admII9admII10
Asbestos Inspector$44.57Staff Professional$ 32.80Environmental Scientist$ 40.64Environmental Scientist$ 47.00Staff Professional$ 47.68Senior Project Scientist$ 48.60Environmental Engineer$ 50.68ai7ai8ai9ai10
Exterior Abatement Worker$0.00eaw1$ - 0eaw2eaw3eaw4eaw5eaw6eaw7eaw8eaw9eaw10
Exterior Asbestos Supervisor$0.00eas1$ - 0eas2eas3eas4eas5eas6eas7eas8eas9eas10
Asbestos Worker$0.00aw1$ - 0aw2aw3aw4aw5aw6aw7aw8aw9aw10
Asbestos Supervisor$47.00Environmental Scientist$ 47.00as2as3as4as5as6as7as8as9as10
Asbestos Project Designer$0.00apd1$ - 0apd2apd3apd4apd5apd6apd7apd8apd9apd10
Asbestos Management Planner$0.00amp1$ - 0amp2amp3amp4amp5amp6amp7amp8amp9amp10
Example:Average Hourly RateClassification 1Hourly rate 1Classification 2Hourly Rate 2Classification 3Hourly Rate 3Classification 4Hourly Rate 4Classification 5Hourly Rate 5Classification 6Hourly Rate 6
Scientist$30.57Staff Scientist 1$ 21.20Staff Scientist 2$ 23.70Staff Scientist 3$ 27.50Geologist 1$ 32.50Geologist 2$ 37.50Senior Project Technical$ 41.00

Tab 4 Fueling System Removal

GEI Consultants, Inc.Fueling System Removal
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateCoordination & PlanningFuel System Removal, TSSA, and Geoprobe SamplingManagement of Project Derived WasteDocumentation SubmittalTask 5Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotalSubcontractorTaskTotal
Contract Manager$64.770.50.5$ 32.39PID1Day50$ 50.00UST Cleaner/Remover, Excavator, Backfilling, Tank/Pump Island DisposalFuel System Removal, TSSA, and Geoprobe Sampling$5,800.00
Project Supervisor I$49.880$ - 0Mileage0MIles0$ - 0Geoprobe Sampling (half day)Fuel System Removal, TSSA, and Geoprobe Sampling$800.00
Project Supervisor II$76.090$ - 0$ - 0Laboratory TestingFuel System Removal, TSSA, and Geoprobe Sampling$1,050.00
Engineer I$36.310$ - 0$ - 0$ - 0
Engineer II$43.440$ - 0$ - 0$ - 0
Engineer III$63.220$ - 0$ - 0$ - 0
Hydrogeologist I$38.850.50.5$ 19.42$ - 0$ - 0
Hydrogeologist II$48.880$ - 0$ - 0$ - 0
Hydrogeologist III$66.560$ - 0$ - 0$ - 0
Scientist I$32.57483419$ 618.87$ - 0$ - 0
Scientist II$42.500$ - 0$ - 0$ - 0
Scientist III$57.230.50.5$ 28.61$ - 0$ - 0
Field Technician I$27.210$ - 0$ - 0$ - 0
Field Technician II$32.450$ - 0$ - 0$ - 0
Field Technician III$38.990$ - 0$ - 0$ - 0
CADD/GIS I$36.6711$ 36.67$ - 0$ - 0
CADD/GIS II$45.060$ - 0$ - 0$ - 0
Accounting I$37.360$ - 0$ - 0$ - 0
Accounting II$0.000$ - 0$ - 0$ - 0
Administrative Support I$26.74112$ 53.48$ - 0$ - 0
Administrative Support II$33.650$ - 0$ - 0$ - 0
Asbestos Inspector$44.570$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$0.000$ - 0$ - 0$ - 0
Asbestos Supervisor$47.000$ - 0$ - 0$ - 0
Asbestos Project Designer$0.000$ - 0$ - 0$ - 0
Asbestos Management Planner$0.000$ - 0$ - 0$ - 0

Total Staff Labor $ 789.45 Total Direct Expenses $ 50.00 Total Subcontracts $ 7,650.00

Tab 5 Phase 2 Site Assessment

GEI Consultants, Inc.Phase 2 Site Assessment
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateHealth & Safety PlanningSite Access & CoordinationSampling Layout & Utility ClearanceFieldworkReportingProject Management & Historical Site Information ReviewTask 7Task 8Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotal costSubcontractorTaskTotal cost
Contract Manager$64.770$ - 0Mileage50Miles0.51$ 25.50Analytical Lab - Base ScopeFieldwork$ 2,500.00
Project Supervisor I$49.880.50.5225$ 249.40Field Supplies1Each50$ 50.00Analytical Lab - ContingencyFieldwork$ 750.00
Project Supervisor II$76.090$ - 0PID1Day50$ 50.00Geoprobe FirmFieldwork$ 2,500.00
Engineer I$36.310$ - 0$ - 0$ - 0
Engineer II$43.440$ - 0$ - 0$ - 0
Engineer III$63.220$ - 0$ - 0$ - 0
Hydrogeologist I$38.850$ - 0$ - 0$ - 0
Hydrogeologist II$48.880$ - 0$ - 0$ - 0
Hydrogeologist III$66.560$ - 0$ - 0$ - 0
Scientist I$32.570.521610221.5$ 700.30$ - 0$ - 0
Scientist II$42.500$ - 0$ - 0$ - 0
Scientist III$57.230$ - 0$ - 0$ - 0
Field Technician I$27.21216514$ 380.89$ - 0$ - 0
Field Technician II$32.450$ - 0$ - 0$ - 0
Field Technician III$38.990$ - 0$ - 0$ - 0
CADD/GIS I$36.6722$ 73.35$ - 0$ - 0
CADD/GIS II$45.060$ - 0$ - 0$ - 0
Accounting I$37.360$ - 0$ - 0$ - 0
Accounting II$0.000$ - 0$ - 0$ - 0
Administrative Support I$26.7422$ 53.48$ - 0$ - 0
Administrative Support II$33.650$ - 0$ - 0$ - 0
Asbestos Inspector$44.570$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$0.000$ - 0$ - 0$ - 0
Asbestos Supervisor$47.000$ - 0$ - 0$ - 0
Asbestos Project Designer$0.000$ - 0$ - 0$ - 0
Asbestos Management Planner$0.000$ - 0$ - 0$ - 0
Total Staff Labor$ 1,457.42Total Direct Expenses$ 125.50Total Subcontracts$ 5,750.00

Tab 6 Construction Dewatering

GEI Consultants, Inc.Construction Dewatering
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateDNR Case File ReviewMaterials Handling Plan & Contract Spe cial ProvisionsProject Management & Design ReviewTask 4Task 5Task 6Task 7Task 8Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotal costSubcontractorTaskTotal cost
Contract Manager$64.7711$ 64.77(None)$ - 0(None)$ - 0
Project Supervisor I$49.881236$ 299.28$ - 0$ - 0
Project Supervisor II$76.090$ - 0$ - 0$ - 0
Engineer I$36.310$ - 0$ - 0$ - 0
Engineer II$43.440$ - 0$ - 0$ - 0
Engineer III$63.220$ - 0$ - 0$ - 0
Hydrogeologist I$38.850$ - 0$ - 0$ - 0
Hydrogeologist II$48.880$ - 0$ - 0$ - 0
Hydrogeologist III$66.560$ - 0$ - 0$ - 0
Scientist I$32.573811$ 358.29$ - 0$ - 0
Scientist II$42.500$ - 0$ - 0$ - 0
Scientist III$57.230$ - 0$ - 0$ - 0
Field Technician I$27.210$ - 0$ - 0$ - 0
Field Technician II$32.450$ - 0$ - 0$ - 0
Field Technician III$38.990$ - 0$ - 0$ - 0
CADD/GIS I$36.6711$ 36.67$ - 0$ - 0
CADD/GIS II$45.060$ - 0$ - 0$ - 0
Accounting I$37.360.50.5$ 18.68$ - 0$ - 0
Accounting II$0.000$ - 0$ - 0$ - 0
Administrative Support I$26.7410.51.5$ 40.11$ - 0$ - 0
Administrative Support II$33.650$ - 0$ - 0$ - 0
Asbestos Inspector$44.570$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$0.000$ - 0$ - 0$ - 0
Asbestos Supervisor$47.000$ - 0$ - 0$ - 0
Asbestos Project Designer$0.000$ - 0$ - 0$ - 0
Asbestos Management Planner$0.000$ - 0$ - 0$ - 0

Total Staff Labor $ 817.81 Total Direct Expenses $ - 0 Total Subcontracts $ - 0

Tab 7 Pre-Acquisition Assessmen

GEI Consultants, Inc.Pre- Acquisition Site Assessment
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateHealth & Safety PlanningSite Access & CoordinationSampling Layout & Utility ClearanceFieldworkReportingProject Management & Historical Site Information ReviewTask 7Task 8Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotal costSubcontractorTaskTotal cost
Contract Manager$64.77123$ 194.32Mileage220Miles0.51$ 112.20Drilling/Probe SubFieldwork$ 7,000.00
Project Supervisor I$49.8811248$ 399.04Lodging/Meals1Each288$ 288.00Laboratory TestingFieldwork$ 25,000.00
Project Supervisor II$76.090$ - 0Field Supplies1Each150$ 150.00Laboratory (Contingency)Fieldwork$ 7,000.00
Engineer I$36.310$ - 0PID3Day50$ 150.00$ - 0
Engineer II$43.440$ - 0$ - 0$ - 0
Engineer III$63.220$ - 0$ - 0$ - 0
Hydrogeologist I$38.850$ - 0$ - 0$ - 0
Hydrogeologist II$48.8866$ 293.28$ - 0$ - 0
Hydrogeologist III$66.560$ - 0$ - 0$ - 0
Scientist I$32.571112216$ 521.15$ - 0$ - 0
Scientist II$42.500$ - 0$ - 0$ - 0
Scientist III$57.230$ - 0$ - 0$ - 0
Field Technician I$27.21424202050$ 1,360.33$ - 0$ - 0
Field Technician II$32.450$ - 0$ - 0$ - 0
Field Technician III$38.990$ - 0$ - 0$ - 0
CADD/GIS I$36.67426$ 220.04$ - 0$ - 0
CADD/GIS II$45.060$ - 0$ - 0$ - 0
Accounting I$37.3611$ 37.36$ - 0$ - 0
Accounting II$0.000$ - 0$ - 0$ - 0
Administrative Support I$26.74415$ 133.70$ - 0$ - 0
Administrative Support II$33.650$ - 0$ - 0$ - 0
Asbestos Inspector$44.570$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$0.000$ - 0$ - 0$ - 0
Asbestos Supervisor$47.000$ - 0$ - 0$ - 0
Asbestos Project Designer$0.000$ - 0$ - 0$ - 0
Asbestos Management Planner$0.000$ - 0$ - 0$ - 0

Total Staff Labor $ 3,159.23 Total Direct Expenses $ 700.20 Total Subcontracts $ 39,000.00

Tab 8 Residential Lead Sampling

GEI Consultants, Inc.Residential Lead Sampling
Sample TypePrice per SampleExpedited Turnaround Price per Sample
Paint chips9.512.5
Bulk Lead Sampling24.527.5
Wipe Sampling9.512.5

Total Cost Score

CategoryMarket BasketTotal Cost
Environmental Assessment{(Labor + Labor*overhead)*profit +(Labor + Labor*overhead)+Direct Expenses + Subcontractor}* Market Basket
Fueling system Removal22221060.500658162
Phase 2 Site Assessment1571603061.00333462
Construction Dewatering2560814.1538584833
Pre-Acquisition Assessment462258475.50741344
Total Environmental Assessment COST4143411.16526471
Residential Lead SamplingMarket basket
Paint Chips5$ 47.50
Bulk Lead100$ 2,450.00
Wipe1250$ 11,875.00
Paint chips expedited0$ - 0
Bulk Lead expedited10$ 275.00
Wipe Expedited3000$ 37,500.00

Total Residential Lead Sampling Cost $ 52,147.50

Program Management AssistanceNumber of HoursStaff classificationtotal
1040Admin Support 1$ 27,809.60
40Project supervisor 2$ 3,043.47
20Contract Manager$ 1,295.47
40CADD/GIS 2$ 1,802.40
Total Program Management Assistance Cost$ 33,950.93
Market Basket
Asbestos inspection
Normal one person844$ 585,736.00
Asbestos plus bats
confined space, two people35$ 46,676.00
Total Asbestos Inspection cost$ 632,412.00

Total Cost 4861921.59859804

File details come from the government source that posted it. Updated .