About this file

This document is a detailed cost proposal spreadsheet for RFP 510573 submitted by AECOM Team to a state agency, containing comprehensive pricing information for environmental assessment services. The spreadsheet includes multiple worksheets covering hourly rates, staff classifications, and cost calculations for various environmental services including asbestos inspections, site assessments, and residential lead sampling. AECOM has provided detailed staff classifications ranging from Contract Managers at $76.67/hour to Field Technicians at $24.81/hour, with proposed overhead rates of 148% and profit margins of 9% on labor and overhead costs.

The contract covers a comprehensive range of environmental services with specific pricing structures: asbestos inspections for bridges ranging from $1,200-$2,500 per structure depending on quantity, combined bat and asbestos inspections from $1,800-$5,000 per structure, and confined space inspections from $6,000-$12,000 per structure. Additional services include fueling system removal, Phase 2 site assessments, construction dewatering, pre-acquisition assessments, and residential lead sampling with paint chip samples at $10 each and bulk lead sampling at $62 per sample. The total market basket cost breakdown shows $2,983,455 for environmental assessments, $182,118 for residential lead sampling, $30,881 for program management assistance, and $2,530,000 for asbestos inspections, resulting in a total contract value of approximately $5.73 million. Direct expenses are charged at cost with no markup, subcontractor costs at actual cost with no markup, and mileage at the current state reimbursement rate of $0.51 per mile.

View the file

Other files

File Type Posted
RFP_510573_Attachment_D_Cost_table_TRC.xlsx XLSX spreadsheet
RFP_510573_Attachment_D_Cost_table_Ramboll.xlsx XLSX spreadsheet
RFP_510573_Attachment_D_Cost_table_Terracon.xlsx XLSX spreadsheet
GEI__Attachment_D_Cost_table_510573.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Contract Cost Worksheets RFP 510573 Attachment E
INSTRUCTIONS Return as Excel Spreadsheet! Do not reformat.
Fill in only those cells highlighted in blue. Cells in green are calculated.
Tab 1 Hourly Rates and CostsCell #
1. Fill in firm nameB2
2. Fill in asbestos inspection costs per bridge structure, cellsB5, C5, D5, E5
3. Fill in combined bat and asbestos inspection cost per bridge structure, cellsB6, C6, D6, E6
4. Fill in confined space combined bat and asbestos inspection cost per bridge structure, cellsB7 C7 D7 E7
5. Fill in standalone bat inspections cost per bridge structure, cellsB8, C8, D8, E8
6. Fill in confined space standalone bat inspection cost per bridge structure, cellsB9, C9, D9, E9
7. Fill in proposed overhead rateB42
8. Fill in proposed profit percentage as a whole number, field is formatted as a percentageB45
Tab 2 Classifications in titlesCell #
1. Please fit each of your current employee classifications into one of the Twenty Eight contract Rate titlesB4 through AC13
2. Put no more than ten classifications into each rate category.
3. Leave unused cells blank
Tab 3 Average Wage Rate CalcCell #
1. Enter the direct hourly wage rate (without overhead or profit) for each classification entered in Tab 2Columns D,F,H,J,L,N,P,R,T,V, Cells 4 through 31
2. Put a zero in any unused cell in column D
3. Leave all other unused cells blank
Tab 4 Fueling System Removal
1. Enter the number of hours for each classification for each task in columns C through F GColumns C, D, E, F, G rows 4 through 31
2. Enter direct expenses in columns J K through M NColumns J K, L, M, N rows 4 through 31
3. Enter subcontract costs in columns P Q through R SColumns P, Q, R S rows 4 through 31
Tab 5 Phase 2 Site Assessment
1. Enter the tasks from the project scope document in Cells C3 through J3Columns C, D, E, F, G, H, I, J row 3
2. Enter the number of hours for each classification for each task in Columns C through JColumns C, D, E, F, G, H, I, J rows 4-31
3. Enter the direct expenses in columns N through QColumns N, O, P, Q, rows 4-31
5. Enter the subcontract costs in columns T through VColumns T, U, V rows 4-31
Tab 6 Construction Dewatering
1. Enter the tasks from the project scope document in Cells C3 through J3
2. Enter the number of hours for each classification for each task in Columns C through J
3. Enter the direct expenses in columns N through Q
5. Enter the subcontract costs in columns T through V
Tab 7 Pre-Acquisition Site Assessment
1. Enter the tasks from the project scope document in Cells C3 through J3
2. Enter the number of hours for each classification for each task in Columns C through J
3. Enter the direct expenses in columns N through Q
5. Enter the subcontract costs in columns T through V
Tab 8 Residential Lead Sampling
1. Fill in the price per sample in Column B
2.Fill in the price per expedited sample in Column C

Tab 1 Hourly Rates and Costs

Contract Cost Package 2024Fill in only those cells highlighted in blue. Cells in green are calculated.
FIRM NAME:AECOM Team
Asbestos Inspections - BridgesTerms: Lump Sum
Cost per single structureTwo to four structures, cost per structureFive to nine structures, cost per structureTen or more structures, cost per structure
Asbestos inspection, per bridge structure (Terms: Lump Sum)$ 2,500.00$ 2,000.00$ 1,500.00$ 1,200.00
Combined Bat and Asbestos inspection, per bridge structure (Terms:Lump Sum)$ 5,000.00$ 3,500.00$ 2,200.00$ 1,800.00
Asbestos and Bat inspection - Confined Space or Two Person project (for traffic control, water entry or other safety considerations)# Terms: Lump Sum$ 12,000.00$ 10,000.00$ 8,000.00$ 7,000.00# The determination of need for confined space entry, or two person team for traffic control, water entry, or other safety considerations will be made by the consultant.
Bat inspection of bridges without asbestos inspection (Terms: lump sum)$ 4,000.00$ 2,500.00$ 1,500.00$ 1,100.00
Bat inspection of bridges without asbestos inspection - Confined space # (Terms: lump sum)$ 10,000.00$ 8,500.00$ 6,800.00$ 6,000.00
NOTE: Structures requrested at the same time in the same spreadsheet constitute a single request, number of structures for pricing is determined by number of structures in request, not number of project IDs. Prices for long, multiple-section structures such as the Hoan Bridge, Wisconsin River bridges, St Croix river bridges, and Mississippi River bridges, will be negotiated separately at the time of request.
Asbestos inspection, buildings, bridge tender houses, other structuresTerms: average direct hourly rate*
Asbestos abatementTerms: average direct hourly rate*
Project StaffTerms: average direct hourly rate**the average direct hourly rate for each classification shall be the rate charged for the contract
Contract Manager$76.67Average Hourly Rate
Project Supervisor I$50.00Average Hourly Rate
Project Supervisor II$66.67Average Hourly Rate
Engineer I$48.89Average Hourly Rate
Engineer II$57.41Average Hourly Rate
Engineer III$62.96Average Hourly Rate
Hydrogeologist I$39.26Average Hourly Rate
Hydrogeologist II$46.67Average Hourly Rate
Hydrogeologist III$54.07Average Hourly Rate
Scientist I$32.59Average Hourly Rate
Scientist II$38.15Average Hourly Rate
Scientist III$45.93Average Hourly Rate
Field Technician I$24.81Average Hourly Rate
Field Technician II$29.26Average Hourly Rate
Field Technician III$35.93Average Hourly Rate
CADD/GIS I$30.37Average Hourly Rate
CADD/GIS II$41.11Average Hourly Rate
Accounting I$31.48Average Hourly Rate
Accounting II$42.59Average Hourly Rate
Administrative Support I$24.07Average Hourly Rate
Administrative Support II$35.93Average Hourly Rate
Asbestos Inspector$41.11Average Hourly Rate
Exterior Abatement Worker$0.00Average Hourly Rate
Exterior Asbestos Supervisor$0.00Average Hourly Rate
Asbestos Worker$0.00Average Hourly Rate
Asbestos Supervisor$0.00Average Hourly Rate
Asbestos Project Designer$0.00Average Hourly Rate
Asbestos Management Planner$0.00Average Hourly Rate
Equipment and suppliesTerms: direct expense, no markup
Subcontractor CostsTerms: actual cost, no markup
MileageTerms: current state reimbursement rate
Per mile, personal vehicle rate$0.51/mile
MealsTerms: current state reimbursement rate
Breakfast$ 10.00
Lunch$ 12.00
Dinner$ 23.00
LodgingTerms: current state reimbursement rate, excluding taxes
Per night$98.00
Per night, Milwaukee, Racine and Kenosha counties$103.00
Asbestos inspection, buildings, bridge tender houses, other structuresTerms: average direct hourly rate*
Overhead
Proposed rate148.000%Percentage of Direct Labor
ProfitTerms: percentage of labor and overhead, no profit on subcontractors or direct expenses
Proposed Rate9%Percentage of Direct Labor + Labor Overhead, NO PROFIT ON SUBCONTRACTORS OR DIRECT EXPENSES

Tab 2 Classifications in Titles

Classifications included in average wage rate: (list each classification on a separate line, do not insert or delete rows, do not leave blank rows between classifications.)
AECOM TeamPlease fill in the actual titles of your staff. Limit 10 titles per classification
Rate Title:Contract ManagerProject Supervisor IProject Supervisor IIEngineer IEngineer IIEngineer IIIHydrogeologist IHydrogeologist IIHydrogeologist IIIScientist IScientist IIScientist IIIField Technician IField Technician IIField Technician IIICADD/GIS ICADD/GIS IIAccounting IAccounting IIAdministrative Support IAdministrative Support IIAsbestos InspectorExterior Abatement WorkerExterior Asbestos SupervisorAsbestos WorkerAsbestos SupervisorAsbestos Project DesignerAsbestos Management Planner
Classifications included in Rate Titles:Project Director IScientist IVScientist VEngineer IEngineer IIEngineer IIIScientist IScientist IIScientist IIIScientist IScientist IIScientist IIITechnician ITechnician IIITechnician IIITechnician IVScientist IAccountant IAccountant IIProject Administrator IProject Administrator IIScientist Ieaw1eas1aw1as1apd1amp1
Project Director IIScientist VScientist VIEngineer IIEngineer IIIEngineer IVScientist IIScientist IIIScientist IVTechnician IIScientist IScientist IITechnician IIftII2Scientist IcadI2Engineer IAccountant IIAccountant IIIProject Administrator IIProject Administrator IIScientist IIeaw2eas2aw2as2apd2amp2
Project Director IIIScientist VIScientist VIIEngineer IIIEngineer IVEngineer VhI3hII3Engineer ITechnician IIITechnician IVTechnician VTechncian IIIftII3Technician VcadI3cadII3accI3accII3Project Administrator IIIProject Administrator IIEngineer Ieaw3eas3aw3as3apd3amp3
cm4psI4psII4eI4eII4eIII4hI4hII4hIII4sI4sII4sIII4ftI4ftII4ftIII4cadI4cadII4accI4accII4admI4admII4ai4eaw4eas4aw4as4apd4amp4
cm5psI5psII5eI5eII5eIII5hI5hII5hIII5sI5sII5sIII5ftI5ftII5ftIII5cadI5cadII5accI5accII5admI5admII5ai5eaw5eas5aw5as5apd5amp5
cm6psI6psII6eI6eII6eIII6hI6hII6hIII6sI6sII6sIII6ftI6ftII6ftIII6cadI6cadII6accI6accII6admI6admII6ai6eaw6eas6aw6as6apd6amp6
cm7psI7psII7eI7eII7eIII7hI7hII7hIII7sI7sII7sIII7ftI7ftII7ftIII7cadI7cadII7accI7accII7admI7admII7ai7eaw7eas7aw7as7apd7amp7
cm8psI8psII8eI8eII8eIII8hI8hII8hIII8sI8sII8sIII8ftI8ftII8ftIII8cadI8cadII8accI8accII8admI8admII8ai8eaw8eas8aw8as8apd8amp8
cm9psI9psII9eI9eII9eIII9hI9hII9hIII9sI9sII9sIII9ftI9ftII9ftIII9cadI9cadII9accI9accII9admI9admII9ai9eaw9eas9aw9as9apd9amp9
cm10psI10psII10eI10eII10eIII10hI10hII10hIII10sI10sII10sIII10ftI10ftII10ftIII10cadI10cadII10accI10accII10admI10admII10ai10eaw10eas10aw10as10apd10amp10
EXAMPLE:0
Rate Title: Scientist I
Classifications included in title: Staff scientist 1
Arborist
Geologist 1
Geologist 2
Senior Project Technical 1
Senior Project Technical 2

Tab 3 Average Wage Rate Calc

AECOM TeamFill in only those cells highlighted in blue. Cells in green are calculated.Do not alter or change the formulas.
Enter the hourly rate for each classification shown
TitleAverage Hourly RateClassification 1Hourly rate 1Classification 2Hourly Rate 2Classification 3Hourly Rate 3Classification 4Hourly Rate 4Classification 5Hourly Rate 5Classification 6Hourly Rate 6Classification 7Hourly Rate 7Classification 8Hourly Rate 8Classification 9Hourly Rate 9Classification 10Hourly Rate 10
Contract Manager$76.67Project Director I$ 72.38Project Director II$ 77.00Project Director III$ 80.62cm4cm5cm6cm7cm8cm9cm10
Project Supervisor I$50.00Scientist IV$ 47.00Scientist V$ 50.00Scientist VI$ 53.00psI4psI5psI6psI7psI8psI9psI10
Project Supervisor II$66.67Scientist V$ 61.70Scientist VI$ 66.90Scientist VII$ 71.40psII4psII5psII6psII7psII8psII9psII10
Engineer I$48.89Engineer I$ 43.30Engineer II$ 49.29Engineer III$ 54.08eI4eI5eI6eI7eI8eI9eI10
Engineer II$57.41Engineer II$ 52.58Engineer III$ 57.15Engineer IV$ 62.50eII4eII5eII6eII7eII8eII9eII10
Engineer III$62.96Engineer III$ 58.18Engineer IV$ 63.10Engineer V$ 67.60eIII4eIII5eIII6eIII7eIII8eIII9eIII10
Hydrogeologist I$39.26Scientist I$ 34.60Scientist II$ 43.91hI3hI4hI5hI6hI7hI8hI9hI10
Hydrogeologist II$46.67Scientist II$ 41.50Scientist III$ 51.83hII3hII4hII5hII6hII7hII8hII9hII10
Hydrogeologist III$54.07Scientist III$ 49.29Scientist IV$ 63.81Engineer I$ 49.10hIII4hIII5hIII6hIII7hIII8hIII9hIII10
Scientist I$32.59Scientist I$ 38.90Technician II$ 27.46Technician III$ 31.40sI4sI5sI6sI7sI8sI9sI10
Scientist II$38.15Scientist II$ 41.31Scientist I$ 31.99Technician IV$ 41.15sII4sII5sII6sII7sII8sII9sII10
Scientist III$45.93Scientist III$ 50.28Scientist II$ 42.07Technician V$ 45.43sIII4sIII5sIII6sIII7sIII8sIII9sIII10
Field Technician I$24.81Technician I$ 19.50Technician II$ 25.84Techncian III$ 29.10ftI4ftI5ftI6ftI7ftI8ftI9ftI10
Field Technician II$29.26Technician III$ 29.26ftII2ftII3ftII4ftII5ftII6ftII7ftII8ftII9ftII10
Field Technician III$35.93Technician III$ 29.73Scientist I$ 34.80Technician V$ 43.26ftIII4ftIII5ftIII6ftIII7ftIII8ftIII9ftIII10
CADD/GIS I$30.37Technician IV$ 30.37cadI2cadI3cadI4cadI5cadI6cadI7cadI8cadI9cadI10
CADD/GIS II$41.11Scientist I$ 38.85Engineer I$ 43.37cadII3cadII4cadII5cadII6cadII7cadII8cadII9cadII10
Accounting I$31.48Accountant I$ 27.78Accountant II$ 35.17accI3accI4accI5accI6accI7accI8accI9accI10
Accounting II$42.59Accountant II$ 34.85Accountant III$ 50.32accII3accII4accII5accII6accII7accII8accII9accII10
Administrative Support I$24.07Project Administrator I$ 21.22Project Administrator II$ 24.00Project Administrator III$ 27.00admI4admI5admI6admI7admI8admI9admI10
Administrative Support II$35.93Project Administrator II$ 23.29Project Administrator II$ 34.00Project Administrator II$ 50.50admII4admII5admII6admII7admII8admII9admII10
Asbestos Inspector$41.11Scientist I$ 38.79Scientist II$ 41.28Engineer I$ 43.26ai4ai5ai6ai7ai8ai9ai10
Exterior Abatement Worker$0.00eaw1$ - 0eaw2eaw3eaw4eaw5eaw6eaw7eaw8eaw9eaw10
Exterior Asbestos Supervisor$0.00eas1$ - 0eas2eas3eas4eas5eas6eas7eas8eas9eas10
Asbestos Worker$0.00aw1$ - 0aw2aw3aw4aw5aw6aw7aw8aw9aw10
Asbestos Supervisor$0.00as1$ - 0as2as3as4as5as6as7as8as9as10
Asbestos Project Designer$0.00apd1$ - 0apd2apd3apd4apd5apd6apd7apd8apd9apd10
Asbestos Management Planner$0.00amp1$ - 0amp2amp3amp4amp5amp6amp7amp8amp9amp10
Example:Average Hourly RateClassification 1Hourly rate 1Classification 2Hourly Rate 2Classification 3Hourly Rate 3Classification 4Hourly Rate 4Classification 5Hourly Rate 5Classification 6Hourly Rate 6
Scientist$30.57Staff Scientist 1$ 21.20Staff Scientist 2$ 23.70Staff Scientist 3$ 27.50Geologist 1$ 32.50Geologist 2$ 37.50Senior Project Technical$ 41.00

Tab 4 Fueling System Removal

AECOM TeamFueling System Removal
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateGen'l, H&S, Pre-FieldField WorkDisposalReportingTask 5Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotalSubcontractorTaskTotal
Contract Manager$76.6711$ 76.67PID (OVM)1Day$75$ 75.00Tank remover/cleanerTank Sys'm Rem'l, Disposal$ 8,600.00
Project Supervisor I$50.0061310$ 500.00Level D PPE2Day$15$ 30.00Landfill (Haul & Disposal)Disposal: 1 Load C-Soil$ 1,500.00
Project Supervisor II$66.670$ - 0Field Supplies1LS$10$ 10.00LaboratorySoil & Wastewater Testing$ 2,895.00
Engineer I$48.890$ - 0Vehicle Usage20Mile$0.51$ 10.20$ - 0
Engineer II$57.410$ - 0Lunch1Day$12$ 12.00$ - 0
Engineer III$62.960$ - 0$ - 0$ - 0
Hydrogeologist I$39.260$ - 0$ - 0$ - 0
Hydrogeologist II$46.670$ - 0$ - 0$ - 0
Hydrogeologist III$54.070$ - 0$ - 0$ - 0
Scientist I$32.5922$ 65.17$ - 0$ - 0
Scientist II$38.150$ - 0$ - 0$ - 0
Scientist III$45.930$ - 0$ - 0$ - 0
Field Technician I$24.8121041228$ 694.77$ - 0$ - 0
Field Technician II$29.260$ - 0$ - 0$ - 0
Field Technician III$35.930$ - 0$ - 0$ - 0
CADD/GIS I$30.370$ - 0$ - 0$ - 0
CADD/GIS II$41.110$ - 0$ - 0$ - 0
Accounting I$31.4844$ 125.90$ - 0$ - 0
Accounting II$42.590$ - 0$ - 0$ - 0
Administrative Support I$24.07224$ 96.29$ - 0$ - 0
Administrative Support II$35.930$ - 0$ - 0$ - 0
Asbestos Inspector$41.110$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$0.000$ - 0$ - 0$ - 0
Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Project Designer$0.000$ - 0$ - 0$ - 0
Asbestos Management Planner$0.000$ - 0$ - 0$ - 0

Total Staff Labor $ 1,558.80 Total Direct Expenses $ 137.20 Total Subcontracts $ 12,995.00

Tab 5 Phase 2 Site Assessment

AECOM TeamPhase 2 Site Assessment
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateGen'l, H&S, Pre-FieldField Work & AnalysisReportingTask 4Task 5Task 6Task 7Task 8Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotal costSubcontractorTaskTotal cost
Contract Manager$76.6711$ 76.67PID (OVM)1Day$75$ 75.00Driller (direct-push)Soil Borings & Sampling$ 2,600.00
Project Supervisor I$50.0061310$ 500.00Level D PPE1Day$15$ 15.00LaboratorySoil & Water Analysis$ 3,468.00
Project Supervisor II$66.670$ - 0Field Supplies1LS$10$ 10.00$ - 0
Engineer I$48.890$ - 0Vehicle Usage10Mile$0.51$ 5.10$ - 0
Engineer II$57.410$ - 0Lunch1Day$12$ 12.00$ - 0
Engineer III$62.960$ - 0$ - 0$ - 0
Hydrogeologist I$39.260$ - 0$ - 0$ - 0
Hydrogeologist II$46.670$ - 0$ - 0$ - 0
Hydrogeologist III$54.070$ - 0$ - 0$ - 0
Scientist I$32.5922$ 65.17$ - 0$ - 0
Scientist II$38.150$ - 0$ - 0$ - 0
Scientist III$45.930$ - 0$ - 0$ - 0
Field Technician I$24.814102034$ 843.65$ - 0$ - 0
Field Technician II$29.260$ - 0$ - 0$ - 0
Field Technician III$35.930$ - 0$ - 0$ - 0
CADD/GIS I$30.370$ - 0$ - 0$ - 0
CADD/GIS II$41.110$ - 0$ - 0$ - 0
Accounting I$31.4844$ 125.90$ - 0$ - 0
Accounting II$42.590$ - 0$ - 0$ - 0
Administrative Support I$24.07224$ 96.29$ - 0$ - 0
Administrative Support II$35.930$ - 0$ - 0$ - 0
Asbestos Inspector$41.110$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$0.000$ - 0$ - 0$ - 0
Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Project Designer$0.000$ - 0$ - 0$ - 0
Asbestos Management Planner$0.000$ - 0$ - 0$ - 0
Total Staff Labor$ 1,707.68Total Direct Expenses$ 117.10Total Subcontracts$ 6,068.00

Tab 6 Construction Dewatering

AECOM TeamConstruction Dewatering
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateGen'l, H&S and Pre-FieldField Work and AnalysisReportingTask 4Task 5Task 6Task 7Task 8Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotal costSubcontractorTaskTotal cost
Contract Manager$76.6711$ 76.67PID (OVM)2Day$118$ 236.00None$ - 0
Project Supervisor I$50.0062210$ 500.00Level D PPE2Day$15$ 30.00$ - 0
Project Supervisor II$66.670$ - 0Field Supplies (expendable)1LS$10$ 10.00$ - 0
Engineer I$48.890$ - 02,500-gallon Poly Tanks2Each3,000$ 6,000.00$ - 0
Engineer II$57.410$ - 0Vehicle Mileage20Mile$0.51$ 10.20$ - 0
Engineer III$62.960$ - 0Lunch2day$12$ 24.00$ - 0
Hydrogeologist I$39.260$ - 0$ - 0$ - 0
Hydrogeologist II$46.670$ - 0$ - 0$ - 0
Hydrogeologist III$54.070$ - 0$ - 0$ - 0
Scientist I$32.5922$ 65.17$ - 0$ - 0
Scientist II$38.150$ - 0$ - 0$ - 0
Scientist III$45.930$ - 0$ - 0$ - 0
Field Technician I$24.812161230$ 744.40$ - 0$ - 0
Field Technician II$29.260$ - 0$ - 0$ - 0
Field Technician III$35.930$ - 0$ - 0$ - 0
CADD/GIS I$30.370$ - 0$ - 0$ - 0
CADD/GIS II$41.110$ - 0$ - 0$ - 0
Accounting I$31.4844$ 125.90$ - 0$ - 0
Accounting II$42.590$ - 0$ - 0$ - 0
Administrative Support I$24.07123$ 72.22$ - 0$ - 0
Administrative Support II$35.930$ - 0$ - 0$ - 0
Asbestos Inspector$41.110$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$0.000$ - 0$ - 0$ - 0
Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Project Designer$0.000$ - 0$ - 0$ - 0
Asbestos Management Planner$0.000$ - 0$ - 0$ - 0

Total Staff Labor $ 1,584.36 Total Direct Expenses $ 6,310.20 Total Subcontracts $ - 0

Tab 7 Pre-Acquisition Assessmen

AECOM TeamPre- Acquisition Site Assessment
STAFF HOURSDirect ExpensesSubcontract
ClassificationHourly rateGen'l, H&S, Pre-FieldField Work & AnalysisReportingTask 4Task 5Task 6Task 7Task 8Total HoursTotal costItemQuantityUnit or rateRate or Unit CostTotal costSubcontractorTaskTotal cost
Contract Manager$76.6711$ 76.67PID (OVM)1Day$75$ 75.00Driller (direct-push)Soil Borings & Sampling$ 2,600.00
Project Supervisor I$50.0061310$ 500.00Level D PPE1Day$15$ 15.00LaboratorySoil & Water Samples Analysis$ 6,537.00
Project Supervisor II$66.670$ - 0Field Supplies1LS$10$ 10.00$ - 0
Engineer I$48.890$ - 0Vehicle Usage10Mile$0.51$ 5.10$ - 0
Engineer II$57.410$ - 0Lunch1Day$12$ 12.00$ - 0
Engineer III$62.960$ - 0$ - 0$ - 0
Hydrogeologist I$39.260$ - 0$ - 0$ - 0
Hydrogeologist II$46.670$ - 0$ - 0$ - 0
Hydrogeologist III$54.070$ - 0$ - 0$ - 0
Scientist I$32.5922$ 65.17$ - 0$ - 0
Scientist II$38.150$ - 0$ - 0$ - 0
Scientist III$45.930$ - 0$ - 0$ - 0
Field Technician I$24.814102236$ 893.28$ - 0$ - 0
Field Technician II$29.260$ - 0$ - 0$ - 0
Field Technician III$35.930$ - 0$ - 0$ - 0
CADD/GIS I$30.370$ - 0$ - 0$ - 0
CADD/GIS II$41.110$ - 0$ - 0$ - 0
Accounting I$31.4844$ 125.90$ - 0$ - 0
Accounting II$42.590$ - 0$ - 0$ - 0
Administrative Support I$24.07123$ 72.22$ - 0$ - 0
Administrative Support II$35.930$ - 0$ - 0$ - 0
Asbestos Inspector$41.110$ - 0$ - 0$ - 0
Exterior Abatement Worker$0.000$ - 0$ - 0$ - 0
Exterior Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Worker$0.000$ - 0$ - 0$ - 0
Asbestos Supervisor$0.000$ - 0$ - 0$ - 0
Asbestos Project Designer$0.000$ - 0$ - 0$ - 0
Asbestos Management Planner$0.000$ - 0$ - 0$ - 0

Total Staff Labor $ 1,733.24 Total Direct Expenses $ 117.10 Total Subcontracts $ 9,137.00

Tab 8 Residential Lead Sampling

AECOM TeamResidential Lead Sampling
Sample TypePrice per SampleExpedited Turnaround Price per Sample
Paint chips$10$54
Bulk Lead Sampling$62$193
Wipe Sampling$9.55$54

Total Cost Score

CategoryMarket BasketTotal Cost
Environmental Assessment{(Labor + Labor*overhead)*profit +(Labor + Labor*overhead)+Direct Expenses + Subcontractor}* Market Basket
Fueling system Removal22381611.0974016
Phase 2 Site Assessment1571695805.8880416
Construction Dewatering25264825.868586667
Pre-Acquisition Assessment46641211.809335467
Total Environmental Assessment COST2983454.66336533
Residential Lead SamplingMarket basket
Paint Chips5$ 50.00
Bulk Lead100$ 6,200.00
Wipe1250$ 11,937.50
Paint chips expedited0$ - 0
Bulk Lead expedited10$ 1,930.00
Wipe Expedited3000$ 162,000.00

Total Residential Lead Sampling Cost $ 182,117.50

Program Management AssistanceNumber of HoursStaff classificationtotal
1040Admin Support 1$ 25,036.27
40Project supervisor 2$ 2,666.67
20Contract Manager$ 1,533.33
40CADD/GIS 2$ 1,644.40
Total Program Management Assistance Cost$ 30,880.67
Market Basket
Asbestos inspection
Normal one person844$ 2,110,000.00
Asbestos plus bats
confined space, two people35$ 420,000.00
Total Asbestos Inspection cost$ 2,530,000.00

Total Cost 5726452.830032