RFP
1 MB Posted
- Attached to
- Escalator Modernization
- Solicitation number
- RFPGWCC081123EC
- Issued by
- Fulton County, Georgia
About this file
This Request for Proposal (RFP) is issued by the Georgia World Congress Center Authority for escalator modernization services at the Georgia World Congress Center located in Atlanta, Georgia. The project involves the modernization of twenty escalators in the "B" Wing, designated as units #5-24, consisting of two 48-inch wide escalators (units #23-24) with 40-inch steps and a 13-foot rise, and eighteen 32-inch wide escalators (units #5-22) with 24-inch steps and a 20-foot rise. All escalators will operate at 100 feet per minute with reversible operation at a 30-degree angle of inclination. The scope of work includes all engineering, labor, materials, transportation, and equipment necessary to complete the modernization, along with warranty preventive maintenance for 12 months commencing at the end of the second escalator's completion. A mandatory proposal conference and site visit is scheduled for August 25, 2023, at 11:00 AM at the Georgia World Congress Center Authority's boardroom in Building B. Written questions and requests for clarification must be submitted by August 28, 2023, at 2:00 PM. Quotations must be submitted via email to Erle Coleman at EColeman@GWCC.com by 10:00 AM on September 6, 2023. All quotations will remain open for acceptance for 180 days following the submission deadline. Contractor selection will be based on cost of required work, cost of interim maintenance, cost of warranty maintenance, completion schedule, successful completion of similar projects, and maintenance capability in the project location.
Pricing shall be provided as firm quotations with no escalation permitted if the contract is awarded within 180 days of the quotation due date; awards deferred beyond 180 days may allow for adjustment to reflect changes in labor and material costs. The contractor must provide evidence of experience, qualifications, and financial ability to carry out contract requirements. All work must comply with ASME A17.1 and A17.2 codes, the National Electrical Code, ADA accessibility standards, and local building codes. The contractor is responsible for obtaining all necessary permits and scheduling required inspections and tests with local authorities. The payment schedule consists of 25 percent downpayment at contract award, 35 percent upon material delivery, 30 percent as progress payment, and 10 percent retention upon completion of all work to the owner's satisfaction. Warranty maintenance is included in the base quotation and shall provide 24-hour emergency callback service with monthly preventive maintenance using only components produced by the original manufacturer. The contractor must also supply three sets of project manuals, complete as-built wiring diagrams, maintenance control programs, diagnostic equipment with access codes, parts catalogs, and four sets of properly tagged keys prior to final payment.
Text of this file
GEORGIA WORLD CONGRESS CENTER
ESCALATOR MODERNIZATION
Georgia World Congress Center Authority 285 Andrew Young International Blvd NW
Atlanta, Georgia 30313
Prepared by
Lerch Bates Inc.
900 Circle 75
Suite 1300 Atlanta, Georgia 30339
PROCUREMENT OBJECTIVE
1. Summary Statement
Notice is hereby given the Georgia World Congress Center Authority (hereafter referred to as “Authority” or “Owner”) is soliciting competitive sealed proposals from qualified and experienced companies ordinarily engaged in the business of escalator modernization as it pertains to the project specified in detail herein, located at the Georgia World Congress Center Authority in accordance with the terms, conditions, and requirements set forth in this Request for Proposal (RFP) and further defined herein.
2. Issuing Officer and Authority Contract
This RFP is being issued by the Georgia World Congress Center Authority, which is the only office authorized to change, modify, clarify, etc., the provisions of this RFP and to award any contract(s) resulting from the RFP.
The Issuing Officer and sole point of contact for administrative and technical issues regarding this RFP is:
Erle Coleman, Director of Supply Chain Management Georgia World Congress Center Authority 285 International Boulevard, NW Atlanta, Georgia 30313-1591 Telephone: (404) 223-4244 E-mail: ecoleman@gwcc.com
The Issuing Officer may designate others to act on his/her behalf. The Authority may change the Issuing Officer or the limits of his/her authority at its discretion.
3. Mandatory Proposal Conference/Site Visit
A Mandatory proposal conference/Site Visit will be held on August 25th at 11:00 A.M. at the following location:
Georgia World Congress Center Authority Authority Boardroom Building B, Administration 285 Andrew Young International Blvd Atlanta, Georgia 30313
Attendance at this conference is Mandatory in order to submit a quotation. Two (2) representatives from each firm may attend. A map to the facilities and the parking decks is available at http://www.gwcc.com/pdf/gwccmap.pdf.. For information regarding this conference contact: Erle Coleman, Georgia World Congress Center Authority, (404) 223- 4244.
The purpose of this conference will be to clarify the contents of this Request for Quotation in order to help ensure a thorough understanding of the Authority’s requirements. Any questions as to the requirements of this Request for Quotation, or any apparent omission or discrepancy should mailto:ecoleman@gwcc.com http://www.gwcc.com/pdf/gwccmap.pdf be presented to the Authority’s representatives at this conference. This conference also provides a forum by which interested parties will have equal access to relevant RFP information prior to the final quotation submission.
4. Obtaining Quotation Documents
The complete RFP package Documents, scope of work, quotation form and associated Addendum (if issued) will be PUBLICALLY POSTED on the GEORGIA PROCUREMENT REGISTRY at the following web address (and may be directly downloaded using Acrobat 7.0):
http://ssl.doas.state.ga.us/PRSapp/PR_index.jsp
5. Quotation Submission and Deadline
Quotations will be emailed to the following:
Georgia World Congress Center Authority 285 International Boulevard, NW Atlanta, Georgia 30313-1591 Attn: Erle Coleman, Supply Chain Management Director E m a i l :
E C o l e m a n @ g w c c . c o m Telephone: (404) 223-4244
Such submission will be received until 10:00 A.M. on September 6, 2023.
Any proposal received after the date and time specified or prepared, or submitted may not be eligible for consideration.
6. Duration of Offer
Once submitted, a quotation becomes the property of the Authority and constitutes an offer by the Proposer that may not be revoked or withdrawn after the time set for deadline for receipt of quotations and shall remain open for acceptance for a period of One Hundred and Eighty
(180) days following such time, and thereafter only in writing.
7. Proposer Questions: Requests for Information, Extensions of Deadlines, or Addenda
Proposers are expected to exercise their best professional independent judgment in analyzing the requirements of this RFP to ascertain whether additional clarification is necessary or desirable before responding.
Proposer questions, interpretations of this document, requests for information, requests for extensions of quotation deadlines, or requests for clarification of the scope of services/work shall be submitted in writing to the Issuing Officer ONLY at the e-mail address provided. Questions and requests submitted shall be numbered and separated from each other by at least two-line spaces. The e-mail message title shall reference the RFP title and number. To be given consideration these questions shall be submitted to the Authority by no later than August 28th, 2023 2:00 p.m. The Authority may, but is not required to, answer questions submitted. If, upon http://ssl.doas.state.ga.us/PRSapp/PR_index.jsp review of such questions/requests, the Authority deems that a change in any part of the quotation documents is in order, an addendum addressing that change may be issued to all interested parties via the Georgia Procurement Registry. All interested parties are responsible for monitoring the site for the latest information regarding the proposed project. Failure of any Proposer to receive any such addenda or interpretation shall not relieve the Proposer from any obligation that shall apply to their quotation as submitted. All addenda so issued shall become part of this RFP. Requests for extensions of quotation deadline(s) will be reviewed by the Authority and may be approved or denied at the sole discretion of the Authority.
Corrections, changes or clarifications, if required, will be made in written addenda. The Authority will not be responsible for any other instructions, interpretations, or explanations. Any written addenda to the quotation documents issued by the Authority prior to the quotation acceptance deadline will be considered a part of these documents. No response other than written will be binding upon the Authority. (See also “Restrictions of Communications”)
BACKGROUND and INTENT
General Information
1. Organizational Context:
The Georgia World Congress Center (GWCC) hosts a wide variety of conventions, consumer/trade shows and corporate events each year. Owned by the State of Georgia and operated by the Georgia World Congress Center Authority the GWCC encompasses 3.9 million square feet and is among the largest convention centers in the nation in terms of prime exhibit space. The GWCC contains 12 exhibit halls offering 1.4 million square feet of prime exhibit space in addition to 105 meeting rooms encompassing. Additionally, the GWCC offers two ballrooms - 33,000 and 25,700 square feet, a 1,746-seat auditorium and two plazas. The Georgia International Plaza includes a parking deck and pedestrian plaza on Andrew Young International Boulevard adjacent to the Georgia World Congress Center.
Centennial Olympic Park is the largest center-city park to be developed in the United States in the last 20 years. The 21-acre park was developed and is operated by the Georgia World Congress Center Authority and hosts a variety of events, from corporate receptions and picnics to major concerts and festivals. Centennial Olympic Park is located adjacent to the Georgia World Congress Center.
1. Intent
The intent of this project is to provide the Owner a quotation for the Escalator Modernization.
The Contractor is to provide to the Owner, as a minimum equipment , labor, materials and such other appurtenances as are required.
END OF SECTION I
LERCH BATES INC.
Elevator Consul�ng Group ESCALATORS
SECTION 00020
TABLE OF CONTENTS
PART 1 - GENERAL
1.1 PROJECT: ESCALATOR MODERNIZATION
1.2 CONTRACT DOCUMENTS
1.3 CONSTRUCTION SCHEDULE
1.4 ELECTRONIC QUOTATION
1.5 NOTICE OF INTENT TO SUBMIT A QUOTATION
1.6 OPENING
1.7 QUOTATION
1.8 PURCHASER’S RIGHTS
Georgia World Congress Center B 5-24 August 5, 2023 LB Project No. 0100044069 00020 - 1 2023 Lerch Bates Inc.
SECTION 00020
REQUEST FOR QUOTATION
PART 1 - GENERAL
1.1 PROJECT: ESCALATOR IN TRUSS MODERNIZATION
The Georgia World Congress Center
285 Andrew Young Interna�onal Blvd.
Atlanta, GA 30313
“B” Wing Escalators #5-24
A. Lerch Bates Inc. has been authorized by The Georgia World Congress Center to request your firm to submit a quota�on for:
1. All engineering, labor, materials, transporta�on, services, and equipment necessary and reasonably incidental to perform work required by Contract Documents.
2. Warranty preven�ve maintenance.
3. Con�nuing preven�ve maintenance subsequent to comple�on of work.
1.2 CONTRACT DOCUMENTS
A. One set of electronic contract documents are provided for your use.
B. Make inquiries to Director of Supply Chain, Erle Coleman.
C. Permission to review exis�ng equipment and site condi�ons shall be secured from Erle Coleman, 404223-4244 EColeman@GWCC.com.
D. We will be conduc�ng a site visit of this property on August 25th at 11:00 am for all interested bidders.
1.3 CONSTRUCTION SCHEDULE
A. See Sec�on 00310, “Quota�on Form” for project schedule.
1.4 ELECTRONIC QUOTATION
A. Email quota�ons will be received un�l 5:00 pm prevailing local �me on September 6, 2023 iden�fied as follows:
Georgia World Congress Center B 5-24 August 5, 2023 LB Project No. 0100044069 00020 - 2
Contractor Address
City/State/Zip
ESCALATOR MODERNIZATION
The Georgia World Congress Center 285 Andrew Young Interna�onal Blvd Atlanta, GA 30313
CONFIDENTIAL QUOTATION
Email quota�on to: The Georgia World Congress Center 285 Andrew young Interna�onal Blvd.
Atlanta, GA 30313 Atn: Erle Coleman EColeman@GWCC.com
B. Quota�ons must be submited on form provided as a part of Contract Documents, Sec�on 00310.
Quota�ons shall be subject to all requirements of Contract Documents, site condi�ons, General Condi�ons, Supplementary and Special Condi�ons and any other documents issued in connec�on with project. All blank spaces and ques�ons on the quota�on form must be completed and/or responded to.
Failure to comply will cons�tute a non-responsive submital.
C. If Contractor desires to furnish items different from specified, Contractor shall submit subs�tu�on as an alternate quota�on. Contractor shall supply Consultant with informa�on in regard to proposed subs�tu�on of components or materials. Consultant shall decide whether the Contractor’s subs�tu�on is equivalent to that specified. Devia�on from requirements of Contract Documents shall be stated, in wri�ng, in Contractor’s transmital leter submited with quota�on.
1.5 NOTICE OF INTENT TO SUBMIT A QUOTATION
A. Contractors who elect not to provide a quota�on a�er having reviewed Contract Documents and site condi�ons shall no�fy Consultant no later than ten (10) working days prior to quota�on due date.
Failure to submit a quota�on without prior no�ce will be construed as jus�fiable cause for elimina�on of such Contractor for future considera�on.
1.6 OPENING
A. Opening of quota�ons will be in private. Contractor selec�on will be based upon the following criteria:
1. Cost of required work.
2. Cost of interim maintenance.
3. Cost of warranty maintenance.
4. Comple�on schedule.
Georgia World Congress Center B 5-24 August 5, 2023 LB Project No. 0100044069 00020 - 3
5. Contractor’s successful comple�on of similar projects and track record in the loca�on of project.
6. Contractor’s maintenance capability in the loca�on of the project.
1.7 QUOTATION
A. All quota�ons shall be firm. Escala�on will not be permited if Contract is awarded within 180 days from quota�on due date.
B. If award is deferred beyond 180 days, Contractors’ quota�ons shall be subject to adjustment to reflect changes in the cost of labor and material.
1.8 CONTRACTOR
A. Contractor shall be prepared to provide evidence of experience, qualifica�ons and financial ability to carry out the requirements of the Contract Documents.
1.9 PURCHASER’S RIGHTS
A. Purchaser reserves right to reject any or all quota�ons, to accept other than lowest quota�on and to waive any informality in connec�on with opening and award of Contract.
END OF SECTION
Elevator Consulting Group ESCALATORS
SECTION 00100
PART 1 - GENERAL
1.1 EXAMINATION
1.2 EXISTING MAINTENANCE CONTRACT
Georgia World Congress Center B 5-24 LB Project No. 0100044069
2023 Lerch Bates Inc.
August 5, 2023 00100 - 1
SECTION 00100
INSTRUCTIONS TO CONTRACTOR
PART 1 - GENERAL
1.1 EXAMINATION
A. In order to discover and resolve conflicts or lack of definition which might create problems, Contractor must review Contract Documents, existing site conditions, and existing equipment specified to be retained for compatibility with its product prior to submitting quotation. Site review shall include, but not be limited to adequacy of access, retained equipment, wellways, overhead clearances, electrical power characteristics, structural supports, etc. Investigation and structural calculations required to determine compliance of existing escalator components including support beams, with ASME A17.1, Rule 8.7.2.15.2, are responsibility of Contractor. Attach specific, written exception and/or clarification with quotation. Compliance with all provisions of Contract Documents is assumed and required in absence of written exception. If written exception is acceptable to Contractor and Consultant, an Addendum to the specifications will be issued and authorized. Purchaser will not pay for change to building structure, structural supports, mechanical, electrical or other systems required to accommodate Contractor’s equipment if not identified before Contract award and authorized as stipulated above.
B. Submission of quotation is considered evidence that Contractor has visited and is conversant with the site facilities, site conditions, requirements of the Contract Documents, pertinent state and local codes, state of labor and material markets, and has made due allowance in his quotation for all contingencies.
Should Contractor’s investigation of site conditions or local codes or rules reveal requirements contrary to Contract Documents, or if Contractor finds any discrepancies or omissions from Contract Documents, or if Contractor is in doubt as to their meaning, they shall contact the Consultant for clarification at least five working days prior to quotation due date.
C. No oral explanation will be made and no oral instructions will be given before quotation due date.
Contractor shall act promptly and allow sufficient time for a reply to reach him before submission of his quotation. Any required interpretation or supplemental instructions will be issued in the form of an addendum to the specifications and forwarded to all pre-qualified Contractors.
D. Provide everything necessary for and incidental to the satisfactory completion of work required by Contract Documents. All required preparations and hoisting and movement of new equipment, reused equipment, or removal of existing equipment shall be the responsibility of Contractor.
1.2 EXISTING MAINTENANCE CONTRACT
A. The existing maintenance contract will be suspended from the time of manning the project to the completion of the warranty maintenance period. During that time the maintenance and callback responsibilities of the 2nd escalator to be modernized will be the responsibility of the GWCC Escalator maintenance provider (Kone). When the first escalator is completed tested by the State and Accepted for public use, the responsibility of the maintenance will fall on the successful contractor.
SECTION 00310
PART 1 - GENERAL
1.1 CONTRACTOR’S BASE QUOTATION
1.2 ADDENDA
1.3 CONTRACTOR’S OTHER SUPPORTING ENCLOSURES
1.4 PROPOSED MODERNIZATION INSTALLATION SCHEDULE
1.5 CONTRACTOR PROPOSED MODERNIZATION COMPONENTS AND TECHNOLOGY
1.6 CONTRACTOR’S LIST OF SUBCONTRACTORS
1.7 SUBMISSION AND ACCEPTANCE OF QUOTATIONS
1.8 ALTERNATES
1.9 CONTRACTOR SIGNATURE
2023 Lerch Bates Inc.
00310 - 1
SECTION 00310
QUOTATION FORM
DATE:
PROJECT:
SUBMITTED BY:
Name of CONTRACTOR
CONTRACTOR’S Representative Telephone Number
Street Address
City State Zip Code
TO Company The Georgia World Congress Center
Address 285 Andrew Young International Blvd.
City, State Zip Atlanta, GA 30313
Attn: Attn: Erle Coleman (EColeman@GWCC.com) mailto:EColeman@GWCC.com
2023 Lerch Bates Inc.
00310 - 2
PART 1 - GENERAL
1.1 CONTRACTOR’S BASE QUOTATION
A. Having examined documents prepared by Lerch Bates Inc. dated May 15, 2023, and having reviewed site conditions, applicable codes and all conditions affecting and governing the work, the Undersigned Contractor hereby offers to provide all engineering, labor, materials, transportation, services and equipment necessary and incidental to properly execute required work of the Contract Documents for the sum of:
Item: 1 In-Truss Escalator Modernization: #5-#24
Section: 143100
Dollars $
Item: 2 Related Building Work: ##5-#24
Section: 01900
Total of the above items: 1 through 2
B. MAINTENANCE
1. 12-Month Warranty Preventive Maintenance commencing at the end of the 2nd escalator:
Amount included in base quotation Item A., 1, 2, above.
Total Included in Item A.
Escalator #5-#24: $ /Month
NOTE: Purchaser reserves the right to pay warranty maintenance cost in a lump sum or on a monthly basis during period maintenance is actually performed.
2. Contract Maintenance: None associated with this project.
C. Enter a cost figure for all pricing requested. Failure to comply, subjects quotation to disqualification.
2023 Lerch Bates Inc.
00310 - 3
D. Undersigned affirms that quotations provided represent entire cost including site conditions, code requirements, drawings, specifications, addenda, and any other Contract Documents, and no claim will be made due to any increase in wage scales, material prices, taxes, insurance, cost indexes or any other factors affecting the construction industry or this project except as expressly allowed in Owner’s maintenance contract.
1.2 ADDENDA
Undersigned acknowledges receipt of Addendum No. through
1.3 CONTRACTOR’S OTHER SUPPORTING ENCLOSURES
A. Undersigned has enclosed the following (Check YES or NO):
1. Separate letter containing any “Qualification” related to its Quotation. YES NO
2. Separate Substitution Proposal. YES NO
1.4 PROPOSED MODERNIZATION INSTALLATION SCHEDULE
A. Undersigned contractor submits the following completion schedule for project. Bidders are instructed to add additional rows to the following schedule grid to accommodate job specific phasing.
PHASE # PHASE DURATION
(WEEKS)
1 Engineering Surveys
2 Submittal Preparation
3 Client Approval Period
4 Engineering, Procurement and Fabrication
5 In Truss Modernization Escalators #23-24
6 In Truss Modernization Escalators #20-22
7 In Truss Modernization Escalators #17-19
8 In Truss Modernization Escalators #14-16
9 In Truss Modernization Escalators #11-13
10 In Truss Modernization Escalators #8-10
11 In Truss Modernization Escalators #5-7
12 Total Project Duration
1.5 CONTRACTOR PROPOSED MODERNIZATION COMPONENTS AND TECHNOLOGY
A. Undersigned Contractor will utilize the following modernization technology for the projects and submits these systems for approval. Upon acceptance of these systems by Purchaser/Consultant, no substitutions shall be made without written approval of Consultant.
Modernization Systems and Components
Proposed Model Description/Vendor
Escalator
Other
2023 Lerch Bates Inc.
00310 - 4
1.6 CONTRACTOR’S LIST OF SUBCONTRACTORS
A. The undersigned Contractor will utilize the following subcontractors for major components of work and submits these firms for approval. Upon acceptance of these Sub-Contractors by Purchaser/Consultant, no substitutions shall be made without written approval of Consultant.
Subcontractor Name Type of Work
Electrician
General Contractor
1.7 SUBMISSION AND ACCEPTANCE OF QUOTATIONS
A. Undersigned Contractor agrees to Purchaser’s right to reject any and all quotations without explanation.
B. Undersigned Contractor declares that preparation and submission of quotations herein contained do not obligate Purchaser or Consultant in any way.
C. Undersigned Contractor agrees and understands that Purchaser assumes no obligation to enter into a Contract.
1.8 ALTERNATES
A. State net sum to be added to or deducted from Stipulated Sum (Base Quotation) in event any Alternate Quotation is accepted.
B. Submit Alternate Quotations by filling in blank spaces provided herein.
C. Purchaser reserves right to accept or reject any or all Alternates.
D. Provide lump sum price for all alternates as described below and in Section 01030, Alternates.
ALTERNATE 1: Escalator Monitoring System
DOLLARS $
2023 Lerch Bates Inc.
00310 - 5
ALTERNATE 2:
DOLLARS $
1.9 CONTRACTOR SIGNATURE
DATE:
SIGNED:
PRINT NAME:
TITLE:
NAME OF FIRM:
STATE LICENSE NO.:
LEGAL ADDRESS: ORGANIZED AS A (MARK ONE):
INDIVIDUAL
PARTNERSHIP
CORPORATION
UNDER STATE LAW OF
TELEPHONE:
(SEAL)
SECTION 00800
PART 1 - GENERAL
1.1 DEFINITION OF TERMS
1.2 CONSULTANT’S STATUS
1.3 CONTRACT
1.4 MEASUREMENTS AND DRAWINGS
1.5 CODES AND ORDINANCES
1.6 CONTRACTOR’S INSURANCE
1.7 PURCHASER INSURANCE
1.8 TAXES, OLD AGE PENSIONS AND UNEMPLOYMENT INSURANCE
1.9 LABOR LAWS
1.10 PATENTS
1.11 ASSIGNMENTS
1.12 ADVERTISING
1.13 PROTECTION OF WORK AND PROPERTY
1.14 ACCIDENT REPORTS
1.15 STORAGE OF MATERIALS
1.16 REMOVAL OF EQUIPMENT AND RUBBISH
1.17 MATERIALS AND WORKMANSHIP
1.18 SUPERVISION
1.19 ROUTINE BUSINESS
1.20 CHANGES AND EXTRA WORK
1.21 PAYMENTS
1.22 PAYMENT WITHHELD
1.23 LIENS AND AFFIDAVITS
1.24 CLAIMS FOR EXTRA COST
1.25 DELAYS AND EXTENSION OF TIME
1.26 PERMITS
PART 2 - SPECIAL CONDITIONS
2.1 PROGRESS OF WORK
SECTION 00800
SUPPLEMENTAL CONDITIONS
PART 1 - GENERAL
1.1 DEFINITION OF TERMS
A. Term ELEVATOR CONSULTANT or CONSULTANT as used herein refers to Lerch Bates Inc. (Lerch Bates).
B. PURCHASER as used herein refers to The Georgia World Congress Center.
Georgia World Congress Center #5-24 August 5, 2023 LB Project No. 0100044069 00800 - 1
C. The term CONTRACT or CONTRACT DOCUMENTS as used herein consists of the Agreement, Condi�ons of Contract, Specifica�ons, Addenda, Drawings if included, and Alternates if accepted.
D. CONTRACTOR or ESCALATOR CONTRACTOR as used herein refers to any persons, partners, firm, or corpora�on having a contract with Purchaser to furnish labor and materials for the execu�on of work required.
E. CONTRACT AWARD as used herein refers to Purchaser’s verbal or writen award for work required.
F. SUBCONTRACTOR as used herein refers to any persons, partners, firm, or corpora�on having a contract with Contractor to furnish labor and materials for the execu�on of work required.
G. As used in these Contract Documents “provide” shall be understood to mean “furnish and install.”
H. As used in these Contract Documents “retain or reuse exis�ng” shall be understood to mean restore exis�ng components or parts to like-new condi�on.
I. Words in the singular shall include the plural whenever applicable or context so indicates.
J. All technical terms in these Contract Documents have their defini�on given in latest edi�on of American Na�onal Standard Safety Code for Elevators, Dumbwaiters, Escalators, and Moving Walks ASME A17.1.
and A17.2.
1.2 CONSULTANT’S STATUS
A. Consultant shall act as Purchaser’s and/or Building Management’s representa�ve on all maters pertaining to required work. Consultant shall interpret Contract Documents, analyze Contractor’s quota�ons, review Contractor suggested alternates, review all submitals of Contractor, approve billings, review technical details and construc�on procedure, perform work progress reviews and review and test completed work for compliance with Contract Documents prior to acceptance of work by Purchaser.
B. Field Review Scheduling: Schedule progress and final work reviews with Consultant. Reply promptly, in wri�ng, to correc�ve work indicated on Consultant’s progress and/or final review reports, indica�ng status and schedule for comple�on. Consultant an�cipates scheduled site review appointments will be met. Contractor’s price will be reduced to reimburse Consultant at its normal billing rates for appointments not kept or for addi�onal follow up reviews required due to Contractor’s gross noncompliance with previous review requirements.
1.3 CONTRACT
A. Contract includes all engineering, labor, tools and material required to complete the work in every respect. Contractor is cau�oned to familiarize itself with exis�ng site condi�ons and to include all incidental work that might occur or be required during the work. A�er Contract has been awarded, verbally or in wri�ng, no extra charges will be allowed for any labor or material necessary to complete required work whether exactly described in these specifica�ons herein or not, as long as such work, labor, and material are required to accomplish desired effect and results.
Georgia World Congress Center #5-24 August 5, 2023 LB Project No. 0100044069 00800 - 2
B. Any discrepancies or ambigui�es found in Contract Document or drawings shall be reported to the Consultant prior to Contractor’s quota�on submital.
1.4 MEASUREMENTS AND DRAWINGS
A. Drawings or measurements included with Contract Documents are for convenience of Contractor.
Complete responsibility for detailed dimensions lies with Contractor. Contractor shall verify all dimensions with the actual onsite condi�ons. Where work of Contractor is to join another trade, Contractor’s shop drawings shall show actual dimensions and method of joining work of those trades.
1.5 CODES AND ORDINANCES
A. All work covered by these Contract Documents is to be done in full accord with na�onal code, state and local codes, ordinances, and escalator safety orders as are in effect at �me of Contract award. All requirements of local Building Department and fire jurisdic�on are to be fulfilled by Contractor and its Subcontractors. Also see Sec�on 01040, Ar�cle 1.01.
1.6 CONTRACTOR’S INSURANCE
A. Contractor shall take out and maintain during the life of this Contract Worker’s Compensa�on Insurance with statutory limits set by the State of Georgia laws for protec�on of its employees.
B. Contractor shall carry a comprehensive general liability policy including completed opera�ons blanket contractual broad form property damage, and Purchaser’s and Contractor’s protec�ve liability in a casualty or liability insurance company acceptable to Purchaser. Insurance policy shall fully protect Contractor, its Subcontractors, Purchaser, and Consultant from all loss and liability. Refer to Purchaser Terms and Condi�ons provided.
C. Prior to commencing work, Contractor shall secure required insurance, at its sole cost, and submit cer�ficate of confirma�on naming indemnified par�es as addi�onal insured. Said policies, including an endorsement which states that such insurance will not be cancelled or materially changed unless Purchaser is given thirty (30) days no�ce, in wri�ng, of the inten�on of said insurer to cancel or change any such policy. In the event Property is owned by a joint venture or other mul�-party en�ty, all joint venture partners or par�es with an equity interest in the ownership shall be named as addi�onal insureds. Contractor’s insurance shall be primary to any applicable loss. With Purchaser’s prior approval, an Owners & Contractors Protec�ve Liability (OCPL) Policy may be subs�tuted for commercial general liability coverage. Please refer to the atached appendix that states the project specific insurance requirements.
D. Contractor shall file with Purchaser a cer�ficate of insurance from its insurance company, sta�ng that such insurance is being carried and that Purchaser will be no�fied at least 10 days prior to any cancella�on of said insurance.
Georgia World Congress Center #5-24 August 5, 2023 LB Project No. 0100044069 00800 - 3
1.7 PURCHASER INSURANCE
A. Purchaser’s insurance policy covers work and equipment in place in building and approved and accepted by Consultant and Purchaser. All material and equipment stored on site and not actually installed is not included in Purchaser’s policy and such material and equipment shall be covered under Contractor’s Property Damage Insurance.
1.8 TAXES, OLD AGE PENSIONS AND UNEMPLOYMENT INSURANCE
A. Contractor’s quota�ons for required work, materials and equipment shall include all local, state, and federal occupa�onal and sales taxes, luxury taxes, excise taxes, federal and state old age pensions, unemployment insurance contribu�ons, and any other similar taxes and contribu�ons in effect at �me of award of Contract, verbally or in wri�ng. Contractor shall be liable for aforemen�oned taxes whether or not specifically included in his quota�on or in final Contract Document. In event addi�onal sales or use taxes are imposed a�er award of Contract, such sales or use taxes are to be paid, in addi�on to original Contract amount, by Purchaser to Contractor, who in turn is to pay them to proper authori�es.
Reciprocally, if any of above men�oned taxes or contribu�ons in effect at �me of award of Contract should be revoked before consumma�on of Contract, Contractor shall rebate Purchaser amount of taxes included in original quota�on and Contract. Where required by law, amount of the tax is to be specifically stated in Contractor’s quota�on; however, failing to do so will not relieve Contractor from responsibility for assump�on of these taxes.
1.9 LABOR LAWS
A. Contractor and its Subcontractors performing work under this Contract shall comply with applicable provisions of all federal, state, and local labor laws.
1.10 PATENTS
A. Contractor shall save and hold harmless Purchaser and its officers, agents, servants, employees, and Consultant from liability of any nature or kind on account of any patented or unpatented inven�on, process, ar�cle, or appliance manufactured or used in performance of Contract, including its use by Purchaser including all cost and expenses for defending any suits unless otherwise specifically s�pulated in Contract Documents.
B. Licenses which may be required for comple�on of required work are to be obtained and paid for by the Contractor.
1.11 ASSIGNMENTS
A. Neither party to this Contract shall assign Contract or sublet it as a whole without writen consent of other party, nor shall Contractor assign any payment due him or to become due to him hereunder without previous writen consent of Purchaser.
Georgia World Congress Center #5-24 August 5, 2023 LB Project No. 0100044069 00800 - 4
1.12 ADVERTISING
A. Adver�sing privileges will be retained by Purchaser. It is the duty of Contractor to keep premises free from posters, signs, decora�ons, etc., unless specifically approved by Purchaser.
1.13 PROTECTION OF WORK AND PROPERTY
A. Contractor shall con�nuously maintain adequate protec�on of all its work from damage and shall protect Purchaser property from injury or loss arising out of this Contract. Contractor shall make good any such damages, injury, or loss, except such as may be directly caused by agents, subcontractors, or employees of the Purchaser. Contractor shall provide all barricades required to protect open wellways per OSHA regula�ons. Design of barricades in public areas shall be approved by Purchaser prior to fabrica�on and installa�on. Contractor shall submit barricade plan with bid submission. Intent is for contractor to provide 8’-0’’ tall “Mall Form” barricades – or approved equal – at upper and lower ends of escalator units. Complete protec�on and blocked visibility from the running adjacent escalator. Prior to work being conducted each unit shall be enclosed the en�re length of the incline to obstruct view.
Contractor shall supply carpet tape, foam padding, and Masonite on all finished flooring where material is stored and work is conducted. Contractor should coordinate deliveries with the GWCC staff.
B. Escalator modules shall be designed for ease of delivery with rubber caster wheels that can be discarded following the delivery of each applicable product.
C. Design and delivery of each “module” shall accommodate site specific limita�ons including but not limited to the following:
1. Semi-Truck accessible delivery dock with 42’’ tall dock.
2. Freight Elevator with 12,000 lb. capacity.
a. Freight Elevator interior clear dimensions are approximately 21’-5’’ deep by 9’-8’’ wide by
10’-0’’ tall.
b. Freight serves landings levels 1-5.
3. Interior/ Back of House corridors have limited turning radius of approximately 6’-8’’ widths.
4. Standard commercial doors.
D. If Contract includes work which would be disrup�ve during normal business opera�ons, or would be dangerous to building occupants, said work shall be performed during hours as building management dictates. Examples of such work include, without limita�on, saw cu�ng of concrete, jack hammering, welding, metal cu�ng, pouring concrete, erec�ng steel or hois�ng equipment over occupied por�ons of the building, or performing tests requiring all escalators in a group. Contractor shall perform such work at �mes coordinated with the building management based on the facility’s event schedule. These services as well as the items listed in this paragraph shall be performed at �mes coordinated with the building management based on the facility’s event schedule: All final tes�ng and life safety tes�ng.
E. Contractor shall install a suitable protec�ve covering on all finished floors whether marble, wood, carpet or other, in areas where work is being performed. No material handling equipment shall be permited on
Georgia World Congress Center #5-24 August 5, 2023 LB Project No. 0100044069 00800 - 5 or over finished floors unless said floors have been protected in a manner approved by building management.
F. Portable fire ex�nguishers shall be provided throughout Contractor’s area of work and shall be placed so as to be accessible at all �mes. Ex�nguishers shall be mul�-purpose dry chemical type, provided on a basis of one 2A-20BC rated unit for each 3,000 square feet of floor area. Ex�nguishers will remain property of Contractor.
G. Contractor shall at all �mes maintain work areas so all por�ons are accessible to fire department personnel and apparatus. Fire hydrants and fire department connec�ons to building sprinkler systems must be kept free from obstruc�on at all �mes.
H. Contractor shall strictly supervise any welding, metal cu�ng or other opera�ons employing open flame work. All welding and cu�ng equipment shall be safely arranged and all combus�bles in vicinity of any work being performed shall either be removed or protected by a noncombus�ble cover. Welding or cu�ng shall be atended by an assistant or fire watchman who is equipped with at least one 2A-20BC rated mul�-purpose dry chemical fire ex�nguisher. Fire watchman will maintain strict surveillance during en�re welding or cu�ng opera�on and ex�nguish flying sparks or burning slag. A�er welding or cu�ng opera�on fire watchman shall thoroughly search en�re area for remnants of smoldering materials before he is released from his duty. Any welding or other opera�on employing open flame in any por�on of building shall be scheduled with and receive approval of Purchaser. Hot work permits shall be scheduled and approved with Owner.
I. Contractor shall keep noise level below 80 dBA level during normal building hours. When it is necessary to produce noise above this level, Contractor shall advise building management of such needs and �mes will be scheduled as directed. The Contractor shall an�cipate and schedule excessive noise genera�ng procedures and include allowance for same in its quota�on and schedule. Anything above 80 dBA shall be conducted in previously listed off hours.
1.14 ACCIDENT REPORTS
A. In the event of accidents of any kind, Contractor shall furnish Purchaser with copies of all accident reports. Reports shall be sent without delay and at same �me that they are forwarded to any other par�es.
1.15 STORAGE OF MATERIALS
A. Contractor shall confine storage of materials on job site to limits approved by Purchaser and shall not unnecessarily encumber premises or overload any por�on of building with materials to a greater extent than structure design load. All material supplied including tools and job boxes shall be confined within Contractors barricaded area.
1.16 REMOVAL OF EQUIPMENT AND RUBBISH
A. Contractor shall remove and properly dispose of all rubbish as fast as it accumulates including all exis�ng parts and components not retained, keeping building and premises clean during progress of work and leave premises at comple�on in a condi�on acceptable to the Purchaser. Store parts and components
Georgia World Congress Center #5-24 August 5, 2023 LB Project No. 0100044069 00800 - 6 iden�fied by Consultant as useful for maintenance of units not being modernized as directed by Purchaser. All other parts and components not retained shall become property of Contractor. Dumpster shall be located in the loading dock area.
B. Contractor shall be responsible for storing exis�ng escalator parts and components on site that are iden�fied by Consultant and/or purchaser. At a minimum, Motors & Gearbox are to be retained from both exis�ng escalators, Controllers are to be retained exis�ng escalators, all steps assemblies are to be retained and stored. Contractor to supply pallets for all retained components and shrink wrapped for ground freight shipping. Storage for retained components should be stored at designated storage area as defined by purchaser.
1.17 MATERIALS AND WORKMANSHIP
A. All materials and equipment furnished shall be new and best quality. Installa�on shall be accurate, workmanlike, and subject to approval of Consultant. All materials and equipment provided shall conform to regula�ons of enforcement bodies having jurisdic�on. Contractor shall furnish material samples for approval.
1.18 SUPERVISION
A. Contractor shall assign a competent Project Manager, superintendent, and on-site foreman for project sa�sfactory to Purchaser and Consultant. Such persons shall represent Contractor and all instruc�ons given to them shall be binding as if given to Contractor.
1.19 ROUTINE BUSINESS
A. A�er award of Contract, all business rela�ng to required work shall be transacted through Consultant, unless otherwise directed.
1.20 CHANGES AND EXTRA WORK
A. Purchaser may at any �me make changes to Contract Documents, plans and drawings, omit work, or require addi�onal work by Contractor. For such addi�onal work performed hereunder, Purchaser shall pay Contractor on the basis of a mutually agreed lump sum. See Ar�cle 1.25 for method of compu�ng lump sum cost of addi�onal work. Contractor shall make no addi�ons, changes, altera�ons, or omissions, or perform extra work, without receipt of writen authoriza�on of Purchaser.
1.21 PAYMENTS
A. Unless otherwise agreed, Contractor shall submit monthly applica�ons for payment together with necessary data, informa�on, waivers, and affidavits to Consultant. Consultant shall review data for accuracy and forward such applica�ons to Purchaser for payment. Informa�on shall be submited with payment request and work progress forms.
Georgia World Congress Center #5-24 August 5, 2023 LB Project No. 0100044069 00800 - 7
B. Applica�ons for payments are to cover 90% of the value of labor performed and material installed and delivered during the preceding month or materials delivered to Contractor’s storage facility.
C. Balance (reten�on) shall be paid by Purchaser upon final acceptance of en�re work by Consultant and Purchaser and a�er performance guarantees have been sa�sfactorily demonstrated. See Sec�on 01700, Ar�cle 1.02, D-G.
D. Contractors Payment Schedule is agreed to mirror the following:
1. 25% Downpayment due at the award of contract.
2. 35% Material Payment due upon delivery.
3. 30% Progress Payment.
4. 10% Retainage Due at the comple�on of all work and at the sa�sfac�on of owner.
1.22 PAYMENT WITHHELD
A. Purchaser and/or Consultant may withhold approval of payment on any Contractor request to such extent as may be necessary to protect Purchaser from loss on account of:
1. Believed negligence on part of Contractor to execute the work properly or fail to perform any provision of Contract. Purchaser, a�er 15 days’ writen no�ce to Contractor, may without prejudice to any other remedy he may have, make good such deficiencies and may deduct its cost from the overall Contract sum.
2. Claims filed or reasonable evidence indica�ng probable filing of claims by other Contractors or Subcontractors.
3. Failure of Contractor to make proper payments to its material suppliers or Subcontractors for material and labor.
4. A reasonable doubt that required work can be completed by Contractor for balance then unpaid or in Contract �me frame.
5. Contractor’s damage to building or another Contractor.
B. When the above grounds are removed, payment shall be made in full, less reten�on.
1.23 LIENS AND AFFIDAVITS
A. Neither final payment nor any part of billing reten�on shall become due un�l Contractor shall deliver to Purchaser a complete release of all liens arising out of this Contract or receipts marked paid in full in lieu thereof. In addi�on, Contractor shall furnish an affidavit to Purchaser that, so far as he has knowledge or informa�on, releases, or receipts include all labor and materials for which a lien could be filed. If any lien remains unsa�sfied a�er all payments are made by Purchaser, Contractor shall refund to Purchaser all monies the later may be compelled to pay in discharging such a lien, including all costs and reasonable atorney’s fees.
1.24 CLAIMS FOR EXTRA COST
A. Contractor claims for extra cost due to addi�ons or changes to required work shall be submited to Consultant in wri�ng within a reasonable �me a�er such addi�ons or changes iden�fied or are
Georgia World Congress Center #5-24 August 5, 2023 LB Project No. 0100044069 00800 - 8 requested and in any event before proceeding with required work. No such claim shall be valid unless so made. Maximum charge for addi�ons/changes to work shall be Contractor cost +10% for overhead and profit. Contractors cost shall be verifiable from actual supplier invoices, purchase orders, �me �ckets, etc.
1.25 DELAYS AND EXTENSION OF TIME
A. If Contractor progress is delayed due to acts of Purchaser or Consultant, acts of other Contractors, fire, floods, strikes or other casual�es beyond the control or without fault or negligence of Contractor, �me for comple�on of the work shall be extended for a period determined by Consultant to be equivalent to �me of such delay. Contractor must no�fy Consultant, in wri�ng, of such delay within 48 hours a�er delay commences, or no extension of �me will be granted. Extension of �me without writen request within said period on one or more occasions shall not be deemed a waiver of provisions of this ar�cle.
1.26 PERMITS
A. Contractor shall obtain and pay for or cause its Subcontractor to obtain and pay for all permits required to complete required work. In addi�on, Contractor shall arrange, schedule, and pay for or cause its Subcontractors to arrange, schedule and pay for all required final inspec�ons by state, local or independent cer�fied inspec�ng authori�es necessary for issuance of all required Purchaser u�liza�on permits in regard to completed work.
PART 2 - SPECIAL CONDITIONS
2.1 PROGRESS OF WORK
A. Upon award, verbally or in wri�ng, Contractor shall reconfirm in wri�ng, star�ng and comple�on schedule including equipment delivery dates based upon the informa�on submited on its quota�on form, Sec�on 00310.
B. Contractor shall submit in wri�ng monthly reports with payment request, including current equipment delivery dates and an�cipated comple�on dates for individual units and groups of units.
C. Project Manual: Upon award, verbally or in wri�ng, Contractor shall prepare three project manuals neatly bound in a three ring binder. One manual shall be retained by Contractor, one provided to Purchaser and one provided to Consultant. The manuals shall contain the following informa�on and sec�ons iden�fied in an index with numbered divisions.
1. Project Specifica�on, revised if required to indicate basis of award. (While maintaining original text and clearly iden�fying revision.)
2. Contractor completed Bid Form, specifica�on Sec�on 00310. Include copy of original submission and any revisions.
3. Alternate quota�ons indica�ng Purchaser acceptance or rejec�on.
4. Purchaser’s executed Contract.
5. Ini�al project schedule with es�mated versus actual milestone dates. Include schedule revisions.
Georgia World Congress Center #5-24 August 5, 2023 LB Project No. 0100044069 00800 - 9
6. Project payment requests including verifica�on of payment and lien releases.
7. Code acceptance.
8. Purchaser’s temporary acceptance documents
9. Purchaser’s final acceptance documents.
10. Consultants progress review comments and requirements.
11. Consultant’s final Contract review comments and requirements.
12. Shop drawing submitals, including sets with review remarks.
13. As built drawings, including control wiring diagrams.
14. Maintenance Agreement, Owner Supplied
D. A second manual shall include the iden�cal sec�on numbers and shall be iden�fied and u�lized for general correspondence on these subjects. Addi�onal sec�ons shall include correspondence not specifically iden�fied by one of these sec�ons. An index in front of this sec�on shall number and iden�fy source of correspondence and subject.
E. Contractor shall maintain all six manuals in an up-to-date condi�on. Prior to final payment, Contractor shall deliver to Purchaser the documents in Items 1, 2, 3, and 13 above on flash drive.
SECTION 01040
PART 1 - GENERAL
1.1 APPLICABLE CODES
1.2 STAGING AREA
1.3 WORK PHASE
1.4 OCCUPANCY AND WORK BY OTHERS
2023 Lerch Bates Inc.
01040 - 1
SECTION 01040
PROJECT PROCEDURES
PART 1 - GENERAL
1.1 APPLICABLE CODES
A. Compliance with Regulatory Agencies: Comply with most stringent applicable provisions of following Codes, laws, and/or Authorities, including revisions and changes in effect:
1. Safety Code for Elevators and Escalators, ASME A17.1
2. Guide for Inspection of Elevators, Escalators, and Moving Walks, ASME A17.2
3. Elevator and Escalator Electrical Equipment, ASME A17.5
4. National Electrical Code, NFPA 70
5. Americans with Disabilities Act, ADA A117.1
6. Local Fire Authority
7. Requirements of most stringent provision of local applicable building code.
8. Life Safety Code, NFPA 101
1.2 STAGING AREA
A. An equipment staging area will be available for use by Contractor. Contractor shall restrict usage to area designated and shall notify Purchaser/Property Management prior to storing of any large equipment which will impose heavy concentrated loading on floor area. Do not store such equipment until approval is received. Contractor is to store all material including tools and job boxes in barricaded area as defined in Section 00800.
1.3 WORK PHASE
A. See Section 00310, Quotation Form.
1.4 OCCUPANCY AND WORK BY OTHERS
A. Contractor expressly affirms Purchaser’s rights to let other contracts and employ other Contractors in connection with required work. Contractor will afford other Contractors and their workmen reasonable opportunity for introduction and storage of materials and equipment, for execution of their work, and will properly connect and coordinate its work with theirs. Contractor will also incorporate comparable provisions in all its subcontracts.
B. Contractor declares that other Contractors employed by Purchaser on basis of separate contracts may proceed at such times as necessary to install items of work required by Purchaser.
C. Contractor declares that it will cooperate with other Contractors employed by Purchaser and, in addition to other coordination and expediting efforts, will coordinate their work by written notices regarding necessity of such work to be done on or before certain dates.
D. Contractor declares that it is responsible for review, stamped, and signed approval of all shop drawings for required work.
2023 Lerch Bates Inc.
01040 - 2
E. Contractor hereby declares that content of foregoing paragraphs and influence they may have on project:
1. Shall not cause a change in stipulated Contract Sum
2. Shall not cause a change in Construction Time Schedule
SECTION 01300
PART 1 - GENERAL
1.1 SUBMITTALS
1.2 FINAL CONTRACT DOCUMENTS
2023 Lerch Bates Inc.
01300 - 1
SECTION 01300
SUBMITTALS
PART 1 - GENERAL
1.1 SUBMITTALS
A. Within 45 calendar days after award of contract and before beginning equipment fabrication submit shop drawings, and required material samples for review. Allow 14 days for response to initial submittal.
1. Scaled or Fully Dimensioned Layout: Plan of wellway, pit, upper end, lower end and structural connection points.
2. Design Information: Indicate equipment lists, reactions, and design information on layouts.
3. Power Confirmation Information: Design for existing conditions.
4. Finish Material: Submit 3" x 12" samples of actual finished material for review of color, pattern, and texture. Compliance with other requirements is the exclusive responsibility of the Contractor. Include, if requested, signal fixtures, lights, graphics, Braille plates, and detail of mounting provisions.
5. Design Information: Provide calculations verifying the following:
a. Adequacy of existing electrical provisions.
b. Adequacy of existing retained truss support beams/ intermediate supports/ and building structure.
c. Adequacy of existing upper and lower ends (machine room and pit) and any necessary alterations that will be made.
6. Written Maintenance Control Program (MCP) specifically designed for the equipment included under this contract. Include any unique or product specific procedures or methods required to inspect or test the equipment. In addition, identify weekly, bi-weekly, monthly, quarterly, and annual maintenance procedures, including statutory and other required equipment tests.
B. Submittal review shall not be construed as an indication that submittal is correct or suitable or that the work represented by submittal complies with the Contract Documents. Compliance with Contract Documents, Code requirements, dimensions, fit, and interface with other work is Contractor’s responsibility.
C. Acknowledge and/or respond to review comments within 14 calendar days of return. Promptly incorporate required changes due to inaccurate data or incomplete definition so that delivery and installation schedules are not affected.
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Sign In Sheet | — | |
| Addendum One | — | |
| Event Schedule | — | |
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .