RFP 27-20 Addendum 2_9.9.26.pdf
PDF 12 MB Posted
- Solicitation number
- 2138156
- Issued by
- Erie County, New York
About this file
This addendum to RFP #27-20 modifies the contract documents for Roswell Park Comprehensive Cancer Center's Community Outreach and Engagement Center Phase II project located at 907 Michigan Avenue, Buffalo, New York. The addendum extends the bid submission deadline to Friday, September 25, 2026, at 2:00 PM EST to allow for enhanced minority and women-owned business enterprise (MWBE) outreach. The project involves construction of approximately 4,600 square feet of new space including a 20+ seat classroom, large collaboration room, two community co-working rooms, semi-private drop-down areas, public gathering space, expanded community gallery, private offices, and hoteling workstations, with a partial second story and basement for future growth and storage. The anticipated total project budget is $4 million, including design, construction, and furniture, fixtures, and equipment (FFE). Construction must achieve Ready for Intended Use by September 13, 2027. The addendum contains 13 specification modifications addressing valves, excavation and backfill, water heaters, natural gas systems, electrical systems, and lighting controls; 24 drawing replacements including structural, mechanical, plumbing, fire protection, electrical, and architectural plans; and 10 sketch replacements with attached details. Seven questions and answers are provided for clarification, including confirmation that liquidated damages are not contemplated on the project, and that retention shall be five percent of each progress payment in accordance with Section 139f of the State Finance Law.
The addendum requires that all potable water conveying items comply with NSF Standards 61 and 372 with third-party testing certification and MSS-110 compliance. Backflow prevention must be provided on all hose bibbs, and specific excavation and backfill procedures are mandated where rock is encountered. Fire protection specifications include the addition of hydrant flow test data, quick response sidewall sprinkler symbols, and pressure type waterflow switches on dry pipe systems. Electrical modifications delete requirements for medium voltage cable fireproofing and training specifications while clarifying identification nameplate provisions and panelboard trim heights. Mechanical systems require cabinet unit heaters with Building Management System (BMS) integration accessories, and plumbing systems must comply with NFPA 37 requirements with provisions for dead-end section elimination and continuous circulation. Roswell Park established MWBE participation goals of 30 percent overall (15% minority-owned and 15% women-owned) plus a 6% service-disabled veteran-owned business goal. All on-site staff must hold OSHA 10 certification with on-site supervision holding OSHA 30 certification. Prior awards for similar work have been granted to Telco Construction, Arc Construction, LeChase Construction, and The Liro Group.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 27-20 - Specifications.pdf | ||
| RFP 27-20 Addendum 1_9.2.26.pdf | ||
| RFP 27-20 - Drawings.pdf | ||
| RFP 27-20 Addendum 3_9.16.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roswell Park Comprehensive Cancer Center ADDENDUM #2 Community Outreach and Engagement Center – Phase II (RFP #27-20) Page 1 of 8 #15-24-001 Young + Wright Architects
ADDENDUM #2
Date of Addendum: 9/9/2026
NOTICE TO ALL BIDDERS AND PLANHOLDERS
The Contract Documents for the above-referenced Project are modified as set forth in this Addendum. The original Contract Documents and any previously issued addenda remain in full force and effect, except as modified by this Addendum, which is hereby made part of the Contract Documents. Bidder shall take this Addendum into consideration when preparing and submitting a bid, and shall acknowledge receipt of this Addendum in the space provided on the Bid Form.
BID SUBMITTAL DEADLINE
The bid submittal deadline has been extended to Friday September 25, 2026 at 02:00 PM EST.
1.0 – SPECIFICATIONS
Item Section No. Description of Change
1.1 220523 –
VALVES
Refer to Part 2.1 Valves – General, Paragraph A, 3.
REPLACE:
All items here-in used to convey water for potable use shall be lead free in accordance with NSF Standard, Standard 61, Section 9 - Standard for Drinking Water and Lavatory Faucets and NSF Standard 372 - Maximum Lead Requirements. In Compliance shall be via third party testing and certification.
WITH:
All items here-in used to convey water for potable use shall be lead free in accordance with NSF Standard, Standard 61, Section 9 - Standard for Drinking Water and Lavatory Faucets and NSF Standard 372 - Maximum Lead Requirements. In compliance with MSS-110 (Manufacturers Standardization Society (MSS)). Compliance shall be via third party testing and certification.
1.2 220523 –
VALVES
Refer to Part 3.1 Installation
ADD:
Provide backflow prevention. Any standard hose bibb that attaches to a hose for general use must have an atmospheric or pressure-type vacuum breaker to prevent contamination. Where used for anything other than tank draining.
1.3 220580 –
EXCAVATION
AND
BACKFILL
Refer to Part 3.5 Excavation – Paragraph B, 3.
REPLACE:
Should rock be encountered., excavate 6 in. deeper and fill space between trench bottom and pipe with coarse sand, well compacted to form a firm pipe bed.
WITH:
Where rock is encountered in trenching, the rock shall be removed to not less than 3 inches below the installation level of the bottom of the pipe., Community Outreach and Engagement Center – Phase II (RFP #27-20) Page 2 of 8 excavate 6 in. deeper and fill space between trench bottom and pipe with coarse sand, well compacted to form a firm pipe bed.
1.4 220580 –
EXCAVATION
AND
BACKFILL
Refer to Part 3.6 Backfill – Paragraph B, 1.a
ADD:
Earth used for backfill above the pipe shall be free from rocks, broken concrete, and frozen chunks. Place backfill in maximum 6-inch lifts and compact each lift until the crown of the pipe is covered by a minimum of 12 inches of compacted earth.
1.5 223010 –
EQUIPMENT
Refer to Part 3.1 Equipment Connections – Paragraph A, 7.
ADD:
Earth used for backfill above the pipe shall be free from rocks, broken concrete, and frozen chunks. Place backfill in maximum 6-inch lifts and compact each lift until the crown of the pipe is covered by a minimum of 12 inches of compacted earth.
1.6 223400 –
WATER
HEATERS
Refer to Part 1.3 Special Coordination – I.
ADD:
Earth Electric instantaneous water heaters shall be listed and labeled in accordance with UL 499.
1.7 227010 –
NATURAL
GAS SYSTEMS
Refer to Part 3.3 Piping Installation – K.
ADD:
Line gas pressure regulators shall be listed as complying with ANSI Z21.80
1.8 260501 – BASIC
MATERIALS
AND
METHODS
Refer to Part 3.1 Installation, Paragraph E - Wiring Methods
DELETE:
Fire proof tape all medium voltage cables in handholes, man holes, building entrance and junction/pull boxes.
1.9 260501 – BASIC
MATERIALS
AND
METHODS
Refer to Part 3.1 Installation, Paragraph E - Wiring Methods
DELETE:
Medium voltage cables shall be installed, terminated and tested by trained and qualified personnel with a minimum of 5 years' experience. Training shall be for all types of installations and for the specific types of splices/terminations. Installation shall be in accordance with the cable manufacturer and IEEE. Provide circuit tagging with engraved phenolic plate attached with UV resistant tie wrap indicating source, circuit # and date installed with 3/16 in. test.
1.10 260501 – BASIC
MATERIALS
AND
METHODS
Refer to Part 3.1 Installation, Paragraph J – Identification
REPLACE:
Provide engraved lamicoid identification nameplates on all items of equipment including individual circuit breaker enclosures and disconnect switches, listing the equipment connected to the particular device provided under Specification Sections 262000 and 262913, including, but not limited to: starters, disconnect switches, adjustable speed drives, circuit
Community Outreach and Engagement Center – Phase II (RFP #27-20) Page 3 of 8 breakers, etc. Include voltage, phase, equipment served, voltage source to panel or equipment.
WITH:
Provide engraved lamicoid identification nameplates on all items of equipment including individual circuit breaker enclosures and disconnect switches, listing the equipment connected to the particular device provided under Specification Sections 262000, including, but not limited to:
starters, disconnect switches, adjustable speed drives, circuit breakers, etc.
Include voltage, phase, equipment served, voltage source to panel or equipment.
1.11 262000 –
ELECTRIC
DISTRIBUTION
Refer to Part 3.1 Installation, Paragraph G – Panelboards
REPLACE:
Mount top of trim 90 inches above finished floor unless otherwise noted. In ADA accessible locations, mount top of trim 48 inches above finished floor.
WITH:
Mount top of trim 72 inches above finished floor unless otherwise noted.
1.12 263600 –
TRANSFER
SWITCHES
Refer to Part 3.2 Connections, Paragraph D
REPLACE:
Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."
WITH:
Ground equipment according to Section 260526 "Grounding"
1.13 265000 –
LIGHTING
Refer to Part 3.8 Startup Service, Paragraph A
REPLACE:
Comply with requirements for startup specified in Section 260936 “Lighting Controls.”
WITH:
Comply with requirements for startup specified in Section 265500 “Lighting Control.”
2.0 – DRAWINGS
Item Drawing No. Description of Change
2.1 S001 REPLACE:
Sheet S001- SYMBOLS, ABBREVIATIONS, GENERAL NOTES &
DESIGN CRITERIA
2.2 S003 REPLACE:
Sheet S003 - CONCRETE PIER DETAILS
2.3 S004 REPLACE:
Sheet S004 - TYPICAL CONCRETE DETAILS
Community Outreach and Engagement Center – Phase II (RFP #27-20) Page 4 of 8
2.4 S006 REPLACE:
Sheet S006 COLUMN SCHEDULE & COLUMN BASE DETAILS
2.5 S100 REPLACE:
Sheet S100 FOUNDATION/ FIRST FLOOR PLAN
2.6 S101 REPLACE:
Sheet S101 SECOND FLOOR/ LOW ROOF FRAMING PLAN
2.7 S101.1 REPLACE:
Sheet S101.1 TRUSS BOTTOM CHORD/ LOW ROOF FRAMING PLAN
– ALTERNATE 1
2.8 S102 REPLACE:
Sheet S102 ROOF FRAMING PLAN
2.9 S102.1 REPLACE:
Sheet S102.1 ROOF FRAMING PLAN – ALTERNATE 1
2.10 S200 REPLACE:
Sheet S200 CONCRETE SECTIONS
2.11 M001 REPLACE:
Sheet M001 – FIRST FLOOR PLANS – HVAC.
Removing return grille in Corridor J-201.
2.12 M001.1 REPLACE:
Sheet M001.1 – FIRST FLOOR PLANS – HVAC – ALTERNATE # 1.
Removing return grille in Corridor J-201
2.13 M601 REPLACE:
Sheet M601 – SYMBOL LIST, SCHEDULES & DETAILS – HVAC.
Adding note to provide cabinet unit heater with an accessory for BMS integration.
2.14 M701 REPLACE:
Sheet M701 – TEMPERATURE CONTROLS - HVAC.
Modifying controls diagrams and/ or sequence of operation for details 2, 3, and 4.
2.15 P000 REPLACE:
Sheet P000 – SYMBOL LIST, GENERAL NOTES, DETAILS AND
SCHEDULES - PLUMBING
Adding general note X: No dead-end sections of piping.
Adding general note Y: Maintaining continuous circulation.
2.16 P001 REPLACE:
Community Outreach and Engagement Center – Phase II (RFP #27-20) Page 5 of 8
Sheet P001 - SITE PLAN – PLUMBING
Adding general note 8: Added note referring to NFPA 37 requirements.
2.17 P003 REPLACE:
Sheet P003 - FIRST FLOOR PLAN – PLUMBING
Adding recessed wall hydrant detail.
Clarifying that location of WH-1 will not interfere with new duct work layout. Clarifying that location of floor drains will not intrude on clear floor space required for water closets
2.18 FP000 REPLACE:
Sheet FP000 – SYMBOL LIST, GENERAL NOTES, AND DETAILS -
FIRE PROTECTION
Adding fire hydrant flow test data chart detail.
Adding quick response sidewall sprinkler symbol to symbol list.
Adding low air pressure supervisory switch to 1/FP000.
Replacing paddle type waterflow switch on dry pipe with pressure type waterflow switch on 1/FP000.
2.19 FP001 REPLACE:
Sheet FP001 – FLOOR PLANS - FIRE PROTECTION
Adding pipe sizes to all sprinkler piping.
Adding Riser Diagram - Fire Protection.
Moving location of remote inspector test connection.
Clarifying notes 11 and 15 that piping shall be insulated within wall.
2.20 FP001.1 REPLACE:
Sheet FP001.1 – FLOOR PLANS - FIRE PROTECTION – ALTERNATE 1
Adding Riser Diagram - Fire Protection - Alternate 1.
Replacing ball valve with flow switch on second floor plan.
2.21 E000 REPLACE:
Sheet E000 – SYMBOL LIST, LUMINAIRE SCHEDULE AND
GENERAL NOTES - ELECTRICAL
Deleting TS – fire alarm tamper switch and FS – fire alarm flow switch
2.22 E003 REPLACE:
Sheet E003 – FIRST FLOOR PLAN – POWER & SYSTEMS.
Added fire alarm candela values, flow and tamper switch locations, revised circuiting homeruns, and corrected mechanical equipment locations.
2.23 E004.1 REPLACE:
Sheet E004.1 – SECOND FLOOR PLAN - POWER, SYSTEMS &
LIGHTING - ALTERNATE 1
Adding EF-102 in Mechanical J-223, revising symbology FS to SFS and TS to PSS.
2.24 E600 REPLACE:
Community Outreach and Engagement Center – Phase II (RFP #27-20) Page 6 of 8
Sheet E600 – ONE LINE DIAGRAM & SCHEDULES - ELECTRICAL
Revising circuit breaker sizes for VRF-1 through VRF-8 and EUH-101.
3.0 - SKETCHES
Item Sketch No. Description of Change
3.1 A101 REPLACE:
Portion of 1/A101 FIRST FLOOR REFLECTED CEILING PLAN
WITH:
Attached ASK-004 FIRST FLOOR REFLECTED CEILING PLAN
3.2 A601 REPLACE:
Portion of 1/A601 STOREFRONT TYPES
WITH:
Attached ASK-005 STOREFRONT TYPES
3.3 A001 REPLACE:
Portion of Detail 1/A001 FIRST FLOOR PLAN
WITH:
Attached ASK-006 FIRST FLOOR PLAN
3.4 A400 REPLACE:
Portion of Detail 8/A400 TYPICAL FIXTURE MOUNTING HEIGHTS
WITH:
Attached ASK-007 TYPICAL FIXTURE MOUNTING HEIGHTS
3.5 A002 REPLACE:
Portion of Detail 1/A002 SECOND FLOOR PLAN
WITH:
Attached ASK-008 SECOND FLOOR PLAN
3.6 A201 REPLACE:
Portion of Detail 4/A201 NORTH EXTERIOR ELEVATION AND
BUILDING SECTION
WITH:
Attached ASK-009 NORTH EXTERIOR ELEVATION AND BUILDING Section
3.7 A201 REPLACE:
Portion of Detail 3/A201 SOUTH EXTERIOR ELEVATION
WITH:
Attached ASK-010 SOUTH EXTERIOR ELEVATION
3.8 A400 REPLACE:
Portion of Detail 2/A400 ENLARGED TOILET ROOM PLAN
WITH:
Attached ASK-011 ENLARGED TOILET ROOM PLAN
Community Outreach and Engagement Center – Phase II (RFP #27-20) Page 7 of 8 #15-24-001 Young + Wright Architects
3.9 A451 REPLACE:
Detail 8/A451 STAIR DETAIL
WITH:
Attached ASK-012 STAIR DETAIL
3.10 C121
REPLACE:
Portion of Detail 1/C121 CIVIL UTILITY PLAN
WITH:
Attached SK-02 ADDENDUM 2
4.0 – QUESTIONS AND ANSWERS
The following questions and answers are provided as a matter of information to clarify issues raised about the Contract Documents. To the extent that changes to the Contract Documents are required based on the questions received, the Contract Documents have been modified as noted above in the Specifications and Drawings sections of this Addendum.
4.1 QUESTION: It appears there are some unidentified structural members (horizontal beams?) on drawings: S101 ( CL C at line 4), S102 (CL C), S102.1 (CLs C and A between CLs 3 and 6). Please provide steel member sizes
ANSWER: Refer to revised structural drawings attached.
4.2 QUESTION: RFI#001: We are requesting an extension of the bid due date to September 25, 2026, to maximize MWBE outreach and support our efforts to meet the project goals. Please advise if this extension can be accommodated.
ANSWER: The bid due date has been extended to Friday, September 25th at 2:00PM
EST.
4.3 QUESTION: Drawing C-111 – Note #2 – shows a new exterior sign and refers us to the architectural drawings for details. There is no exterior type sign shown on the architectural drawings. Is an exterior sign needed and if so can details be provided.
ANSWER: Signage located at civil drawings for general location and site preparation.
Refer to E001 for additional information.
4.4 QUESTION: Drawing A001.1 – This drawing shows dotted lines under certain walls for the alternate. Are these lines for haunch concrete under those walls and if so, can a detail be provided?
ANSWER: Dashed lines are used to highlight alternate #1 scope of work in relation to partition type revisions.
4.5 QUESTION: Do you have a budget cost for the project, need a number for the bonding company.
ANSWER: Anticipated total project budget (including design, construction & FFE) is $4M.
4.6 QUESTION: Are there any liquidated damages on the project and if so, how much per day/week?
Community Outreach and Engagement Center – Phase II (RFP #27-20) Page 8 of 8
ANSWER: Liquidated damages are not contemplated on this project.
Contractor shall be obligated to pay RPCI actual damages, as required in General Conditions 007213.
4.7 QUESTION: What is the payment retention for the project?
ANSWER: Please refer to Item 27.3 in the General Conditions 007213.
RPCI shall retain five (5) percent of the amount of each progress payment in accordance with Section 139 f of the State Finance Law.
If the Contract Documents for this Contract do not include Performance and Payment Bonds, RPCI shall retain ten percent of the amount of each progress payment in accordance with Section 139 f of the State Finance Law.
5.0 – INFORMATION
The following information is provided to all bidders and plan holders and will modify and become a part of the Contract Documents.
Item Description N/A N/A
END OF ADDENDUM
30 SF
RISER
ROOM
J-217
8' - 0"
ACT-1
6.1
7.1
ISSUE DATE:
PROJECT NO.:
REF. DWG:
REF. DOC:
ASK-004
FIRST FLOOR REFLECTED CEILING PLAN
ROSWELL 907 COMMUNITY OUTREACH AND ENGAGEMENT CENTER
09/03/2026
25103 1/A101
PHASE 2
SCALE: 1/4" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN
bhuang Rectangle bhuang Rectangle
2" 5'
2"
2"
2" 1' - 4" 2"
1' - 8" R.O.
5'
6" R
.O
B
H1
J1
S1
IGL-2
ISSUE DATE:
PROJECT NO.:
REF. DWG:
REF. DOC:
ASK-005
STOREFRONT TYPES
ROSWELL 907 COMMUNITY OUTREACH AND ENGAGEMENT CENTER
09/03/2026
25103 1/A601
PHASE 2
SCALE: 1/4" = 1'-0"1 STOREFRONT TYPES
ISSUE DATE:
PROJECT NO.:
REF. DWG:
REF. DOC:
ASK-006
FIRST FLOOR PLAN
ROSWELL 907 COMMUNITY OUTREACH AND ENGAGEMENT CENTER
09/03/2026
25103 1/A001
PHASE 2
SCALE: 1/4" = 1'-0"1 FIRST FLOOR PLAN
8A
ADA TILTED
MIRROR
M
AX
3'
4"
3' - 4"
1'
8"
1' - 0" 3' - 6"
1'
6" T
YP
TYPICAL TOILET
SIDE ELEVATION
3'
5"
REFER TO
PLUMBING
8"
" M
AX
REFER TO PLUMBING
TYPICAL ADA DRINKING
FOUNTAIN FRONT ELEVATION
(OPTIONAL BOTTLE FILL)
2' - 0"
GRAB BARS
ISSUE DATE:
PROJECT NO.:
REF. DWG:
REF. DOC:
ASK-007
TYPICAL FIXTURE MOUNTING HEIGHTS
ROSWELL 907 COMMUNITY OUTREACH AND ENGAGEMENT CENTER
09/03/2026
25103 8/A400
SCALE: 1/2" = 1'-0"8 TYPICAL FIXTURE MOUNTING HEIGHTS
DNJ-222
ISSUE DATE:
PROJECT NO.:
REF. DWG:
REF. DOC:
ASK-008
SECOND FLOOR PLAN
ROSWELL 907 COMMUNITY OUTREACH AND ENGAGEMENT CENTER
09/03/2026
25103 1/A002
SCALE: 1/4" = 1'-0"1 SECOND FLOOR PLAN
A201
(TYP.)
EXHAUST VENT
ISSUE DATE:
PROJECT NO.:
REF. DWG:
REF. DOC:
ASK-009
NORTH EXTERIOR ELEVATION AND BUILDING SECTION
ROSWELL 907 COMMUNITY OUTREACH AND ENGAGEMENT CENTER
09/03/2026
25103 4/A201
SCALE: 1/8" = 1'-0"4 NORTH EXTERIOR ELEVATION AND BUILDING SECTION
EXHAUST VENT
ISSUE DATE:
PROJECT NO.:
REF. DWG:
REF. DOC:
ASK-010
SOUTH EXTERIOR ELEVATION
ROSWELL 907 COMMUNITY OUTREACH AND ENGAGEMENT CENTER
09/03/2026
25103 3/A201
PHASE 2
SCALE: 1/8" = 1'-0"
SOUTH EXTERIOR ELEVATION3
A400 3
4 4"
1'
4"
1'
4"
A4003
O pp
11 11
2' - 1"
2'
6"
2' - 1"
2'
6"
ISSUE DATE:
PROJECT NO.:
REF. DWG:
REF. DOC:
ASK-011
ENLARGED TOILET ROOM PLAN
ROSWELL 907 COMMUNITY OUTREACH AND ENGAGEMENT CENTER
09/03/2026
25103 2/A400
PHASE 2
SCALE: 1/4" = 1'-0"2 ENLARGED TOILET ROOM PLAN
TREAD
11"
M
AX
7"
3/4" HARDWOOD SHOE MOLDING
2X HARDWOOD TREADS
WALL STRINGER
1X HARDWOOD RISERS
"U" STAIR STRINGER HANGER
2X12 STRINGER, TYP. OF (3)
BLOCKING AS REQUIRED
COLD FORMED JOISTS;
SEE STRUCTURAL
CONCRETE SLAB OVER
METAL FORM DECK;
REFER TO STRUCTURAL
METAL TRACK; SEE
STRUCTURAL
ISSUE DATE:
PROJECT NO.:
REF. DWG:
REF. DOC:
ASK-012
STAIR DETAIL
ROSWELL 907 COMMUNITY OUTREACH AND ENGAGEMENT CENTER
09/03/2026
25103 8/A451
PHASE 2
SCALE: 1 1/2" = 1'-0"8 STAIR DETAIL
638.00
636.00
635.00 636.00
637.00
638.00
638.00
637.50
637.50
635.00
634.00 633.50
635.50
636.50
636.50
635.00
634.50
636.00 635.50
638.00
MICHIGAN AVENUE (66.0')
C
O N
C . W
AL
K
C O
N C
. W
AL
K
COVERED
WD. PO.
8.
0'
6.2'
6.
6'
COVERED
CONC. PO.
CONC.
UTILITY PAD
14.7'
7.
2'
1 STY. W.F.
BUILDING #907
C O
N C
. P
AD
H
YD
W
V
C O
GRASS
G R
AS
S
LANDSCAPING
C O
638.0
636.5
636.0
635.5
634.5
634.0
633.5
637.5
637.5
637.0
637.5
PP
PP OEOEOEOEOE
W V
(U N
AB
LE
T O
O
PE
N
SMH
RIM:634.33
(UNABLE TO OPEN)
SASASA
ST
LA
N
D
SC
AP
IN
G
PLPL
637.0
636.0
635.0
634.5
635.5
636.5
637.5
EX
. I
P.
1.
' E
635.0
N . I
N V.
;6
.7
(1 2"
C
LA
Y)
S.
IN
V.
;6
.6
(1
2" C
LA
Y)
CONC. CURB
SMH
RIM:634.17
N. INV.;626.92 (12" CLAY)
S. INV.;626.92 (12" CLAY)
YD
R
IM
;6
.1
S.
IN
V.
;6
.7
(8
" P
VC
E.
IN
V.
;6
.6
(8
" P
VC
) YD
R
IM
:6
.5
N . I
N V.
;6
.1
(8 " P
VC
S.
IN
V.
;6
.9
(8
" P
VC
CH. LINK FNC.
BENCHMARK: "X" MARK ON
BONNET BOLT ON HYDRANT
ELEV:637.45EXIST. WATER MAIN
APPROX. LOCATION, NFV
637.0
637.5
633.0
ST
ST ST
917 MICHIGAN
AVE.
PL
P L P L
PL PL
ST ST ST
EXIST. 30" RCP STORM SEWER, FROM RECORD
DRAWINGS, NFV
EXIST. 12" CLAY SAN.
SEWER
EXIST. WALL
MOUNTED
ELECTRIC METERS
(4)EXIST. 6" SMT
STORM FOR
DOWNSPOUTS
(BASED ON
RECORD
DRAWINGS ONLY,
NFV)
5.00' MIN. (TYP.)
BIOSWALE,
REFER TO C-111
NEW CATCH BASIN 24"X24", CB-1
RIM: 634.00
E. 6" IN INV. 630.00
W. 6" OUT INV. 629.98
MIN. INV. AT BLDG TO
MAINTAIN 1.0% SLOPE:
6" INV. 630.10
EXIST. 4" WATER
ELEV. AT BLDG:
629.66 +/-
(FROM RECORD DRAWINGS, NFV)
+/-12 LF 6" SICPP
@1.0 % MIN.
35 LF 6" SICPP
@ 1.0% MIN.
70 LF 4" PVC
(SDR-35)
@2.0% SLOPE MIN.
8 LF 4" PVC
(SDR-35) @2.0% SLOPE MIN.
MIN. INV. AT BUILDING TO
MAINTAIN 2.0% SLOPE:
4" INV. 631.93
6" SICPP
OUTLET INV.
634.00
30 LF 36" SICPP
@3.73 %
36" SICPP
INV. 632.65
SAN. C.O
CONNECT TO
EXIST. STORM,
6" INV.
635.62+/-
STORM
C.O
8"x4" TAPPING SLEEVE AND
VALVE
+/- 87 LF 4" DI FIRE
PROTECTION LINE
1.5' MIN. VERTICAL
SEPARATION BETWEEN
WATER AND SANITARY
4" GATE
VALVE
6" INV. 627.20
EXIST. 30" INV.
626.08 +/-
CONTRACTOR TO LOCATE
AND PROTECT EXISTING
UTILITIES AT BUILDING
CORNER
4" INV. AT
SAN CONNECTION:
630.55
7 LF 6" SICPP
@ 1.0% MIN.
STORM C.O
36" SICPP INV. AT
WATER CROSSING:
632.71
86 LF 36" SICPP
@0.09% MIN.
NEW CATCH BASIN 48"X48", CB-2
RIM: 635.50
N. 36" IN INV. 631.53
S. 6" OUT INV. 634.03
6" SICPP
INV.
635.75
STORM C.O
3 LF 6" SICPP
@1.0%
36" SICPP INV.
632.73
STORM C.O
4" DIA 45 DEGREE BENDS
36" SICPP INV. AT SAN
CROSSING: 632.71
SK-02
ADDENDUM 2
ROSWELL 907
COMMUNITY OUTREACH AND
ENGAGEMENT CENTER-PHASE 2
09/04/2026ISSUE DATE:
25103PROJECT NO.:
REF. DWG:
REF. DOC:
C-121
ROSWELL COMMUNITY OUTREACH
AND ENGAGEMENT CENTER
907 MICHIGAN AVE
BUFFALO NY, 14203
SCALE: 1" = 20'1 CIVIL UTILITY PLAN
AutoCAD SHX Text
FFE:638.08
AutoCAD SHX Text
FFE:638.04
AutoCAD SHX Text
FFE:638.22
AutoCAD SHX Text
TC:633.15
AutoCAD SHX Text
BC:632.72
AutoCAD SHX Text
BC:633.42
AutoCAD SHX Text
TC:633.85
AutoCAD SHX Text
BC:634.05
AutoCAD SHX Text
TC:634.48
AutoCAD SHX Text
TC:635.23
AutoCAD SHX Text
BC:634.83
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text
SCALE: 1''= 20'-0"
AutoCAD SHX Text
AutoCAD SHX Text 20'
AutoCAD SHX Text 20'
AutoCAD SHX Text 10'
B-X
STRUCTURAL SYMBOLS LEGEND
SOIL BORING LOCATION & NUMBER
BOTTOM OF FOOTING ELEVATION
LATERAL FRAME MOMENT CONNECTION
GRAVITY MOMENT CONNECTION
ONE-WAY SPAN DIRECTION
TWO-WAY SPAN DIRECTION
STEP IN ELEVATION
RAMP DOWN
RAMP UP
STRUCTURAL SECTION
STRUCTURAL ELEVATION
DETAIL CALLOUT
A101
SIM
A101
SIM
A101
SIM
STRUCTURAL ABBREVIATIONS
ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION
ADJ ADJACENT
ADDL ADDITIONAL
ALT ALTERNATE
AB ANCHOR BOLT
BRG BEARING
ARCH ARCHITECT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CONST JT CONSTRUCTION JOINT
CJ CONTROL JOINT
CU YD CUBIC YARD
DIA DIAMETER
DWG DRAWING
EL ELEVATION
EF EACH FACE
EQ EQUAL
EW EACH WAY
EOD EDGE OF DECK
EOS EDGE OF SLAB
EXIST EXISTING
EXP EXPANSION
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
HORIZ HORIZONTAL
GC GENERAL CONTRACTOR
HP HIGH POINT
HSS HOLLOW STRUCTURAL SECTION
JT JOINT
IF INSIDE FACE
L ANGLE
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LOW POINT
FS FAR SIDE
MO MASONRY OPENING
MAX MAXIMUM
MIN MINIMUM
NTS NOT TO SCALE
NIC NOT IN CONTRACT
NS
OC ON CENTER
NEAR SIDE
OF OUTSIDE FACE
PL PLATE
R RADIUS
RD ROOF DRAIN
RO ROUGH OPENING
SIM SIMILAR
SOG SLAB ON GRADE
SYMM SYMMETRICAL
STD STANDARD
T&B TOP & BOTTOM
TRANS TRANSVERSE
TYP TYPICAL
VIF VERIFY IN FIELD
UNO UNLESS NOTED OTHERWISE
WP WORK POINT
VERT VERTICAL
WD WOOD
WWF WELDED WIRE FABRIC
TOS TOP OF STEEL
TOW TOP OF WALL
TOL TOP OF LEDGEFTG FOOTING
SC SLIP CRITICAL
LW LIGHT WEIGHT
P PIER (CONCRETE)
MP MASONRY PIER
DIM DIMENSION
ES EACH SIDE
STRUCTURAL DESIGN CRITERIA
NOTE: ALL LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE "2025 BUILDING CODE OF NEW YORK STATE"
FOR THE AREAS OF WORK SHOWN IN THESE DRAWINGS.
TYPE DESCRIPTION DESIGN CRITERIA
FLOOR LIVE LOAD
ROOF LIVE LOAD
SNOW LOAD
WIND LOAD
EARTHQUAKE
LOAD
OFFICES
ASSEMBLY / CORRIDORS
ROOF CONSTRUCTION LOAD
RISK CATEGORY
GROUND SNOW LOAD
SNOW EXPOSURE FACTOR
THERMAL FACTOR (GABLE / FLAT)
FLAT ROOF SNOW LOAD
DRIFTING SNOW (ON FLAT ROOF FROM GABLE ROOFS)
RISK CATEGORY
BASIC WIND SPEED (3-SECOND GUST)
WIND EXPOSURE CATEGORY
MAXIMUM WIND PRESSURE
RISK CATEGORY / IMPORTANCE FACTOR
MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETER (S1)
DESIGN SPECTRAL RESPONSE COEFFICIENT (Sd1)
SOIL SITE CLASSIFICATION
SEISMIC DESIGN CATEGORY
BASIC SEISMIC - FORCE RESISTING SYSTEM
RESPONSE MODIFICATION FACTOR (R)
ANALYSIS PROCEDURE
DESIGN SEISMIC BASE SHEAR
50 PSF + 15 PSF
100 PSF
20 PSF
II
80 PSF
1.0
1.18 / 1.10
61.6 PSF
52 PSF
W = 8.60 FT
II
109 MPH
B
18.9 PSF
II / 1.0
0.040 g
0.057 g
D
A
TABLE 12.2-1 (TYPE A17)
6.5
EQUIV. LATERAL FORCE
3.63 KIPS
(MWFRS)
INTERNAL PRESSURE COEFFICIENT +/- 0.18
DESIGN SPECTRAL RESPONSE COEFFICIENT (Sds) 0.140 g
MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETER (Ss) 0.170 g
SEISMIC RESPONSE COEFFICIENT (Cs) 0.01
RAIN LOAD RAIN INTENSITY (i) 2.5 IN/HR
SOIL BEARING ALLOWABLE NET SOIL BEARING PRESSURE 2,000 PSF
SLOPE FACTOR (GABLE / FLAT) 0.70 / 1.0
50 PSFMECHANICAL
2.50 KIPS (ALT. #1)
FLOOR DEAD LOAD
45 PSFSECOND FLOOR
ROOF DEAD LOAD 20 PSF
15 PSF (ALT. #1)ATTIC SPACE (ALT. #1)
FLAT / GABLE ROOF
SLIDING SNOW (ON FLAT ROOF FROM GABLE ROOFS)
24 PSF
W = 15 FT
EXPIRATION DATE:
BUFFALO OFFICE
50 ELK ST. STE 200
BUFFALO, NY 14210
FAX: 716.842.1807
ROCHESTER OFFICE
85 ALLEN ST. STE 310
ROCHESTER,NY 14608
FAX: 585.461.4771
PHONE: 716.842.1800
WWW.YOUNGANDWRIGHT.COM
PROJECT INFORMATION:
SHEET TITLE:
This is a single sheet of a cohesive set of construction documents, including drawings and specifications. Interpretation of information presented is to be based on the entire set of documents
Drawn By:
Project NO.:
Copyright 2025, Young Architectural, LLC
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required by law to affix his or her seal and the notation
"altered by" followed by his or her signature and a specific description of the alterations made.
SHEET NUMBER:
CONSULTANTS:
STRUCTURAL ENGINEER
MEP ENGINEER
CIVIL ENGINEER
ISSUE DATE:
REVISIONS:
REV. DATE DESCRIPTION
ADDITIONAL BUILDINGS:
SIRACUSE ENGINEERS PC
716.852.1894 EXT. 116
ME ENGINEERING
716.845.5092
WATTS ARCHITECTS & ENGINEERS
716.206.5100
PHASE 2
907 MICHIGAN AVE
BUFFALO, NY 14203
25103
ROSWELL COMMUNITY OUTREACH AND
ENGAGEMENT CENTER
S001
SYMBOLS,
ABBREVIATIONS,
GENERAL NOTES &
DESIGN CRITERIA
ER
8/10/2026
ROSWELL 907
COMMUNITY
OUTREACH AND
ENGAGEMENT
CENTER
GENERAL NOTES
1 THE WORK SHOWN ON THESE DRAWINGS HAS BEEN DESIGNED IN ACCORDANCE WITH THE
STRUCTURAL REQUIREMENTS OF THE "2025 BUILDING CODE OF NEW YORK STATE."
2 THE STRUCTURAL COMPONENTS HAVE BEEN DESIGNED FOR THE LOADS INDICATED IN THE
STRUCTURAL DESIGN CRITERIA.
3 CONTRACTOR SHALL FIELD MEASURE AND VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS
PRIOR TO THE START OF CONSTRUCTION AND THE FABRICATION OF ANY MATERIALS. NOTIFY
ENGINEER OF ANY EXISTING CONDITION DISCREPANCIES.
4 THIS STRUCTURE HAS BEEN DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER THE
CONSTRUCTION OF THE BUILDING HAS BEEN COMPLETED. THE STABILITY OF THE STRUCTURE
PRIOR TO COMPLETION IS SOLEY THE RESPONSIBILITY OF THE CONTRACTOR. THIS RESPONSIBILITY
EXTENDS TO ALL RELATED ASPECTS OF THE CONSTRUCTION ACTIVITY INCLUDING, BUT NOT
LIMITED TO, ERECTION METHODS, ERECTION SEQUENCE, TEMPORARY BRACING, SHORING, FORMS, USE OF EQUIPMENT AND SIMILAR CONSTRUCTION PROCEDURES. LACK OF COMMENT ON THE PART OF THE ENGINEER WITH REGARD TO CONSTRUCTION PROCEDURES IS NOT TO BE INTERPRETED AS
APPROVAL OF THOSE PROCEDURES.
5 THE CONTRACTOR IS RESPONSIBLE FOR DESIGNING, PROVIDING AND INSTALLING ALL TEMPORARY
SHORING THAT IS REQUIRED DURING CONSTRUCTION.
6 JOB SITE SAFETY AND CONSTRUCTION MEANS AND METHODS ARE SOLEY THE RESPONSIBILITY OF THE CONTRACTOR. REVIEW OF THE CONSTRUCTION BY THE ENGINEER IS FOR CONFORMANCE WITH
THE DESIGN ASPECTS ONLY, NOT TO REVIEW THE CONTRACTOR'S PROVISIONS FOR JOB SITE
SAFETY AND CONSTRUCTION PROCEDURES. LACK OF COMMENT BY THE ENGINEER IS NOT TO BE
INTERPRETED AS APPROVAL.
7 LOADS, OPENINGS AND STRUCTURE IN ANY WAY RELATED TO REQUIREMENTS OF OTHER
NON-STRUCTURAL DISCIPLINES ARE SHOWN FOR REFERENCE ONLY. THESE PLANS DO NOT SHOW
THE FULL SCOPE OF OPENINGS IN ROOFS, FLOORS AND WALLS. FOR SIZE AND LOCATION OF ALL OPENINGS SEE ARCHITECTURAL AND MEP DRAWINGS. THE CONTRACTOR SHALL OBTAIN FROM THE MEP AND OTHER TRADES THE FINAL APPROVED SIZE AND LOCATION OF ALL OPENINGS AND WORK TO BE PROVIDED FOR THEIR TRADE IN ROOFS, FLOORS AND WALLS WHETHER SHOWN OR NOT ON STRUCTURAL DRAWINGS. EXCESS COST RELATED TO VARIATION IN REQUIREMENTS OR EQUIPMENT
ARE NOT TO BE BORNE BY THE OWNER.
8 IF FAULTY CONSTRUCTION PROCEDURES OR MATERIAL RESULT IN DEFECTIVE WORK THAT
REQUIRES ADDITIONAL ENGINEERING TIME TO DEVISE CORRECTIVE MEASURES, PROFESSIONAL
FEES MAY BE CHARGED TO THE CONTRACTOR AT THE STANDARD HOURLY RATE OF ADDITIONAL
SERVICES. SUCH FEES MY BE WITHHELD FROM THE GENERAL CONTRACTOR'S PAYMENT.
9 ONE BLACKLINE PRINT OF ALL ERECTION AND DETAIL SHOP DRAWINGS INDICATING THE
FABRICATOR, MANUFACTURER, FINISH, LAYOUT AND ALL ACCESSORIES MUST BE SUBMITTED TO AND BE CHECKED BY THE CONTRACTOR AND SUBCONTRACTOR AND BEAR THE CHECKER'S INITIALS
BEFORE SUBMISSION TO THE ARCHITECT FOR REVIEW PRIOR TO FABRICATION.
10 THESE DRAWINGS ARE SUPPLEMENTED BY A DETAILED TECHNICAL SPECIFICATION. THE NOTES
SHOWN UNDER CERTAIN CATEGORIES OF WORK ARE INTENDED TO SUMMARIZE BASIC
REQUIREMENTS.
11 WORK SHOWN AS "TYPICAL DETAILS" APPLY THROUGHOUT THE PROJECT AS REQUIRED. WORK SHOWN AS "SECTIONS" SHALL BE CONSIDERED TO APPLY FOR THE SAME AND SIMILAR CONDITIONS
IN THE BUILDING.
12 SOME DETAILS OF THE WORK ARE SHOWN ON THE ARCHITECTURAL DRAWINGS. CAREFUL REVIEW
AND STUDY OF THE DETAILS ARE NECESSARY BEFORE THE FULL SCOPE OF THE WORK CAN BE
COMPREHENDED.
13 DO NOT SCALE THE DRAWINGS.
FOUNDATION NOTES
1 REFER TO DIVISION 31 OF THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS OF
EARTHWORK MATERIAL AND BACKFILLING.
2 REFER TO THE PROJECT "STATEMENT OF SPECIAL INSPECTIONS" FOR REQUIRED FOUNDATION
TESTING AND INSPECTIONS.
3 FOUNDATIONS HAVE BEEN DESIGNED BASED ON THE GEOTECHNICAL REQUIREMENTS STATED IN
THE PROJECT GEOTECHNICAL REPORT. SEE PROJECT SPECIFICATIONS FOR REPORT.
4 ALL FOUNDATIONS SHALL BEAR ON INORGANIC, UNDISTURBED SOILS AS DESCRIBED IN THE
PROJECT GEOTECHNICAL REPORT OR ON COMPACTED STRUCTURAL FILL. ACCEPTABLE BEARING
STRATA IS ANTICIPATED AT THE BOTTOM OF FOOTING ELEVATIONS NOTED ON PLAN AND SHALL BE
INSPECTED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACING CONCRETE.
5 DO NOT PLACE CONCRETE ON FROZEN GROUND OR IN EXCAVATIONS CONTAINING FREE STANDING
WATER. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL BEARING GRADES AND
SURROUNDING SOILS PRIOR TO AND AFTER FOUNDATIONS HAVE BEEN POURED.
6 BACKFILL FOUNDATION WALLS IN SUCH A MANNER TO MAINTAIN EQUAL LEVELS OF FILL ON EACH
SIDE OF WALL. FILL LEVELS MAY VARY UP TO 1'-0" ON EITHER SIDE AT ANY ONE TIME.
7 CONCRETE SLABS AT THE TOP AND BOTTOM OF BASEMENT WALLS ARE ASSUMED TO BRACE THE WALLS. DO NOT BACKFILL BASEMENT WALLS UNTIL THESE SLABS HAVE BEEN POURED AND ACHIEVE
THEIR SPECIFIED 28-DAY COMPRESSIVE STRENGTH.
8 LOCATE EXISTING UNDERGROUND UTILITIES IN AREAS OF EXCAVATION WORK. PROVIDE ADEQUATE
MEANS OF SUPPORT AND PROTECTION DURING EARTHWORK OPERATIONS.
9 WHERE FOOTINGS ARE IN CLOSE PROXIMITY OF SUB-SURFACE PIPING, BOTTOM OF FOOTINGS SHALL BE AT LEAST 8-INCHES BELOW ELEVATION OF PIPING UNLESS OTHERWISE SHOWN ON THE
CONTRACT DRAWINGS.
10 COMPLY WITH ALL OSHA STANDARDS AND REGULATIONS WHEN EXCAVATING FOR FOUNDATIONS.
CONCRETE NOTES
1 REFER TO DIVISION 03 OF THE PROJECT SPECIFICATIONS FOR ADDITONAL CONCRETE
REQUIREMENTS.
2 REFER TO THE PROJECT "STATEMENT OF SPECIAL INSPECTIONS" FOR REQUIRED CONCRETE
TESTING AND INSPECTIONS.
3 ALL CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF THE LATEST EDITION OF ACI 301
- "SPECIFICATIONS FOR STRUCTURAL CONCRETE BUILDINGS".
4 ALL DETAILING, FABRICATION AND ERECTION OF REINFORCING BARS, UNLESS NOTED OTHERWISE, MUST FOLLOW THE LATEST EDITION OF THE ACI CODE AND ACI "MANUAL OF STANDARD PRATICE
FOR DETAILING REINFORCED CONCRETE STRUCTURES.
5 "WET STICKING" DOWELS AND REINFORCING INTO CONCRETE IS NOT PERMITTED. ALL DOWELS, REINFORCING AND WELDED WIRE FABRIC MUST BE SUPPORTED AND TIED IN ITS PROPER LOCATION
PRIOR TO POURING CONCRETE.
6 REFER TO CHAPTER 20 OF THE LATEST EDITION OF ACI 318 FOR MINIMUM CONCRETE COVER
REQUIREMENTS.
7 NO ADMIXTURES ARE PERMITTED WITHOUT THE ENGINEERS WRITTEN PERMISSION OTHER THAN
ENTRAINED AIR.
8 DO NOT USE CALCIUM CHLORIDE IN ANY CONCRETE.
9 REFER TO AND COORDINATE WITH ARCHITECTURAL AND MEP DRAWINGS FOR ALL ITEMS REQUIRED
BY OTHER TRADES TO BE PLACED INTO CONCRETE PRIOR TO POURING.
10 REFER TO AND COORDINATE WITH ARCHITECTURAL AND MEP DRAWINGS FOR ALL SLAB
DEPRESSIONS, WALL AND SLAB OPENINGS AND FLOOR FINISHES PRIOR TO POURING CONCRETE.
11 PLACE CONCRETE PIERS AND WALLS MONOLITHICALLY WITH WALL REINFORCING EXTENDING
THROUGH PIER.
12 DEFLECTION OF STEEL FRAMED FLOORS WILL OCCUR DURING PLACEMENT OF CONCRETE FLOOR SLABS. PROVIDE ADDITIONAL CONCRETE AS REQUIRED TO FINISH SLABS WITHIN THE SPECIFIED TOLERANCES SET FORTH IN THE PROJECT SPECIFICATIONS. ALLOW FOR AN AVERAGE OF 1/2-INCH
OF ADDTIONAL CONCRETE AT EACH FLOOR SLAB POUR.
13 SAW CUT CONTROL JOINTS FOR SLABS ON GRADE WHEN CUTTING ACTION WILL NOT TEAR, ABRADE
OR OTHERWISE DAMAGE THE SURFACE OF THE CONCRETE WITH AN EARLY-ENTRY DRY-CUT SAW
EQUIPPED WITH DIAMOND-RIMMED BLADES. START CUTTING WITHIN 4-HOURS OF FINISHING
CONCRETE AND COMPLETE CUTTING WITHIN 12-HOURS OF FINISHING CONCRETE. JOINTS SHALL BE
CUT IN PATTERN SHOWN ON PLAN.
14 A REPRESENTATIVE FROM THE FIBER REINFORCING MANUFACTURER SHALL BE PRESENT AT THE
PRE-POUR MEETING TO ADVISE ON PLACING AND FINISHING TECHNIQUES OF CONCRETE
CONTAINING FIBER REINFORCING.
STRUCTURAL STEEL NOTES
1 REFER TO DIVISION 05 OF THE PROJECT SPECIFICATIONS FOR ADDTIONAL STRUCTURAL STEEL
REQUIREMENTS.
2 REFER TO THE PROJECT "STATEMENT OF SPECIAL INSPECTIONS" FOR REQUIRED STRUCTURAL
STEEL TESTING AND INSPECTIONS.
3 DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE LATEST
EDITION OF THE AISC 360 - "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS".
4 ALL WELDING SHALL CONFORM TO THE AMERICAN WELDING SOCIETY'S AWS D1.1 - "STRUCTURAL WELDING CODE-STEEL" FOR ARC AND GAS WELDING. WELDS SHALL BE PERFORMED BY A CERTIFIED
WELDER IN ACCORDANCE WITH AWS STANDARDS.
5 WHERE SLOTTED HOLE CONNECTIONS ARE SHOWN TO ALLOW FOR PERMANENT DIFFERENTIAL
MOVEMENT BETWEEN TWO MEMBERS, NUTS SHALL BE FASTENED SNUG TIGHT THEN UNTIGHTENED
BY ONE-HALF TURN. PEEN THREADS TO PREVENT FURTHER LOOSENING OF THE NUT. THIS IS NOT REQUIRED AT SLOTTED HOLE CONNECTIONS THAT ARE TO BE FIELD WELDED AFTER ADJUSTMENT.
6 PROVIDE NUMBER OF BOLTS REQUIRED TO SATISFY LOAD REQUIREMENTS SET FORTH IN THE
PROJECT SPECIFICATIONS WITH A MINIMUM OF 2-BOLTS AT EACH CONNECTION UNLESS SHOWN
OTHERWISE ON THE CONTRACT DRAWINGS.
7 REFER TO ARCHITECTURAL DRAWINGS FOR STRUCTURAL STEEL FIRE RATINGS AND PROTECTION.
COORDINATE STRUCTURAL STEEL SURFACE PREPARATION AND PRIMER WITH FIRE RATING
REQUIREMENTS.
8 DO NOT FIELD ALTER OR FIELD CUT OPENINGS IN STRUCTUAL STEEL WITHOUT WRITTEN APPROVAL
FROM ENGINEER. ALL OPENINGS IN STRUCTURAL STEEL MUST BE INDICATED ON STEEL SHOP
DRAWINGS PRIOR TO FABRICATION.
9 PACK COLUMN AND BEAM BASE PLATES WITH NON-SHRINK GROUT AFTER BUILDING HAS BEEN
ERECTED AND PLUMBED TO WITHIN AISC TOLERENCES AND BEFORE POURING OF ANY CONCRETE
FLOORS.
10 COMPLY WITH ALL OSHA STANDARDS AND REGULATIONS WHEN ERECTING STRUCTURAL STEEL.
11 BEAMS SHALL BE EQUALLY SPACED BETWEEN GRID LINES UNLESS NOTED OTHERWISE ON FRAMING
PLANS.
STEEL DECK NOTES
1 REFER TO DIVISION 05 OF THE PROJECT SPECIFICATIONS FOR ADDITIONAL STEEL DECK
REQUIREMENTS.
2 REFER TO THE PROJECT "STATEMENT OF SPECIAL INSPECTIONS" FOR REQUIRED STEEL DECK
TESTING AND INSPECTIONS.
3 STEEL DECK SHALL BE DESIGNED, FABRICATED AND ERECTED IN ACCORDANCE WITH THE LATEST
EDITION OF THE STEEL DECK INSTITUTE SPECIFICAITON.
4 SUPPLY STEEL DECK IN MINIMUM LENGTHS AS REQUIRED TO PROVIDE A 3-SPAN CONDITION.
5 SUPPLY STEEL DECK WITH END CLOSURES, ROOF SUMPS, CLOSURES AT PENETRATIONS AND ALL
OTHER ACCESSORIES NECESSARY TO COMPLETE INSTALLATION.
6 POINT LOADS THAT EXCEED 50 POUNDS SHALL NOT BE SUPPORTED DIRECTLY ON OR HUNG
DIRECTLY FROM STEEL ROOF DECK. SUPPORT ALL DUCTWORK, PIPING AND OTHER MEP AND
ARCHITECTURAL ITEMS DIRECTLY FROM STRUCTURAL STEEL OR SUPPLEMENTAL STEEL FRAMING
AS REQUIRED. HANGING LOADS LESS THAN 50 POUNDS SHALL BE SPACED A MINIMUM OF 36-INCHES
APART AND CONNECTED USING AN APPROPRIATE ANCHORING SYSTEM.
7 TOTAL AMOUNT OF LOADS HUNG FROM COMPOSITE METAL DECK FLOOR SLABS SHALL NOT EXCEED 400 POUNDS IN ANY 48-INCH WIDTH OF SLAB. SUPPORT LOADS EXCEEDING THIS AMOUNT DIRECTLY
FROM STRUCTURAL STEEL OR SUPPLEMENTAL STEEL FRAMING.
8 COMPLY WITH ALL OSHA STANDARDS AND REGULATIONS WHEN ERECTING STEEL DECK.
SPECIAL INSPECTION NOTES
1 REFER TO DIVISION 01 OF THE PROJECT SPECIFICATIONS FOR THE SCHEDULE OF SPECIAL INSPECTIONS
AND ADDITIONAL SPECIAL INSPECTIONS REQUIREMENTS.
2 MATERIAL SPECIFICATION SECTIONS, THE SCHEDULE OF SPECIAL INSPECTIONS AND ALL ASSOCIATED
NOTES DESCRIBE THE STRUCTURAL TESTING AND INSPECTIONS REQUIRED FOR THE PROJECT.
COLLECTIVELY THEY SHALL BE CONSIDERED THE STATEMENT OF SPECIAL INSPECTIONS.
3 THE OWNER SHALL ENGAGE THE SERVICES OF A QUALIFIED SPECIAL INSPECTOR FOR THIS PROJECT.
SIRACUSE ENGINEERS, PC IS NOT THE SPECIAL INSPECTOR FOR THIS PROJECT UNLESS ENGAGED BY
THE OWNER UNDER A SEPARATE CONTRACT.
4 THE CONTRACTOR SHALL HOLD A PRE-CONSTRUCTION MEETING PRIOR TO THE START OF
CONSTRUCTION TO DISCUSS THE REQUIRED TESTING AND INSPECTION PROCEDURES FOR THIS
PROJECT. THE MEETING SHALL ALSO DISCUSS NOTIFICATION AND REPORTING PROCEDURES.
5 THE CONTRACTOR SHALL NOTIFY THE SPECIAL INSPECTOR AND TESTING AGENCY AT LEAST 24 HOURS IN ADVANCE OF A REQUIRED INSPECTION OR TEST. UN-INSPECTED WORK THAT REQUIRES INSPECTION OR
TESTING MAY BE REJECTED SOLELY ON THAT BASIS.
6 THE SPECIAL INSPECTOR AND/OR TESTING AGENCY SHALL IMMEDIATELY NOTIFY THE CONTRACTOR OF DEFICIENT WORK THAT REQUIRES CORRECTIVE ACTION. INSPECTION REPORTS FOR THIS WORK SHALL NOTE WHEN AND HOW THE DEFICIENT WORK WAS CORRECTED. WORK IMMEDIATELY CORRECTED WITH SPECIAL INSPECTOR OR TESTING AGENCY PRESENT AND RE-INSPECTED OR TESTED NEED NOT BE
IDENTIFIED AS NON-CONFORMING WORK.
7 DEFICIENT WORK, NOT IMMEDIATELY CORRECTED WHILE SPECIAL INSPECTOR OR TESTING AGENCY ARE ON SITE, SHALL BE REPORTED TO THE ENGINEER OF RECORD AND CODE ENFORCEMENT OFFICIAL
WITHIN 24 HOURS. A REPORT OF NON-CONFORMANCE SHALL BE ISSUED FOR THIS WORK.
8 THE CONTRACTOR SHALL COOPERATE WITH THE SPECIAL INSPECTOR AND TESTING AGENCY INCLUDING SAFE ACCESS TO THE WORK AREAS SO THAT TESTING AND INSPECTIONS CAN BE PERFORMED IN A
TIMELY MANNER OR UNDUE DELAY TO THE PROJECT.
9 THE SPECIAL INSPECTIONS REQUIREMENTS OF THIS PROJECT IN NO WAY RELIEVE THE CONTRACTOR OF HIS/HER OBLIGATION TO PERFORM WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS OR FROM IMPLEMENTING AN EFFECTIVE QUALITY CONTROL PROGRAM.
10 EACH TESTING AGENCY SHALL SUBMIT, STAMP AND SIGN AN AGENT'S FINAL REPORT TO THE SPECIAL INSPECTOR FOR ATTACHMENT TO THE SPECIAL INSPECTOR'S FINAL REPORT. THE FINAL REPORT SHALL BE STAMPED AND SIGNED BY THE SPECIAL INSPECTOR AND SUBMITTED TO THE CODE ENFORCEMENT
OFFICIAL AND OWNER PRIOR TO THE ISSUANCE OF A CERTIFICATE OF USE AND OCCUPANCY.
COPYRIGHT C 2026 SIRACUSE ENGINEERS, PC
ALL RIGHTS RESERVED. NO PART OF THIS
DRAWING MAY BE REPRODUCED OR COPIED IN
ANY FORM BY ANY MEANS WITHOUT THE WRITTEN
PERMISSION OF SIRACUSE ENGINEERS, PC
REPRODUCTION OF THIS DRAWING FOR USE IN
THE PRODUCTION OF SHOP DETAILS AND
ERECTION DRAWINGS IS EXPRESSLY FORBIDDEN.
WOOD NOTES
1 REFER TO DIVISION 06 OF THE PROJECT SPECIFICATION FOR ADDITIONAL WOOD REQUIREMENTS.
2 REFER TO PROJECT "STATEMENT OF SPECIAL INSPECTIONS" FOR REQUIRED WOOD INSPECTIONS.
3 ALL WOOD CONSTRUCTION SHALL CONFORM TO AWC NDS - NATIONAL DESIGN SPECIFICATION FOR
WOOD CONSTRUCTION AND ITS SUPPLEMENTS AND APA PANEL DESIGN SPECIFICATION.
4 STORAGE OF ALL LUMBER AND TIMBER ON SITE SHALL BE KEPT OFF GROUND, UNDER COVER AND
PROTECTED FROM DAMAGE.
5 ALL WOOD FRAMING DETAILS NOT SHOWN OTHERWISE SHALL BE CONSTRUCTED TO THE MINIMUM
STANDARDS OF THE INTERNATIONAL BUILDING CODE.
6 MINIMUM NUMBER AND SIZE OF FASTENERS CONNECTING WOOD MEMBERS SHALL CONFORM TO
TABLE 2304.10.1 IN THE INTERNATIONAL BUILDING CODE.
7 ALL NAILS FOR STRUCTURAL WORK SHALL BE COMMON WIRE NAILS. HOLES SHALL BE PRE-DRILLED
WHERE NECESSARY TO PREVENT SPLITTING.
8 ALL FLOOR AND ROOF SHEATHING SHALL BE INSTALLED WITH THE FACE GRAIN PERPENDICULAR TO
THE SUPPORTS.
9 ALL SHEATHING PANELS SHALL BE INSTALLED WITH END JOINTS STAGGERED UNLESS NOTED
OTHERWISE ON THE DRAWINGS.
10 STRUCTURAL WOOD MEMBERS MAY NOT BE BORED OR NOTCHED WITHOUT WRITTEN PERMISSION
FROM THE ENGINEER OR AS INDICATED ON THE CONTRACT DRAWINGS.
11 STRUCTURAL WOOD FRAMING USED IN EXTERIOR APPLICATIONS OR IN CONTACT WITH CONCRETE
OR MASONRY SHALL BE SOUTHERN YELLOW PINE NO. 2 OR BETTER, PRESERVATIVE PRESSURE
TREATED WOOD WITH A RETENTION APPROPRIATE FOR END USE.
1 9/4/2026 ADDENDUM 2
1' - 6" 1' - 0"
8"
CONC. WALL, SEE PLAN
(6) #8 VERT. BENT DOWELS
(3) #4 TIES @ 3 1/2" O.C.
AT TOP & 12" O.C. FOR
REMAINDER
TOP OF PIER,
SEE PLAN
1' - 0" 1' - 0"
CONC. WALL, SEE PLAN
(6) #8 VERT. BENT DOWELS
(3) #4 TIES @ 3 1/2" O.C.
AT TOP & 12" O.C. FOR
REMAINDER
TOP OF PIER,
SEE PLAN
10" 10"
(4) #8 VERT. BENT DOWELS
#4 TIES @ 3 1/2" O.C. AT
TOP & 12" O.C. FOR
REMAINDER
TOP OF PIER,
SEE PLAN
1' - 8"
CONC. WALL, SEE PLAN
(4) #8 VERT. BENT DOWELS
(3) #4 TIES @ 3 1/2" O.C.
AT TOP & 12" O.C. FOR
REMAINDER
TOP OF PIER,
SEE PLAN
6"
10"
8"
CONC. WALL, SEE PLAN
(6) #8 VERT. BENT DOWELS
#4 TIES @ 3 1/2" O.C. AT
TOP & 12" O.C. FOR
REMAINDER
TOP OF PIER,
SEE PLAN
CONC. WALL, SEE PLAN
(4) #8 VERT. BENT DOWELS
#4 TIES @ 3 1/2" O.C. AT
TOP & 12" O.C. FOR
REMAINDER
TOP OF PIER, SEE PLAN
EXIST. STONE WALL, V.I.F.1
10" 6"
8" 8"
EXIST. WOOD
FLOOR JOISTS
CONC. WALL, SEE PLAN
4"
#5 BENT DOWEL TOP &
BOTT. OF 10" TALL CURB
EXPIRATION DATE:
BUFFALO OFFICE
50 ELK ST. STE 200
BUFFALO, NY 14210
FAX: 716.842.1807
ROCHESTER OFFICE
85 ALLEN ST. STE 310
ROCHESTER,NY 14608
FAX: 585.461.4771
PHONE: 716.842.1800
WWW.YOUNGANDWRIGHT.COM
PROJECT INFORMATION:
SHEET TITLE:
This is a single sheet of a cohesive set of construction documents, including drawings and specifications. Interpretation of information presented is to be based on the entire set of documents
Drawn By:
Project NO.:
Copyright 2025, Young Architectural, LLC
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required by law to affix his or her seal and the notation
"altered by" followed by his or her signature and a specific description of the alterations made.
SHEET NUMBER:
CONSULTANTS:
STRUCTURAL ENGINEER
MEP ENGINEER
CIVIL ENGINEER
ISSUE DATE:
REVISIONS:
REV. DATE DESCRIPTION
ADDITIONAL BUILDINGS:
SIRACUSE ENGINEERS PC
716.852.1894 EXT. 116
ME ENGINEERING
716.845.5092
WATTS ARCHITECTS & ENGINEERS
716.206.5100
PHASE 2
907 MICHIGAN AVE
BUFFALO, NY 14203
25103
ROSWELL COMMUNITY OUTREACH AND
ENGAGEMENT CENTER
S003
CONCRETE PIER
DETAILS
ER
8/10/2026
ROSWELL 907
COMMUNITY
OUTREACH AND
ENGAGEMENT
CENTER
COPYRIGHT C 2026 SIRACUSE ENGINEERS, PC
ALL RIGHTS RESERVED. NO PART OF THIS
DRAWING MAY BE REPRODUCED OR COPIED IN
ANY FORM BY ANY MEANS WITHOUT THE WRITTEN
PERMISSION OF SIRACUSE ENGINEERS, PC
REPRODUCTION OF THIS DRAWING FOR USE IN
THE PRODUCTION OF SHOP DETAILS AND
ERECTION DRAWINGS IS EXPRESSLY FORBIDDEN.
SCALE:
CONC. PIER DETAIL
1" = 1'-0" S003
P-1
SCALE:
CONC. PIER DETAIL
1" = 1'-0" S003
P-2
SCALE:
CONC. PIER DETAIL
1" = 1'-0" S003
P-3
SCALE:
CONC. PIER DETAIL
1" = 1'-0" S003
P-4
SCALE:
CONC. PIER DETAIL
1" = 1'-0" S003
P-5
SCALE:
CONC. PIER DETAIL
1" = 1'-0" S003
P-6
1 1
NOTES:
1.) TOP BARS ARE THOSE WHICH ARE ORIENTED HORIZONTALLY AND HAVE MORE THAN 12" OF CONCRETE BELOW THE BAR.
2.) EMBEDMENT AND LAP SPLICE LENGTHS SHOWN ARE APPLICABLE TO ASTM A615 GR. 60 REINFORCING BARS. FOR GR. 75 REINFORCING BARS, MULTIPLY
LENGTHS BY 1.25.
3.) TABULATED VALUES ARE BASED ON CONCRETE COVER CONTROLLING. FOR BARS WITH CENTER-TO-CENTER SPACING LESS THAN 1.0Db (BAR DIAMETER)
PLUS TWICE THE CONCRETE COVER, NOTIFY THE ENGINEER.
4.) WHERE CONCRETE DEPTH PRECLUDES FULL EMBEDMENT, PROVIDE 90 DEGREE HOOK.
5.) PROVIDE CONCRETE PROTECTION FOR REINFORCEMENT AS DESCRIBED IN ACI 318, CHAPTER 7.
6.) TABULATED VALUES ARE BASED ON NORMAL WEIGHT AGGREGATE. FOR LIGHTWEIGHT AGGREGATE, MULTIPLY LENGTHS BY 1.33.
REINFORCING BAR EMBEDMENT / LAP SPLICE SCHEDULE
BAR SIZE
CONCRETE COVER < 1 1/2"
TOP BARS OTHER BARS
3,000 psi 4,000 psi 3,000 psi 4,000 psi 3,000 psi 4,000 psi 3,000 psi 4,000 psi
#3
#4
#5
#6
#7
#8
13"
22"
32"
43"
69"
86"
CONCRETE COVER > 1 1/2"
TOP BARS OTHER BARS
EMBED. LAP EMBED. LAP EMBED. LAP EMBED. LAP EMBED. LAP EMBED. LAP EMBED. LAP EMBED. LAP
17"
28"
41"
56"
90"
111"
12"
17"
24"
33"
53"
66"
13"
22"
32"
43"
69"
86"
12"
19"
28"
37"
60"
74"
15"
24"
36"
48"
78"
96"
12"
15"
21"
29"
46"
57"
12"
19"
28"
37"
60"
64"
13"
17"
22"
26"
43"
54"
17"
23"
28"
34"
55"
70"
12"
13"
17"
20"
33"
41"
13"
17"
22"
26"
43"
54"
12"
15"
19"
22"
37"
47"
15"
20"
24"
29"
48"
60"
12"
12"
15"
17"
28"
36"
12"
15"
19"
22"
37"
47"
#9
#10
104"
125"
135"
162"
80"
96"
104"
125"
90"
108"
117"
140"
69"
83"
90"
108"
66"
81"
86"
105"
51"
62"
66"
81"
57"
70"
74"
91"
44"
54"
57"
70"
CONCRETE SLAB,
SEE PLAN
15 MIL CLASS A STEGO WRAP
VAPOR BARRIER OR APPROVED
EQUIVALENT
FULLY COMPACTED SUITABLE
GRANULAR FILL WHERE REQUIRED.
FILL SHALL BE WELL GRADED FROM
COURSE TO FINE & CLASSIFIED AS GW,
GP, GM, SW, SP & SM SOILS USING THE
USC SYSTEM (ASTM D-2487)
PROOF-ROLLED EXIST. GRADE
STABILIZATION SEPARATION
GEOTEXTILE FABRIC
CUT LINE
12" MIN. COMPACTED
NYSDOT ITEM 304.12 -
TYPE 2 SUBBASE STONE
2' - 6" 2' - 0" 2' - 6"
"d
1/8"
APPLY SEALANT FLUSH WITH
TOP OF CONCRETE SLAB
PROVIDE 1" CLEAR COVER WHERE MESH IS
REQ'D, SEE PLAN. SET MESH ON BOLSTERS/
CHAIRS TO MAINTAIN POSITION
SAWCUT
CONCRETE SLAB, SEE PLAN
SEE TYPICAL SLAB
ON GRADE DETAIL
CONCRETE SLAB, SEE PLAN
PROVIDE 1" CLEAR COVER WHERE MESH IS
REQ'D, SEE PLAN. SET MESH ON BOLSTERS/
CHAIRS TO MAINTAIN POSITION
2x4 CONT.
KEYWAY
T O
T H
IC
K
E N
S L
A B
SEE TYPICAL SLAB ON
GRADE DETAIL.
CONTRACTION JOINT
CONSTRUCTION JOINT
/4 d
6" CONC. STRUCT. SLAB
W/ #5 @ 12" O.C. EA. WAY,
CENTERED
SLOPE 1/4" / FT.
CONCRETE SLAB, SEE PLAN
"d
SLAB DEPRESSION WHERE
INDICATED, SEE ARCH. DWGS.
FIN. FLOOR EL.,
SEE PLAN
SEE TYPICAL SLAB ON
GRADE DETAIL
#4 DWLS. @ 12" O.C.
FOR REINF. AND THICKNESS
FDN. WALL, SEE SECTIONS
NON-COMPACTED
FILL
1'-4" x 1'-0" CONT. CONC.
FOOTING, CENTER ON WALL
#4 DWLS. @ 12" O.C.
#4 DWLS. @ 12" o.c.
& (1) #6 TOP AND BOTT., CONT.
8" CONC. WALL W/ #5 @ 12" O.C., E.W.
SIDEWALK, SEE
CIVIL/SITE DWGS
PER LAP SPLICE SCHD.
EXTEND HORIZ.
REINFORCING
WATERSTOP REQ'D WHEN EXTERIOR
GRADE IS ABOVE FINISHED FLOOR
2 x 4 KEYWAY
WALL JOINT - VERIFY JOINT
LOCATIONS WITH THE
STRUCTURAL ENGINEER
C.J.
C .J
C.J.
C .J
ISOLATION JOINT
15# FELT BOND
BREAKER
CONTRACTION OR /
CONSTRUCTION JOINTS
ON COLUMN CENTERLINES
SEPARATE POUR
STEEL COLUMN,
SEE SCHEDULE
WALL REINF.,
SEE SECTIONS
CONC. FDN. WALL
CORNER BARS: SAME SIZE AND SPACING
AS WALL REINFORCING x 4'-0" LG. WHERE
NO REINF. EXISTS OTHER THAN (2) #6 TOP
AND BOTTOM, PROVIDE #6 BENT BARS AT
24" O.C. AND (3) #4 VERT. SPACER BARS
NOTE: REFER TO SECTIONS FOR REQUIRED REINFORCING
SIZE AND SPACINGS.
3' - 0" 1' - 0" 3' - 0"
SEE PLAN FOR
FOOTING ELEV.
FOOTING REINFORCING
BENT DOWELS TO MATCH
FOOTING REINFORCING, TYP.
HORIZONTAL WALL
REINFORCING
ADDITIONAL HORIZONTAL BAR TO MATCH
HORIZONTAL WALL REINFORCING, TYP.
SEE MECH., ELEC., PLUMBING & SITE DWGS. FOR
LOCATION, ELEV., AND SIZE OF UTILITY LINE
PIPE SLEEVE OR FORMED OPENING
2" COMPRESSIBLE FILLER
NOTES:
1. SEE TYPICAL STEPPED FOOTING DETAIL FOR REINFORCEMENT
2. IF REQUIRED, FOR ADDITIONAL WALL REINFORCEMENT, SEE TYPICAL WALL /SLAB
OPENING DETAIL
FOUNDATION
WALL
S E
E P
L A
N C
O N
C S
L A
B
FF ELEV. +0'-0"
UNEXCAVATED
MATERIAL
BACKFILL
SEE TYPICAL SLAB
ON GRADE DETAIL
1' - 0"
E X
IS
T
F
IL
L
S E
E P
L A
N C
O N
C S
L A
B
FF ELEV. +0'-0"
UNEXCAVATED
MATERIAL
BACKFILL
SEE TYPICAL SLAB
ON GRADE DETAIL
H/2H/2
ENGINEERED
FILL
H
E X
IS
T
F
IL
L
UNDISTURBED, SUITABLE
BEARING GRADE. SEE
PROJECT GEOTECH REPORT
FOR ADD'L INFORMATION
UNDISTURBED, SUITABLE
BEARING GRADE. SEE
PROJECT GEOTECH REPORT
FOR ADD'L INFORMATION
OPENING IN WALL, COORDINATE
SIZE & LOCATION W/ ARCH. & MECH .
DRAWINGS
(2) #5 BARS, EA. SIDE
(2) #5 TYP. AT EA.
CORNER, 6'-0" LONG
(2) #5 TOP AND
BOTT. OF
OPENING
E X
T E
N D
T
Y P
EXTEND 3'-0" TYP.
NOTES:
1. OPENING SIZE AND LOCATIONS SHALL BE SUBMITTED TO ENGINEER FOR REVIEW PRIOR TO
CONSTRUCTION.
2. THIS DETAIL APPLIES TO ALL OPENINGS 12" x 12" AND LARGER. DETAIL IS SIMILAR FOR CIRCULAR
OPENINGS 12" DIA. AND LARGER.
3. PROVIDE SIMILAR DETAIL AT MULTIPLE PIPE PENETRATIONS WHEN DIMENSIONS OF PIPE GROUP
EXCEEDS 12" IN ANY DIMENSION.
EXPIRATION DATE:
BUFFALO OFFICE
50 ELK ST. STE 200
BUFFALO, NY 14210
FAX: 716.842.1807
ROCHESTER OFFICE
85 ALLEN ST. STE 310
ROCHESTER,NY 14608
FAX: 585.461.4771
PHONE: 716.842.1800
WWW.YOUNGANDWRIGHT.COM
PROJECT INFORMATION:
SHEET TITLE:
This is a single sheet of a cohesive set of construction documents, including drawings and specifications. Interpretation of information presented is to be based on the entire set of documents
Drawn By:
Project NO.:
Copyright 2025, Young Architectural, LLC
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required by law to affix his or her seal and the notation
"altered by" followed by his or her signature and a specific description of the alterations made.
SHEET NUMBER:
CONSULTANTS:
STRUCTURAL ENGINEER
MEP ENGINEER
CIVIL ENGINEER
ISSUE DATE:
REVISIONS:
REV. DATE DESCRIPTION
ADDITIONAL BUILDINGS:
SIRACUSE ENGINEERS PC
716.852.1894 EXT. 116
ME ENGINEERING
716.845.5092
WATTS ARCHITECTS & ENGINEERS
716.206.5100
PHASE 2
907 MICHIGAN AVE
BUFFALO, NY 14203
25103
ROSWELL COMMUNITY OUTREACH AND
ENGAGEMENT CENTER
S004
TYPICAL CONCRETE
DETAILS
ER
8/10/2026
ROSWELL 907
COMMUNITY
OUTREACH AND
ENGAGEMENT
CENTER
TYPICAL SLAB ON GRADE DETAIL
TYPICAL CONTROL JOINT DETAILS
TYPICAL SLAB AT EXTERIOR DOOR DETAIL TYPICAL FDN. WALL CONSTRUCTION JOINT DETAIL
TYPICAL ISOLATION JOINT DETAIL
TYPICAL CORNER REINFORCING DETAIL
COPYRIGHT C 2026 SIRACUSE ENGINEERS, PC
ALL RIGHTS RESERVED. NO PART OF THIS
DRAWING MAY BE REPRODUCED OR COPIED IN
ANY FORM BY ANY MEANS WITHOUT THE WRITTEN
PERMISSION OF SIRACUSE ENGINEERS, PC
REPRODUCTION OF THIS DRAWING FOR USE IN
THE PRODUCTION OF SHOP DETAILS AND
ERECTION DRAWINGS IS EXPRESSLY FORBIDDEN.
TYPICAL STEP FOOTING DETAILTYPICAL STEP-FTG. @ UTILITY/PIPE PENETRATION DETAILTYPICAL EXCAVATION DETAIL
TYPICAL WALL / SLAB OPENING DETAIL
SEE BASE PLATE DETAILS FOR
ANCHOR BOLT SIZE AND SPACING
LEVELING NUT AT EACH ANCHOR
BOLT
TOP OF CONCRETE
NON-SHRINK, NON-METALLIC
GROUT, SEE NOTES BELOW
BASE PLATE - SEE BASE
PLATE DETAILS
COLUMN, SEE SCHED.
F
IN
F
L O
O R
PLATE WASHER
AND NUT
F O
R C
O L C
U T
O F
F S
E E
C O
L S
C H
E D
U L E
1.) SET COLUMN PLUMB - ADJUST LEVELING NUTS AS REQUIRED
2.) IF CLEARANCE IS INSUFFICIENT FOR ADJUSTMENT OF NUTS, SUPPORT
BASEPLATE WITH STEEL SHIMS.
3.) DRY-PACK BELOW BASE PLATE WITH NON-SHRINK, NON-METALLIC GROUT
2" 4" 4" 2"
6" 6"
3/4" THICK BASEPLATE
4 - AB-1 ANCHOR BOLTS
HSS 4x4 COLUMN, SEE SCHED.
6" 4" 4" 6"
10" 10"
/2
/2
3/4" THICK BASEPLATE
(4) AB-1 ANCHOR BOLTS
HSS 4X4 COLUMN
SEE SCHED.
DETAIL A
DETAIL C
1/4
1/4
4"
3/4" THICK BASEPLATE
(4) AB-1 ANCHOR BOLTS
HSS 4X4 COLUMN
SEE SCHED.
DETAIL D
1/4
2" 4" 3 1/2"
/2
/2
/2
10" 3 1/2"
/2
6" 4" 4" 6"
10" 10"
3/4" THICK BASEPLATE
(4) AB-1 ANCHOR BOLTS
HSS 4X4 COLUMN
SEE SCHED.
DETAIL B
1/4
2" 5" 5" 2"
7" 7"
3/4" THICK BASEPLATE
4 - AB-1 ANCHOR BOLTS
HSS 6x6 COLUMN, SEE SCHED.
1/4
DETAIL E
3 1/2" 3 1/2"
6" 5" 5" 6"
11" 11"
1" THICK BASEPLATE
(4) AB-1 ANCHOR BOLTS
HSS 6X6 COLUMN
SEE SCHED.
DETAIL F
1/4
2" 4" 0" 2"
6" 2"
3/4" THICK BASEPLATE
4 - AB-1 ANCHOR BOLTS
HSS 4x4 COLUMN, SEE SCHED.
DETAIL H
1/4
4" 5" 5" 4"
11" 11"
1" THICK BASEPLATE
(4) AB-1 ANCHOR BOLTS
HSS 6X6 COLUMN
SEE SCHED.
DETAIL G
1/4
/2
/2
2" 2"
COLUMN SCHEDULE
FIRST FLOOR FIRST FLOOR
0" 0"
SECOND
FLOOR / LOW
ROOF TOS
SECOND
FLOOR / LOW
ROOF TOS
10' - 11 3/4" 10' - 11 3/4"
RIDGE TOS RIDGE TOS
23' - 8 1/2" 23' - 8 1/2"
Column Locations
A-6 A-7 A.1-1 A.7-3 A.7-4 B-1 B-3 B.9-1 C-2 C-3 C-4 C-6 C-6.1 C-7 C-7.1 C.8-2 D-3 D-5 E-2 E-3 F-5 F-6 G-5 G-6
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
H S
S
X X
/8
CUTOFF
COLUMN
LOCATIONS
BASEPLATE
-8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8" -8"-8" -8" -8"
H S
S
X X
/8
H S
S
X X
/8
ANCHOR BOLT HOLE &
WASHER SIZE SCHEDULE
ANCHOR BOLT
SIZE
MAX. BASEPLATE
HOLE SIZE
MIN. WASHER
SIZE
3/4" DIA.
7/8" DIA.
1 1/4" DIA.
1 5/16" DIA.
1 9/16" DIA.
2 1/16" DIA.
2" DIA. x 1/4"
2 1/2" DIA. x 5/16"
3" DIA. x 1/2"
1" DIA. 1 13/16" DIA. 3" DIA. x 3/8"
1 1/2" DIA.
1 3/4" DIA.
2 1/2" DIA.
2 5/16" DIA.
2 3/4" DIA.
3 3/4" DIA.
3 1/2" DIA. x 1/2"
4 DIA. x 5/8"
5 1/2" DIA. x 7/8"
2" DIA. 3 1/4" DIA. 5" DIA. x 3/4"
E M
B E
D
/2
5 1/2" THRD. PROJECTION
HEAVY HEX NUT
3/4" DIA. ASTM F1554
ANCHOR ROD
TOP OF CONC.
AB-1
E M
B E
D
6 1/2" THRD. PROJECTION
HEAVY HEX NUT
1" DIA. ASTM F1554
ANCHOR ROD
TOP OF CONC.
AB-2
EXPIRATION DATE:
BUFFALO OFFICE
50 ELK ST. STE 200
BUFFALO, NY 14210
FAX: 716.842.1807
ROCHESTER OFFICE
85 ALLEN ST. STE 310
ROCHESTER,NY 14608
FAX: 585.461.4771
PHONE: 716.842.1800
WWW.YOUNGANDWRIGHT.COM
PROJECT INFORMATION:
SHEET TITLE:
This is a single sheet of a cohesive set of construction documents, including drawings and specifications. Interpretation of information presented is to be based on the entire set of documents
Drawn By:
Project…
This is the start of the file's text. The full file is on GovTribe.