RFP 22-028 Low-No DW Charging Infrastructure Construction - Addendum 1 - Final.pdf

PDF 149 KB Posted

Attached to
RFP 22-028 Low-No Del Webb Charging Infrastructure Construction
Solicitation number
S-KS2410-00004084
Issued by
Marion County, Oregon

About this file

This document is an addendum to Request for Proposals (RFP) 22-028 issued by the Salem Area Mass Transit District (SAMTD) for the construction of low-no Del Webb charging infrastructure. The addendum states that the previous file attachment titled "RFP 22-028 Low-No DW Charging Infrastructure Construction - Instructions For Proposers with Drawings Part 1-4 - Final" has been deleted in its entirety and replaced with a new file titled "RFP 22-028 Low-No DW Charging Infrastructure Construction - Instructions For Proposers with Drawings Part 1-4 - Final 2". All other specifications and terms and conditions remain unchanged.

The RFP 22-028 seeks construction services for infrastructure to support SAMTD's Battery Electric Bus (BEB) program, including the installation of new electrical service, BEB charging equipment, underground electrical infrastructure, demolition, excavation, concrete work, site testing, and commissioning support. The project is located in Salem, Oregon.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 22-028 – Addendum #1

SALEM AREA MASS TRANSIT DISTRICT

REQUEST FOR PROPOSALS

RFP 22-028

LOW-NO DEL WEBB CHARGING INFRASTRUCTURE

CONSTRUCTION

ADDENDUM #1

Salem Area Mass Transit District is providing information and making changes / additions / modifications / revisions as an Addendum to RFP 22-028.

The following changes, clarifications and SAMTD responses to questions posed to date are hereby provided to all proposers:

1. The file attachment to the solicitation entitled “RFP 22-028 Low-No DW Charging Infrastructure Construction - Instructions For Proposers with Drawings Part 1-4 – Final” is deleted in its entirety and is replaced with the file entitled “RFP 22-028 Low-No DW Charging Infrastructure Construction - Instructions For Proposers with Drawings Part 1-4 – Final 2”.

All other specifications and terms and conditions remain unchanged.

By: Daniel M. Knauss Procurement & Contracts Manager

Salem Area Mass Transit District 555 Court Street NE, Suite 5230 Salem, Oregon 97301 August 19, 2022

File details come from the government source that posted it. Updated .