Suwannee Valley Electric Cooperative (SVEC) has issued Addendum #1 for Request for Proposals (RFP No. 2025-03) for Logistics Support and Base Camp Services in Live Oak, Florida. The solicitation seeks a contractor to provide comprehensive emergency base camp facilities capable of supporting up to 500 individuals during disaster recovery operations, with the ability to fully mobilize within 72 hours of contract activation. The proposal due date is May 2, 2025, at 4:00 PM Eastern, with potential contract award anticipated shortly thereafter. Historically, similar service deployments have lasted 3-5 days, as demonstrated during Hurricane Helene, where the base camp was operational for 9 days with fluctuating bed occupancy.
The addendum provides critical clarifications about the contract, including requirements for medical personnel in the medical tent, mandatory bed linens (sleeping bags are not acceptable), and potential fuel cost reimbursement for mobilization and demobilization. SVEC will notify the successful respondent via email and maintains discretion about previous contractors and pricing. The contract will be funded through FEMA assistance, requiring strict adherence to federal guidelines and cost principles. Contractors must demonstrate comprehensive service capabilities across various occupancy levels and be prepared to provide infrastructure including food, water, electricity, sleeping accommodations, shower and laundry facilities, and medical support at SVEC's 22-acre site in Live Oak, Florida.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_2025-03_-_Addendum_1.docx | DOCX document | |
| RFP_2025-03_-_Addendum_1.docx | DOCX document | |
| SVEC_RFP_2025-03_-_Logistics_Management_Services.pdf | ||
| SVEC_RFP_2025-03_-_Logistics_Management_Services.pdf | ||
| SVEC_RFP_2025-03_-_Logistics_Management_Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Suwannee Valley Electric Cooperative Lighting the Way Since 1937
Request for Proposals for Logistics Support and Base Camp Services RFP No. 2025-03 Addendum #1
This Addendum is hereby incorporated into the solicitation package for the Request for Proposals (“RFP”) referenced above.
RESPONDENT QUESTIONS:
SVEC issues this first Addendum to provide responses to the questions received from prospective Respondents (slightly revised for clarity). SVEC confirms that any additional questions are due by 4:00 PM Eastern on April 18, 2025. SVEC further confirms to all interested Respondents that the Proposal Due Date and Time is May 2, 2025 at 4:00 PM Eastern. All Proposals must be submitted on or before this deadline and consistent with the requirements set forth in the RFP.
| No. |
| Question |
| Response |
| 1 |
| What was the last event that impacted SVEC which required activation and performance by the logistics and base camp contractor(s)? |
| Hurricane Helene. |
| 2 |
| How long was the camp set up? |
A total of 9 days; however, the total number of beds fluctuated during that period.
| 3 |
| Which Contractor(s) held the previous or holds the current contract for the services requested in the solicitation? |
| Details regarding previous solicitations, contracts, and vendors will not be provided. Respondents must submit a proposal in accordance with the terms of the RFP and any addenda. |
| 4 |
| Can SVEC provide the current pricing? |
| See Response to Question #3. |
| 5 |
| For the Respondents that submit a proposal, how will they be notified of award /non-award? |
| SVEC will issue via email a notice of award to the successful Respondent(s). |
| 6 |
| Are medical personnel needed to staff the 60x60 medical tent? |
| SVEC assumes this question pertains to the “Medical Tent” Section found on page 19 of the RFP. Medical personnel (e.g. nurse) are required to staff the medical tent, especially during breakfast and dinner hours. |
| 7 |
| Can sleeping bags and pillows be substituted for the bed linens? |
| SVEC assumes this question pertains to the “Medical Tent” Section found on page 19 of the RFP. Sleeping bags and pillows cannot be substituted for the required two sets of bedding per cot. |
| 8 |
| Is there a minimum deployment period for the proposals? |
| SVEC assumes this question pertains to the “Medical Tent” Section found on page 19 of the RFP. There is no minimum deployment period. However, The base camps must be fully operational within 72 hours after Contractor’s receipt of SVEC’s notice of contract activation. Historically, when SVEC has used services of this nature in the past, the services have been needed for at least 3-5 days. |
| 9 |
| Is fuel reimbursed for mobilization or de-mobilization? |
| SVEC may provide reimbursement for fuel costs related to mobilization and demobilization as long as the costs are timely submitted to SVEC and are reasonable, necessary, and sufficiently documented in compliance with FEMA guidelines and requirements. |