About this file

This is a Request for Proposal (RFP) issued by Colorado State University (CSU) for the Colorado State Forest Service (CSFS), specifically for the Michigan Ditch Wildfire Mitigation Forest Service Project. The project involves harvesting approximately 4,150 CCF of merchantable wood products across 150 acres in two units located in the Colorado State Forest, Jackson County, at elevations between 10,000 and 11,000 feet. The primary objectives are to remove dead overstory trees to limit wildfire impact on a critical water source, reduce live basal area around structures, and remove trees prone to windthrow. The operational period is expected to be from July 15 to October 30, 2024, with potential extensions through November 30, 2025. The RFP was published on May 30, 2024, with a non-mandatory virtual information meeting on June 13, 2024, and proposals are due by July 1, 2024.

The contract will be awarded based on evaluation criteria including equipment, key personnel, price, prior experience, and project timeline. While specific pricing is to be determined by bidders, the project aims to complete as much work as possible within the allotted funds. The project is funded jointly by the City of Fort Collins and the Colorado State Forest Service, with the ultimate goal of protecting the Michigan Ditch watershed, which can provide up to 25% of Fort Collins' water supply. The project involves specialized steep-slope logging with slopes averaging 50% and reaching over 90% in some areas. Bidders are required to submit detailed information about their experience, equipment, and proposed approach, with the CSFS reserving the right to adjust the project scope based on funding availability.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal #RFP-2024-070-JF

Michigan Ditch Wildfire Mitigation Forest Service Project

Table of Contents I. Background

A. Colorado State University System Background

B. Colorado State University Background

C. Colorado State University Pueblo Background

D. Colorado State University Global

E. Colorado State Forest Service

F. Purpose

II. Statement of Work

A. Project Location

B. Project Administration

C. Contract and Operational Period

D. Plan of Operations

E. Volume Determination and Product Ownership

F. Utilization Standards

G. Load Identification and Log Accountability

H. Temporary Roads

I. Skid Trails

J. Landing and Decking Specifications

K. Landing Pile Specifications

L. Stumps

M. Colorado State Forest Service Quality Assurance Plan

N. Performance Summary

O. Acceptable Quality Levels (AQL)

P. Resource Protection Standards

Q. Other Resource Protections

R. Other Protection Measures

S. Subcontracting

T. Damage Deposit

U. Damage Penalty

V. Other Project Specifications

W. Threatened and Endangered Species Considerations

X. Units Overview and Prescriptions for Treatment

Y. Bids

III. Information Required from Respondents

A. Cover Letter

B. Experience

C. Equipment

D. Price

E. Timeline

F. Additional Information

G. Exceptions to the RFP Terms and Conditions

H. Authorized Agent

IV. Administrative Information

A. Issuing Office

B. Purpose

C. Definitions

D. Scope

E. Schedule of Activities

F. Request for Proposal - Respond and Responsibilities of Offeror

G. Inquiries

H. Addendum or Supplement to Request for Proposal

I. Proposal Submission

J. Confidentiality

K. News Releases

L. Response Material Ownership

M. Incurring Costs

N. Acceptance of Proposal Content

O. Acceptance Time

P. Additional Data

Q. Evaluation and Award

R. Standard Contract

S. Exceptions

T. Specification Requirement

U. Payment Schedule

V. RFP Opening

W. Term

X. Resident Bidders

Y. Aerial Drone Video

Z. Non-Mandatory Virtual Information Meeting

AA. Selection of Proposal

BB. Award of Contract

CC. RFP Cancellation

DD. Insurance

Appendix A: Georeferenced Project Maps

Appendix B: Project Cutting Specifications

Appendix C: Cost Page

Appendix D: Signature Page

Appendix E: Non-Mandatory Virtual Information Meeting

Appendix F: Independent Services Contract

I. Background A. Colorado State University System Background The CSU System is comprised of three campuses with very distinct roles and missions, CSU-Fort Collins, CSU‐Pueblo and CSU-Global Campus. The CSU campuses serve the state, region, country, and world, educating nearly 60,000 students annually. Highly skilled graduates number almost 9,000 per year, and more than 250,000 alumni live around the globe.

B. Colorado State University Background Colorado State University in Fort Collins, the System’s flagship institution, is a doctoral-granting research university with a student body of more than 33,000, with one out of four students being first-generation scholars. As the state’s only land-grant institution, CSU has been serving Colorado since 1870. Our world-class research in infectious disease, atmospheric science, clean energy technologies, environmental science, and biomedical technology attracts more than $350 million in research funding annually. Our professional programs in veterinary medicine, occupational therapy, journalism, agriculture and construction management are ranked among the nation’s best.

Colorado State is the “university of choice” for Colorado residents; 30% of all of Colorado’s science, math, engineering and technology majors pursue degrees at CSU.

CSU’s purpose is to ensure students can realize their dreams and impact the world through access to innovative and relevant academic programming, an incomparable student experience, extraordinary faculty and staff, research and new knowledge discovery to solve global challenges, and state-of-the-art working and learning environments.

C. Colorado State University Pueblo Background Colorado State University-Pueblo is a regional, comprehensive, federally designated Hispanic-Serving Institution, serving approximately 4,000 students – 47 percent of whom identify as a minority, including more than 25 percent Hispanic, and 31 percent first-generation. Diverse, intimate, and supportive, the Pueblo campus serves the Southern Colorado area offering both undergraduate and graduate degrees in business, education, engineering, nursing, and the humanities. CSU-Pueblo delivers unique programs in mechatronics, railroad engineering, and automotive industry management.

D. Colorado State University Global Colorado State University Global is the nation’s first, independent, 100-percent online accredited public university. With almost 19,000 students in more than 40 countries, CSU Global serves adults, active military, and business professionals who seek flexible educational options. Created to serve modern learners in Colorado and beyond, CSU Global is committed to academic excellence, innovative and outcome-driven learning solutions, and career-relevant degree programs.

E. Colorado State Forest Service Established in 1955, the Colorado State Forest Service (CSFS) is a service and outreach agency of the Warner College of Natural Resources at Colorado State University.

Headquartered in Fort Collins, the agency provides staffing for the Division of Forestry within the Colorado Department of Natural Resources. We have approximately 100 (full-time and part-time); more than 70 seasonal employees; and 17 field offices throughout the state. The CSFS is committed to providing timely, relevant forestry information and education to the citizens of Colorado to achieve resilient forests and communities. Using applied science, we have adapted our focus and approach throughout the decades in response to emerging forestry issues. CSFS funding consists of federal grants, state general fund and state grants, self-funded operations, other revenues, and severance tax. The mission of the Colorado State Forest Service is to achieve stewardship of Colorado’s diverse forest environments for the benefit of present and future generations.

F. Purpose The Targeted Infrastructure Protection through Wildfire Mitigation at the Michigan Ditch is 150 acres across two units. The area of work is located in the Colorado State Forest, Jackson County, Colorado. The stands are high-elevation spruce-fir ranging from 10,000 to 11,000 feet. The sites are wet and steep throughout. The Offeror will harvest 4,150 CCF of merchantable wood products from the project.

This project removes dead overstory to limit impact of severe wildfire on a critical water source; and also includes reduction of live basal area around structures and removes live trees prone to windthrow. Treatments within the project area will provide a landscape more resilient to catastrophic fire. The removal of large fuels will reduce soil burn severity, a critical element in protecting watersheds from post-fire erosion. The treatment will result in reduced fuel loading, better protected watersheds, and protection of the Michigan Ditch infrastructure.

This project will limit impacts of catastrophic wildfire throughout the upper Michigan Ditch watershed that can provide up to 25% of City of Fort Collins’ water supply.

The Colorado State Forest Service (CSFS) will administer this project funded by the City of Fort Collins and Colorado State Forest Service.

II. Statement of Work A. Project Location This project is located near Cameron Pass on the Colorado State Forest, approximately 31 road miles southeast of Walden, CO and 68 miles west of Fort Collins, CO. All units are located off the Michigan Ditch Road, off state highway 14 at Cameron Pass. From Fort Collins, take 287-N to CO-14W to the Cameron Pass parking lot.

Township 6 North, Range 76 West, Sections 11 and 12, Jackson County, Colorado 6th Meridian

B. Project Administration CSFS Forester Mark Melham will serve as the Administering Forester.

Mark Melham 59228 State Highway 14 Walden, CO 80480 Office: (970) 723-4505 Cell: (970) 819-6668 mark.melham@colostate.edu

The Administering Forester reserves the right to suspend operations for non-compliance.

The Administering Forester reserves the right to specify specific on the spot work on a case-by-case basis that may override the specifications listed below.

C. Contract and Operational Period This project will begin from the date of contract execution until November 30, 2025. The expected operational period is from July 15 – October 30 to allow for the landscape to dry enough for heavy equipment operation and prior to significant snowfall. CSFS will accommodate extensions to the operational period earlier and later than the expected season as conditions allow, e.g. June 1 – November 30. The Administering Forester may choose to suspend operations during this period because of extenuating circumstances related to unnecessary damage due to weather, fire restrictions, or conflicts with heavy recreation activity. The install and removal of necessary infrastructure for access may further impact the operational period.

D. Plan of Operations The Offeror shall prepare a Plan of Operations for CSFS prior to the start of any work but not later than thirty (30) days after contract execution. Upon approval by CSFS, the Plan of Operations shall identify all subcontractors. Offeror shall not commence any work until the mailto:mark.melham@colostate.edu

Administering Forester has approved the Plan of Operations. The Offeror, subject to the approval of the CSFS, may amend the Plan of Operations.

The entire operating season may include inoperable periods due to monsoons, drought, and other weather conditions where soil or road conditions could result in resource damage or wildfire risk. CSFS has the authority to suspend operations when conditions warrant. CSFS shall suspend operations when weather has caused forest soil and road conditions to degrade enough to cause damage with continued operations.

If autumn operations require snow clearing along the roads, then the Offeror will be responsible for removal.

Treatment should be complete at the end of the operating season 2024. Given the difficult terrain and environmental conditions, treatment may extend into 2025.

The Plan of Operations will include:

• Planned rate of cutting (volume/day, week, etc.)

• Planned rate of hauling (per day, per week, etc.)

• Schedule of operation by Sub-Unit and Date

• Methodology to progress through the treatment area

• Address any road or access issues

E. Volume Determination and Product Ownership CSFS makes no warranties of any kind expressed or otherwise as to the products value under this contract. CSFS does not guarantee the volumes of wood products. The Offeror is responsible for making their own estimates of actual gross volume, defect, and net volume recovery. Ownership of forest products transfer when the Offeror removes product from the treatment unit.

Table 1: Total volume summary of all merchantable volume available within the entire treatment area. Net volume for each species is listed. Harvest volume is listed at the bottom and includes all dead and limited live fir. Estimated volumes are based on 6" minimum DBH. The Offeror should account for the value of the timber when providing the per acre price.

Table 1. Total Volume Summary - Sawtimber

Species Net Volume (CCF) Dead Live

Lodgepole Pine 89 42 Engelmann Spruce 2,801 883 Subalpine Fir 718 1,572

Total Stand Volume: 6,105 Total Harvest Volume: 4,159

F. Utilization Standards Offeror shall harvest and utilize all dead trees, both standing and on the ground, over 6” DBH outside bark and containing at least one 8’ segment to a 5” top Diameter Inside Bark (DIB), and at least 1/3 sound. Offeror will harvest all live sub-alpine fir prone to windthrow, isolated from other trees, or otherwise prone to falling. Offeror shall not intentionally cut logs to avoid utilization standards.

Table 2: Utilization standards by product type and species. Volumes provided in this scope of work are based on sawtimber minimums. Firewood & POL utilization standards are listed as these products are available within the units and may be removed at the discretion of CSFS and the Offeror.

Table 2. Utilization Standards

Species Product Minimum

DBH

Top

DIB

Minimum Piece Size

Net Merchantabilit y Minimum

DEAD:

Engelmann Spruce, Subalpine Fir, & Lodgepole Pine

LIVE:

Subalpine Fir

Sawtimber 6.0” 5.0” 8.0’ ≥ 1/3

Firewood /

POL 5.0” 4.0” 8.0’ ≥ 1/3

G. Load Identification and Log Accountability CSFS must track timber volume to report supply provided to the Colorado Timber Industry.

The Offeror shall identify all loads of timber in transit using load tickets and markings as described in this section. The Offeror shall show such documentation upon request by CSFS as evidence of accountability and authority to move timber products.

CSFS will issue load ticket books, containing 50 individual load tickets and comprised of four numerically corresponding stubs (book stub, mill stub, load stub, and CSFS) to the Offeror prior to the commencement of timber product hauling. These load tickets and their included instructions are a part of this Agreement. Offeror must complete all items on all four stubs of the load ticket in ink (or their designated hauler, as an agent of Offeror) prior to timber removal from the project area. These listed items include project name, payment unit, mill destination, hauler name, date and time of product removal from sale area, and species hauled.

Identify loads of timber in transit by displaying the load stub portion of the load ticket securely stapled as a placard on a front- driver’s side log.

Load ticket books, and book stubs are accountable items and Offeror must return to the Administering Forester used or unused upon project completion and prior to project closeout. Administering Forester and the Offeror shall count and sign for issuance and return of tickets on a receipt form provided by CSFS prior to commencement of hauling activity or timber sale closure, respectively. The CSFS will bill Offeror $100 for each used or unused load ticket book that is not returned to CSFS.

H. Temporary Roads The Offeror will follow the CSFS Colorado Forest Road Field Handbook and the 2023 CSFS Forestry Best Management Practices to Protect Water Quality at all times. The CSFS will provide copies of this handbook. Use existing roads whenever possible. Offeror will locate additional roads, skid trails, landings and decks required, constructed, and rehabilitated according to the standards set forth below.

Where applicable, and as agreed in the plan of operation, CSFS will coordinate with the Offeror and potential sub-contractors to implement the appropriate roadwork. The Offeror will maintain all roads in their original or upgraded condition during harvest.

Offeror will take care to maintain drainage necessary to prevent erosion during construction or upgrading of roads and hauling products. The Offeror is responsible for any erosion problems resulting from their operation on the subject property. The Offeror will correct these problems immediately upon discovery or as soon as conditions permit as determined by the Administering Forester. Prior to final acceptance of this project completion, Offeror must grade all roads utilized by the project and the Administering Forester will inspect drainage facilities for working condition. All permanent improvements installed as a part of this contract will remain the property of the landowner.

The Offeror will repair any damage to existing private, state, or county roads caused by the project operations as soon as practical. CSFS will approve all proposed road locations and any changes to existing road locations prior to any work initiation.

The Offeror shall return all roads to their original or upgraded condition, including installation or restoration of appropriate drainage devices as otherwise described in the contract scope of work upon cutting unit completion.

Following use for harvest and treatment implementation, Offeror will decommission temporary roads, which may involve re-contouring where significant side slope exists, elimination of ditches and other structures, removal of temporary stream crossings https://static.colostate.edu/client-files/csfs/pdfs/csfs-frst-rd-hndbk-www.pdf https://csfs.colostate.edu/wp-content/uploads/2024/01/BMP_WaterQuality_2023_Web_CMP.pdf https://csfs.colostate.edu/wp-content/uploads/2024/01/BMP_WaterQuality_2023_Web_CMP.pdf

(including all fill material in the active channel), out-sloping during construction, ripping of severely compacted soils, removal of ruts and berms, effectively blocking the road to normal vehicular traffic where feasible, and construction of drainage features such as cross ditches and water bars.

I. Skid Trails Offeror will use existing skid trails and landings whenever possible. The Administering Forester will approve all skid trails and landings in advance. Offeror will place trails and landings spacing at 50 foot or greater and outside of the Stream Side Management Zones (SMZs). Skid trails, landings and temporary roads should not exceed more than 15% of harvest area. Skid trail and landing closure will require water barring, re-contouring, ripping, slash scattering, or a combination of these treatments, as determined by the Administering Forester.

The Offeror is responsible for any erosion problems resulting from their operation on the subject property. The Offeror will correct problems immediately upon discovery or as soon as conditions permit as determined by the Administering Forester.

J. Landing and Decking Specifications The Administering Forester will consult with the Offeror regarding optimal placement of landings, decks and skid trails prior to work starting in each unit. There is a large landing directly adjacent State Highway 14 and multiple decking locations along the main access and service roads for Cut-to-Length Systems (see Appendix A).

K. Landing Pile Specifications Offeror shall pile logs not meeting utilization standards and all slash at landings. Ensure piles are compact and free of soil to facilitate burning. Offeror will ensure piles are not less than 10 feet in height. Piles will not impair road use or result in damage to residual timber.

Locate piles at least 20 feet from residual timber. Offeror will cut off and return to the pile all objects which extend more than 8 feet in any direction from the pile profile. The Offeror must not burn slash piles.

L. Stumps Offeror must cut stumps at twelve (12) inches or less as measured on the uphill side unless rocks or other objects require a taller stump.

M. Colorado State Forest Service Quality Assurance Plan

1. Inspection. CSFS’s quality assurance inspections will determine compliance with specifications. Inspections will consist of visual observations to determine compliance with the specifications. CSFS will use these inspections to determine compliance of the work performed with contract specifications which are conclusive.

Noncompliance will result in non-acceptance of the work.

2. Rework and Re-inspection after Rework. CSFS will make inspections after rework in the same manner as the first inspection but in different areas.

3. Inspection of Slash Treatment and Other Contract Requirements. CSFS will use these inspections to determine compliance of work performed with contract specifications which are conclusive. Noncompliance with any of the specifications will require rework to bring the treatment up to specification standards.

N. Performance Summary The following describes the major items in the contract with the incentives and deductions for the work described.

Table 1: Performance standards, the assessment methods, and appropriate resolutions for each of the major tasks in the contract.

Work Statement

Performance Standard

CSFS Method of Assessment

Incentive/ deduction

Cutting all designated trees

Quality meets specifications

Visual Inspection

Rework required if Offeror fails to meet standard.

Lop and scatter according to specifications

Quality meets specifications

Visual Inspection

Rework required if Offeror fails to meet standard.

Piling according to specifications

Quality meets specifications

Visual Inspection

Rework required if Offeror fails to meet standard.

O. Acceptable Quality Levels (AQL) Acceptable Quality Level – Thinning (cut trees) AQL 90% acceptable level of performance Monitoring Method – Visual inspections and sampling of project work Acceptable Quality Level – Slash Treatment AQL 90% acceptable level of performance

Monitoring Method – Visual inspections and sampling of project work

P. Resource Protection Standards Water Quality The Offeror shall follow the measures below to protect stream courses:

CSFS has identified Streamside management zones (SMZs) and flagged in blue/ ribbon. Offeror shall not operate equipment in SMZs except at crossings designated by the CSFS. Offeror should cross streams perpendicular to direction of flow. Offeror is allowed to reach into SMZs to harvest dead trees. Additional SMZs may be identified throughout operating season and flagged in accordance with specifications.

The Offeror shall conduct operations to prevent debris from entering waterways. In the event the project operations cause debris to enter waterways in amounts which adversely affect the natural flow of the stream, water quality or fishery resource, the Offeror shall remove such debris as soon as practicable, but not to exceed 48 hours, and in an agreed manner that will cause the least disturbance to stream courses. Any debris entering Michigan Ditch from operations shall be immediately removed by the Offeror.

Wet Period Restrictions The operational period accounts for the wet spruce-fir forest type. Heavy annual snowpack may delay the start date and early snowfall may shorten the end date. CSFS may temporarily suspend operation in a specific area. CSFS is not responsible for additional mobilization costs if the project is suspended due to wet conditions.

Q. Other Resource Protections Offeror shall conduct project activities to minimize any adverse impact to the following listed resources.

1. Surface Conditions

Offeror shall not operate wheeled motorized equipment when conditions are muddy or the soil moisture is high enough for the vehicles to cause substantial damage to the roads or landscape. CSFS will work with Offeror to navigate issues presented by wet conditions.

2. Protection of Improvements and Survey Monuments

The Offeror shall avoid any damage to improvements such as, but not limited to, fences, gates, utility poles, survey markers or monuments, claim stakes, survey witness trees and cultural sites. The CSFS will require Offeror to repair or pay fair market value to replace any damaged improvements.

R. Other Protection Measures Hazardous Materials and Spills

CSFS requires Offeror comply with all appropriate State and Federal Regulations when using hazardous materials and/or petroleum products including, but not limited to, Material Safety Data Sheets (MSDS) and necessary Personal Protective Equipment (PPE). On-site contamination will require the Offeror to remove the spilled materials and dispose of contaminated material, soil, or water.

Safety When the project’s operations are adjacent to or on Forest Service controlled roads and trails open to public travel, the Offeror shall furnish, install and maintain all temporary traffic controls that provide the public with adequate warning of hazardous or potentially hazardous conditions. Offeror shall provide traffic control notices appropriate to current conditions and covered or removed when not needed.

Noxious Weeds The Offeror shall insure all equipment moved onto Public Land is free of soil, seeds and vegetative matter or other debris that could contain or hold weed seeds. The Offeror shall employ whatever cleaning methods are necessary to ensure compliance and shall notify the Administering Forester prior to moving each piece of equipment onto public land.

Notification will include identifying the location of the equipment’s most recent operations.

The Offeror will make arrangements for Administering Forester to inspect each piece of equipment prior to it being moved onto public land. “Equipment” includes all machinery except log trucks, chip vans, pickup trucks, cars, or other vehicles primarily for transport of personnel.

Fire Control The Offeror will exercise all precautions to prevent wildfire and shall assist in the suppression of any fire that is on or threatening the SLB land. Offeror will equip all motorized equipment with an operational spark arrester and charged fire extinguisher.

During the fire season the Offeror will have the following firefighting tools located on the sale site:

• A combination of McLeod and Pulaski shovels sufficient to equip each person on the treatment crew.

• A minimum of one 5-gallon back-pack pump per every five people on the treatment crew.

• A minimum of two 5-pound fire extinguishers available at fueling locations.

S. Subcontracting The Offeror may not assign this contract or any interest without prior written consent of the CSFS and CSU Procurement Office. The Offeror shall submit the use of subcontractor with the bid response and identify their work tasks in the operations plan prior to work initiation.

CSFS will hold all subcontractors to the same standards as outlined in this contract.

Subcontractors and operators of subcontractors must meet with the Administering Forester prior to starting any work.

T. Damage Deposit The Offeror will pay a damage deposit of $20,000 upon contract execution. The Offeror will pay cash at the CSFS State Office in Fort Collins or certified check to the Administering Office.

Administering Forester shall deduct any penalties for damages to soils, improvements or other elements of the forest stand not repaired or corrected by the Offeror from the Damage Deposit. If at any time the Damage Deposit balance falls below $2,000 during the performance of this agreement, Offeror shall bring it back to the original full amount through additional payments.

CSFS will release any remaining deposit balances to Offeror promptly upon satisfactory completion of this agreement.

U. Damage Penalty Offeror shall protect residual trees to the maximum extent possible. The Offeror fell and pay at current contract rates for any residual trees damaged during operation. In addition, CSFS will assess a fixed $15 penalty per tree if Offeror does not promptly take mitigation measures to address these damages. The Offeror must pay the damage penalty within thirty

(30) days of invoice by CSFS. CSFS may also assess penalties for damage to soils, improvements, or other elements of the forest stand. Determination of damage is at the sole discretion of the CSFS but is typically described as basal damage in excess of 1/3 the circumference of the tree, broken tops and limbs greater than four (4) inches in diameter, unnecessary soil disturbance and excessive amounts of any and all of the above.

Administering Forester may require utilization of damaged timber.

The Offeror shall conduct all operations in a timely manner and in accordance with Plan of Operation attached hereto and incorporated as set forth above and shall take all necessary precautions to protect the remaining forest stand, soils, and any improvements.

V. Other Project Specifications

• The Administering Forester must approve in advance any harvest related operations occurring outside of unit boundaries as depicted in Appendix A (Georeferenced Project Maps).

• CSFS will facilitate coordination between the Offeror and the City of Fort Collins for harvest activities and ditch crossings. The Offeror will report any communications from the City of Fort Collins or others to the CSFS Administrating Forester.

• Offeror will report any damage to ditch infrastructure to the Administering Forester immediately who will communicate with the City of Fort Collins.

• Offeror must take all precautions to prevent damage to the Michigan Ditch Road. If excessive rutting occurs on the road edge near tethered operations, the Administering Forester may require designated anchor points for machinery.

• CSFS may limit harvest in areas above the ditch to prevent erosion risk.

• Keep the ditch free of slash; immediately remove any logging debris in the ditch.

• The Offeror shall maintain a drug and alcohol-free work environment on the subject property.

• The Offeror will take all necessary precautions to prevent damage to improvements on the sale area. If damage occurs to any improvement, the Offeror will restore the improvement to original or better condition and bear all costs associated with the repair.

• Offeror must “line brace” any fences to prevent loss of tension that the Administering Forester authorizes Offeror to cut for harvest operations.

• The CSFS may suspend or limit the Offeror’s harvest operation if excess damage is occurring or due to the following conditions:

o Excess damage is occurring due to mud, snow, rutting or due to unstable soil conditions such as, unfrozen soil, lack of snowpack or saturated soils (or above the plastic limit).

o Failure to make required payments.

o Theft of timber.

o Extreme fire danger.

o Other extreme, severe or excessive situations as deemed appropriate by the CSFS.

• The Offeror will pick up trash at all times, and will be hauled from the site on a regular basis.

• The Offeror shall install, if not already present, and maintain legible “Log Trucks Hauling” signs at the start of the Transfer Road (vicinity intersection Divide Road and Transfer Road). The Offeror shall install additional “Log Trucks Hauling” and maintain at intersections with trail crossing along the trail’s approach to the road. CSFS may require additional cautionary signs for safety concerns. The Administering Forester must approve safety signage and placement, which meets the Manual of Uniform Traffic and Control Devices (MUTCD) standards.

W. Threatened and Endangered Species Considerations No threatened or endangered species are known to be present within the project area.

Should the offeror find evidence of a threatened or endangered species, they should contact the Administering Forester immediately.

X. Units Overview and Prescriptions for Treatment Product Removal Units (150 acres)

Existing and Desired Conditions Primary tree species in these units include Engelmann Spruce, Sub-alpine Fir, and Lodgepole Pine. A spruce bark beetle outbreak peaked in 2012 in the area, and the majority of overstory trees are dead Engelmann Spruce. Unit 1 is dominated by these large dead overstory spruce.

Offeror should thin young live green fir near critical infrastructure in Unit 2. There is limited lodgepole pine scattered throughout the units.

Table 2: Metrics summaries of merchantable trees (>6" DBH), the removal targets, and important prescription guidelines for Unit 1.

Unit #1 (104 Acres)

Cruise Number Estimates

Species Live TPA Dead TPA Total TPA Live BA Dead BA Total BA

Subalpine Fir 111 40 151 46 24 70

Lodgepole Pine 2 6 8 3 5 8

Engelmann Spruce 48 117 165 33 130 162

Total 161 163 324 82 159 241

Removal Targets

Basal Area: 159 - 172 Trees Per Acre:

193 – 213 Total CCF: 3560

Species Live TPA Dead TPA Total TPA Live BA Dead BA Total BA

Subalpine Fir 30 - 50 40 47 - 70 13 24 37

Lodgepole Pine 0 6 6 0 5 5

Engelmann Spruce 0 117 117 0 130 130

Total 30 - 50 163 193 - 213 13 159 173

CSFS has provided a range for live tree removal. Removal of live trees is based on the following:

Composition: Remove lone live trees in dense stands of dead with the dead

Exposure: Trees taller (>30 feet in height) susceptible to windthrow or lacking sufficient surrounding live density around them

Table 3: Metrics summaries of merchantable trees (>6" DBH), the removal targets, and important prescription guidelines for Unit 2.

Unit #2 (46 Acres)

Cruise Number Estimates

Species Live TPA Dead TPA Total TPA Live BA Dead BA Total BA

Subalpine Fir 243 31 274 100 24 124

Lodgepole Pine 0 2 2 0 2 2

Engelmann Spruce 21 5 26 9 11 20

Total 264 38 302 109 37 146

Removal Targets

Basal Area Removal: 81 – 61 TPA Removal: 100 Total CCF Removal: 600

Species Live TPA Dead TPA Total TPA Live BA Dead BA Total BA

Subalpine Fir 26 - 65 31 57 - 96 27 21 48

Lodgepole Pine 0 2 2 0 2 2

Engelmann Spruce 0 5 5 0 11 11

Total 26 – 65 38 85 - 124 27 34 61

The number of live trees removed will vary through the stand and based on the same targeting parameters as Unit 1. Unit 2 will provide most of the live green fir for use as slash mats. The listed TPA does not include the sub-merchantable fir used in those mats.

Operability on both units will require specialized equipment to perform steep-slope logging.

Slopes average 50% throughout both units, with maximum slopes >90%. There are large areas with unbroken, relatively smooth slopes, but outcrops and severe washes exist in the units. Units have a predominantly southern aspect. CSFS will work with the offeror where conditions limit operability.

Treatment focuses on removing large dead trees to reduce the risk of high soil burn severity.

Treatment should also thin subalpine fir affected by western balsam bark beetle and dead spruce at risk of blowdown post-removal. Retain lodgepole free of mistletoe, all live lodgepole and aspen to enhance stand diversity and climate/wildfire resilience.

Unit Designation Unit boundaries are flagged with pink ribbon, except in areas delineated by “virtual boundary.” Unit 1 contains two virtual boundaries. On the west side of the unit, the stand meets an open, shrubby riparian area with a creek running through it. The service road uphill of the ditch runs along the east side of the unit and serves as the second virtual boundary. All boundaries deviating from a virtual boundary are flagged.

Unit 1 abuts US Forest Service land along its northern boundary. The CSFS has placed flagging 75-ft on the State Land Board (SLB) side of the property boundary. Operators are not permitted to reach in and cut dead trees beyond this USFS boundary. On all remaining boundaries, machines are permitted to reach beyond the flagging for harvest of dead trees.

Wet areas, also called SMZs, are flagged with blue/ ribbon.

Prescription for Treatment Unit 1 (Prescription 1) Prescription for Unit 1 has a post-harvest target live Basal Area of 65-85 ft2 per acre. Remove dead standing trees 6”dbh (BA 159 ft2 per acre), excluding four snags per acre for wildlife (spruce & fir >10”dbh). Surface fuels target is 20-30 tons per acre, to maintain soil moisture & provide habitat while minimizing potential for high soil burn severity. Administering Forester will work with Offeror to achieve fuel loading goals. All merchantable sawtimber on the ground will be removed. Prescription calls for removal of live overstory fir greater than 30ft in height at risk of blowdown or declining from western balsam bark beetle.

Prescription is designation by prescription. The Offeror will conduct treatment based upon the following criteria by tree species. Additional information is provided in Appendix B.

Engelmann Spruce

• Harvest and remove all dead Engelmann spruce from project area per utilization standards.

• Retain live Engelmann spruce protected from windthrow; either 30 foot or less total height or clumped with other live trees in a protected area.

Sub-Alpine Fir

• Harvest and remove from project area all merchantable (dead and live) subalpine fir greater than 30 feet in total height to meet basal area targets.

• Retain windfirm, healthy fir where applicable, painted in blue.

Lodgepole Pine

• Harvest and remove from project area all dead lodgepole pine.

• Retain all live lodgepole pine where operationally feasible.

Snags

• Favor spruce for retaining four snags per acre.

• No snag retention in areas within 200 feet of the Ditch and associated infrastructure.

• Painted in

Within Unit 2 there is an approximately four-acre area that will follow Prescription 3, which reduces fuels surrounding City of Fort Collins structures. Guidance follows standards in the 2021 CSFS HIZ guide. Offeror is responsible for product removal in Zone 3. Thin the crowns In Zone 3 (30 to ≥ 150ft uphill & parallel to structures, 30 to ≥250 ft on downslope of structures) to average spacing of 10ft. Retain lodgepole pine before Engelmann spruce and before subalpine fir. Cut all dead trees and mistletoe or broom rust infected trees. Build slash piles where operationally feasible.

For both units, trees directly along the Ditch road may be painted in a TBD color for high stumps or otherwise. These trees will be marked and discussed with the Offeror prior to any physical work and represent a negligible volume.

Prescriptions for Slash (All Units) For tethered harvest, use lop and scatter slash treatment. Cut intermediate and co-dominant fir to create slash mats for minimizing erosion.

Helicopter treatment will employ whole tree harvest. Fly trees to landing sites along the American Lakes Road for processing and build slash piles using non-merchantable material.

CSFS will conduct winter burning operations at a later date.

Y. Bids Offerors will submit bids at a per-acre price that reflects treatment for all units. Bids must indicate if the price includes the value of the timber or removal only. The goal is to complete as much of the project as possible with the allotted funds.

CSFS retains the right to request additional service for small areas around or adjacent to the prescribed units at the same per acre price with the Offeror’s concurrence and a Contract Amendment if the Awardee’s bid is under budget.

A non-refundable State Land Application Fee of $25.00 is required of the awardee at the time of contract execution.

III. Information Required from Respondents

The following describes the minimum information that is required from interested Suppliers. If references are made in your response to accompanying materials, specify document names and pages where the information can be found. Failure to comply with the required format and content of all required information may, at the discretion of the University, result in the proposal being eliminated from further consideration.

A. Cover Letter The Supplier shall furnish a cover letter to introduce the company and its qualifications, length of time in business, street and mailing address, email address, number of full-time employees, and provide a general overview of the Offeror’s proposal and/or initial plan of operation.

B. Experience

1. List the key persons and number of dedicated personnel assigned to this project, including:

o Title o Expertise o Experience and tenure with your organization (projects completed) o Experience in the industry outside of your organization if applicable o Applicable certifications or education (trade certificates, academic coursework or degrees)

2. Provide a list of three (3) client projects completed within the past five years that are in similar scope and size to this RFP and provide a brief overview of the relationship, including the following information:

o company or individual name o title of signatory o address o phone number o email address o project description o project title if applicable o project location o date of project o contract amount

CSU has your permission to contact these references if needed.

C. Equipment

• List all equipment your firm will dedicate and relative to the project.

o Equipment types o Brand o Model o Year o Maintenance History

D. Price Complete Appendix C in its entirety.

E. Timeline CSFS has specified when the Offeror may begin work and the operating seasons. The Offeror must fill out the performance period start and end dates (anticipated period of performance) located on Appendix C.

F. Additional Information

1. Describe any services that your company offers that has not been previously requested in this RFP document that may be unique to your organization and add value to the University.

2. Provide any additional information believed to be relevant to the RFP and your firm’s capability to provide the services requested.

G. Exceptions to the RFP Terms and Conditions Any and all exceptions to the provisions contained in this RFP must be clearly and specifically stated in this section. Failure to specifically state an exception shall be conclusively deemed a waiver of any such objection. Failure or refusal to execute the contract documents as accepted, within the required time period stated in this RFP, shall be cause for immediate cancellation of the award.

H. Authorized Agent Signature Page (Appendix D) must be completed and signed by an authorized agent of the firm and attached to the proposal.

IV. Administrative Information A. Issuing Office

This Request for Proposals (RFP) is issued for the State of Colorado, Board of Governors of the Colorado State University System, by the Colorado State University Office of Procurement Services for the use and benefit of the Colorado State Forest Service. This RFP is governed by the Colorado State University Procurement Rules in effect at the time of its issuance and may differ from the State of Colorado Procurement Code and Rules.

This RFP is not governed by or subject to the State of Colorado Procurement Code or Rules.

B. Purpose This Request for Proposal provides prospective Offeror with sufficient information to enable them to prepare and submit proposals.

C. Definitions In the following Request for Proposal (RFP) the term “University” shall be understood to mean “The Board of Governors of the Colorado State University System acting by and through Colorado State University for the benefit of the Colorado State Forest Service.”

The term “Offeror,” as used herein, shall be understood to mean the individual, company, corporation, or firm formally submitting a response to this RFP, and may also be referred to as the “Supplier” or “Firm.”

The term “Response,” as used herein, shall be understood to mean a written offer to provide goods and/or services in accordance with the general conditions, instructions, and specifications stated herein with exceptions clearly stated, and may be used interchangeably with the term “Proposal.”

D. Scope This Request for Proposal contains the governing proposal instructions for submission and the material included therein; mandatory requirements which must be met by the Offeror to be eligible for consideration, and other requirements of the proposal.

E. Schedule of Activities

Schedule of Activities Timeline All times are Mountain Time (MDT)

RFP Published Thursday, May 30, 2024

Non-Mandatory Virtual Information Meeting Thursday, June 13, 2024, 9:00 a.m.

Written Inquiry Deadline Friday, June 21, 2024, 5:00 p.m.

Final Responses to Written Inquiries Published Tuesday, June 25, 2024, 5:00 p.m.

Proposal Submission Deadline Monday, July 1, 2024, 3:00 p.m.

Award Notification (estimate) Monday, July 15, 2024

F. Request for Proposal - Respond and Responsibilities of Offeror All interested individuals/firms are invited to submit a proposal in accordance with the policies, procedures, and dates as set forth herein.

G. Inquiries Prospective Offeror may make written inquiries by e-mail concerning this Request for Proposal to obtain clarification of requirements. Answers to any inquiries will be published on Rocky Mountain E-Purchasing System (BidNet) as a modification to the Request for Proposal each Friday while the RFP is active starting, June 7, 2024. No inquiries will be accepted after 5:00 p.m. on June 21, 2024. Inquiries should be directed to the following e-mail address:

Jim Frantz Procurement Services 6010 Campus Delivery Fort Collins, CO 80523-6010 Email: james.frantz@colostate.edu

The Procurement Official listed herein is the SOLE point of contact concerning this RFP.

Offerors shall not directly contact other personnel regarding matters concerning this RFP or to arrange meetings related to such.

H. Addendum or Supplement to Request for Proposal In the event it becomes necessary to revise any part of this Request for Proposal, Procurement Services will publish an Addendum to this RFP on Rocky Mountain E- Purchasing System (BidNet). Offeror shall not rely on any other interpretations, changes, or corrections.

I. Proposal Submission Your written Proposal with all mandatory documents must be submitted to the CSU Procurement Office via Rocky Mountain E-Purchasing System (BidNet) by 3:00 p.m. on Monday, July 1, 2024. The file name should be “RFP-2024-070-JF Michigan Ditch Wildfire Mitigation Forest Service Project”.

https://www.bidnetdirect.com/colorado/colorado-state-university https://www.bidnetdirect.com/colorado/colorado-state-university https://www.bidnetdirect.com/colorado/colorado-state-university https://www.bidnetdirect.com/colorado/colorado-state-university

UNDER NO CIRCUMSTANCES WILL A TELEPHONE, EMAIL OR FAX BID BE ACCEPTED.

The University reserves the right, in its sole discretion, to reject any and all proposals and to waive informalities and minor irregularities in proposals received and to accept any portion of a proposal or all items bid if deemed in the best interest of the University to do so.

The Colorado State University Procurement Rules require that contracts be awarded to responsive bidders only. Bidder responsibility is a determination made in the sole discretion of CSU. The University reserves the right to make this determination at any time in this RFP process, and may not make a responsibility determination for every Offeror.

Factors to be considered in determining whether the standard of responsibility has been met include whether an Offeror has:

(a) availability of the appropriate financial, material, equipment, facility, and personnel resources and expertise, or the ability to obtain them, as necessary to indicate the capability to meet all contractual requirements.

(b) a satisfactory record of past performance with CSU and/or other institutions, agencies and similar customers.

(c) a satisfactory record of integrity.

(d) the legal authority to contract with the University; and

(e) supplied all necessary information in connection with the inquiry concerning responsibility.

The Offeror shall supply information requested in Section III concerning the Offeror’s responsibility. The University reserves the right to request further information as it deems necessary to determine the Offeror’s responsibility. If the Offeror fails to supply the requested information, the University shall base the determination of responsibility upon any available information or may find the Offeror non-responsible if such failure is unreasonable. An Offeror determined by the Procurement Official to be non-responsible shall be eliminated from the solicitation and its response will not be evaluated by the Evaluation Committee.

J. Confidentiality Any restrictions on the disclosure or use of Confidential Information contained within a bid or proposal must be clearly stated in the bid or proposal itself. The Colorado Open

Records Act, C.R.S. sec 24-702-201 et seq., applies to all documents submitted in response to this solicitation. The Open Records Act specifically states that the following are considered confidential: “Trade secrets, privileged information, and confidential commercial, financial, geological, or geophysical data.” The Bidder or Offeror must designate documents as Confidential Information that fall into these categories by clearly and conspicuously marking the documents. Confidential Information shall not include any subsequent contractual terms or pricing that result from the Bidder or Offeror’s submission.

If Confidential Information is submitted, it must be submitted as a separate file, with the file name clearly and conspicuously marked with: “Confidential Information RFP- 2024-070-JF Michigan Ditch Wildfire Mitigation Forest Service Project”. Failure to comply with this requirement shall render all materials received from Offeror as non-confidential after the award.

K. News Releases News releases pertaining to this procurement, or any part of the subject shall not be made without prior written approval from the Colorado State University Office of Procurement Services.

L. Response Material Ownership All material submitted regarding this RFP becomes the property of the University and only returned to the Offeror at the University’s option.

M. Incurring Costs Notwithstanding any other statement, representation, or information acquired by an Offeror the University shall not be liable for any cost incurred by Offeror prior to issuance of an agreement, contract, or purchase order for such cost.

N. Acceptance of Proposal Content The contents of the proposal (including persons specified to implement the project) of the Selected Supplier(s) will become contractual obligations if acquisition action ensures.

Failure of a Selected Supplier to accept these obligations in a contract, purchase order, or other commitment voucher may result in cancellation of the award.

O. Acceptance Time The University intends to make a bid selection for contract negotiation within the period indicated in the Schedule of Activities, subject to amendment.

P. Additional Data The Offeror should submit any additional information or data not requested in this RFP which the Offeror believes should be considered in the evaluation of a response.

Q. Evaluation and Award All proposals submitted in response to this RFP will be evaluated by a committee of University personnel and the partnering sponsor. Contracts/Purchase Order(s) will be awarded to the Bidder whose proposal, conforming to this RFP, will be the most advantageous to the University, price and other factors considered. Due to the evaluation procedure for the Request for Proposal, lowest dollar price MAY or MAY NOT indicate the successful awardee. Price constitutes only one of several evaluation criteria. The CSFS reserves the right to award one or both units depending on funding availability.

The Evaluation Committee will judge the merit of proposals received in accordance with the criteria described below (in no particular order):

• Equipment

• Key personnel and number of dedicated staff assigned to the project

• Price

• Prior experience

• Project timeline

The Offeror(s) selected for an award will be the Offeror(s) whose proposal is the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .