Addendum No. 3 Questions, Responses and Statements.pdf

PDF 213 KB Posted

Attached to
Michigan Ditch Wildfire Mitigation Forest Service Project
Solicitation number
RFP-2024-070-JF
Issued by
Colorado

About this file

This document is Addendum #3 for the Michigan Ditch Wildfire Mitigation Forest Service Project, issued by Colorado State University Procurement Services and Colorado State Forest Service (CSFS), documenting questions and answers from a non-mandatory virtual information meeting held on June 13, 2024. The project involves wildfire mitigation work in the upper Michigan Ditch watershed located in Jackson County, Colorado, with key discussion points including road access, culvert installations, landing areas, and project logistics. The City of Fort Collins will install two culverts (50-ft and 40-ft) to facilitate project access, and CSFS will provide six detailed maps covering crossing locations, service road landings, landing options, roadside decking, and forest road/trail closures.

The addendum provides comprehensive details about project requirements and site conditions, including road maintenance expectations, hauling considerations, and operational guidelines. The City of Fort Collins will help maintain the ditch road and has confirmed the road's ability to support heavy equipment, with dump trucks and excavators previously used on the route. There are no strict hauling restrictions beyond climate and weather impacts, though the contractor must repair any excessive damage. The American Lakes road will be closed to the public during operations, and the project allows flexibility for handling wood with rot, potentially using additional burn piles with administering forester approval. Insurance requirements follow standard independent service contract terms, with a damage deposit slightly higher than traditional sales.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP-2024-070-JF

Michigan Ditch Wildfire Mitigation Forest Service Project

Addendum #3 – Questions, Responses and Statements from the Non-Mandatory Virtual Information Meeting held on June 13, 2024, at 9:00 a.m.

• The east northeast side with a road along the boundary. Is that road usable?

The road is in good overall condition. At the start of the service road, just after the ditch crossing, widening could help. Beyond that, the road could use a blading along it for trucks.

And that crossing is on Unit 2?

Yes, the City of Fort Collins (The City) will install a 50-ft culvert. That crossing is just past the cabins on the ditch road.

There is now a “Service Road Landings” map for that NE section and “Service Road Crossing” map for the crossing.

• Is it possible to build a crossing to another landing area towards the north of Unit1?

Who is responsible for installing the culvert?

Yes, the City will install a 40-ft culvert there as well. It is pictured in the “North Crossing” map. CSFS expects each install will take a week.

• Are additional crossings possible?

CSFS recommends no additional crossings outside of those shown in the new maps (North Crossing & Service Road Crossing). If CSFS and the Offeror agree on an additional crossing, all install costs would fall on the Offeror.

• Would it be possible to drive in there and look at it closer?

Current options are to walk or bike (e-bikes allowed) into the unit from Highway 14 at Cameron Pass parking lot. City staff are operating heavy equipment throughout and around the project area, presenting a risk for additional trucks.

• Are you comfortable with 100s of truck loads on the Michigan Ditch road?

From a pure hauling standpoint, yes, it is a heavily maintained road. The current City staff has maintained that road for close to twenty years. They are good with their equipment;

using equipment in 4 feet of snow and opening it up, dealing with seepage issues, etc.

There are concerns beyond the cabins and the American Lakes turnoff. These areas are steeper, more erosion prone, and typically stay wetter longer than any of the section used for this project.

Tethered equipment working off the road is a concern. CSFS will require slash mats from onsite �ir are required to limit the erosion there.

• I have some concerns with some road sections and weight impact.

CSFS spoke with City of Fort Collins ditch staff. Both of the experienced city employees have high con�idence in the road. An excavator weighing roughly 80,000 pounds was used for projects along the ditch. The City has used dump trucks in excess of 40,000 pounds along the ditch for hauling materials.

• What is the maintenance expectation?

The City will help direct and maintain the road for general maintenance . The Offeror must �ix excessive damage from the project operations.

If the project goes into late fall, then the Offeror would also be responsible for plowing the ditch road.

• Insurance requirements?

Standard insurance requirement per the independent service contract listed as an exhibit within the solicitation. Damage deposit is slightly higher than traditional sales.

• Are there strict restrictions regarding hauling on the ditch road? Any regulations to be aware of?

No restrictions, excluding climate/weather impacts to the road per the contract. The City will close the ditch road to all recreation activity during the operating season (normally used as a hiking/biking trail). The City will also close the nearby trails going to American Lakes to the public; both from the American Lakes parking lot and Crags Campground.

Flaggers are not necessary as contractor will post signage.

City staff has cabins along the road for housing. They want to facilitate the Offeror getting as much work done as possible and have put no restrictions on contractor operation hours.

Damage to the road due to negligence could result in temporary closure for maintenance and repair.

• Coming out on the highway, the possibility of a landing area on American Lakes Road onto Hwy 14. Discussion about page 20. Multiple sites to deck.

The rough locations for landings along the American Lakes road are on the “Landing Options Overview Map.” The furthest west landing requires the least amount of work to install; the other options are good, would require more work to install but less distance to haul logs.

• Would that road be closed to the public?

Road to Crags Campground and the road to Lake Agnes will remain open. The American Lakes road, with the parking lot below Unit 2, will be closed to the public. These are shown in the “Closures Overview Map.”

• Are these landings designated on the maps?

Landings are usually the Offeror’s choice and need to be approved by CSFS administering forester. CSFS will point out considerations.

Options for landings and additional info is on the “Landing Options Overview” map

• CSFS does have an elevation (topographical) map.

Four elevation products are available. All derived from USGS LiDAR data are roughly 1-2’ horizontal resolution and roughly 6” vertical resolution.

The products include a (1) digital elevation model and (2) slope model at 1’ resolution.

Contours at 10-ft and 20-ft are also available.

• An actual map product would be best.

CSFS is providing six additional maps that detail:

1. The north crossing

2. Service road crossing

3. Service road landings

4. Landing options throughout the project area

5. Roadside decking options

6. Forest road and trail closures

CSFS is still working on a map package, but all data in the map package, and evident in the above maps is available in vector or raster format for import into ArcMap, ArcGIS Pro, QGIS or alternative. Formats are shape�ile or TIFF depending on data type.

• Is there rot? Trucking is expensive. Wood with rot is heavy. People do not want to buy rot. Recommend 100% sound/salvage and burn rotted wood. Not worth hauling. Firewood facilities do not want rotted wood.

CSFS does a lot of salvage projects. Too much forest product left above fuel loading goals can be an issue for how to deal with rot. E.g. Mastication may leave too much fuel.

Additional burn piles could be an option. Administering forester must approve additional burn piles.

CSFS has been �lexible in the past and understands there is hauling costs. CSFS has a standard to meet in terms of volume removed, remaining surface fuels, etc. but is open to additional burn piles where appropriate.