Addendum No. 5 Questions and Response.pdf
PDF 136 KB Posted
- Solicitation number
- RFP-2024-070-JF
- Issued by
- Colorado
About this file
Addendum #5 for the Michigan Ditch Wildfire Mitigation Forest Service Project, issued by Colorado State Forest Service (CSFS) and Colorado State University Procurement Services, addresses key bidder questions for RFP-2024-070-JF. The document clarifies project timeline flexibility, with CSFS indicating they will consider operations starting in 2025 while preferring a 2024 treatment start. Regarding timber volume assessment, CSFS confirmed their methodology for plot sampling in Unit 2 using U.S. Forest Service's Forest Vegetation Simulator, noting that plot spacing and location may lead to variation in final numbers.
The addendum also provides details on payment and mapping procedures, specifying that payments correspond directly to acres treated and that CSFS requires treated areas to be mapped prior to payment. To help contractors manage initial costs, CSFS proposed increasing the frequency of treated area mapping, suggesting they could map and submit treated acreage every 7.5 acres instead of the original 13-acre increments for Unit 1. The document addresses potential challenges with complex operations, such as helicopter-based treatments, which involve multiple costly steps, and indicates flexibility in accommodating different operational approaches.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP-2024-070-JF
Michigan Ditch Wildfire Mitigation Forest Service Project
Addendum #5 – Questions and Responses
• Timeline is only one scoring component of proposals, but would bidders proposing operations not starting until 2025 still be competitively considered?
CSFS will consider operations starting in 2025 as part of the evaluation process. The CSFS understands that a number of contractors may not be able to start in 2024 given the mid-summer start date and timeline of the solicitation. It is our strong preference that treatment start in 2024. The CSFS is ultimately looking for the best possible treatment and evaluating all criteria.
• The tree count for dead trees per acre in Unit 2 does not agree with on the ground site review or review from the drone footage. Can you confirm this information, and if it is incorrect, can it be corrected before the proposal due date?
Ten cruising plots were established in Unit 2 at 400-ft spacing using in-house software. The CSFS removed one plot that fell in HIZ treatment area. Plots were cruised July 2023 and later run using U.S. Forest Service’s Forest Vegetation Simulator (FVS) to determine the appropriate live and dead timber volume. This is the same process CSFS staff use for traditional treatments on the State Forest, e.g. regeneration harvests.
CSFS can confirm the location of the plots, data for the plots, and the methods used to deliver metrics in the RFP are accurate and/or standard. These are designed to provide the best available insight into a stand’s value in an efficient manner.
The spacing and location of plots is random and FVS does not currently have a reliable spatial component; these factors will lead to variation in the final numbers. However, the numbers should reflect accurately. The more variable the stand, the more variable the final numbers will be.
We will not be able to re-cruise Unit 2 with new plots prior to the deadline. Per the RFP, CSFS does not guarantee timber volume.
• Will payment only be approved for acres with removal completed? Some operations, specifically helicopter operations, are ideally performed in this prescription with several steps that each incur significant cost which would best invoiced as individual milestones.
Payments correspond to acres treated. Funding for this project requires treated areas to be mapped and submitted by CSFS staff prior to payment. CSFS can increase the frequency it maps treated areas. For example, instead of 13-acre increments Unit 1, CSFS could map and submit treated acreage every 7.5-acres to help alleviate high initial costs.