RFP 122125 O3 Alivia Analytics Cost Sheet.docx

DOCX document 59 KB Posted

Attached to
Program Integrity Case Management (PICM) and Fraud Abuse Detection (FAD) Analytics Solution
Solicitation number
122125 O3
Issued by
Blaine County, Nebraska

About this file

This document is a Cost Sheet for RFP #122125 issued by the State of Nebraska's Department of Health and Human Services (DHHS) for a Program Integrity Case Management (PICM) and Fraud Abuse Detection System (FADS) Analytics solution. The solicitation seeks a comprehensive cloud-based software platform to replace the current Medicaid program case management system, with a total proposed cost of $7,596,943.63. The project includes multiple implementation phases covering executive kick-off, requirements validation, design and configuration, development and testing, data migration, training, CMS certification, implementation, and post-implementation support. The initial contract term is five years, with options for two additional two-year renewal periods, and an expected implementation date no later than October 31, 2026.

The cost breakdown includes $1,150,000 for Part I (implementation) and $3,033,129.58 for Part II (maintenance, operations, and support), with optional renewal periods totaling $3,403,814.06. The vendor, Alivia Analytics, LLC, will provide services at predetermined rates, including up to 500 free vendor hours annually for system modifications. Hourly rates for additional services range from $80 to $160 per hour depending on the role, such as Software Engineer, Project Manager, and Data Scientist. The solution must integrate with existing state systems like the Medicaid Management Information System (MMIS) and Nebraska Family Online Client User System (N-FOCUS), and comply with security requirements including TLS encryption, AES-256 data protection, and HIPAA compliance.

View the file

Other files

File Type Posted
122125 O3 Alivia Analytics Technical Narrative Response Proprietary File 1 of 4.pdf PDF
122125 O3 Attachment 5 - CMS Certification Outcomes and Metrics.docx.pdf PDF
122125 O3 Deloitte File 7 of 9 Corp Experience and Tech Response (Redacted).pdf PDF
PICM Intent to award Final.docx DOCX document
Solicitation List of Respondents.pdf PDF
Statement of Proprietary Information_Deloitte - 122125.docx DOCX document
122125 O3 Attachment 1 - Minimum Qualifications.docx.docx DOCX document
122125 O3 Attachment 3 - Technical Specifications.docx.docx DOCX document
122125 O3 Attachment 6 - Deviations Form to Section VI.docx.docx DOCX document
122125 O3 Deloitte File 5 of 9 Cost Sheet.pdf PDF
Evaluator Scoring Worksheet - Summary (Internal) Completed..xlsx XLSX spreadsheet
PICM Intent to award Final.docx DOCX document
Solicitation List of Respondents.pdf PDF
122125 O3 Alivia Analytics Attachment 3 - Technical Specifications_Proprietary Redacted File 2 of 4.pdf PDF
122125 O3 Attachment 3 - Technical Specifications.docx.docx DOCX document
122125 O3 Deloitte File 7 of 9 Corp Experience and Tech Response (Redacted).pdf PDF
122125 O3 PICM RFP.docx.pdf PDF
Addendum 1 - Attachment 2 - Functional Specifications [Use This Attachment].docx DOCX document
Copy of Evaluator Scoring Worksheet - Summary (Internal) Completed.xlsx XLSX spreadsheet
RFP 122125 O3 Alivia Analytics Cost Sheet.docx DOCX document
Statement of Proprietary Information_Deloitte - 122125.docx DOCX document
122125 O3 Alivia Analytics Attachment 3 - Technical Specifications_Proprietary Redacted File 2 of 4.pdf PDF
122125 O3 Attachment 3 - Technical Specifications.docx.docx DOCX document
122125 O3 Attachment 5 - CMS Certification Outcomes and Metrics.docx.pdf PDF
122125 O3 Deloitte File 7 of 9 Corp Experience and Tech Response (Redacted).pdf PDF
Addendum 1 - Attachment 2 - Functional Specifications [Use This Attachment].docx DOCX document
122125 O3 Alivia Analytics Attachment 2 - Functional Specifications_Proprietary Redacted File 3 of 4.pdf PDF
122125 O3 Deloitte File 9 of 9 Attachment 3 Technical Specifications (Redacted).pdf PDF
122125 O3 PICM RFP Solicitation Evaluation Criteria.docx.pdf PDF
122125 O3 Attachment 5 - CMS Certification Outcomes and Metrics.docx.pdf PDF
122125 O3 PICM RFP Cost Sheet.docx.docx DOCX document
Addendum 1 - Attachment 2 - Functional Specifications [Use This Attachment].docx DOCX document
122125 O3 Attachment 1 - Minimum Qualifications.docx.docx DOCX document
122125 O3 PICM RFP.docx.docx DOCX document
122125 O3 PICM RFP.docx.pdf PDF
122125 O3 PICM RFP.docx.pdf PDF
122125 O3 Attachment 3 - Technical Specifications.docx.docx DOCX document
122125 O3 PICM RFP Cost Sheet.docx.docx DOCX document
Addendum 1 - Attachment 2 - Functional Specifications [Use This Attachment].docx DOCX document
122125 O3 Attachment 5 - CMS Certification Outcomes and Metrics.docx.pdf PDF
122125 O3 PICM RFP Cost Sheet.docx.docx DOCX document
122125 O3 Attachment 1 - Minimum Qualifications.docx.docx DOCX document
122125 O3 Attachment 3 - Technical Specifications.docx.docx DOCX document
Addendum 1 - Attachment 2 - Functional Specifications [Use This Attachment].docx DOCX document
122125 O3 Attachment 1 - Minimum Qualifications.docx.docx DOCX document
122125 O3 Attachment 2 - Functional Specifications.docx.docx DOCX document
122125 O3 Attachment 5 - CMS Certification Outcomes and Metrics.docx.pdf PDF
122125 O3 Attachment 6 - Deviations Form to Section VI.docx.docx DOCX document
122125 O3 Attachment 3 - Technical Specifications.docx.docx DOCX document
122125 O3 PICM RFP.docx.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Sheet

RFP#: 122125 O3

Program Integrity Case Management (PICM) and Fraud Abuse Detection System (FADS) Analytics solution State of Nebraska, Department of Health and Human Services

Bidder Name: _Alivia Analytics, LLC.__________

Important Instructions: Bidders are to complete all fields highlighted in yellow.

Do not alter existing format or content within the Cost Sheet. However, if Bidder identifies that other items are essential in Part I and/or Part II to create full functionality, and meet the requirements as outlined in the RFP document and any related attachments, then additional lines may be inserted as needed. Such additional lines must be included in Part I and Part II pricing and be reflected in the Total Overall Cost. Any inclusion of additional lines must still conform within the stated percentages as outlined in Part I and follow the prescribed format as provided. Important: In case of a mathematical error in extension of price, unit price shall govern.

Please indicate the “Total Overall Cost” for the PICM / FADS Analytics solution $ __7,596,943.63_______ This amount shall equal the sum of the Total for both Part I and Part II. Do not include any costs for Part III and Part IV in the “Total Overall Cost”, as these sections are not included in the cost evaluation.

Part I: Project section requirements as outlined in Section (VI)(A) of the Request for Proposal (RFP) document and any related attachments. Bidder to provide pricing for each of the project deliverable categories listed. The sum of all project deliverable categories listed directly below constitutes the Part I – Total. Important: Bidders are to ensure that allocation of their percentages are based on the % provided for each category and that the total of all categories within Part I does not exceed 100%.

Description
% Breakdown by Category for Part I
Number of Units
Unit of Measure (UOM)
Cost (Unit Price)
Executive Kick off
Executive Kick-Off (i–iii) & Project Initiation (i-ix):

Shall equal 5% of the total cost for Part I

1
Each
$57,500

i. Pre-Kick off

ii. Kick off

iii. Post-Kick off

Project Initiation

i. Develop a Master Project Plan

ii. Develop an Integrated Master Project Schedule

iii. Develop a Project Management Plan

iv. Develop a Risk Management Plan

v. Develop an Issue Management Plan

vi. Develop a Communication Plan

vii. Develop a Staffing Plan

viii. Develop a Change Management Plan

ix. Develop an Application Configuration and Maintenance plan

Requirements Validation
Requirements Validation:

Items i. through iv. shall equal 5% of the total cost for Part I

1
Each
$57,500

i. Develop a Requirements Validation Matrix

ii. Coordinate and facilitate Requirements gathering session(s)

iii. Formally demonstrate key features and functions

iv. Develop a Requirements Traceability Matrix (RTM).

Design and Configuration
Design and Configuration:

Items i. through viii. shall equal 5% of the total cost for Part I

1
Each
$57,500

i. Establish and utilize a deliverable review and acceptance Process;

ii. Configure environments for Development, Testing, Training and Production;

iii. Complete Standard System Configuration;

iv. Assist the State with configuration of system;

v. Assist the State with user role determination;

vi. Develop Infrastructure plan;

vii. Develop system security plan; and

viii. Obtain acceptance from the State on Design and System.

Part I Continued in next page

Development and Testing
Development and Testing:

Items i. through viii. shall equal 10% of the total cost for Part I

1
Each
$115,000

i. Complete all necessary custom development;

ii. Complete all necessary reports;

iii. Complete all necessary Integrations (Interfaces, Imports, and Exports);

iv. Develop a Testing Plan;

v. Execute and evaluate Testing;

vi. Document Testing Results;

vii. Assist the State with User Acceptance Testing (UAT); and

viii. Obtain acceptance from the State on Testing Results

Data/File Conversion and Migration
Data/File Migration:

Items i. through v. shall equal 5% of the total cost for Part I

1
Each
$57,500

i. Develop a Data/File Conversion and Migration Plan;

ii. Develop a Conversion Mapping Guide;

iii. Perform the Data/File Conversion and Migration;

iv. Provide a Data/File Conversion and Migration Results Report;

v. Obtain acceptance from the State on Data/File Conversion and Migration Results.

Training
Training:

Items i. through iv. shall equal 5% of the total cost for Part I

1
Each

$57,500

i. Develop Training materials;

ii. Coordinate and facilitate Training Instruction;

iii. Provide online reference Training Materials for Administrator and User Manuals; and

iv. Obtain acceptance from the State on Training Results.

CMS Certification Requirements
CMS Certification Requirements (i-v) & CMS Certification Support (i-iv):

Ishall equal 5% of the total cost for Part I

1
Each
$57,500

i. General

ii. Pre-Operational Readiness Review;

iii. Operational Readiness Review;

iv. Certification Review;

v. Operations

CMS Certification Support

i. CMS Certification Plan;

ii. Assist the State with Advanced Planning Document (APD) Supporting Materials;

iii. Assist the State with Operational Readiness Review (ORR);

iv. Assist the State with Certification Review (CR);

Pre-Implementation and Pilot
Pre-Implementation and Pilot:

Items i. through xi. shall equal 10% of the total cost for Part I

1
Each

$115,000

i. Develop Implementation Plan;

ii. Develop Implementation Checklist(s);

iii. Facilitate Go\No Go Decision;

iv. Develop Pilot Plan;

v. Implement Pilot;

vi. Develop cut over Playbook;

vii. Develop Contingency Plan;

viii. Conduct Third-Party Security Assessment;

ix. Complete Pre-Go Live Third-Party Penetration Test;

x. Develop Disaster Recovery and Business Continuity Plan; and

xi. Complete Production Readiness Assessment.

Part I Continued in next page

Implementation
Implementation:

Items i. through iv. shall equal 40% of the total cost for Part I

1
Each
$460,000

i. Perform and Complete all Aspects of the Implementation;

ii. Go-live;

iii. Assist the State with on-site Implementation assistance for Go-live week; and

iv. Obtain acceptance from the State on Implementation Results.

Post-Implementation
Post-Implementation:

Items i. through v. shall equal 10% of the total cost for Part I

1
Each
$115,000

i. Warranty Period

ii. Coordinate and Facilitate Post-Implementation Review Teleconference Meeting

iii. Conduct Lessons Learned

iv. Develop Lessons Learned Document

v. Provide a Plan for Enhancement Requests

vi. Provide a Transition Plan from Implementation to Maintenance, Operations and Support

Part I – Total
$1,150,000

Part II – Maintenance, Operations and Support (Note: These items would be paid on a quarterly basis)

During the Maintenance, Operations and Support period of the initial contract term and all subsequent renewals, the vendor must accommodate requests from the State for any necessary modifications necessary to comply with any Federal or State statutory or regulatory requirements or any system enhancement or modification deemed necessary by the PI team. These changes shall be offered at no cost to the State for up to 500 Vendor hours annually. Any additional hours required beyond this allocation will be billed at the appropriate rates specified in the Cost Sheet under Part IV – Optional Services.

Bidder’s price for Maintenance, Operations and Support shall include all associated costs or fees (including but not limited to subscriptions costs). Important: Do not include statements in the RFP proposal submittals, attachments, etc. indicating that there will be additional fees which are not included in the table below. The sum of the extended cost (Number of Units x Unit Price) constitutes the Part II – Total.

Description
Contract Term
Unit of Measure (UOM)
Number of Units
Cost

(Unit Price) Extended Cost

Maintenance, Operations and Support, and any additional costs or fees (including but not limited to subscriptions) - Post Warranty period
Year Two (2) of the Initial Term*
Monthly
12
$60,416.67
$725,000.00
Maintenance, Operations and Support, and any additional costs or fees (including but not limited to subscriptions)
Year three (3) of the Initial Term
Monthly
12
$62,229.17
$746,750.00
Maintenance, Operations and Support, and any additional costs or fees (including but not limited to subscriptions)
Year Four (4) of the Initial Term
Monthly
12
$64,096.04
$769,152.50
Maintenance, Operations and Support, and any additional costs or fees (including but not limited to subscriptions)
Year Five (5) of the Initial Term
Monthly
12
$66,018.92
$792,227.08
Part II - Total
$3,033,129.58

*No Maintenance, Operations and Support compensation shall be paid until all requirements of the Warranty Period have been satisfied.

Optional Services

Part III – Optional Renewal for Maintenance, Operations and Support (Do not include these amounts in the Total Overall Cost associated with Part I and Part II)

Optional Two (2) Year Renewal Period One (1)

Description
Contract Term
Unit of Measure (UOM)
Number of Units
Cost

(Unit Price) Extended Cost

Maintenance, Operations and Support and any additional costs or fees (including but not limited to subscriptions)
Year One (1) of the Renewal Period One (1)

Monthly

$67,999.49
$815,993.89
Maintenance, Operations and Support, and any additional costs or fees (including but not limited to subscriptions)
Year Two (2) of the Renewal Period One (1)

Monthly

$70,039.48
$840,473.70

Total Cost for Optional Renewal Period One (1)

$1,646,467.59

Optional Two (2) Year Renewal Period Two (2)

Description
Contract Term
Unit of Measure (UOM)
Number of Units
Cost

(Unit Price) Extended Cost

Maintenance, Operations and Support and any additional costs or fees (including but not limited to subscriptions)
Year One (1) of the Renewal Period Two (2)

Monthly

$72,140.66
$865,687.91
Maintenance, Operations and Support, and any additional costs or fees (including but not limited to subscriptions)
Year Two (2) of the Renewal Period Two (2)

Monthly

$74,304.88
$891,658.55
Total Cost for Optional Renewal Period Two (2)
$1,757,346.47

Example (Example applies to Part II and Part III of Cost Sheet)

Description
Contract Term
Unit of Measure (UOM)
Number of Units
Cost

(Unit Price) Extended Cost

Maintenance, Operations and Support, and any additional costs or fees
Year Two (2)
Monthly
12
$10
$120

Extended Cost = Number of Units x Unit Price (12 x 10) = $120

Important: In case of a mathematical error in extension of price, unit price shall govern.

Part IV – Optional Services Miscellaneous Enhancements (Do not include these amounts in the Total Overall Cost associated with Part I and Part II)

Custom Programming and Additional Features Work may be needed that was not originally delineated in this RFP but considered within the scope of work (i.e., Custom Programming). This additional work may stem from legislative mandates, emerging technologies, secondary research and/or data integration solutions not otherwise addressed in this RFP or known at the time this RFP was issued. If additional work is needed, the Contractor must submit a detailed Scope of Work and detailed pricing to include items such as, but not limited to, Title/Role(s), number of hours, unit of measure, and due dates/deliverables for DHHS review and approval. The bidder shall provide hourly pricing for any current and future custom programming needs to meet specific requirements for the PICM / FADS Analytics solution as requested and mutually agreed upon by the bidder and DHHS.

Hourly Rates for Miscellaneous Support/Maintenance (beyond RFP/Contract requirements) The Bidder should provide the Title/Role with each respective hourly rate to perform additional services*.

Title / Role such as, but no limited to:
Hourly Rate
Software Engineer
$ 128
IT Business Analyst
$ 80
Project Manager
$ 128
Senior Security Analyst
$160
Data Engineer
$136
Senior Data Engineer
$160
Data Scientist
$152
Senior Data Scientist
$160
Account Manager
$120
Account Executive
$160

*Bidder may add additional lines as needed.