RFP_1100_DCM3050_0500_3_v4.pdf
PDF 393 KB Posted
- Attached to
- Strategic Energy Management Services
- Solicitation number
- RFP 1100 DCM3050
- Issued by
- Texas
About this file
This Request for Proposals (RFP 1100 DCM3050) is issued by the City of Austin, Texas, seeking an experienced Strategic Energy Management Services provider to deliver statistical- and behavioral-focused energy management programs to large institutional and commercial property portfolios within Austin's jurisdiction. The scope targets approximately 100 eligible facilities with 150,000 or more aggregate square footage across primary industries including hospital/healthcare, educational campuses, nonprofits, and government non-municipal facilities, with secondary targets in hospitality, commercial office/retail, and industrial/manufacturing sectors. Services include customer recruitment and outreach, site energy audits, facility assessments, improvement training, and quarterly and annual program reporting. A mandatory pre-offer conference is scheduled for October 1, 2026 at 1:30 p.m. via Microsoft Teams, with proposals due October 15, 2026 at 2:00 p.m. The contractor must conduct on-site visits within 48 hours and maintain a dedicated Project Manager. The initial contract term is two years with options for up to three additional one-year extensions, potentially extending the engagement to five years. Questions are due October 2, 2026 at 5:00 p.m., and all offerors must acknowledge receipt of five addenda (most recently Addendum 5, posted September 24) with their proposals. Proposals are limited to eight pages in 12-point minimum font.
The maximum contract value is $250,000 per contract year, comprising up to $200,000 for baseline program costs plus a results-based bonus of up to $50,000 annually, with potential total value reaching $1.25 million over five years. The City strongly prefers performance-based and results-based compensation structures, particularly for Years 2–5, with documented cost reduction milestones targeting 3–10% reduction in total energy consumption and approximately 5% reduction in peak energy use. Evaluation criteria are weighted as follows: five-year implementation plan (15 points), case studies and team experience (20 points), scenario responses (15 points), cost proposal (20 points), and sample program documentation (10 points). Local Business Preference and Small Business Preference are available for qualifying vendors; combined small business subcontracting values must meet or exceed five percent of the total contract amount for partial preference eligibility. The contractor must hold or secure Certified Energy Manager and ASHRAE Building Energy Assessment Professional credentials (may be satisfied by different team members or qualified subcontractors). Compliance requirements include wage theft training within 30 days of award, Texas Local Government Code Chapter 252 and 271 compliance, comprehensive insurance (professional liability minimum $2 million, commercial general liability $1 million per occurrence), and adherence to City data handling controls with 48-hour incident reporting and seven-day remediation timelines.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Strategic Energy Management Services
Version 3, 10/26/2026
Solicitation No.
RFP 1100 DCM3050
Scope of Work V3 - RFP 1100 DCM3050 Page 1 of 7
1.0 Purpose
Austin Energy is seeking an experienced Strategic Energy Management (SEM) program provider to support large institutional and commercial property portfolios in Austin. The selected firm will coordinate with the Austin Energy program team to implement the firm’s existing statistical- and behavioral-focused energy management program which will include recruiting firms, conducting outreach events, negotiating SEM agreements with Austin clients, assessing facilities, conducting improvement trainings, events, documenting results, and producing quarterly and annual SEM program summary reports for Austin Energy. The SEM projects are designed to support large commercial customers, not at City facilities, and SEM activities must align with Austin Energy’s organizational commitment to reduce peak energy use and greenhouse gas emissions to achieve Austin Energy’s Resource Generation Plan.
Program Intent:
Engage with Customers to establish data-driven energy optimization strategies, Identify eƯiciency opportunities, Support behavioral changes, Recommend equipment upgrades, and Calculate estimated and actual energy (peak) savings.
Program Goal:
Drive persistent and measurable energy savings to optimize energy facility use, Reduce operational costs, Invest in energy eƯicient technologies, and Provide analytical reports of kilowatt peak, kilowatt hour, and greenhouse gas equivalent emission (kWh, kW, and GHGe) savings results in Austin, Texas.
The maximum budget allocated for this project is $250,000 with up to $200K annually for the SEM program baseline costs with an additional “Results-Based” bonus of up $50K available at the end of each Contract year. OƯerors are expected to propose detailed monthly activities, bonus milestones, and expectations of results that align with the SEM expectations set forth -- while remaining within this budget.
2.0 Term of Contract
This Contract shall remain in eƯect for an initial term of 24-months, or the City terminates the Contract. This Contract may be extended beyond the initial term for up to three (3) additional 12-month periods at the City’s sole option
3.0 Project Overview and Background
3.1 This Scope of Work outlines the proposal requirements and operational requirements for a new
Strategic Energy Management services contract for City. The contract will support Austin Energy’s Energy EƯiciency Services Commercial Rebate Program. Austin Energy will only provide the Customer with energy use and the Customer at that point can share the information with any party. Austin Energy is not involved with the data storage, nor responsible for any PII the Customer wants to provide to any party.
Version 3, 10/26/2026
Scope of Work V3 - RFP 1100 DCM3050 Page 2 of 7
3.2 Target Industries. The term “Customers” or “Large Commercial Customers” refers to large commercial facility and institutional owners in Austin’s full-purpose jurisdiction. Strategic Energy Management Customers will have an aggregate square footage (SQFT) of 150K and larger.
Primary
Hospital/Healthcare Facilities Educational Campuses Non-Profit Facilities Government Non-Municipal Facilities
Secondary (2nd year only)
Hospitality/Large Hotels Commercial Office/Retail Campuses Medium/Large Industrial/Manufacturing
4.0 SEM Contractor Responsibilities
4.1 The SEM Contractor shall kickoƯ a tailored Strategic Energy Management Program for large commercial property portfolios, or large institutional facility owners, in Austin in coordination with Austin Energy - Energy EƯiciency staƯ. At a minimum this shall include:
4.1.1 Kick-oƯ program in coordination with Austin Energy
4.1.2 Develop and document program processes, operational documents, and workflows
4.2 The SEM Contractor shall recruit Large Commercial Customers (Customers). At a minimum this shall include:
4.2.1 Engagement plan and milestones for new and potential Customers
4.2.2 Site energy audits and assessments and estimated savings reports
4.2.3 Facilities shall be in the City of Austin full-purpose jurisdiction and Austin Energy utility customers
4.2.4 Identify opportunities for Austin Energy Rebates to encourage Energy EƯiciency investments
4.2.5 Negotiate and sign SEM Service Agreements between the SEM Contractor and the
Customer. Austin Energy is not party to these customer-specific SEM Service Agreements. The relationship between the Customer and the SEM Contractor is governed by their Service Agreement, including managing any customer issues directly with the customer, providing dashboards/reporting to the customer, etc.
Austin Energy reserves the right to request a copy of the template Service Agreement used by the SEM Contractor.
4.2.5.1 Before the SEM firm and the Customer have a signed agreement, the 48-hour response time is intended to provide reasonable response time to a Customer or Austin Energy request for a site visit. After the signed Agreement between the SEM Firm and the Customer, the Agreement governs the response expectations. The 48-hours would be business hours and does not include weekends or City holidays.
Version 3, 10/26/2026
Scope of Work V3 - RFP 1100 DCM3050 Page 3 of 7
4.2.5.2 The SEM Firm may charge the Customer for their SEM services under the signed Agreement between the Customer and SEM Firm. The funds from Austin Energy’s Contract can be used to scale, provide site energy assessments, oƯset some of the Customer’s costs, and provide education and outreach to target industries and eligible Customers.
4.3 The SEM Contractor shall provide customers with Energy Baseline Analysis, modeling, audits, and improvement recommendations. The SEM Contractor shall provide copies of the program reports to Austin Energy Program Manager. At a minimum, this shall include documentation or quarterly summaries of the following:
4.3.1 Statistical analysis of 24 months of energy use, load profile, and response opportunities
4.3.2 Develop project proposals for the Customer based on behavioral, training, equipment rebates, building management controls, power factor, or other improvements.
4.3.3 Energy EƯiciency rebate project support and equipment specification recommendations
4.3.4 Coordination with participating Customers, property managers, and the facility maintenance teams
4.3.5 Document Customer’s options, costs/benefits, and estimated savings (Avoided
Costs, kW, kWh, and GHGe savings) in following 12 months
4.4 The SEM Contractor shall establish and provide cost reduction milestones to be achieved within a 24-month period. At a minimum this shall include:
4.4.1 Target 3-10% reduction in total energy consumption, ~5% reduction in peak energy use
4.4.2 Develop behavioral, equipment rebate, and projected savings project proposals for
Customers
4.4.3 Identify and secure available utility incentives, rebates, and tax credits
4.4.4 Establish energy budget forecasting and variance analysis procedures
4.4.5 12-Month Actual Savings (Avoided Costs, kW, kWh, and GHGe savings) versus
Estimated Savings.
4.5 The SEM Contractor shall provide customer capability-building services. At a minimum, this shall include:
4.5.1 Support Customer’s energy performance metrics and reporting dashboards
4.5.2 Create energy awareness programs for building occupants
4.5.3 Develop internal energy management competencies
4.6 The SEM Contractor shall provide coordination and compliance. At a minimum, this shall include:
4.6.1 Train facility staƯ on energy management best practices/behavioral changes (at least
2 training events per facility once new equipment or new processes are in place)
4.6.2 Measure and report the operational savings annually (actual versus estimated)
4.6.3 Ensure compliance with local, state, and federal energy regulations
Version 3, 10/26/2026
Scope of Work V3 - RFP 1100 DCM3050 Page 4 of 7
4.6.4 Coordinate with Customer’s LEED, Energy Star Portfolio Manager, or other facility certification eƯorts, if applicable
4.6.5 Propose energy eƯiciency upgrades and a renewable energy integration strategy, when applicable
4.7 Reserved
4.8 The SEM Contractor shall provide Local Resources and Availability throughout the term of the contract. At a minimum, this shall include:
4.8.1 Provide a dedicated Project Manager who will be the primary point of contact to
Austin Energy staƯ. The Primary Project Manager shall lead the SEM activities throughout the term of the contract
4.8.2 Maintain local presence or ability to conduct on-site visits within 48 hours (48-hours would be business hours and does not include weekends or City holidays.
4.8.3 Provide Emergency technical support capability for Customer concerns. Response time and coverage requirements apply to the industry standard.
4.8.4 Provide SuƯicient staƯ depth to ensure continuity of service with key personnel staƯ turnover
4.9 Marketing Materials
4.9.1 The SEM Contractor shall not create, distribute, publish or otherwise use any materials that market, promote, include logos, references, or representations referencing Austin Energy, or the City of Austin, without prior written approval from the Austin Energy Marketing Department .
4.9.1.1 The Contractor shall submit all proposed marketing materials electronically to the Austin Energy Marketing Department.
4.9.1.2 Austin Energy will review the submitted materials and provide written approval, written denial, or a request for revisions within ten (10) business days of receipt.
4.9.1.3 If revisions are requested, the Contractor shall resubmit the revised materials for approval. Each resubmission will be subject to a new ten (10) business-day review period.
4.9.1.4 No materials may be released, displayed, distributed, or used in any form until formal written approval has been issued by Austin Energy Marketing Department.
5.0 Single Point of Contact
5.1 The SEM Contractor(s) shall provide a Single Point of Contact Project Manager (SPOC) who is skilled, knowledgeable, and experienced in providing the types of services listed in this Scope of Work and who shall be available.
5.2 The SEM Contractor(s) shall provide the SPOC’s name, phone number and e-mail address to the Austin Energy Program Manager five (5) days after contract award.
5.3 The SPOC shall not be removed from the project without prior written consent by the Austin
Version 3, 10/26/2026
Scope of Work V3 - RFP 1100 DCM3050 Page 5 of 7
Energy Program Manager.
5.4 The SEM Contractor(s) shall provide a designee for the SPOC, during times the SPOC is unavailable (due to vacation, travel, etc., for example). The designee shall meet the same requirements as specified for the SPOC within this Scope of Work and shall have the same authority as the SPOC.
6.0 Specific Invoice Requirements:
6.1 The City’s preference is to have invoices emailed. E-mail addresses will be provided at the Contract Kick-oƯ Meeting or by the Austin Energy Program Manager.
6.2 For questions regarding your invoice/payment please contact the City Contract Manager
7.0 Austin Energy Responsibilities
7.1 Austin Energy will provide a Point of Contact at the Kick-oƯ meeting.
7.2 Austin Energy will schedule a Kick-oƯ meeting when contract is awarded.
7.3 Austin Energy reserves the right to award this contract to one or more Contractor(s)
7.4 Deleted.
7.5 Austin Energy will only provide the Customer with energy use and the Customer at that point can share the information with any party. Austin Energy is not involved with the data storage, nor responsible for any PII the customer wants to provide to any party.
7.6 Austin Energy reserves the right to request a copy of the template Service Agreement used by the SEM Contractor.
7.7 Austin Energy will review all submitted materials and provide written approval, written denial, or a request for revisions within ten (10) business days of receipt.
8.0 Designation of Key Personnel
The City and the SEM Contractor(s) resolve to keep the same key personnel assigned to this engagement throughout its term. In the event that it becomes necessary for the SEM Contractor(s) to replace any key personnel, the replacement will be an individual having equivalent experience and competence in executing projects such as the one described herein. Additionally, the SEM Contractor(s) shall promptly notify the City and obtain approval for the replacement. Such approval shall not be unreasonably withheld.
Version 3, 10/26/2026
Scope of Work V3 - RFP 1100 DCM3050 Page 6 of 7
9.0 Deliverables/Milestones
Deliverables/Milestones Description Timeline (due/completion date, reference date, or frequency)
Performance Measure/
Acceptance Criteria
Contract Reference/
Section
Energy Baseline Analysis, Modelling, Audits, and Improvement Recommendations
Document Customer’s options, costs/benefits, and estimated savings (Avoided Costs, kW, kWh, and GHGe savings)
Within 12 months of contract award
Copy of Customer analysis and recommendation documents with any PII redacted
4.3.5
KickoƯ an Austin-specific Strategic Energy Management (SEM) Program
Kick-oƯ program in coordination with Austin Energy Develop and document program processes, operational documents, and workflows Focus on Austin Energy’s target Customers or industries
Within 90 days of contract award
Provide Kick-oƯ documents, marketing/outreach plan, and events schedule for outreach eƯorts in 1st contract year
4.1
Cost reduction milestones
Target 3-10% reduction in total energy consumption, ~5% reduction in peak energy use
Develop behavioral, equipment rebate, and projected savings project proposals for Customers
Identify and secure available utility incentives, rebates, and tax credits
Establish energy budget forecasting and variance analysis procedures
12-Month Actual Savings (Avoided Costs, kW, kWh, and GHGe savings) versus Estimated Savings
Outreach eƯorts expected in Contract Year 1, Documentation of energy shifts and savings expect before or during Contract Year
Plan outreach and event plans executed as agreed in Year 1.
Customer and utility benefits documented before or during Contract Year 2
4.4
Version 3, 10/26/2026
Scope of Work V3 - RFP 1100 DCM3050 Page 7 of 7
Deliverables/Milestones Description Timeline (due/completion date, reference date, or frequency)
Performance Measure/
Acceptance Criteria
Contract Reference/
Section
Communication, Documentation of Results, and Compliance
Monthly communications of progress, setbacks, requests, and recommendations.
Quarterly in-person or video meetings for coordination and transparency.
Measure and report the operational savings annually (actual versus estimated)
Monthly, Quarterly, Annually, or as agreed in writing between Successful Proposer and Austin Energy Program Team
Timely Communications with AE staƯ and management.
Zero complaints from Customers requiring escalation to AE’s Executive Team.
4.6