Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977_(Nov2024).pdf

DoD Form Nov 2024 PDF 43 KB Posted

Attached to
USSOCOM RFI TE 26-3 Maritime Operations in Contested Electromagnetic Spectrum (EMS) Environments
Solicitation number
RFI_TE_26_3_Maritime_Operations_in_Contested_Electromagnetic_Spectrum_Environments
Issued by

About this file

This document is a PDF viewer error message, not a contract opportunity file. The document contains only technical instructions for upgrading Adobe Reader and troubleshooting PDF display issues. No contract information, solicitation details, or procurement requirements are present. The file appears to be corrupted or improperly formatted and does not contain substantive contract documentation.

View the file

Other versions and copies of DD Form 2977

File Revision Posted Attached to
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977_(Nov2024).pdf Same revision and size as this file Nov 2024 USSOCOM Open Call for Technical Experimentation 27-1: Special Operations Forces (SOF) Combat Diving (Diver Communications, Diver Propulsion, Underwater Interfaces) and Maritime Domain Situational Awareness Sensing Integration on USVs
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977_(Nov2024).pdf Same revision and size as this file Nov 2024 RFI for USSOCOM Rapid Experimentation of Prototyping Technology in Learning Environments 26-1
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977_(Nov2024).pdf Same revision and size as this file Nov 2024 RFI for USSOCOM Technical Experimentation (TE) 26-4: Signature Management and Defeat
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977_(Nov2024).pdf Same revision and size as this file Nov 2024 USSOCOM RFI TE 26-3 Rapid Experimentation of Prototyping in Learning Environments: Counter-Unmanned Systems (C-UxS)
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated RESCHEDULED - USSOCOM RFI Rapid Experimentation of Prototyping in Learning Environments 26-1: Counter-Unmanned Systems (C-UxS)
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM RFI TE 26-2 Agentic Artificial Intelligence (AI)-based Modular Capabilities for SOF
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM RFI TE 26-1 TE: Multi-Domain Joint SOF Operations (MDO)
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM RFI TE 25-3: Human Machine Teaming
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM RFI TE 25-2 Collaborative Autonomy Integration
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM RFI TE 25-1: Arctic Technical Experimentation
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM RFI TE 24-3 Technical Experimentation: Human Machine Teaming
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM RFI TE 24-2 Intelligence, Surveillance, Reconnaissance (ISR) and Tactical Communications Integration
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM_RFI_TE_23_Event_USSOCOM_Chemical_Biological_Radiological_Nuclear_CBRN_RFI_Research_Development_Acquisition_Experiment_RDAX_Dragon_Spear_23_Event_SOF_CWMD_SOF_CBRN
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM_RFI_TE_24_1_Technical_Experimentation_Event_Naval_Special_Warfare_Command_NSWC_Surface_Systems_Combat_Diving
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM_RFI_TE_23_3_Technical_Experimentation_Event_Information_Advantage_Information_Dominance
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM_RFI_TE_23_2_Technical_Experimentation_Special_Reconnaissance_Related_Technologies
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM_RFI_Technical_Experimentation_Event_Medical_Training
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977 (002).pdf Revision not stated USSOCOM_RFI_TE_23_1_Technical_Experimentation_Science_and_Technology_Capability_Focus_Areas
Attachment_4_Deliberate Risk Assessment Worksheet_DD 2977.pdf Revision not stated USSOCOM_RFI_TE_22_3_Technical_Experimentation_Soldier_Systems_and_Standoff_Through_Wall_Imaging
Attachment_3_Deliberate Risk Assessment Worksheet (DD 2977).pdf Revision not stated 2022 International Special Operations Forces Range Event
Show all 20

Who attaches DD Form 2977

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITION IS OBSOLETE.

DD FORM 2977, NOV 2024

Page of

DELIBERATE RISK ASSESSMENT WORKSHEET

3. PREPARED BY

Five steps of Risk Management:

(1) Identify the hazards

(2) Assess the hazards

(3) Develop controls & makes decisions

(4) Implement controls

(5) Supervise and evaluate (Step numbers not equal to numbered items on form)

4. SUBTASK/SUBSTEP OF MISSION/TASK

5. HAZARD

6. INITIAL RISK LEVEL

7. CONTROL

8. HOW TO IMPLEMENT/ WHO WILL IMPLEMENT

10. OVERALL RESIDUAL RISK LEVEL (All controls implemented):

12. APPROVAL OR DISAPPROVAL OF MISSION OR TASK

RISK ASSESSMENT MATRIX

Probability (Expected frequency) Frequent:

Continuous, regular, or inevitable occurrences Likely:

Several or numerous occurrences Occasional:

Sporadic or intermittent occurrences Seldom:

Infrequent occurrences Unlikely:

Possible occurrences but improbable Severity (expected consequence) A B C D E Catastrophic: Mission failure, unit readiness eliminated; death, unacceptable loss or damage I

EH

EH

H H M Critical: Significantly degraded unit readiness or mission capability; severe injury, illness, loss or damage

II

EH

H H M L Moderate: Somewhat degraded unit readiness or mission capability; minor injury, illness, loss, or damage

III

H M M L L Negligible: Little or no impact to unit readiness or mission capability; minimal injury, loss, or damage

IV

M L L L L

LEGEND:

EH - Extremely High Risk H - High Risk M - Medium Risk L - Low Risk

13. RISK ASSESSMENT REVIEW (Required when assessment applies to ongoing operations or activities) Instructions for Completing DD Form 2977, "Deliberate Risk Assessment Worksheet"

1. Mission/Task Description and Execution Date(s): Briefly describe the overall Mission or Task and execution date(s) for which the deliberate risk assessment is being conducted.

2. Date Prepared: Enter date form was prepared.

3. Prepared By: Information provided by the individual conducting the deliberate risk assessment for the operation or training.

Legend: UIC = Unit Identification Code; CIN = Course ID Number; OPORD = operation order; DSN = defense switched network; COMM = commercial

4. Subtask/SubStep of Mission/Task: Briefly describe all subtasks or substeps that warrant risk management.

5. Hazard: Specify hazards related to the subtask in block 4.

6. Initial Risk Level: Determine initial risk level. Using the risk assessment matrix (preceding block 13), determine level of risk for each hazard specified. Use probability and severity to determine risk level; enter risk level into column.

7. Control: Enter risk mitigation resources/controls identified to abate or reduce risk relevant to the hazard identified in block 5.

8. How to Implement / Who Will Implement: Briefly describe the means of employment for each control (i.e., OPORD, briefing, rehearsal) and the name of the individual, unit or office that has primary responsibility for control implementation.

9. Residual Risk Level: After controls are implemented, determine resulting probability, severity, and residual risk level. Entered hazards may be automatically sorted by residual risk level by clicking the header for Block 9.

10. Overall Risk After Controls are Implemented: Assign an overall residual risk level. This is equal to or greater than the highest residual risk level (from block 9).

11. Supervision Plan and Recommended Course of Action: Completed by preparer. Identify specific tasks and levels of responsibility for supervisory personnel and provide the decision authority with a recommend course of action for approval or disapproval based upon the overall risk assessment.

12. Approval/Disapproval of Mission/Task: Risk approval authority approves or disapproves the mission or task based on the overall risk assessment, including controls, residual risk level, and supervision plan.

13. Risk Assessment Review: Should be conducted on a regular basis. Reviewers should have sufficient oversight of the mission or activity and controls to provide valid input on changes or adjustments needed. If the residual risk rises above the level already approved, operations should cease until the appropriate approval authority is contacted and approves continued operations.

14. Feedback and Lessons Learned: Provide specific input on the effectiveness of risk controls and their contribution to mission success or failure. Include recommendations for new or revised controls, practicable solutions, or alternate actions. Submit and brief valid lessons learned as necessary to persons affected.

15. Additional Comments or Remarks: Preparer or approval authority provides any additional comments, remarks, or information to support the integration of risk management.

Additional Guidance: Blocks 4-9 may be reproduced as necessary for processing of all subtasks/substeps of the mission/task. The addition button will add a row below the row at which selected. The subtraction button will remove the row at which selected.

9.0.0.2.20120627.2.874785 DD Form 2977, "Deliberate Risk Assessment Worksheet"

CurrentPage:
PageCount:
1. MISSION/TASK DESCRIPTION AND EXECUTION DATE(S):
2. DATE PREPARED:
a. DATE:
b. LAST NAME:
C. RANK/GRADE:
d. DUTY TITLE/POSITION:
e. SIGNATURE OF REVIEWER:
f. TELEPHONE (DSN, Commercial (Include Area Code)):
g. UIC/CIN (as required):
h. TRAINING SUPPORT/LESSON PLAN OR OPORD (as required):
i. SIGNATURE OF PREPARER:
9. RESIDUAL RISK LEVEL:
Click to Delete this row:
Click to insert below:
4. SUBTASK/SUBSTEP OF MISSION/TASK:
5. HAZARD:
6. INITIAL RISK LEVEL (select from drop-down list):
7. CONTROL:
8. HOW TO IMPLEMENT/WHO WILL IMPLEMENT - HOW::
8. HOW TO IMPLEMENT/WHO WILL IMPLEMENT - WHO::
9. RESIDUAL RISK LEVEL (select from drop-down list):
Select for "EXTREMELY HIGH": 0
Select for "HIGH": 0
Select for "MEDIUM": 0
Select for "LOW": 0
11. OVERALL SUPERVISION PLAN AND RECOMMENDED COURSE OF ACTION:
Select for "APPROVE": 0
Select for "DISAPPROVE": 0
14. FEEDBACK AND LESSONS LEARNED:
15. ADDITIONAL COMMENTS OR REMARKS:

File details come from the government source that posted it. Updated .