This is a Technical Specification document for the HSR 49.2 MHz RF System Power Amplifiers to be procured by Brookhaven Science Associates (BSA) on behalf of Brookhaven National Laboratory for the Electron-Ion Collider (EIC) project under the Department of Energy Office of Science. The specification defines requirements for Solid-State Power Amplifiers (SSPAs) capable of reliably delivering up to 120 kW of continuous-wave RF power at 49.2 MHz to support bunch splitting operations in the Hadron Storage Ring's normal-conducting RF cavities. The SSPA must operate in both continuous-wave and pulsed modes, with specified gain (87 dB nominal), phase linearity, noise figure (10 dB maximum), and efficiency (55% AC to RF minimum). All RF devices must maintain die temperatures not exceeding 160°C for LDMOS or 180°C for GaN devices under all operating conditions.

The SSPA shall incorporate modular, redundant power supplies and RF-PA designs allowing 120 kW operation even with up to 10% of RF-PAs in failed or inhibited states, with predicted mean time between failures exceeding 10,000 hours for the complete system and 35,000 hours for individual amplifying stage units. The system requires an industrial programmable logic controller managing state machine operations (AC OFF, AC ON, DC ON, RF ON states), comprehensive local and remote monitoring via Ethernet using Modbus/TCP, Ethernet/IP, or OPC-UA protocols, water cooling removing minimum 80% of heat at pressures up to 150 psi, and air cooling for up to 20% of heat dissipation. Protection features include input overdrive hardware protection, 48-hour burn-in testing at full rated power, thermal sensing, RF switching with 100-500 nanosecond response time, and comprehensive fault/warning reporting with 1000-entry circular buffers for historical data. The specification mandates compliance with IEC 61000-6-2 and IEC 61000-6-4 for electromagnetic compatibility, NFPA 70E-2021 electrical safety standards, and UL 508 industrial control equipment standards, with acceptance testing performed at the contractor's facility and at the BSA site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electron-Ion Collider, Brookhaven National Laboratory

Doc No. [Insert here]
Author: [Insert here]
Effective Date: [Insert here]
Review Frequency: N/A
Specification Title: [Insert Title]
Revision: 00

2 National Synchrotron Light Source II

TECHNICAL SPECIFICATION

for the HSR 49.2 MHz RF System Power Amplifiers Quality Classification: A-3

Prepared By:

_____________________________________________ Date: __________________ Mark Hoffmann Wallner, High Power RF Engineer

Reviewed By:

_____________________________________________ Date: __________________ Daniel Lukach, Collider HPRF Systems Manager

_____________________________________________ Date: __________________ Alexander Zaltsman, EIC High Power RF Technical Lead

_____________________________________________ Date: __________________ Freddy Severino, EIC RF Controls Technical Lead

_____________________________________________ Date: __________________ Mike Sowinski, High Power RF Engineer

_____________________________________________ Date: __________________ Marcel Romero, Procurement Liaison Engineer

_____________________________________________ Date: __________________ Charles Schaefer, ESH Manager

_____________________________________________ Date: __________________ Christina Sullivan, Quality Assurance

Approved By:

_____________________________________________ Date: __________________ Warren Halbig, EIC HSR Systems Manager

Electron-Ion Collider, Brookhaven National Laboratory

Doc No. [Insert here]
Author: [Insert here]
Effective Date: [Insert here]
Review Frequency: N/A
SOW: [Insert Title]
Revision: 00

2 National Synchrotron Light Source II

Electron-Ion Collider, Brookhaven National Laboratory

Doc No. EIC-RFS-SPC-017
Author: Mark Hoffmann Wallner
Effective Date: November 5, 2026
Review Frequency: N/A
Specification: Technical Specification for the HSR 49.2 MHz RF System Power Amplifiers
Revision: 03

Version n 10 of 8 nnMon2009 Brookhaven National Laboratory This document contains BNL procurement requirements and specifications for solicitation and technical evaluation. The information is high-level and does not include the detail necessary for 'development' or 'production' as defined under 15 CFR §772.1, 22 CFR §120.33, or 10 CFR Part 810; therefore, it does not constitute export-controlled technology or technical data.

The only official copy of this document is the one online in the SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s Revision History log with that of the online version.

Electron-Ion Collider, Brookhaven National Laboratory

Doc No. [Insert here]
Author: [Insert here]
Effective Date: [Insert here]
Review Frequency: 5 years
Plan: [Title]
Revision: [#]

2 National Synchrotron Light Source II

This page intentionally left blank, to accommodate back-to-back printing.

Version n 10 of 8 nnMon2009

This document contains BNL procurement requirements and specifications for solicitation and technical evaluation. The information is high-level and does not include the detail necessary for 'development' or 'production' as defined under 15 CFR §772.1, 22 CFR §120.33, or 10 CFR Part 810; therefore, it does not constitute export-controlled technology or technical data.

REVISION HISTORY

Revision #
Effective Date
Summary of Change
00
3/31/2026
Initial Release
01
9/02/2026
Grammar and Spelling Revisions. Addition of export control statement.
02
10/29/2026
Increased Die Temperature Requirements
03
11/5/2026
Addition of export control statement on all pages.

Table of Contents

LIST OF ACRONYMS7
1SCOPE8
1.1Background8
1.2Definitions8
2APPLICABLE DOCUMENTS9
3SPECIFICATIONS11
3.1SSPA Characteristics11
3.1.1Stability16
3.1.2Forward Power Degradation versus Load VSWR16
3.1.3Input Overdrive Protection16
3.1.4Burn-in Testing16
3.1.5Redundant Operation16
3.1.6Power supplies17
3.1.7Earth Connections17
3.1.8Control System 120 VAC Switch17
3.1.9Internal Energy Dissipation17
3.1.10SSPA Reliability (MTBF)18
3.1.11Temperature Limits18
3.1.12RF Hardware Requirements18
3.1.13Water Cooling18
3.1.14Air Cooling19
3.2SSPA Control System Specifications19
3.2.1Programmable Logic Controller (PLC)19
3.2.2Communication Interface and Protocols19
3.2.3External Interlocks20
3.2.4Status Connections20
3.2.5RF ON/AC OFF Status Connections20
3.2.6Local Protection20
3.2.7AC Contactor Actuation21
3.2.8CRASH Switch22
3.2.9Internal Protection22
3.2.10Local Human-Machine Interface (HMI)22
3.2.11SSPA state machine23
3.2.12LED Status Indicators25
3.2.13Local/Remote Operation25
3.2.14Data Time Stamping and Sampling Rate25
3.2.15Runtime Hour Meter25
3.2.16Remote Status Monitoring and Reporting26
3.2.17Network Interface Configuration26
3.3RF-PA Specifications27
3.4Local RF Instrumentation Specifications27
3.4.1Digital RF Power Meter28
3.5RF Patch-Panel Specifications28
3.6Code/Standard Compliance28
3.6.1Electromagnetic Compatibility28
3.6.2Electrical Code29
3.7Construction Specifications29
3.8Environment, Safety and Health (ESH)29
4VERIFICATION30
4.1Classification of Inspections30
4.1.1Acceptance Tests30

LIST OF ACRONYMS

AC
Alternating Current
BNL
Brookhaven National Laboratory
BSA
Brookhaven Science Associates
CFR
Code of Federal Regulations
CW
Continuous Wave
DC
Direct Current
DHCP
Dynamic Host Configuration Protocol
EIA
Electronic Components Industry Association
EIC
Electron-Ion Collider
EMC
Electromagnetic Compatibility
EPICS
Experimental Physics and Industrial Control System
ESH
Environment, Safety and Health
FET
Field-effect transistor
FPC
Fundamental Power Coupler
GaN
Gallium Nitride
GND
Ground
GUI
Graphical User Interface
HMI
Human-Machine Interface
HPRF
High-Power RF
HSR
Hadron Storage Ring
LDMOS
Laterally Diffused Metal Oxide Semiconductor
LED
Light-Emitting Diode
MTBF
Mean Time Between Failures
NTP
Network Time Protocol
PLC
Programmable Logic Controller
RF
Radiofrequency
RF-PA
Radiofrequency Power Amplifier
SRF
Superconducting Radiofrequency
SSPA
Solid-State Power Amplifier
VAC
Volts Alternating Current
VSWR
Voltage Standing Wave Ratio

Technical Specification for the HSR 49.2 MHz RF System Power Amplifiers

SCOPE

This document defines the technical specifications for the Hadron Storage Ring (HSR) 49.2 MHz Radiofrequency (RF) System Power Amplifiers to be used at the Electron-Ion Collider (EIC) at Brookhaven National Laboratory (BNL) managed by Brookhaven Science Associates (BSA).

Background The EIC Project will design, build, and install the accelerator hardware for a new electron storage ring, an electron injector, and modifications to the hadron ring required to produce an electron-ion collider and infrastructure. It will include one interaction region, with an allowance for a second, and one detector. The facility is designed to meet requirements to ensure high reliability and availability for the user program.

The High-Power RF (HPRF) System for the HSR 49.2 MHz RF will be used to provide power to the 49.2 MHz Normal Conducting RF (NCRF) Cavities. These cavities will be used for the bunch splitting of hadron beams in the HSR of the EIC. Amplifiers that can reliably deliver up to 120 kW of RF power are needed to achieve the necessary bunch splitting pattern in the HSR 49.2 MHz Normal Conducting RF Cavities.

Definitions Local Protection – Protection designed to be applied at the Solid-State Power Amplifier level.

Solid-State Power Amplifier (SSPA) – The Solid-State Power Amplifier (SSPA) comprises all subsystems (AC distribution, DC power supplies, RF, cooling, control) assembled in a functional device that provides RF power amplification. This term is mutually exchangeable with HSR 49.2 MHz RF System Power Amplifier for this document.

Amplifying Stage – An Amplifying Stage is defined as the group of identical RF amplifiers that are operated in parallel to provide signal amplification within the SSPA. A SSPA usually has at least a couple amplifying stages.

RF Device – A RF Device is a RF power field-effect transistor (FET). It usually has one or two sets of gate and drain terminals, a metallic flange that is also its source terminal, and either a plastic or ceramic package covering its semiconductor elements.

Radiofrequency Power Amplifier (RF-PA) – A Radiofrequency Power Amplifier (RF-PA) is defined as the modular unit of the last Amplifying Stage within the SSPA. It may have one to several identical RF Devices operating in parallel with embedded RF splitting and combining structures. A SSPA may have up to several hundred RF-PAs.

Remote Control – The Remote Control system is BSA’s control system to handle communication between different equipment. It will be implemented via Experimental Physics and Industrial Control System (EPICS).

Soft Limit – An adjustable limit to a fault or warning condition which may be further sensitized by the end user.

Hard Limit – A limit to a fault or warning condition that is locked behind contractor-protected password, meant for critical SSPA protection.

APPLICABLE DOCUMENTS

The following specifications, standards and drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the applicable revision level of these documents shall be that in effect on the date of the solicitation or contract. Exceptions must be approved in writing by BSA.

In the event of a conflict between the applicable documents and this specification, the Contractor shall immediately notify the BSA Contractual Representative who shall in each instance determine which document takes precedence and advise the Contractor accordingly. Failure to notify BSA of a document conflict shall not relieve the Contractor’s responsibility to ensure full compliance to all requirements.

Document Number
Document Title
EIC-RFS-SOW-011
Statement of Work for the HSR 49.2 MHz RF System Power Amplifiers
IEC 61000-6-2
Immunity Testing of Industrial Equipment
IEC 61000-6-4
Emission Standard for Industrial Environments
NFPA 70E-2021
Standard for Electrical Safety in the Workplace

Articles 340, 350, 360

UL 508
Standard for Industrial Control Equipment
10 CFR Part 810
Assistance to Foreign Atomic Energy Activities
15 CFR §772.1
Export Administration Regulations (EAR) Definitions
22 CFR §120.33
International Traffic in Arms Regulations (ITAR) Technical Data
29 CFR 1910 Subpart S
Occupational Safety and Health Standards 1910 Subpart S – Electrical

SPECIFICATIONS

SSPA Characteristics The SSPA shall be constructed with solid-state devices. Its mode of operation shall be Continuous Wave (CW) and Pulsed. CW is the primary mode of operation. The SSPA Pulsed operation will be used during cavity conditioning.

Regardless of the RF output power specification, the SSPA shall fulfill the following specifications. The SSPA interface specifications are shown in Table 1. The environmental specifications are shown in Table 2. The specifications of CW and Pulsed operation are shown in Table 3 and Table 4.

Table 1: SSPA Interface Specifications

Parameter
Min.
Nominal
Max.
Unit

Reference impedance (input and output) ohms

Input rf connection

Type N (F)

N/A

Output rf connection[footnoteRef:2] [2: Transmission line for output RF power must exit the SSPA from the top.]

EIA 6 1/8’’

N/A

3 Phase AC voltage input
432
480
528
VAC
1 Phase AC voltage input (for controls)
108
120
132
VAC

AC frequency

Hz

Power Factor
0.92

N/A

3-Phase 480 VAC connection

Through holes in a bus bar inside the AC power rack.

N/A

1-Phase 120 VAC connection

1 IEC 3-pin inlet to the control rack

N/A

Remote control connection

RJ-45

N/A

Cooling system

Tap water

N/A

Coolant tube material

Copper or stainless steel

N/A

Lifting

At least 3 mounting holes prepared for crane lifting with crane eye bolts and/or standard notches for forklift

N/A

Table 2: SSPA Environment Specifications

Parameter
Min.
Nominal
Max.
Unit

Audible noise at 1 m distance

70
dB(A)
Tolerable coolant input temperature
30
35
40
ºC
Tolerable ambient temperature
15
40
ºC

Tolerable relative air humidity

65%
N/A

Tolerable coolant input pressure

80-100
150
psi
Tolerable barometric pressure
29.50

inHg

Table 3: SSPA CW Specifications

Parameter
Min.
Nominal
Max.
Unit
Operating frequency
48.2
49.2
50.2
MHz

Gain (over 40 dB dynamic range)[footnoteRef:3] [3: At no point shall the gain deviate more than 1.5 dB from nominal. The transfer curve of output power versus drive power shall be a smooth curve devoid of discontinuities or abrupt changes. 40 dB dynamic range specifies from nominal output power. ]

85.5
87
88.5
dB

Phase linearity (over 40 dB dynamic range)

20
º
Steady-state forward power
120

kW

Noise figure

10
dB
Input return loss at nominal frequency
20

dB

Input return loss across operating frequency
10

dB

Relative power of harmonic tones

-30
dBc

Relative power of spurious tones

-80
dBc

RF signals sampling power at nominal power (Section 3.4) dBm

Group delay

200
ns
AC to RF efficiency
55

Minimal RF on/off ratio[footnoteRef:4] [4: Gain difference measured between DC ON and RF ON machine states.] dB

Table 4: SSPA Pulsed Specifications

Parameter
Min.
Nominal
Max.
Unit
RF pulse width
0.001
0.1
100
ms

RF duty cycle

50
%

Rise time

1
µs

Fall time

1
µs

Pulse droop (at maximum pulse width)

0.5
dB

Phase Error Over Pulse (at maximum pulse width)

2.5
º

Table 5 presents specifications of gain, phase and group delay deviations across all units from any amplifying stage across all SSPAs.

Table 5: Unit-to-unit RF Specifications across all SSPAs

Parameter
Min.
Nominal
Max.
Unit

Gain deviation at operating frequency

0.25
dB

Phase deviation at operating frequency

7.5
º

Group delay deviation at operating frequency

5
ns

Stability The RF Amplifier system shall be unconditionally stable over the entire load space and dynamic range.

Forward Power Degradation versus Load VSWR Up to 3:1 Load VSWR, the SSPA shall output 100% of its nominal power. For higher values, the SSPA must present a fault and a transition from the RF ON machine state. The SSPA shall not be damaged in the event of a short or open circuit on the RF output.

Input Overdrive Protection There shall be hardware within the RF amplifier system for input overdrive protection. The hardware shall limit the RF power at the input of the system and the RF amplifier system shall not be inhibited.

Burn-in Testing The SSPA shall go through a 48-hour Burn-in Test at full rated power at the Contractor’s site, without any faults, warnings, trips, or failures.

Redundant Operation The SSPA must be able to provide 120 kW output power with up to 10% of all RF-PAs either in a failed or inhibited state. If a RF-PA fails or is inhibited during operation at any power level, the SSPA must be able to withstand a sudden change in input power that will try to compensate for the failed/inhibited RF-PA power loss in order to restore the rf output power to its previous level before the failure or inhibit.

The SSPA must be able to provide 120 kW output power with up to 10% of all RF-PAs either in a failed or inhibited state for an indefinite amount of time with no negative impact on the expected lifetime of any of its components due to sub-optimal operation conditions. If more than 10% of RF-PAs fail, the SSPA can continue operating if it is deemed safe to do so, and if it does not exceed any of the Soft or Hard Limits for the SSPA.

Apart from the redundant operation described for the RF-PAs above, the SSPA shall not have single points of failure in any of its Amplifying Stages, i.e. the SSPA must remain operational even if at least one unit of any of its Amplifying Stages fails or is inhibited.

Power supplies The Contractor can select power supplies so long as the SSPA characteristics comply with the requirements as specified herein. Redundancy shall exist. Like the RF-PA devices, the selected power supplies must be modular, i.e. several units must together provide the necessary total DC power to the RF-PA devices. A single failure shall not inhibit the entire SSPA. It is of the utmost importance to have a design which is reliable, requires minimal maintenance, and enables easy replacement of faulty modules/components. The controls shall operate on BSA supplied 120 VAC. The main power supplies shall operate on BSA supplied 480 VAC 3-Phase. The 480 VAC 3-Phase will be 4 wires plus GND. The SSPA shall be protected against damage if the AC voltage is out of range.

Earth Connections

Chassis Earth Connections A threaded ¼”-20 earth bolt shall be provided on the rear of each chassis within the racks. Each chassis shall have its own earth ground cable connected to the rack.

Rack Earth Connections A threaded ¼”-20 earth bolt shall be provided on the top of each rack.

Control System 120 VAC Switch An on/off switch for the 1-Phase 120 VAC supply that powers the Control System and a circuit breaker must be present inside the Control System Rack.

Internal Energy Dissipation In the event of an interlock or command that forces the SSPA into a lower machine state (see Section 3.2.11), the SSPA must be able to discharge all of its stored thermal and electrical energy in a safe and controlled manner. Access to the interior of the SSPA shall not be granted unless there is evidence that energy from the AC and DC systems are within safe thresholds.

SSPA Reliability (MTBF) The SSPA shall have a predicted MTBF of greater than 10,000 hours in an environment subject to all possible combinations of values defined in Table 2. The units of all Amplifying Stages shall have a predicted MTBF greater than 35,000 hours.

Temperature Limits

Temperature Limits on Exposed Surfaces The temperature on any touchable surface shall be less than 48.89 °C (120 °F). A touchable surface is defined as any surface that can be accessed without the use of tools.

RF Device Die Temperature The maximum die temperature of LDMOS RF Devices shall not exceed 160 °C over the entire load space, dynamic range, and range of environmental conditions. Gallium Nitride (GaN) RF Devices die temperature shall not exceed 180 °C over the same circumstances outlined above.

RF Hardware Requirements

RF Switch

There shall be a high-speed RF switch at the input of the SSPA that shall shunt the input RF to a 50 ohms termination when the SSPA is not in the RF ON state. The purpose of this switch is to quickly terminate the input RF signal in the event of a fault condition. The rise/fall time of the RF Switch shall be between 100 ns and 500 ns.

Thermal Protection Temperature sensing shall be fitted to heat-generating devices in the SSPA to provide equipment protection if internal temperatures exceed allowable limits.

Water Cooling Water cooling will be provided by BSA. The SSPA shall incorporate water cooling to ensure that the components within the SSPA stay within their thermal limits. A minimum of 80% of the heat generated by the SSPA shall be removed by water cooling. The water shall exit through a flow meter for each water-cooled rack. There shall be a drain valve at the bottom of each rack to drain the water. The cooling system shall be designed such that very little water remains trapped after draining. The cooling system shall tolerate input cooling water with an input pressure of at least 150 psi (as per Table 2). The cooling system total pressure drop shall be no greater than 40 psi. Required flow rates (maximum, minimum, nominal) for operation shall be defined by the Contractor.

Air Cooling In addition to water cooling, the SSPA may incorporate air cooling to dissipate up to 20% of the total heat generated. If required, air shall be drawn in through vents at the front of the chassis and expelled at the rear of the chassis. Air filters shall be fitted to any required fans. Fans and air filters shall be affixed in such a way that they can be easily replaced without the need to remove chassis from the racks.

SSPA Control System Specifications

Programmable Logic Controller (PLC) The SSPA must have a local, industrial-level commercial Programmable Logic Controller (PLC) to handle:

· The SSPA state machine (see Section 3.2.11).

· All critical SSPA variables and parameters.

· All internal warning/fault/interlock signals.

· Communication with the Remote Control and any other sub-controllers inside the SSPA.

The power supplied to the PLC and all other communication subsystems must be derived from the 120 VAC 1-Phase source.

Communication Interface and Protocols All SSPA variables from the AC distribution, DC converter/power supply, RF, cooling, and safety systems must be made available to the Remote Control system via an Ethernet (RJ-45) connection. The SSPA control system shall interface with the Remote Control system via one or more of the following communication protocols:

· Modbus/TCP.

· Ethernet/IP.

· OPC-UA.

External Interlocks The SSPA control system must be able to accommodate for the handling and processing of external interlocks that come from the Remote Control system. The interlock connectors shall be located inside of the rack. The connector type shall be a 2-Pin Phoenix Contact, Male, Feed-through Header, Type DFK-MSTB.

Status Connections The four status connectors shall be located inside of the rack. The connector type shall be a 2-Pin Phoenix Contact, Male, Feed-through Header, Type DFK-MSTB.

RF ON/AC OFF Status Connections The four RF ON/AC OFF Status connectors shall be chassis isolated BNC type female connectors.

Local Protection Table 6 lists the Local Protection features that the SSPA must provide. All features must be reported to the Local and Remote Control systems. All features must also trigger a Summary Fault and/or Summary Warning.

Table 6: SSPA protection features

Warning
System Action
Reset Required

RF Device Over Current Warning The current being drawn a RF Device is excessive

1. Remain in RF ON state

2. Inhibit RF Device

3. Report location N

RF Device Failure Warning A RF Device is blown or damaged

1. Remain in RF ON state

2. Inhibit RF Device

3. Report location N

Thermal Warning The temperature is excessive

1. Remain in RF ON state

2. Report location N

VSWR Warning The VSWR is excessive

1. Remain in RF ON state

2. Report location N

Maximum RF Forward Power Warning The forward power is excessive

1. Remain in RF ON state

2. Report location N

Air Flow Warning Fan failure or low flow rate

1. Remain in RF ON state

2. Report location N

Water Flow Warning The water flow rate is too low

1. Remain in RF ON state

2. Report location N

DC Power Supply Warning[footnoteRef:5] [5: A DC power supply is defined as: any one power supply delivering power to the drain of RF Devices.]

A DC power supply voltage is out of range

1. Remain in RF ON state

2. Report location N

SSPA Input Overdrive Warning The RF input power is excessive

1. Keep RF ON state
N

SSPA VSWR Fault The VSWR at output of the SSPA is excessive

1. Go to DC ON state
Y

SSPA Maximum RF Forward Power Fault The RF forward power at the output of the SSPA is excessive

1. Go to DC ON state
Y

SSPA Thermal Fault1 The temperature is excessive

1. Go to AC ON state

2. Report location Y

SSPA Water Flow Fault The water flow rate is too low

1. Go to AC ON state

2. Report location Y

SSPA AC Power Fault The 480 VAC voltage is out of range

1. Go to AC OFF state
Y

Auxiliary DC Power Supply Fault Auxiliary DC power supply voltage is out of range

1. Go to AC OFF state
Y
RF Device Redundancy Fault[footnoteRef:6] [6: The RF Device Redundancy Fault shall trip when the sum of the following exceeds the maximum limit:
a.Number of RF Device Failure Warnings
b.Number of RF Device Over Current Warnings
c.Any other warning which results in a RF Device being inhibited.]
Go to STANDBY state
Y

AC Contactor Actuation The SSPA control system must be used to electronically actuate on an AC Contactor that shall be present on the AC distribution system. The AC contactor must be connected to the PLC through a dry contact. The following interlocks must immediately trigger the release of the AC contactor:

· Smoke.

· Water leak.

· Open cabinet doors.

· CRASH Switch (see Section 3.2.8).

Once disabled, the AC contactor must only be enabled again locally through the control system Human-Machine Interface (see Section 3.2.10). Suitable circuit breakers for each phase must also be installed before the AC Contactor.

CRASH Switch The SSPA control system must have a CRASH Switch on its control system rack. It must be implemented as a large, red button, and it must always be responsive, both in Local and Remote operation. It must latch mechanically once triggered and must be only locally reset. Pressing this button must trigger an interlock and a transition to the machine AC OFF state (see Section 3.2.11.2). This interlock must only be cleared locally. The CRASH Switch must be physically located between 3 and 5 feet above ground.

Internal Protection The SSPA control system must be able to detect faults and locally protect all its subsystems against damage from, but not limited to:

· Excessive input RF power.

· Excessive temperature readings.

· Inadequate air flow.

· Inadequate water flow.

· Out-of-range 3 Phase, 480 VAC, or 1 Phase, 120 VAC voltage readings.

· Inadequate environmental parameters, such as, but not limited to, ambient temperature, humidity, and atmospheric pressure.

Local Human-Machine Interface (HMI) The SSPA must have a local Human-Machine Interface (HMI) located on its control system rack. The HMI must have a Graphical User Interface (GUI) that is controlled by a dedicated server/computer. The GUI program must be accessible remotely, and it must display:

· Current machine state.

· Visual indications for all alarms, warnings, and interlock status.

· Measurements from the AC distribution, DC power supply, and RF.

· Controls to reset interlocks while in local mode.

SSPA state machine A state machine must be implemented to handle the state of the SSPA. The machine state must consist of the following states:

· AC OFF

· AC ON

· DC ON

· RF ON

The state machine state must be always indicated visually by a 4-tier tower light (green, yellow/orange, red, and white) mounted on top of the SSPA. The white LED must be turned ON if the SSPA has a warning or fault. The description for each one of these states is defined in the following sections.

AC OFF state In the AC OFF state, the SSPA control system shall be operational, and the AC distribution system shall be disabled through the AC Contactor switch. All the fans present in the AC distribution system must be turned off. This state must be visually represented by a flashing red light. A transition to and from this state will follow the AC Contactor Actuation logic described in Section 3.2.7.

AC ON state In the AC ON state, the SSPA control system must be operational, the AC distribution system shall be enabled through the AC Contactor switch. The DC power supplies must be disabled, and the RF Switch must be open, i.e., connected to a 50 ohms termination. The assigned color for this state is green. In this state, the following conditions must be met:

· Control system is active.

· Amplifier power switch is off (ACDC power supplies are off).

· RF Switch is open.

DC ON state In the DC ON state, the DC power supplies are enabled, and the RF Switch must be open, i.e., connected to a 50 ohms termination. The SSPA can only be in the DC ON state if all the following conditions are simultaneously met:

· All rack doors must be closed, and their respective interlocks must be cleared.

· Some, or all external interlocks must be cleared.

· The Emergency Stop interlock must be cleared.

· The AC Contactor is enabled, and its related interlocks must be cleared.

· Water flow is OK, and its related interlocks must be cleared.

· Water inlet temperature and pressure are OK, and its related interlocks must be cleared.

· Fans power supplies are OK, and their related interlocks must be cleared.

· Control system power supplies are OK, and their related interlocks must be cleared.

· RF-PA temperatures are OK, and its related interlocks must be cleared.

· DC power supplies are OK, and their related interlocks must be cleared.

· Cabinet doors are closed, and their related interlocks must be cleared.

· All communication with controllers is OK, and their related interlocks must be cleared.

· Cabinet temperatures are OK, and their related interlocks must be cleared.

RF ON

In the RF ON state, all the conditions mentioned in the DC ON state must be met, and the RF Switch is closed. The RF Switch can only be closed from the DC ON state, and all external interlocks concerning the machine operation must be cleared. Any internal or external interlocks will trigger transitions to either AC OFF, AC ON or DC ON states, depending on which respective interlock were triggered.

LED Status Indicators In addition to the 4-tier tower light described in Section 3.2.11, the status of the SSPA shall be indicated locally by a LED array on the front of the Control System rack. The LEDs shall indicate important aspects of the operating status, fault/warning status and control signal status. In general, a simple color code shall apply, whereby a white LED indicates a fault/warning condition, and a green LED indicates a normal condition. The machine status LED colors and behavior should follow that of the 4-tier tower light, that is:

· Red for RF ON.

· Yellow/orange for DC ON.

· Green for AC ON.

· Flashing red for AC OFF.

· White if the SSPA has warning/faults.

Local/Remote Operation The SSPA control system must allow for both local and remote operation. A Local/Remote switch must be available on the control system rack. It must be implemented through a physical key that may be removed from the SSPA. Changing between Local and Remote will not trigger a transition between machine states.

Data Time Stamping and Sampling Rate All data shall be made available for remote monitoring with time stamp that has 1 millisecond of accuracy. The controller shall synchronize its time-of-day clock over ethernet using an NTP server.

Runtime Hour Meter There shall be a runtime hour meter to monitor the accumulating run time operating hours. The meter shall record all time while the SSPA in the RF ON state. It shall be non-resettable. The range shall be 0 – 99,999 hours (minimal). The display shall be located on the front of the rack.

Remote Status Monitoring and Reporting All status data shall be accessible through the remote interface and shall include:

· SSPA current state (AC OFF, AC ON, DC ON, and RF ON).

· SSPA Local/Remote switch state (Local, Remote).

· All interlock states.

· All faults and warning status shall be accessible through the remote interface. The status shall include the fault/warning physical location(s).

· SSPA first fault condition (reports original/first cause of the SSPA fault).

· Controller shall capture and store at least 1000 entries of each of the following status in a nonvolatile circular buffer. All entries shall include time stamp with at least 1 millisecond of time accuracy. Any number of entries shall be read on request via remote interface:

· SSPA first fault history (first cause for SSPA fault condition)

· SSPA fault history capturing any fault, warning, internal & external interlocks.

· SSPA machine state history which includes cause/reason for the transition between states. It shall clearly indicate the action that caused the SSPA to transition between states.

Network Interface Configuration

Ethernet Configuration Both Dynamic Host Configuration Protocol (DHCP) and STATIC Ethernet configurations shall be supported.

MAC Address The network interface’s MAC address shall be displayed or printed on the control panel.

3.2.11.3 IP Address

The configured IP addresses shall be displayable on the control panel on a digital display.

RF-PA Specifications The RF-PAs must be easily swappable for routine care, maintenance, and repair. If the total weight of the RF-PA is more than 40 pounds, the Contractor must provide dedicated tools and equipment to assist with the handling, moving, and installation of the RF-PA.

The following parameters of each RF-PA must be monitored and handled by the control system:

· Gate voltage of all RF Devices gate terminals.

· Drain voltage of all RF Devices drain terminals.

· Drain current of all RF Devices drain terminals.

· RF Device die temperature.

The RF Device die temperature may be indirectly inferred from a sensible temperature reading taken at a suitable spot close to the RF Device. The Contractor must explain the inference process and elaborate on systematic and random uncertainties.

Local RF Instrumentation Specifications The SSPA must provide sample signals (channels) from critical RF signals for local RF instrumentation. The sampled signals RF power must be (10 ± 0.5) dBm at nominal, and they must be available from female type-N connectors. All RF instrumentation channels must be isolated from one another and from the main RF line path with an isolation of at least 30 dB. The critical RF signals that must be available for local RF instrumentation are:

· SSPA output forward RF power

· SSPA output reverse RF power

· SSPA input forward RF power (before RF Switch)

· SSPA input reverse RF power (before RF Switch)

· Output forward RF power after all Amplifying Stages

Digital RF Power Meter There shall be a digital power meter to monitor the forward and reflected power of the SSPA. The accuracy shall be 2.0% into 50 ohms over the entire dynamic range. Power shall be displayed in kilowatts. The display shall be located on the front of the rack. Power monitoring shall also be available to the Remote Control system.

RF Patch-Panel Specifications The SSPA must provide sample signals (channels) from critical RF signals for the LLRF System (LLRF) through a RF patch-panel that must be located on the top side of the SSPA rack. The sampled signals RF power must be (10 ± 0.5) dBm at nominal, and they must be available from female type-N or SMA connectors. All RF instrumentation channels must be isolated from one another and from the main RF line path and from the Local RF Instrumentation signals with an isolation of at least 30 dB. Different directional couplers must be used to sample the RF patch-panel signals and the local RF instrumentation signals. The critical RF signals that must be available for the LLRF System are:

· SSPA output forward RF power

· SSPA output reverse RF power

· SSPA input forward RF power (before RF Switch)

· SSPA input reverse RF power (before RF Switch)

· Output forward RF power after all Amplifying Stages

Code/Standard Compliance

Electromagnetic Compatibility The SSPA should be designed to be compatible with the following EMC regulations in force, and should neither be perturbed nor perturb other installations according to these regulations:

· EMC Immunity: IEC 61000-6-2.

· EMC Emissions: IEC 61000-6-4.

It shall be assumed that throughout this specification, unless explicitly detailed separately for a given parameter, each SSPA is treated as Class A, Group 1 equipment. The corresponding conducted and radiated limits should be understood, and design practices applied accordingly.

Electrical Code The SSPA shall be designed following the below electrical codes:

· 29 CFR 1910 Subpart S – Electrical

· NFPA 70E-2021

· Article 340 (Power Electronic Equipment),

· Article 350 (Safety Requirements for R&D Labs)

· Article 360 (Safety Requirements for Capacitors)

· UL 508

Except for UL 508, all other referenced standards are required to be implemented.

Construction Specifications The racks shall be constructed to allow for the use of a pallet jack or forklift which will be used to move the racks into their final locations.

Environment, Safety and Health (ESH) Identification of hazards, and their mitigation, shall occur during all stages of the life of the Equipment including; installation, commissioning, operation, maintenance, and repair. Identification of means to eliminate or manage each hazard shall be provided based on the following hierarchy:

· Substitute with something less hazardous, or

· Engineer – mitigate the severity of the hazard, or

· User Personal Protective Equipment (least desirable).

VERIFICATION

Appropriate inspection/tests shall be performed to ensure equipment conforms to all requirements in section 3 of this specification.

Classification of Inspections

Items covered by this specification shall be subjected to the following tests to determine compliance with all applicable requirements:

Acceptance Tests

· Contractor Acceptance Test

· Factory Acceptance Test at Contractor Site

· BSA Site Acceptance Test

Version n 10 of 8 nnMon2009

This document contains BNL procurement requirements and specifications for solicitation and technical evaluation. The information is high-level and does not include the detail necessary for 'development' or 'production' as defined under 15 CFR §772.1, 22 CFR §120.33, or 10 CFR Part 810; therefore, it does not constitute export-controlled technology or technical data.

File details come from the government source that posted it. Updated .