This is a Statement of Work (SOW) for procurement of a tri-band S/X/Ka antenna system for the Landsat 10 (L10) satellite mission, issued by the U.S. Geological Survey (USGS) under Department of the Interior (DOI) auspices. The document outlines comprehensive requirements for design, build, integration, testing, and delivery of antenna infrastructure at the USGS EROS facility in Sioux Falls, South Dakota.

The contractor must deliver a complete turn-key solution including the tri-band antenna pedestal, main and sub-reflector assemblies, positioner motors, servo drive amplifiers, low-noise front-end amplifiers, tracking receivers, antenna controller with graphical user interface, manual positioning controls, fiber optic connections, and boresight system. Associated deliverables encompass a protective radome, civil works including antenna foundation, concrete pad, asphalt access ring, lightning protection systems, environmental controls, power distribution upgrades to motor control centers (MC-11 and MC-31), uninterruptible power supply, internal/external lighting, video surveillance, and road extension. The contractor must also provide comprehensive documentation including design specifications, civil works drawings (four sets stamped by a South Dakota licensed engineer), equipment lists, spares lists, factory and site acceptance test data, and operations/maintenance manuals in both printed and electronic formats. The period of performance is 18 months or less from contract award. Key requirements include compliance with USGS/DOI cybersecurity standards under FISMA, coordination with existing ground station systems, performance verification through factory and site acceptance testing with government participation, end-to-end bit-error rate testing, staff training, warranty coverage for design and workmanship renewable annually, and adherence to National, Federal, South Dakota, and local building codes including NFPA standards. The contractor assumes responsibility for all logistics, site security, equipment procurement, subcontracting, utility coordination, safety compliance, and material disposal.

View the file

Other files

File Type Posted
RFI_Attachment_D_Cost_Data_Template_1.xlsx XLSX spreadsheet
RFI_DOIGFBO260032_1.pdf PDF
RFI_Attachment_C_Timeline_1.pdf PDF
RFI_Attachment_B_Requirements_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LSDS-2418

Version 1.0

Department of the Interior U.S. Geological Survey

Landsat 10 (L10) / Landsat Operations Tri-Band Antenna Statement of Work (SOW)

Version 1.0

May 2026

DOIGFBO260032

RFI ATTACHMENT A SOW

- ii - LSDS-2418

Landsat 10 (L10) / Landsat Operations Tri-Band Antenna Statement of Work (SOW)

May 2026

Prepared By:

G.R. Mah Date Landsat 10 Mission Engineer U.S. Geological Survey

Approved By:

Brian Sauer Date Landsat 10 Project Manager and New Missions Branch Chief U.S. Geological Survey

Approved By:

Joseph Blahovec Date Satellite and Ground Systems Operations Branch Chief U.S. Geological Survey

EROS

Sioux Falls, South Dakota

GRANT MAH

Digitally signed by GRANT

MAH

Date: 2026.06.02 12:26:45 -05'00'

BRIAN SAUER

Digitally signed by BRIAN

SAUER

Date: 2026.06.03 15:52:12 -05'00'

JOSEPH

BLAHOVEC

Digitally signed by JOSEPH

BLAHOVEC

Date: 2026.06.09 11:09:45 -05'00'

- iii - LSDS-2418

Executive Summary

This document defines the Statement for Work (SOW) for the Landsat tri-band antenna, covering the antenna, radome, and civil works.

Landsat represents the world’s longest continuously acquired collection of space-based moderate-resolution land remote-sensing data. The program’s imagery provides a unique resource for those who work in agriculture, geology, forestry, regional planning, education, mapping, and global change research. Landsat images are also invaluable for emergency response and disaster relief.

This is a controlled document under the U.S. Geological Survey (USGS) Landsat 10 (L10) Project. Please submit changes to this document, as well as supportive material justifying the proposed changes, to the Landsat 10 Project Manager (PM).

- iv - LSDS-2418

Document History

Document Number

Document Version

Publication Date

Change Number

LSDS-2418 Version 1.0 May 2026 NA

- v - LSDS-2418

Contents

Executive Summary ..................................................................................................... iii Document History ........................................................................................................ iv Contents ......................................................................................................................... v List of Tables ................................................................................................................. v Section 1 Introduction

1.1 Background

1.2 Purpose

1.3 Scope

1.4 References

Section 2 Landsat 10 Overview

2.1 Mission Statement

2.2 Summary

2.3 Objectives

Section 3 Statement of Work (SOW)

3.1 Definitions

3.2 Project Management and System Engineering

3.3 Antenna Design/Build

3.4 Integration and Test

3.5 Radome

3.6 Civil Works and Utilities

3.7 Logistics

3.8 Deliverables

Appendix A Acronyms

List of Tables

Table 1-1. Applicable Documents Table 1-2. Reference Documents

- 1 - LSDS-2418

Section 1 Introduction

1.1 Background

The Landsat 10 (L10) mission is a component of the Sustainable Land Imaging (SLI) Program conducted jointly by the National Aeronautics and Space Administration (NASA) and U.S. Geological Survey (USGS) of the Department of the Interior (DOI).

L10 was conceived as a follow-on mission to the highly successful Landsat series of missions that have provided satellite coverage of Earth’s continental surfaces since the launch of the Earth Resources Technology Satellite (ERTS, later renamed Landsat 1) in 1972. The Landsat data archive constitutes the longest continuous moderate-resolution record of the global land surface as viewed from space. L10 is intended to ensure that Landsat-like data be provided to the USGS National Satellite Land Remote Sensing Data Archive (NSLRSDA) for a period of not less than five years.

1.2 Purpose

This document provides the Statement of Work (SOW) for procurement of the tri-band S/X/Ka antenna for L10, and the support of ongoing Landsat mission operations for Landsat 8 (L8) and Landsat 9 (L9).

1.3 Scope

This document describes the work required to develop, implement, and test the tri-band antenna, along with associated radome, civil works, and electrical/mechanical equipment.

1.4 References

1.4.1 Applicable Documents

The documents in Table 1-1 are considered to form a part of this document.

Document Number Document Title

LSDS-2417 Landsat 10 (L10) / Landsat Ground Operations Tri-Band Antenna Requirements

N/A Landsat Tri-Band Antenna Statement of Need (SON) TBD Antenna site survey diagrams

JM060424 EROS Buckets - Original Version ¦ UM8-00013254

Table 1-1. Applicable Documents

1.4.2 Reference Documents

The documents in Table 1-2 provide additional background and context for this document.

- 2 - LSDS-2418

Document Number Document Title L10-SYS-PLAN-0007 Landsat 10 Mission Operations Concept Document

L10-SC-ICD-0007 Landsat 10 Spacecraft to Ground Interface Requirements Document (SC-GND IRD)

L10-DESC-0006 Landsat 10 Common Acronyms List L10-SYS-DESC-0004 Landsat 10 Common Lexicon

Table 1-2. Reference Documents

- 3 - LSDS-2418

Section 2 Landsat 10 Overview

2.1 Mission Statement

L10 will continue the acquisition, archive, and distribution of multi-spectral imagery affording global, synoptic, and repetitive coverage of Earth's land surfaces and coastal regions at a scale where natural and human-induced changes can be detected, differentiated, characterized, and monitored over time.

2.2 Summary

The L10 mission is in keeping with the Landsat programmatic goals stated in the Commercial Space Act of 1998 (Public Law 105-303) and the Land Remote Sensing Policy Act of 1992 (Public Law 102-555), which require the Landsat program to provide future data that are consistent with previous Landsat data, allowing the detection and quantitative characterization of changes in or on Earth’s land surfaces.

L10 continues the long-running partnership of NASA and USGS, with NASA providing the Space and Launch segments and USGS providing the Ground System and Mission Operations. NASA/Goddard Space Flight Center (GSFC) will provide overall L10 project management, mission system engineering, and mission assurance during development and will transition the mission to USGS for science operations following on-orbit commissioning.

2.3 Objectives

L10 has these major mission objectives:

Collect and archive moderate resolution multi-spectral image data and thermal image data, affording seasonal coverage of the global landmass for a continuous period of not less than five (5) years.

Ensure that L10 data are sufficiently consistent with data from the earlier Landsat missions in terms of relative acquisition geometry, calibration, coverage characteristics, spectral characteristics, output product quality, and data availability; all of which permit scientific studies, management of land cover and land use change, along with associated inland and coastal water resources, over multi-decadal periods.

Ensure L10 is responsive to documented emerging user needs and applications as characterized by periodic assessment, currently the User Needs for the Sustainable Land Imaging Program July 2018, Release 2.0, and identified by the operational requirements for acquisition, processing, archiving, and distribution of Earth’s image data to the U.S. Government and other users.

Distribute L10 data products to the public freely and on a nondiscriminatory basis.

For detailed information on the L10 mission overview and architecture, and operations concepts, reference the L10-SYS-PLAN-0007 Landsat 10 Mission Operations Concept (Ops Con) Document.

- 4 - LSDS-2418

Section 3 Statement of Work (SOW)

3.1 Definitions

The following conventions will be used in this document:

A “shall” statement is used to document a required task or activity A “may” statement is used to designate a task or activity that allows for compliance at the discretion of the vendor, or the government A “will” statement is used to provide informative information that is not a requirement, and is used to indicate the intent of the government A “must” statement is a require task or activity, and is used to document important relevant conditions that may be outside the context of the contract A “should” statement is used to provide guidance to the Contractor in performance of this contract

3.2 Project Management and System Engineering

This section defines the project management (PM) and system engineering (SE) tasks required to develop and deliver the Landsat tri-band antenna.

3.2.1 The vendor shall participate in a kick-off meeting at the start of the contract. The meeting will review the SOW and requirements to ensure there is mutual understanding of the scope and requirements of the contract.

3.2.2 The vendor shall develop a project management plan that is used to control the development and implementation of Landsat tri-band antenna, which includes, at a minimum, task descriptions and schedules.

3.2.3 The vendor shall provide monthly status updates, describing progress, issues, and schedules. Delivery of monthly status may be in written format or by interactive (virtual) meeting, by mutual agreement of the vendor and the government.

3.2.4 The vendor shall perform engineering and analysis to design, build, and test the Landsat tri-band antenna system.

3.2.5 The vendor shall conduct the following reviews:

Design Review – A presentation that describes the design and performance of the tri-band antenna, along with supporting analysis showing the antenna will meet the specified requirements. This review shall be held prior to start of any major implementation/construction work.

Test Readiness Review (TRR) – A meeting to assess the readiness of the system/subsystem/component to begin testing, including readiness of any required supporting resources (e.g. – test staff, test equipment, facilities, etc.). A TRR with government participation will be required prior to the start of factory acceptance testing (FAT), and site acceptance testing (SAT). TRRs with government participation may be held for other key milestone events (e.g. – antenna range testing, etc.) at the discretion of the vendor.

- 5 - LSDS-2418

The government shall have the option to witness these, the FAT and SAT, and any other lower level tests by mutual agreement (e.g. – antenna range tests, etc.).

Pre-Ship Review (PSR) – A meeting held before shipment of the antenna to the installation site to assess readiness of the site and other resources to support work that will take place at the site. An equivalent review shall be held before the start of major civil works activity (e.g. – before work begins to excavate and pour concrete for the antenna, etc.).

Acceptance Review – A meeting held to review the results of testing, and to assess whether relevant requirements have been met. Acceptance reviews shall be held for both the FAT and SAT.

The period of performance is 18 months or less following the date of contract award.

3.3 Antenna Design/Build

Requirements for the Landsat tri-band antenna are documented in LSDS-2417 Landsat Ground Operations Tri-Band Antenna Requirements.

3.3.1 The Contractor shall provide a complete, turn-key solution to address the requirements outlined in this SOW. A “turn-key solution” is defined as a fully functional, end-to-end deliverable that is ready for immediate use upon acceptance, without the need for additional resources, integration, or development by the government.

3.3.2 The vendor shall design and build the Landsat tri-band antenna per the requirements (LSDS-2417).

3.3.3 The vendor shall conduct testing and perform analysis to verify compliance with the requirements. The government will review and concur with proceeding on subsequent work following the factory acceptance test (FAT) via a pre-ship review (PSR), and following the site acceptance test (SAT), for final delivery acceptance.

3.3.4 The vendor shall conduct a test readiness review with government participation prior to the start of the FAT, and the SAT, to verify maturity of the antenna system for testing, and to confirm readiness of any test support resources. The vendor may choose to have a TRR with government for other key milestone activities, e.g. – antenna range testing, etc.

3.3.5 The vendor shall perform analysis and oversight of the civil works to ensure geodetic accuracy as required to meet antenna requirements (e.g. – for pointing and tracking).

3.3.6 The vendor shall comply with applicable USGS/DOI cybersecurity regulations and standards per the Federal Information Security Modernization Act (FISMA) checklist.

3.3.7 Any computer used in the antenna shall support regular information technology (IT) and network security patching without significant rework or antenna downtime.

- 6 - LSDS-2418

Certain exceptions may be made for controller computers on closed networks that run a secure operating system.

3.3.8 The antenna and associated electronics shall support installation of IT and network security scanning software and applications without impact to the functionality or performance of the antenna. A list of the anticipated software and applications will be provided after contract award.

3.3.9 The vendor shall design and implement a boresight system to support free-space testing of the antenna. An existing S-/X-Band boresight system is located on USGS/EROS water tower, which could be modified or replaced.

3.4 Integration and Test

3.4.1 The vendor shall be responsible for procurement or rental of any equipment or tools required for (onsite) installation, integration or test of the Landsat tri-band antenna.

3.4.2 The vendor shall be responsible for verifying the workmanship and performance of any subcontracted work before installation of the antenna and application of power.

3.4.3 The vendor shall integrate and install the Landsat tri-band antenna at the pre-surveyed location.

3.4.4 The vendor shall integrate and install a boresight system.

3.4.5 Testing and analysis to verify antenna requirements compliance shall be performed in the final, as-delivered configuration. This includes the boresight system.

The government will make Government-Furnished Equipment (GFE) available to support testing, as mutually agreed upon.

3.4.6 The vendor shall support an end-to-end bit-error rate (BER) testing using the antenna and GFE wideband demods and test modulators. This test will take place before final acceptance.

3.4.7 The vendor shall provide training for the ops and maintenance staff on the procedures and documentation required to operate the antenna, interface the antenna to the existing ground station automation systems, and to cooperatively maintain the antenna.

3.5 Radome

3.5.1 The vendor shall provide a radome to cover and protect the Landsat tri-band antenna, without degrading performance below levels specified in the requirements.

3.5.2 The vendor shall be responsible for the design and construction of any required supporting civil works, e.g. – a ring wall, etc.

- 7 - LSDS-2418

3.5.3 The vendor shall be responsible for the assembly and installation of the radome following installation of the antenna.

3.5.4 The vendor shall perform testing and analysis to verify the radome does not degrade performance below the levels specified in the requirements. All antenna requirements must be met with the inclusion of the radome.

3.6 Civil Works and Utilities

Some existing civil works exist at the pre-surveyed location for the Landsat tri-band antenna, specifically cable access (“pull vaults”) and conduits for fiber and electrical connectivity.

3.6.1 The vendor shall be responsible for civil works and utilities at the surveyed location for the Landsat tri-band antenna, including establishing subcontracts as necessary.

3.6.2 The vendor shall perform field reconnaissance surveys, site investigations/site surveys, full schematic design services, working drawings, shop drawing review, and architecture and engineering (A&E) studies, as necessary to design and implement the civil works for the Landsat tri-band antenna.

3.6.3 The vendor shall perform all services necessary to prepare and furnish complete contract documents consisting of drawings, technical specifications, design analysis, schedules of drawings, and addenda as required for accomplishment of the civil works.

3.6.4 The vendor shall provide for structural design, calculations and documentation as required for civil works.

3.6.5 The vendor shall ensure the civil works design complies with National, Federal, South Dakota Department of Agriculture & Natural Resources https://danr.sd.gov/, and local codes for the execution of this work.

3.6.6 The civil works shall comply with all current governing specifications including but not limited to: NFPA 101 – Life Safety Code, NFPA 70, Federal, and local building codes.

3.6.7 The vendor shall provide the specifications and indicate the owner as the US Government.

3.6.8 The vendor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses or permits.

3.6.9 The vendor shall coordinate with USGS/EROS facilities staff in the design and implementation of civil works.

3.6.10 The vendor shall be responsible for coordinating with local utilities and USGS/EROS facility staff to identify and protect existing underground utilities, when doing any construction or excavation work

- 8 - LSDS-2418

3.6.11 The vendor shall construct a foundation and pad for the Landsat tri-band antenna.

3.6.12 The vendor shall construct an asphalt ring surrounding the antenna pad, to allow for parking and service access to the antenna site.

3.6.13 The vendor shall implement lightning protection for the Landsat tri-band antenna, including lightning rods and buried ground plane grid.

3.6.14 The vendor shall upgrade the motor control center to (basement mechanical room and penthouse mechanical room, MC-11 and MC-31) to 8000 XT style buckets to support the additional load and capacity needed to support the new antenna. The original cabinets, bus bars, and feeders will be reused. All positions feeding power or utilized as a spare must be upgraded. A bill of materials (BOM, JM060424 EROS Buckets - Original Version ¦ UM8-00013254) is provided in the procurement package.

3.6.15 The vendor shall coordinate with USGS/EROS facilities staff in the design and implementation of the AC power system, as well as routing of power and other signal connections between the antenna and the main USGS/EROS building.

3.6.16 The vendor shall provide an uninterruptable power supply (UPS) to provide contingency power for the antenna and associated equipment located the antenna site.

The UPS will be placed in the main building, located in the part of the facility housing existing power distribution equipment. Equipment located in the computer room or ops room will utilize existing facility UPS power (and do not need to be included in the load capacity of the new antenna UPS unit). It is expected that the facility will be able source sufficient power for the additional load from the antenna and associated equipment, and the vendor will not be responsible for obtaining additional new utility power connections.

3.6.17 The vendor shall implement connections for power, signals and communications between the antenna and equipment located in main building. Use of existing conduits is acceptable where space is available without impacting the existing antenna installations.

3.6.18 If additional space is needed for power, signals and communications connections, the vendor shall install new buried conduits or other connections as required.

3.6.19 The vendor shall construct an extension of the existing antenna access road to the location of the Landsat tri-band antenna.

3.6.20 The vendor shall be responsible for trimming or removal of any local vegetation that impacts the ability of the antenna to meet requirements (e.g. – minimum elevation angles, etc.). This will include subcontracting as needed. Any work must be coordinated with USGS/EROS facilities. Impacts for both leaf-on and leaf-off conditions shall be considered, as well as projected growth.

- 9 - LSDS-2418

3.7 Logistics

3.7.1 The vendor shall be responsible for coordination and acceptance for deliveries of all equipment and material to the site (nothing can be shipped to the USGS Warehouse for government staff to receive).

3.7.2 All materials and products pertaining to the job site shall be received by the contractor, not USGS/EROS staff.

3.7.3 The vendor shall coordinate logistics for delivery during normal USGS/EROS business hours.

3.7.4 All electrical work and civil works activities shall be coordinated with USGS/EROS facilities staff. Work must be phased to minimize or eliminate the need for outages to critical equipment to the greatest extent possible.

3.7.5 The vendor shall coordinate with USGS/EROS staff for support of work outside of normal business hours. Note that coverage may not be available for all times requested, but an effort will be made to accommodate requests for off-hours work support.

3.7.6 The vendor shall coordinate with USGS/EROS staff for security access and escorts as needed. Note that advance notice is required for access by foreign nationals, and may take a significant amount of time to process (greater than 30 days).

3.7.7 The vendor shall be responsible for the safety, storage and security of the antenna, associated equipment, civil works, and any other I&T equipment until final acceptance of the antenna by the government. Vendor-owned equipment will remain to be the responsibility of the vendor, e.g. – tools, fixtures, etc. There are outside staging areas that can be designated upon coordination with USGS/EROS staff.

3.7.8 All provided civil works documentation shall not be proprietary.

3.7.9 Antenna, electrical design, civil works and engineering documentation shall have government use rights.

3.7.10 Antenna operations and maintenance documentation shall be provided in both printed and electronic (softcopy) formats, with electronic (softcopy) in portable document format (PDF) or Microsoft (MS) Office format.

3.7.11 The vendor will be responsible for supplying any utilities, e.g. – water, interim power, etc., needed at the site. Water may be available at the USGS/EROS warehouse, but the vendor will need to supply a container (e.g. – water buffalo, etc.) to bring it to the antenna site.

3.7.12 The vendor shall adhere to all state, local, and OSHA safety standards in execution of this work.

- 10 - LSDS-2418

3.7.13 The vendor shall ensure the safe disposal of existing materials and metals removed from the USGS/EROS worksite. This includes removal of any boresight equipment no longer needed (e.g. – antennas, cabling, mounting hardware, etc.) if augmenting or removing the existing boresight installation on the USGS/EROS water tower.

3.7.14 The USGS has a mandatory requirement to obtain approval for utility shutdowns. The vendor shall consider these shutdowns and coordinate with USGS/EROS facilities for planning and phasing purposes.

3.8 Deliverables

The vendor shall provide the following deliverables:

3.8.1 Antenna and associated electrical and mechanical equipment, including:

Antenna pedestal Main and sub reflector assembly Positioner motors and servo drive amplifiers Low noise front-end amplifiers (LNAs) for data and tracking channels Tracking receivers Antenna controller and graphical user interface (GUI) Manual antenna positioning control capability (e.g. – portable handset, etc.)

Fiber and D/Cs Boresight

3.8.2 Radome

Radome assembly Servicing platform, as appropriate

3.8.3 Civil works, including:

Antenna foundation and mounting assembly Concrete pad for antenna and associated equipment Pad (asphalt) for access to antenna pad Radome ring wall, if necessary Environmental control equipment for radome (e.g. – HVAC, etc.)

Links for communications, signals and power between the antenna and main

USGS/EROS facility (use of existing conduits is acceptable, where space is available to accommodate new cabling and connections)

UPS for antenna and associated equipment (located at the antenna site) Internal and external lighting Video cameras providing coverage of the interior and exterior (outside the radome) of the antenna Extension of current access road to new antenna location

- 11 - LSDS-2418

3.8.4 Documentation, including:

Antenna design and theory of operation, reflecting the as-built, as-delivered configuration Copies of site survey and other A&E study documentation Copies of civil works diagrams, blueprints and other artifacts used to construct the antenna system. Provide four (4) sets of drawings (Architectural E1 size, 30"×42"), stamped by an Engineer licensed in the State of South Dakota and corresponding specifications reflecting the design and as-built configuration.

Component-level equipment list, to facilitate servicing and repair of the antenna and key components (e.g. – LNAs, etc.)

Spares list Factory and site acceptance test data packages, containing the as-run test procedures and test data measurements, and supporting analyses Design and test data for any key components, as jointly determined by the vendor and government (e.g. – LNAs, high-power amplifier, etc.)

3.8.5 Spares, equipment and components, from the suggested spares list, per the contract

To support cooperative maintenance by USGS/EROS staff

3.8.6 Warranty/Support Agreement

Warranty/support agreement for the antenna, associated equipment and civil works covering design and workmanship Work to address any remaining liens after final acceptance Bug fixes as needed to address issues with functionality or performance Renewable annually, at the discretion of the government, for the life of the antenna system

- 12 - LSDS-2418

Appendix A Acronyms

A&E Architecture and Engineering BER Bit-Error Rate CCB Configuration Control Board CM Configuration Management CR Change Request D/C Downconverter DOI Department of the Interior EROS (Center for) Earth Resources Observation and Science ERTS Earth Resources Technology Satellite FAT Factory Acceptance Test FISMA Federal Information Security Modernization Act GFE Government-Furnished Equipment GS Ground System GSD Ground Sample Distance GSFC (NASA) Goddard Space Flight Center GUI Graphical User Interface HVAC Heating, Ventilation and Air Conditioning IT Information Technology L8 Landsat 8 L9 Landsat 9 L10 Landsat 10 LNA Low Noise Amplifier LSDS Land Satellites Data System MS Microsoft NASA National Aeronautics and Space Administration NFPA National Fire Protection Association NIST National Institute of Standards and Technology NSLRSDA National Satellite Land Remote Sensing Data Archive OSHA Occupational Safety and Health Administration PDF (Adobe) Portable Document Format PM Project Management PSR Pre-Ship Review SAT Site Acceptance Test SE System Engineering SLI Sustainable Land Imaging SON Statement of Need SOW Statement of Work TRR Test Readiness Review UPS Uninterruptable Power Supply USGS U.S. Geological Survey