Attachment_No._3_-_Eligibility_Verification_11-6-14.pdf
PDF 92 KB Posted
- Solicitation number
- RFC-5-52014
- Issued by
-
Department of Energy Office of Science
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment No. 3
ELIGIBILITY VERIFICATION
11/6/14
All efforts funded under this project shall be performed by a U.S. company located within the United States or its territories. The company must manufacture the turbine in the U.S. A U.S.
company is defined as a business incorporated or formed as a legal entity in the United States.
The baseline turbine selected by the Subcontractor must already exist as a U.S.-manufactured product that requires engineering design improvements or manufacturing process upgrades, or be prepared to go through certification testing and turbine certification. All turbine designs meeting the qualifications set forth here are eligible for consideration in this effort.
For purposes of considering this Proposal, Offeror agrees to the following as applicable:
_____ Primary output of turbine will be electrical power
a. For turbines delivering AC power, the frequency is 60 Hz
b. For turbines delivering DC power, the DC voltage is 12, 24, 36, or 48
VDC
_____ Offeror is a U.S. company1
_____ Turbine system2 is manufactured in the U.S.
Provide location(s) of US turbine manufacturing facilities
_____ Turbine system hardware is all new, not refurbished or remanufactured
_____ All reports from certification testing will be publicly available.
Signature __________________________________________
Name (Print) __________________________________________
Title __________________________________________
Company __________________________________________
Date __________________________________________
1 All efforts funded under this project shall be performed by a U.S. company located within the United States or its territories. A U.S. company is defined as a business incorporated or formed as a legal entity in the United States.
2 If the proposal is to improve a generic turbine component (such as a tower, inverter, blade, or other components), the component shall be part of a specific turbine system, which must meet this requirement.
| ELIGIBILITY VERIFICATION |
| _____ Primary output of turbine will be electrical power |
File details come from the government source that posted it. Updated .