FDCF Pre-Cast Sealant and Warehouse Floor Drawings Summary
This is a set of construction drawings prepared for the Iowa Department of Administrative Services for a sealant replacement and freezer floor repair project at the Fort Dodge Correctional Facility located at 1550 L Street. The project encompasses two buildings: Unit L, which requires replacement of joint sealants on precast walls, and Warehouse W, which requires complete demolition and reconstruction of the freezer floor. The scope for Unit L includes removing and replacing backer rod and sealant at vertical and horizontal joints, fixtures, openings, and penetrations, with sealant application requiring concave tooling around light fixtures, telephone shrouds, mechanical louvers, conduit holes, security cameras, electrical boxes, and through-wall pipe penetrations. The Warehouse W scope involves demolishing approximately 66 cubic yards of frozen subgrade, removing and replacing a 4-inch concrete top slab with 4-inch polyiso insulation, installing new drainage systems with perforated fabric-wrapped drain tile, and relocating an existing modular building. Construction is anticipated to begin October 26, 2026, and be completed by June 30, 2027. Bids were due no later than 2:00 p.m. on September 24, 2026, submitted through the IMPACS Electronic Procurement System, with bid opening scheduled for 3:00 p.m. the same day via Microsoft Teams.
The project requires a bid security of 5 percent of the total bid amount in the form of a bid bond, cashier's check, or certified check. All contractor personnel must complete background checks and PREA training prior to site access and attend mandatory contractor orientation. The contractor is responsible for verifying all dimensions and site conditions, managing construction debris disposal in compliance with environmental regulations, protecting adjacent building elements and lawn areas from damage, and storing sealants and primers outside the prison facility except for daily use. Lead paint abatement is required for blue paint door frames identified as lead-containing, with the general contractor requiring lead paint certification. The contract specifies that all work must comply with state building codes and industry standard practices, with all required permits and fees included in the bid. Questions and substitution requests for specified products were due by 10:00 a.m. on September 17, 2026, prior to bid opening. Davis-Bacon wages do not apply to this project, and the project is exempt from Iowa sales tax.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EARTH
PLYWOOD
GYPSUM WALLBOARD
CONCRETE BLOCK
CONCRETE
RIGID INSULATION
BATT INSULATION
DIMENSION LUMBER
WOOD
SAND & GRAVEL
EXPANSION JOINT
DOOR IDENTIFICATION
NOTE REFERENCE
ROOM IDENTIFICATION
BUILDING SECTION
WINDOW IDENTIFICATION
ROOM NAME
DETAIL NUMBER
DRAWING SHEET NUMBER
ELEVATION REFERENCE
ELEVATION NUMBER
DRAWING SHEET NUMBER
A1 A1.1
MATCHLINE
STRUCTURAL GRIDLINE
WALL SECTION
DETAIL NUMBER
DRAWING SHEET NUMBER
A1
A1.1
A1.1
DETAIL SECTION/ DETAIL CALLOUT
DETAIL NUMBER
DRAWING SHEET NUMBER
A1
A1.1
ROOM NAME
ROOM NUMBER
A1
CEILING IDENTIFICATION1
WALL IDENTIFICATION1
LEVELLEVEL 1
SPOT ELEVATION
0'-0"
0'-0"
LEVEL IDENTIFICATION
ELEVATION
FLOORING FINISH TRANSITION
CORNER GUARDS, TYP.
CG
CASEWORK IDENTIFICATION
WIDTH
HEIGHT (INCLUDES COUNTERTOP)
DEPTH
MODEL NUMBER ('M' DENOTES MODIFICATION
100M
EXTRA SHELF MODIFICATION DESCRIPTION
BUILDING "L" BUILDING "W"
PROJECT NUMBER:
DATE:
DRAWING INDEX:
100% CONSTRUCTION
DOCUMENTS
8-21-2026
DOC FDCF Unit L Pre-Cast Sealant & Warehouse W Freezer Floor
1550 L St, Fort Dodge, IA
State of Iowa - Department of Administrative Services
9530.00 RFB 953000-01
.0
R F
B
-0
D O
C F
D C
F U n it L
P re
-C a s t
S e a la n t
W a re h o u s e W
F re e z e r
F lo o r
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly registered architect under the laws of the State of Iowa.
Registration Expires
Reg. #
Pages or Sheets covered by this seal:
Signature
Date issued
O L
N AE
ROF
N S
C E
E
WOI A
I D
L P
T C
E C
TI
H
A R
SS I
ERIC J. BADDING 07511
ARCHITECT
As listed above
6-30-2028
ERIC J.
BADDING
07511
ARCHITECTURE
L1.0 FLOOR PLAN AND DETAILS
L2.0 EXTERIOR ELEVATIONS
W1.0 DEMOLITION PLAN AND DETAILS
W2.0 FLOOR PLAN, ELEVATIONS, AND DETAILS
GENERAL
G0.0 COVER
G1.0 SECURITY AND ACCESS PLAN
MATERIALS LEGEND SYMBOLS LEGEND ABBREVIATIONS
ACT Acoustical Ceiling Tile
AFF After Finish Floor
ALUM Aluminum
ADA Americans with Disabilities Act
& And
L Angle
@ At
BCS Baby Changing Station
BOL Bollard
CIP Cast In Place
CBB Cement Backer Board
CL Center Line
CLR Clear
CONC Concrete
CONF Conference
CJ Construction Joint
CONT Continuous
CLJ Control Joint
CG Corner Guard
DIA Diameter
DS Downspout
EA Each
EHD Electric Hand Dryer
EWC Electric Water Cooler
EL Elevation
ELEV Elevation
ENG Engineered
EQ Equal
ETC Etcetera
EPDM Ethylene Propylene DieneTerpolymer
EXP Expansion
EJ Expansion Joint
EXT Exterior
EIFS Exterior Insulation Finish System
FRP Fiberglass Reinforced Panel
FF Finish Floor
FE Fire Extinguisher
FEC Fire Extinguisher Cabinet
FD Floor Drain
FT Foot or Feet
GA Gage
GT Glazing Type
GB Grab Bar
GYP Gypsum
GYP BD Gypsum Board
HM Hollow Metal
HSS Hollow Structural Sections
IR Impact Resistant
IT Information Technology
IMP Insulated Metal Panel
INSUL Insulation
INT Interior
JT Joint
MFR Manufacturer
MAX Maximum
MECH Mechanical
MEPT Mechanical/ Electrical/ Plumbing/ Technology
MTL Metal
MIN Minimum
MIR Mirror
NIC Not In Contract
OC On Center
OHS Overhead Sectional Door
PT Paint
PTD Paper Towel Dispenser
PLAM Plastic Laminate
PVC Polyvinyl Chloride
LB Pound
RCP Reflected Ceiling Plan
REQD Required
REV Reversed
RTU Roof Top Unit
SNR Sanitary Napkin Receptacle
SJ Saw Joint
SIM Similar
SDS Soap Dispenser
STL Steel
STRUCT Structure
TKSP Tack Strip
MIL Thousands of an Inch
TP Toilet Paper Dispenser
TOW Top of Wall
TYP Typical
VERT Vertical w/ With
WD Wood
SCALE:
TRUE
1/2" = 1'-0"3 AERIAL VIEW - VICINITY MAP
NOT TO SCALE
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed
Professional Engineer under the laws of the State of Iowa.
My license renewal date is:
IA Reg. #
Pages or Sheets covered by this seal:
Date
O
L
NA
E
ROF
N S
C E
E
WOI A
I D
L
P
G E
R E
NI
E
N
SS I
12-31-2027
ERIC E. VERMEER 19938
STRUCTURAL ENGINEER
As listed above
ERIC E.
VERMEER
19938
ABC
D
E
F G
P
H
K
W
L
MAIN PARKING
LOT
DOUBLE PERIMETER
PRISON SECURITY FENCE
PERIMETER SECURITY
ROAD (KEEP CLEAR FOR
PATROL VEHICLE)
GATEGATE
YARD FENCE;
TYP
MAIN YARD ACCESS GATE #6
11 FT X 11 FT
GATE
GREEN HOUSE
GATE
MAIN SALLYPORT GATE
GATE
L S
T R
E E
T
AVE 0
AVE 0
AVE 0
STAGING AREA FOR
WAREHOUSE W
CONTRACTOR VEHICLE
PARKING.
STAGING AND
CONSTRUCTION
VEHICLE PARKING AREA
FOR UNIT L.
ACCESS UNIT L USING
THIS STREET.
NO CONSTRUCTION
TRAFFIC ON PERIMETER
SERVICE ROAD.
COORDINATE CONSTRUCTION
ACCESS TO LOADING DOCK BAYS
WITH OWNER OPERATIONS. DOCK
MAY BE USED FOR REEFER TRAILER
PARKING.
DO NOT BLOCK ACCESS
USE DOUBLE DOOR ON
EAST SIDE AS
CONSTRUCTION
PRIMARY ACCESS
B ACDE
F
B ACDEF
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo gg
A ve
A m es , I
A
P h on e:
.2
.0
F a x:
.2
.0
A R
C H
IT
E
C T
F
O
LD
K el lo gg
A ve m es , I
A
P h on e:
.2
.0
F a x:
-2
2-
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
G1.0
SECURITY AND ACCESS
PLAN
D O
C F
D C
F U ni t L
P re
-C as t S ea la nt
W ar eh ou se
W F re ez er F lo or
S ta te o f I ow a
D ep ar tm en t o f A dm in is tr at iv e
S er vi ce s
L S t, F or t D od ge
, I A
8-21-2026
9530.00 RFB 953000-01
100% CONSTRUCTION DOCUMENTS
SECURITY PLAN - NOT TO SCALE
STAGING & SECURITY NOTES
1. ALL CONTRACTOR'S PERSONNEL ARE TO HAVE BACKGROUND CHECKS AND
PREA TRAINING PRE-APPROVED BEFORE BEING ALLOWED ON SITE FOR
WORK.
2. CONTRACTOR'S PERSONNEL ARE TO FOLLOW ALL RULES FOR
CONSTRUCTION WORKERS & ATTEND CONTRACTOR'S PRE-ORIENTATION.
SEE SPECIFICATION FOR REQUIREMENTS.
3. IT IS NOT ANTICIPATED THAT ANY GATE PASSINGS WILL BE NECESSARY FOR
THE CONTRACTOR. HOWEVER, IF A GATE PASSING IS REQUIRED,
CONTRACTOR TO COORDINATE IN ADVANCE WITH FDCF STAFF FOR ALL
GATE PASSINGS. GATE LOCATIONS ARE IDENTIFIED IN THE SKETCH BELOW.
KEEP GATES CLEAR AT ALL TIMES EXCEPT FOR COORDINATED PASSINGS.
4. CONTRACTOR TO COORDINATE PROPOSED DAILY WORK SCHEDULE WITH
FDCF STAFF AND CONSTRUCTION MANAGER. IDENTIFY THE SCOPE FOR
EACH DAY'S WORK AND REQUIRED MATERIALS.
5. ALL WORK AREAS ARE TO BE THOROUGHLY CLEANED UP AT THE END OF
EACH DAY.
6. SEE SPECIFICATION FOR DAILY TOOL INVENTORY REQUIREMENTS. A
STANDARDIZED LIST OF DAILY TOOLS ENTERING AND EXITING IS
PREFERRED. ALL CONSTRUCTION EQUIPMENT MUST BE REMOVED FROM
THE PRISON DAILY TO THE DESIGNATED STAGING AREA.
7. SEE SPECIFICATION FOR WORK HOURS. COORDINATE ANY PROPOSED
EXTENDED WORK HOURS INCLUDING WEEKENDS.
8. PROTECT LAWN FROM EQUIPMENT AND LIFTS. SEE MAP NOTE TO PROTECT
UNDERGROUND UTILITY LINES. OWNER WILL REPAIR LAWN RUTS & RESEED.
ANY OTHER DAMAGE IS RESPONSIBILITY OF CONTRACTOR.
NORTH
A. ALL WORK IS TO BE CONSTRUCTED IN COMPLIANCE WITH STATE BUILDING CODES.
B. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH INDUSTRY STANDARD
PRACTICES.
C. ANY PERMITS AND FEES REQUIRED TO COMPLETE THE WORK SHALL BE INCLUDED
IN THE CONTRACTOR'S BID.
D. DO NOT SCALE DRAWINGS. DIMENSION SCALES MAY VARY.
E. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL DIMENSIONS, MEASUREMENTS,
QUANTITIES, AND SITE CONDITIONS. REPORT ANY DISCREPANCIES TO ARCHITECT
PRIOR TO PROCEEDING WITH WORK.
F. LINEAL FOOTAGES INDICATED FOR SEALANTS ARE APPROXIMATED. CONTRACTOR IS
RESPONSIBLE TO FIELD VERIFY ALL BUILDING CONDITIONS AND SELF-PERFORM
THEIR OWN ESTIMATES.
G. ALL LIGHT FIXTURES, TELEPHONE SHROUDS, AND SIAMESE FIRE CONNECTIONS ARE
TO HAVE A SINGLE BEAD OF SEALANT AROUND PERIMETER OF EACH FIXTURE.
H. ALL SEALANT JOINTS ARE TO BE TOOLED CONCAVE. REPLACE ANY SEALANT THAT
HAS AIR POCKETS OR DOES NOT HAVE PROPER SIDE ADHESION.
I. PROVIDE SEALANT AROUND ALL EXPOSED MISCELLANEOUS UTILITY PENETRATIONS
THAT ARE NOT CALLED OUT ON THE DRAWINGS.
J. PROTECT FINISHED SEALANT AREAS IN YARDS AND AROUND ENTRANCES BY
PROVIDING TEMPORARY TAPE BARRIER ON CONES FOR THE DURATION OF CURE
TIME, APPROX. 5 DAYS UNLESS INDICATED OTHERWISE.
K. COORDINATE CONSTRUCTION DUMPSTER LOCATIONS WITH OWNER. WORK AREAS
ARE TO BE CLEANED UP AT THE END OF EACH DAY. JOB SITE SHALL BE KEPT CLEAN
AT ALL TIMES.
L. PROTECT ADJACENT BUILDING ELEMENTS FROM DAMAGE DURING WORK. REPAIR
ANY DAMAGE TO ADJACENT AREAS.
M. ALL CONSTRUCTION DEBRIS AND WASTE SHALL BE DISPOSED OF OFFSITE IN FULL
COMPLIANCE WITH CURRENT ENVIRONMENTAL REGULATIONS.
N. PATCH ALL CRACKED OR SPALLED CONCRETE AT JOINTS TO REPAIR AND MAINTAIN
JOINT WIDTH. SEE UNIT COST FOR ANY ITEMS NOT IDENTIFIED.
O. ALL OUTSIDE CORNERS IN PRECAST WALLS TYPICALLY HAVE ONE JOINT 3" FROM
THE CORNER.
P. CONTRACTOR SHALL PROTECT LAWN IN WORK AREAS. FACILITY WILL REPAIR ANY
DAMAGED LAWN. GRADE ANY RUTS SMOOTH, RE-SEED, AND WATER TO RE-
ESTABLISH LAWN.
Q. STORE SEALANTS & PRIMERS OUTSIDE PRISON EXCEPT FOR DAILY USE.
R. BLUE PAINT ON DOOR FRAMES HAS BEEN TESTED TO BE POSITIVE FOR LEAD AND
ARE DESIGNATED AS "LEAD-CONTAINING". DOORS REQUIRE ABATEMENT AT
PERIMETER OF FRAMES. GC TO BE LEAD PAINT CERTIFIED, FOR "LEAD-CONTAINING
ITEMS.
S. REPLACE ALL EXISTING SEALANT AT VERTICAL AND HORIZONTAL JOINTS, FIXTURES,
OPENINGS AND PENETRATIONS INCLUDING AT THE BASE OF THE PRECAST WHERE
ABUTTED BY CONCRETE.
1392 SF
GENERATOR
329 SF
EMERG. PWR.
DISTRIBUTION
132 SF
NORM. PWR.
DISTRIBUTION
236 SF
OFFICE / CONTROLS
108 SF
TEL. / RADIO EQUIP.
405 SF
STOR.
2799 SF
BOILER
3713 SF
COOLING EQUIP.
66 SF
STAFF TOILET
841 SF
CORRIDOR
L2.0F4
L2.0
F3
L2.0 F2
L2.0
F1
(E) CONC. PAD
(E) FENCE
(E) CONC. STOOP
(E) CONC. STOOP
(E) GRASS
(E) GRASS
(E) CONC. PAD
(E) CONC. STOOP
(E) GRASS1
(E) GRASS (E) CONC. PAD
KEY PLAN - NOT TO SCALE
ABC
D
E
F G
H
K
NORTH
BUILDING L
BUILDING W
W
INTERIOR
EXTERIOR
ROUGH RAKED FINISH
BACKER ROD
SEALANT JOINT WIDTH VARIES
(E) INSULATED PRECAST, CORDUROY FINISH
CLOSED CELL BACKER ROD
UNDER 25% COMPRESSION
CONCAVE TOOLED SEALANT
1/
W
W
2:1 RATIO WIDTH TO DEPTH
(E) INSULATED PRECAST, CORDUROY FINISH
(E) METAL ROOF EDGE
(E) METAL GUTTER
REPLACE (E) SEALANT AS HIGH AS CAN
BE REACHED WITHOUT REMOVING THE
METAL GUTTERS OR ROOF EDGE
(E) INSULATED PRECAST, CORDUROY FINISH
(E) METAL GRAVEL GUARD
(E) ROCK BALLAST ROOF SYSTEM
(E) METAL ROOF EDGE
REPLACE (E) SEALANT AS HIGH AS CAN
BE REACHED WITHOUT REMOVING THE
METAL ROOF EDGE
(E) INSULATED PRECAST, CORDUROY FINISH
(E) BALLAST ROOF SYSTEM
B ACDE
F
B ACDEF
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo gg
A ve
A m es , I
A
P h on e:
.2
.0
F a x:
.2
.0
A R
C H
IT
E
C T
F
O
LD
K el lo gg es , I
A
P h on e:
.2
.0
F a x:
-2
2-
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
L1.0
FLOOR PLAN AND
DETAILS
D O
C F
D C
F U ni t L
P re
-C as t S ea la nt
W ar eh ou se
W F re ez er F lo or
S ta te o f I ow a
D ep ar tm en t o f A dm in is tr at iv e
S er vi ce s
L S t, F or t D od ge
, I A
8-21-2026
9530.00 RFB 953000-01
100% CONSTRUCTION DOCUMENTS
GENERAL NOTES
SCALE:
TRUE
1/8" = 1'-0"F1 UNIT L - FLOOR PLAN
SCALE: 3" = 1'-0"C4 TYPICAL PRECAST WALL JOINT
SCALE: 12" = 1'-0"D4 SEALANT JOINT DETAIL
SCALE: 1 1/2" = 1'-0"E4 ROOF DETAIL - GUTTER
FLOOR PLAN NOTES
1 COMPLETELY REMOVE AND REPLACE BACKER ROD AND SEALANT IN JOINT BETWEEN
CONCRETE SLAB AND BASE OF PRECAST WALL.
SCALE: 1 1/2" = 1'-0"F4 ROOF DETAIL - ROOF EDGE
A. ALL WORK IS TO BE CONSTRUCTED IN COMPLIANCE WITH STATE BUILDING CODES.
B. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH INDUSTRY STANDARD
PRACTICES.
C. ANY PERMITS AND FEES REQUIRED TO COMPLETE THE WORK SHALL BE INCLUDED
IN THE CONTRACTOR'S BID.
D. DO NOT SCALE DRAWINGS. DIMENSION SCALES MAY VARY.
E. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL DIMENSIONS, MEASUREMENTS,
QUANTITIES, AND SITE CONDITIONS. REPORT ANY DISCREPANCIES TO ARCHITECT
PRIOR TO PROCEEDING WITH WORK.
F. LINEAL FOOTAGES INDICATED FOR SEALANTS ARE APPROXIMATED. CONTRACTOR IS
RESPONSIBLE TO FIELD VERIFY ALL BUILDING CONDITIONS AND SELF-PERFORM
THEIR OWN ESTIMATES.
G. ALL LIGHT FIXTURES, TELEPHONE SHROUDS, AND SIAMESE FIRE CONNECTIONS ARE
TO HAVE A SINGLE BEAD OF SEALANT AROUND PERIMETER OF EACH FIXTURE.
H. ALL SEALANT JOINTS ARE TO BE TOOLED CONCAVE. REPLACE ANY SEALANT THAT
HAS AIR POCKETS OR DOES NOT HAVE PROPER SIDE ADHESION.
I. PROVIDE SEALANT AROUND ALL EXPOSED MISCELLANEOUS UTILITY PENETRATIONS
THAT ARE NOT CALLED OUT ON THE DRAWINGS.
J. PROTECT FINISHED SEALANT AREAS IN YARDS AND AROUND ENTRANCES BY
PROVIDING TEMPORARY TAPE BARRIER ON CONES FOR THE DURATION OF CURE
TIME, APPROX. 5 DAYS UNLESS INDICATED OTHERWISE.
K. COORDINATE CONSTRUCTION DUMPSTER LOCATIONS WITH OWNER. WORK AREAS
ARE TO BE CLEANED UP AT THE END OF EACH DAY. JOB SITE SHALL BE KEPT CLEAN
AT ALL TIMES.
L. PROTECT ADJACENT BUILDING ELEMENTS FROM DAMAGE DURING WORK. REPAIR
ANY DAMAGE TO ADJACENT AREAS.
M. ALL CONSTRUCTION DEBRIS AND WASTE SHALL BE DISPOSED OF OFFSITE IN FULL
COMPLIANCE WITH CURRENT ENVIRONMENTAL REGULATIONS.
N. PATCH ALL CRACKED OR SPALLED CONCRETE AT JOINTS TO REPAIR AND MAINTAIN
JOINT WIDTH. SEE UNIT COST FOR ANY ITEMS NOT IDENTIFIED.
O. ALL OUTSIDE CORNERS IN PRECAST WALLS TYPICALLY HAVE ONE JOINT 3" FROM
THE CORNER.
P. CONTRACTOR SHALL PROTECT LAWN IN WORK AREAS. FACILITY WILL REPAIR ANY
DAMAGED LAWN. GRADE ANY RUTS SMOOTH, RE-SEED, AND WATER TO RE-
ESTABLISH LAWN.
Q. STORE SEALANTS & PRIMERS OUTSIDE PRISON EXCEPT FOR DAILY USE.
R. BLUE PAINT ON DOOR FRAMES HAS BEEN TESTED TO BE POSITIVE FOR LEAD AND
ARE DESIGNATED AS "LEAD-CONTAINING". DOORS REQUIRE ABATEMENT AT
PERIMETER OF FRAMES. GC TO BE LEAD PAINT CERTIFIED, FOR "LEAD-CONTAINING
ITEMS.
S. REPLACE ALL EXISTING SEALANT AT VERTICAL AND HORIZONTAL JOINTS, FIXTURES,
OPENINGS AND PENETRATIONS INCLUDING AT THE BASE OF THE PRECAST WHERE
ABUTTED BY CONCRETE.
Level 1 0"
2 2 2
C O
R N
E R
C O
R N
E R
F4 L1.0
Level 1 0"
13 13 13 13 13 2 2 2 2 2
E4 L1.0
Level 1 0"
1 3 31
2 2 2
4 44
39 14 14
F4 L1.0
Level 1 0"
3 3
C O
R N
E R
2 2 2 2 2
8 8
C O
R N
E R
F4 L1.0
KEY PLAN - NOT TO SCALE
ABC
D
E
F G
H
K
NORTH
BUILDING L
BUILDING W
B ACDE
F
B ACDEF
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo gg
A ve
A m es , I
A
P h on e:
.2
.0
F a x:
.2
.0
A R
C H
IT
E
C T
F
O
LD
K el lo gg es , I
A
P h on e:
.2
.0
F a x:
-2
2-
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
L2.0
EXTERIOR ELEVATIONS
D O
C F
D C
F U ni t L
P re
-C as t S ea la nt
W ar eh ou se
W F re ez er F lo or
S ta te o f I ow a
D ep ar tm en t o f A dm in is tr at iv e
S er vi ce s
L S t, F or t D od ge
, I A
8-21-2026
9530.00 RFB 953000-01
100% CONSTRUCTION DOCUMENTS
EXTERIOR ELEVATION NOTES
1 OPENING, REMOVE AND REPLACE PERIMETER SEALANT - COLOR MATCH OR PAINT TO
MATCH EXISTING BLUE.
2 LIGHTS HAVE BEEN REPLACED, SEAL PRERIMETER OF FIXTURE AND SEAL (2) EXISTING
ABANDONED HOLES BELOW EACH FIXTURE.
3 MECHANICAL LOUVER, REMOVE AND REPLACE PERIMETER SEALANT.
4 CONDUIT HOLE, REMOVE AND REPLACE PERIMETER SEALANT.
5 COMPLETELY REMOVE AND REPLACE BACKER ROD AND SEALANT IN JOINT BETWEEN
CONCRETE SLAB AND BASE OF PRECAST WALL.
6 SECURITY CAMERA CONDUIT, REMOVE AND REPLACE PERIMETER SEALANT.
7 J-BOX, REMOVE AND REPLACE PERIMETER SEALANT..
8 PRECAST KNOCK OUT PANEL, REMOVE AND REPLACE PERIMETER SEALANT.
9 ELECTRIC BOXES, REMOVE AND REPLACE PERIMETER SEALANT.
10 WEATHER STATION PLATE, REMOVE AND REPLACE PERIMETER SEALANT.
11 PATCH EXPOSED REBAR
12 THROUGH WALL PIPE PENETRATION, REMOVE AND REPLACE PERIMETER SEALANT.
13 DOWNSPOUT, REMOVE AND REINSTALL AFTER REPLACING SEALANT IN PRECAST JOINT
BEHIND.
14 (E) WALL MOUNTED PIPE.
GENERAL NOTES
SCALE: 1/8" = 1'-0"F4 UNIT L - EXTERIOR ELEVATION - EAST
SCALE: 1/8" = 1'-0"F3 UNIT L - EXTERIOR ELEVATION - NORTH
SCALE: 1/8" = 1'-0"F2 UNIT L - EXTERIOR ELEVATION - WEST
SCALE: 1/8" = 1'-0"F1 UNIT L - EXTERIOR ELEVATION - SOUTH
B B
C C
D4 W1.0
C4 W1.0
F4 W1.0
(E )3
'X 7'
(E
(2 )3
'X 7'
CU
CU
(E) PARKING LOT
(E) WALK
(E) DRIVE
(E) WALK
(E) WALK
(E) STORAGE
BUILDING
(E) WALK
(E) DRIVE
(E) CONC. PAD
(E) FENCE
(E) GRASS
(E) GRASS
(E) GRASS
(E) GRASS(E) GRASS (E) WALK
(E) DOOR (E) DOOR
(E )8
'X 8'
O H
D (E
)8 'X
8' O
H D
(E)5'X6.5'
(E) BOLLARD (TYP.)
W1.0 C1
SOIL BORING
APPROXIMATE
LOCATION
MIN. 6" DROP
APPROX. 40'-0"
KEY PLAN - NOT TO SCALE
ABC
D
E
F G
H
K
NORTH
BUILDING L
BUILDING W
.0
° 4
.0
.0
12 2
10 10
.0
°4
.0
NOTE:
1. CONSTRUCT SUBDRAIN OUTLET TO DAYLIGHT WITH THE SAME TYPE AND SIZE OF
PIPE AS USED FOR THE SUBDRAIN.
2. PROVIDE A MIN. 1 FOOT RADIUS FOR ALL BENDS OR USE TWO 45 DEGREE FITTINGS.
3. PROVIDE A 6 INCH MIN. DROP IN ELEVATION BETWEEN SUBDRAIN AND OUTLET.
FORESLOPE
MIN. 12" TRENCH FOR OUTLET PIPE
CONCRETE
BLACK DIRT BACKFILL AND HYDROSEED
8"X16"X4" PRECAST
CONCRETE SPLASH
BLOCK
SECTION
PLAN
CONCRETE
(E) SUBGRADE
POROUS BACKFILL
SUBDRAIN CORRIGATED PIPE
FORK TYPE
RODENT GUARD
8"X16"X4" PRECAST
CONCRETE SPLASH
BLOCK
FORK TYPE
RODENT GUARD
BLACK DIRT BACKFILL AND HYDROSEED
GRANULAR FILL
AROUND OUTLET
GRANULAR FILL
AROUND OUTLET
SUBDRAIN PVC PIPE 5' END
SUBDRAIN CORRIGATED PIPE
SUBDRAIN PVC PIPE 5' END
B ACDE
F
B ACDEF
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo gg
A ve
A m es , I
A
P h on e:
.2
.0
F a x:
.2
.0
A R
C H
IT
E
C T
F
O
LD
K el lo gg es , I
A
P h on e:
.2
.0
F a x:
-2
2-
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
W1.0
DEMOLITION PLAN AND
DETAILS
D O
C F
D C
F U ni t L
P re
-C as t S ea la nt
W ar eh ou se
W F re ez er F lo or
S ta te o f I ow a
D ep ar tm en t o f A dm in is tr at iv e
S er vi ce s
L S t, F or t D od ge
, I A
8-21-2026
9530.00 RFB 953000-01
100% CONSTRUCTION DOCUMENTS
SCALE:
TRUE
1/8" = 1'-0"F1 WAREHOUSE W - PARTIAL DEMOLITION PLAN
DEMOLITION PLAN NOTES
1 DEMOLISH 6" CONCRETE CURB
2 REMOVE AND SALVAGE STEEL PLATE THRESHOLD
3 DEMOLISH 4" CONCRETE TOP, 4" INSULATION, AND 4" SLAB-ON-GRADE WITH
6X6-W4.0XW4.0 W.W.F.
4 ESTIMATED CONE OF FROZEN SUB-GRADE. BASE BID TO INCLUDE REMOVAL OF 66 CU
YD OF SUB GRADE THAWING AND REMOVAL. PROVIDE ACTIVE THAWING, MINIMIZE
THAWING TIME WITH GROUND THAWING EQUIPMENT. AFTER SLAB REMOVAL
CONTRACTOR TO SET UP AN ONSITE MEETING TO FURTHER INVESTIGATE THE
EXPOSED SUBGRADE. OWNER TO CONTRACT WITH THIRD PARTY GEOTECHNICAL
ENGINEER TO DETERMINE FINAL EXTENTS OF REMOVAL, FIELD TESTING OF SOIL
MOISTURE CONTENT, SOIL CLASSIFICATION AND WATER TABLE INFLUENCE AND
DOCUMENT FINDINGS. REMOVE EXPANSIVE SOILS TO FROST DEPTH. PLAN FOR
DEWATERING.
5 SHUT DOWN FREEZER CIRCUIT. REMOVE AND SALVAGE WALL MOUNTED FREEZER
UNIT.
6 MOVE EXISTING MODULAR BUILDING AND AFTER WORK IS COMPLETED PLACE BACK ON
SKIDS IN SAME LOCATION AS PRIOR TO THE START OF WORK.
7 EXCAVATE TO INSTALL NEW 4" PERFORATED FABRIC WRAPPED DRAIN TILE WITH
POUROUS BACKFILL
8 HORIZONTAL BORE UNDER SIDEWALK TO INSTALL NEW 4" PERFORATED FABRIC
WRAPPED DRAIN TILE WITH POUROUS BACKFILL
9 EXCAVATE AND INSTALL 4" PERFORATED DOUBLE-WALLED HDPE FABRIC WRAPPED
DRAIN TILE WITH GRANULAR BACKFILL AND 6" MIN. TOP SOIL. CONTRACTOR TO
HYDROSEED THE DISTURBED AREA.
10 DAYLIGHT DRAIN TILE, SEE DETAIL C1/W1.0 FOR MORE DETAIL
11 COMPLETELY REMOVE AND REPLACE BACKER ROD AND SEALANT IN JOINT BETWEEN
CONCRETE SLAB AND BASE OF PRECAST WALL.
12 ELECTRICAL PULL BOX, HAND DIGGING REQUIRED AT THIS LOCATION.
SCALE: 1/4" = 1'-0"F4 DEMOLITION SECTION
SCALE: 1/4" = 1'-0"D4 DEMOLITION SECTION
SCALE: 1/4" = 1'-0"C4 DEMOLITION SECTION
DEMOLITION SECTION NOTES
1 DEMOLISH (2) 4" SLABS, INCLUDING REINFORCING, CURBS, VAPOR BARRIER, AND 4"
RIGID INSULATION TO EXTENTS SHOWN.
2 CAUTION! EXCERCISE EXTREME CARE TO PROTECT FREEZER PANELS TO REMAIN.
3 REMOVE LOOSE AND REPLACE WITH NEW GROUT TO PROVIDE CONTINUOUS SUPPORT
FOR PRECAST PANELS.
4 NOTE: DO NOT EXCAVATE BEYOND A 45 DEGREE ANGLE OF INCIDENCE FROM THE
REMAINING SLAB AND FREEZER PANEL. CONTACT ENGINEER IF FROZEN SUB-GRADE
EXTENDS INTO THIS ZONE.
5 ESTIMATED CONE OF FROZEN SUB-GRADE. BASE BID TO INCLUDE REMOVAL OF 66 CU
YD OF SUB GRADE THAWING AND REMOVAL. PROVIDE ACTIVE THAWING, MINIMIZE
THAWING TIME WITH GROUND THAWING EQUIPMENT. AFTER SLAB REMOVAL
CONTRACTOR TO SET UP AN ONSITE MEETING TO FURTHER INVESTIGATE THE
EXPOSED SUBGRADE. OWNER TO CONTRACT WITH THIRD PARTY GEOTECHNICAL
ENGINEER TO DETERMINE FINAL EXTENTS OF REMOVAL, FIELD TESTING OF SOIL
MOISTURE CONTENT, SOIL CLASSIFICATION AND WATER TABLE INFLUENCE AND
DOCUMENT FINDINGS. REMOVE EXPANSIVE SOILS TO FROST DEPTH. PLAN FOR
DEWATERING.
6 COMPLETELY REMOVE AND REPLACE BACKER ROD AND SEALANT IN JOINT BETWEEN
CONCRETE SLAB AND BASE OF PRECAST WALL.
7 EXISTING PRECAST PANEL.
8 EXISTING FREEZER PANELS.
9 EXISTING CONCRETE FOUNDATION WALL.
10 EXISTING CONCRETE SLAB.
SCALE: 1 1/2" = 1'-0"C1 SUBDRAIN OUTLET
1 Date 1 Revision 1
6 7
12 13 12 14 15 16
21 21
12 13 12 14 1516
21 21
16 16 16
KEY PLAN - NOT TO SCALE
ABC
D
E
F G
H
K
NORTH
BUILDING L
BUILDING W
3 3 3 3
B C
23 3 3 3
B B
C C
W2.0 F3
W2.0
C3
C4 W2.0
C1 W2.0
FREEZER STORAGE
REFRIG.
COOLER STORAGE
LOADING DOCK
(E) DOOR (E) DOOR
(E) BOLLARD (TYP.)
CU
CU
(E) ASPHALT PARKING LOT
(E) WALK
(E) DRIVE
(E) WALK
(E) WALK
(E) STORAGE
BUILDING
(E) WALK
(E) DRIVE
(E) CONC. PAD
(E) FENCE
(E) GRASS
(E) GRASS
(E) GRASS
(E) GRASS
(E) GRASS
(E) WALK
(E )8
'X 8'
O H
D (E
)8 'X
8' O
H D
(E)5'X6.5'
(E )3
'X 7'
(E
(2 )3
'X 7'
CONCRETE
CONTROL JOINT
W1.0 C1
(E) GRASS
MIN. 6" DROP
APPROX. 40'-0"
A. ALL WORK IS TO BE CONSTRUCTED IN COMPLIANCE WITH STATE BUILDING CODES.
B. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH INDUSTRY STANDARD
PRACTICES.
C. ANY PERMITS AND FEES REQUIRED TO COMPLETE THE WORK SHALL BE INCLUDED
IN THE CONTRACTOR'S BID.
D. DO NOT SCALE DRAWINGS. DIMENSION SCALES MAY VARY.
E. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL DIMENSIONS, MEASUREMENTS,
QUANTITIES, AND SITE CONDITIONS. REPORT ANY DISCREPANCIES TO ARCHITECT
PRIOR TO PROCEEDING WITH WORK.
F. LINEAL FOOTAGES INDICATED FOR SEALANTS ARE APPROXIMATED. CONTRACTOR IS
RESPONSIBLE TO FIELD VERIFY ALL BUILDING CONDITIONS AND SELF-PERFORM
THEIR OWN ESTIMATES.
G. ALL LIGHT FIXTURES, TELEPHONE SHROUDS, AND SIAMESE FIRE CONNECTIONS ARE
TO HAVE A SINGLE BEAD OF SEALANT AROUND PERIMETER OF EACH FIXTURE.
H. ALL SEALANT JOINTS ARE TO BE TOOLED CONCAVE. REPLACE ANY SEALANT THAT
HAS AIR POCKETS OR DOES NOT HAVE PROPER SIDE ADHESION.
I. PROVIDE SEALANT AROUND ALL EXPOSED MISCELLANEOUS UTILITY PENETRATIONS
THAT ARE NOT CALLED OUT ON THE DRAWINGS.
J. PROTECT FINISHED SEALANT AREAS IN YARDS AND AROUND ENTRANCES BY
PROVIDING TEMPORARY TAPE BARRIER ON CONES FOR THE DURATION OF CURE
TIME, APPROX. 5 DAYS UNLESS INDICATED OTHERWISE.
K. COORDINATE CONSTRUCTION DUMPSTER LOCATIONS WITH OWNER. WORK AREAS
ARE TO BE CLEANED UP AT THE END OF EACH DAY. JOB SITE SHALL BE KEPT CLEAN
AT ALL TIMES.
L. PROTECT ADJACENT BUILDING ELEMENTS FROM DAMAGE DURING WORK. REPAIR
ANY DAMAGE TO ADJACENT AREAS.
M. ALL CONSTRUCTION DEBRIS AND WASTE SHALL BE DISPOSED OF OFFSITE IN FULL
COMPLIANCE WITH CURRENT ENVIRONMENTAL REGULATIONS.
N. PATCH ALL CRACKED OR SPALLED CONCRETE AT JOINTS TO REPAIR AND MAINTAIN
JOINT WIDTH. SEE UNIT COST FOR ANY ITEMS NOT IDENTIFIED.
O. ALL OUTSIDE CORNERS IN PRECAST WALLS TYPICALLY HAVE ONE JOINT 3" FROM
THE CORNER.
P. CONTRACTOR SHALL PROTECT LAWN IN WORK AREAS. FACILITY WILL REPAIR ANY
DAMAGED LAWN. GRADE ANY RUTS SMOOTH, RE-SEED, AND WATER TO RE-
ESTABLISH LAWN.
Q. STORE SEALANTS & PRIMERS OUTSIDE PRISON EXCEPT FOR DAILY USE.
R. BLUE PAINT ON DOOR FRAMES HAS BEEN TESTED TO BE POSITIVE FOR LEAD AND
ARE DESIGNATED AS "LEAD-CONTAINING". DOORS REQUIRE ABATEMENT AT
PERIMETER OF FRAMES. GC TO BE LEAD PAINT CERTIFIED, FOR "LEAD-CONTAINING
ITEMS.
S. REPLACE ALL EXISTING SEALANT AT VERTICAL AND HORIZONTAL JOINTS, FIXTURES,
OPENINGS AND PENETRATIONS INCLUDING AT THE BASE OF THE PRECAST WHERE
ABUTTED BY CONCRETE.
B ACDE
F
B ACDEF
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo gg
A ve
A m es , I
A
P h on e:
.2
.0
F a x:
.2
.0
A R
C H
IT
E
C T
F
O
LD
K el lo gg es , I
A
P h on e:
.2
.0
F a x:
-2
2-
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
W2.0
FLOOR PLAN,
ELEVATIONS, AND
DETAILS
D O
C F
D C
F U ni t L
P re
-C as t S ea la nt
W ar eh ou se
W F re ez er F lo or
S ta te o f I ow a
D ep ar tm en t o f A dm in is tr at iv e
S er vi ce s
L S t, F or t D od ge
, I A
8-21-2026
9530.00 RFB 953000-01
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"C3 WAREHOUSE W - EXTERIOR ELEVATION - SOUTH
SCALE: 1/8" = 1'-0"F3 WAREHOUSE W - EXTERIOR ELEVATION - WEST
SCALE: 1/4" = 1'-0"C4 BUILDING SECTION
SCALE: 1/4" = 1'-0"C1 BUILDING SECTION
SCALE:
TRUE
1/8" = 1'-0"F1 WAREHOUSE W - PARTIAL FLOOR PLAN
FLOOR PLAN NOTES
1 NEW 5"x5" CONCRETE CURB
2 REINSTALL STEEL PLATE THRESHOLD
3 COMPACT SUBGRADE AND INSTALL NEW ROCK DRAINAGE LAYER TO FROST DEPTH
4 NEW 4" CONCRETE TOP, POLY VAPOR BARRIER, UNDER SLAB AND WRAP UP TO TOP OF
CURB - TAPE SEAMS, 4" POLYISO INSULATION, AND 4" SLAB-ON-GRADE WITH
6X6-W4.0XW4.0 W.W.F. - SEE STRUCTURE FOR CONTROL JOINTS
5 RE-ENERGIZE FREEZER CIRCUIT AND REINSTALL WALL MOUNTED FREEZER UNIT.
SLOWLY BRING SLAB BACK TO OPERATING TEMP - AVOID THERMAL SHOCK.
6 MOVE EXISTING MODULAR BUILDING AND AFTER WORK IS COMPLETED PLACE BACK ON
SKIDS IN SAME LOCATION AS PRIOR TO THE START OF WORK.
7 EXCAVATE TO INSTALL NEW 4" PERFORATED FABRIC WRAPPED DRAIN TILE WITH
POUROUS BACKFILL
8 HORIZONTAL BORE UNDER SIDEWALK TO INSTALL NEW 4" PERFORATED FABRIC
WRAPPED DRAIN TILE WITH POUROUS BACKFILL
9 EXCAVATE AND INSTALL 4" PERFORATED DOUBLE-WALLED HDPE FABRIC WRAPPED
DRAIN TILE WITH GRANULAR BACKFILL AND 6" MIN. TOP SOIL. CONTRACTOR TO
HYDROSEED THE DISTURBED AREA.
10 DAYLIGHT DRAIN TILE, SEE DETAIL C1/W1.0 FOR MORE DETAIL
11 COMPLETELY REMOVE AND REPLACE BACKER ROD AND SEALANT IN JOINT BETWEEN
CONCRETE SLAB AND WALL.
12 4" CORRUGATED, PERFORATED DRAIN TILE WITH SILT SOCK. SLOPE TO SOUTH. CORE
DRILL OPENING THROUGH FOOTING BELOW TOP ROW OF REINFORCEMENT.
13 ELECTRICAL PULL BOX, HAND DIGGING REQUIRED AT THIS LOCATION.
14 CORE THROUGH EXISTING FOOTING, PROVIDE PVC FOR CORRIGATED PIPE TO RUN
THROUGH AND TIE UNDERSLAB SUBDRAIN INTO EXTERIOR SUBDRAIN TO DAYLIGHT.
EXTERIOR ELEVATION NOTES
1 REMOVE ALL LOOSE/SPALLED AND REPLACE WITH NEW NON-SHRINK GROUT IN
PRECAST BASE JOINT. PERFORM WORK IN SECTIONS TO ENSURE SUPPORT OF
PRECAST PANELS IS NOT COMPROMISED. GROUT FULL DEPTH OF VOID REMAINING
AFTER REMOVAL AND PROVIDE TAPERED EDGE ON EXTERIOR EXPOSED SIDE.
2 MOVE EXISTING MODULAR BUILDING AND AFTER WORK IS COMPLETED PLACE BACK ON
SKIDS IN SAME LOCATION AS PRIOR TO THE START OF WORK.
3 REMOVE AND REPLACE BACKER ROD AND SEALANT AT PRECAST JOINT. EXTEND
BACKER ROD AND SEALANT UP BEHIND THE METAL PARAPET FLASHING ENSURING
THAT JOINT IS SEALED COMPLETELY TO THE UNDERSIDE OF THE PARAPET BLOCKING.
EXTEND DOWN AND ONTO TOP OF CONCRETE FOOTING OR FOUNDATION WALL.
4 COMPLETELY REMOVE AND REPLACE BACKER ROD AND SEALANT IN JOINT BETWEEN
CONCRETE SLAB AND WALL.
5 EXISTING METAL PARAPET FLASHING.
6 EXISTING PRECAST PANELS.
7 EXISTING CONCRETE FOUNDATION WALL.
8 COORDINATE CONSTRUCTION ACCESS TO LOADING DOCK BAYS WITH OWNER
OPERATIONS.
BUILDING SECTION NOTES
1 5"x5" CONCRETE CURB WITH CONTINUOUS #4 BAR AND #4 VERTICAL DOWELS SET IN
SLAB BELOW AT 1'-4" O.C.
2 EXISTING FREEZER PANELS. PROTECT.
3 EXISTING FREEZER DOOR. PROTECT.
4 RE-SET EXISTING DOOR THRESHOLD WITH NEW, RECESSED CONCRETE FASTENERS
AND IN A BED OF EPOXY SEALANT.
5 RE-SET EXISTING MODULAR STORAGE BUILDING ON SKIDS AFTER WORK IS COMPLETE.
6 GRAVEL AGGREGATE. REPLACE AND RE-DRESS AS NECESSARY TO RETURN AREA TO
EXISTING CONDITION. PROVIDE POSITIVE SLOPE AWAY FROM BUILDING.
7 EXISTING ASPHALT SURFACE. PROTECT.
9 4" CORRUGATED, PERFORATED DRAIN TILE WITH SILT SOCK.
10 CORE THROUGH EXISTING FOOTING, PROVIDE PVC FOR CORRIGATED PIPE TO RUN
THROUGH AND TIE UNDERSLAB SUBDRAIN INTO EXTERIOR SUBDRAIN TO DAYLIGHT.
11 STRUCTURAL FILL. QUALIFY WITH GEOTECHNICAL ENGINEER AND COMPACT IN LIFTS.
COORDINATE TESTING WITH GEOTECHNICAL.
12 4" CONCRETE SLAB WITH WWF6X6-W1.4XW1.4.
13 4" THICK 40 PSF HIGH LOAD XPS RIGID INSULATION. PROVIDE TIGHT JOINTS
THROUGHOUT, INCLUDING AT PERIMETER EXISTING FREEZER PANELS. SEAL ALL
JOINTS CONTINUOUSLY.
14 15 MIL VAPOR BARRIER. WRAP UP SIDES ON FACE OF FREEZER PANELS TO THE
FINISHED FLOOR ELEVATION.
15 WASHED AGGREGATE.
16 4" CORRUGATED, PERFORATED DRAIN TILE WITH SILT SOCK. SLOPE TO SOUTH. CORE
DRILL OPENING THROUGH FOOTING BELOW TOP ROW OF REINFORCEMENT.
17 REPLACE NON-SHRINK GROUT FULL DEPTH OF PRECAST PANEL. SLOPE EXTERIOR
EDGE. REPLACE IN SECTIONS TO NOT COMPROMISE PANEL BEARING.
18 EXISTING CONCRETE FOOTING.
19 EXISTING PRECAST PANEL.
20 REPLACE BACKER ROD AND SEALANT AT JOINT BETWEEN PAVING AND CONCRETE
FOUNDATION WALL.
21 PROVIDE 1'-6" #4 DOWEL @ 16" O.C. AT PERIMETER OF SLAB. DRILL, DOWEL, AND
EPOXY WITH 6" EMBEDMENT.
GENERAL NOTES