RFB952400-01 - Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- RFB952400-01
- Issued by
- Jasper County, Iowa
About this file
This file contains the bidding drawings for a Request for Bid (RFB #952400-01) issued by the Iowa Department of Administrative Services for concrete repairs to the Sallyport and Living Unit B utility tunnel lids and walls at the Anamosa State Penitentiary located at 406 N High Street, Anamosa, Iowa 52205. The project involves demolition and replacement of tunnel lids, repair of existing stone masonry walls, installation of new reinforced concrete pavement, and associated structural work. The drawings were issued for bid on September 4, 2026, and include site plans, structural details, demolition plans, planting and signage details, and specifications for concrete work, reinforcing steel, and related construction requirements. The scope encompasses 8-inch reinforced PCC paving with #5 bars at 18-inch spacing, tunnel wall repairs with doweled connections into existing masonry, temporary support systems for existing utilities, and coordination of work around occupied facility areas. All work must maintain emergency vehicle access throughout construction, and tunnels cannot be left open overnight—they must be capped with either new concrete lids or temporary steel plates daily.
The project specifications establish requirements for concrete compressive strength of 4,000 PSI at 28 days, use of high early strength M-mix concrete to minimize drive closures, epoxy-coated reinforcing steel, and integral crystalline waterproofing admixtures. Special inspections are required for reinforced concrete construction, including verification of reinforcing steel placement, concrete testing (compressive strength, slump, air content), and anchoring of post-installed elements in hardened concrete. The contractor must submit concrete mix designs and pour schedules for approval prior to work commencement and schedule a pre-construction meeting at least five business days before starting construction. Contractors are responsible for all means and methods of construction, temporary bracing and supports during erection, site safety, debris removal, and replacement of any pavement or structures damaged during construction at no additional cost to the state. All materials and work must conform to the 2024 International Building Code, Iowa Department of Transportation specifications, and the Iowa Statewide Urban Design and Specifications (SUDAS).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB952400-01 - Addendum 01.pdf | ||
| RFB952400-01 - Bid Form.pdf | ||
| RFB952400-01 - Project Manual.pdf | ||
| RFB952400-01 - Notice to Bidders.pdf | ||
| 1444262-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
DESIGNATED STAGING AREA
AREA OF WORK
SHEET INDEX CERTIFICATIONS
A B C D E F
A B C D E F9 /3
/2
:0 :1
P
M
A u to d e s k D o c s
/I D
A S
D
O C
A n a m o s a S a lly p o rt
T u n n e l R e p a ir
/2 -S
-R .r v t
G000
D O
C A
S P
S A
L L
Y P
O R
T T
U N
N E
L
L
IV
IN
G
U N
IT
B
T U
N N
E L
R E
P A
IR
D A
S P
R O
J E
C T
N O
.0
N
H
IG
H S
T R
E E
T A
N A
M O
S A
IA
P R
O J E
C T
N U
M B
E R
IS
S
U E
D F
O R
B
ID
P
R O
J E
C T
I S
S U
E D
A T
E
/0
/2
DOC ASP SALLYPORT TUNNEL & LIVING UNIT B
TUNNEL REPAIR
DAS PROJECT NO: 9524.00
406 N HIGH STREET
ANAMOSA, IA 52205
SHEET LIST
SHEET NAME
G000 COVER SHEET
C101 SITE PLAN
L000 COVER SHEET
LD001 DEMOLITION PLAN
L100 SITE PLAN
L400 PLANTING PLAN
L500 DETAILS
L600 SIGNAGE DETAILS
S000 STRUCTURAL GENERAL INFORMATION AND SPECIAL INSPECTIONS
S101 SALLYPORT TUNNEL PLAN, SECTIONS, AND DETAILS
S102 LIVING UNIT B TUNNEL PHOTOS AND DETAILS
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Matthew A. Mettemeyer
G AND S SHEETS
20396
STRUCTURAL ENGINEER
NOT TO SCALEX
PROJECT MAP
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Kyle Lawson
C SHEETS
P26414
CIVIL ENGINEER
.7
.0
S
H
IV
E -H
A T
T E
R Y
.C O
M
NOT TO SCALEXX
STAGING MAP
RFB #952400-01
L600 SIGNAGE DETAILS
S000 STRUCTURAL GENERAL INFORMATION AND SPECIAL INSPECTIONS
S101 SALLYPORT TUNNEL PLAN, SECTIONS, AND DETAILS
S102 LIVING UNIT B TUNNEL PHOTOS AND DETAILS
/0
8/
9-8-2026
9-8-2026
METAL STAIRS
CONCRETE
HIGH BARBED WIRE FENCE
CONCRETE
CONCRETE
CONCRETE
GRASS
GRASS
STANDARD CURB
ROLLED CURB
UNKNOWN UTILITY
8" PCC REINFORCED PAVING - #5 BARS AT
18" SPACING. CONTRACTOR TO USE HIGH
EARLY STRENGTH (M-MIX) CONCRETE TO
MINIMIZE DRIVE CLOSURES (TYP)
MATCH EXISTING GRADES AT
REMOVAL LIMITS (TYP)
7.8'
COORDINATE BARRICADE
RELOCATION WITH FACILITY
PROVIDE POSITIVE DRAINAGE AND
CONSISTENT SLOPES THROUGH
PAVEMENT REPLACEMENT AREA (TYP)
PROTECT EXISTING
PCC PAVING (TYP)
ANAMOSA STATE PENITETIARY
REMOVE AND DISPOSE OF
EXISTING PAVING FULL
DEPTH TO NEAREST JOINT
OR HALF JOINT (TYP)
.1
REMOVE AND REPLACE EXISTING
ROLLED CURB (TYP). MATCH
EXISTING HEIGHT AND STYLE
REMOVE AND REPLACE EXISTING
ROLLED CURB (TYP). MATCH
EXISTING HEIGHT AND STYLE
PROTECT EXISTING BUILDING (TYP)
PROTECT EXISTING FENCING (TYP)
SIDEWALK
CLOSED SIGN
SIDEWALK
CLOSED SIGN
EXISTING OPERABLE GATE (FOR REFERENCE ONLY)
TUNNEL LID - SEE SHEET
S101 FOR DETAILS (TYP)
INSTALL WALKING MAT OVER
TRENCHES AND GRASS TO
CONNECT EXISTING SIDEWALKS
CONTRACTOR TO LOCATE WATER
LINE AND UNKNOWN UTILITY PRIOR
TO CONSTRUCTION AND TO PROTECT
DURING CONSTRUCTION
8" PCC REINFORCED PAVING - #5 BARS AT
18" SPACING. CONTRACTOR TO USE HIGH
EARLY STRENGTH (M-MIX) CONCRETE TO
MINIMIZE DRIVE CLOSURES (TYP)
7.
2'
9.6' 3.6'
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C101
SI
TE
P
LA
N
BD
D
KA
L
BI
D
/0
4/
.0
N
HI
G H
ST
RE
ET
D O
C A
SP
S
AL
LY
PO
R
T
TU
N N
EL
L
IV
IN
G
U N
IT
B
T U
N N
EL
R
EP
AI
R
DA
S
PR
O
JE
CT
N O
: 9
4.
AN
AM
O
SA
, I A
\\s h.
sh ive
-h at te ry
.c om
\D
AT
A\ Pr oj ec ts \2
6\
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
- S
IT
E
PL
AN
.d wg 9/
3/
2:
:0
PM
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B
A B C D E F
C D E F
PHASING NOTES:
1. EMERGENCY VEHICLE ACCESS SHALL BE
PROVIDED TO THE FACILITY AT ALL TIMES.
2. CONTRACTOR TO PROVIDE MEANS TO
ALLOW EMERGENCY VEHICLE ACCESS
THROUGH PROJECT AREA. GRANULAR
MATERIAL AND STEEL PLATES SHALL BE
MADE AVAILABLE ADJACENT TO ACTIVE
TRENCHING AND CONCRETE REMOVAL
AREAS THROUGHOUT THE PROJECT.
3. STEEL PLATES SHALL BE EMERGENCY
VEHICLE TRAFFIC RATED (1.5" THICK
MINIMUM), SHALL EXTEND AT LEAST 18"
PAST OPENING IN EACH DIRECTION AND
SHALL HAVE EYE BOLTS THAT A CHAIN CAN
EASILY CONNECT TO.
4. CONSTRUCTION SHALL BE PHASED IN A WAY
THAT MAINTAINS EMERGENCY ACCESS
THROUGHOUT THE PROJECT.
CONSTRUCTION STAGING NOTES
1. CONTRACTOR SHALL COORDINATE ALL STAGING AREAS WITH THE FACILITY AND CONSTRUCTION MANAGER.
2. CONTRACTOR SHALL REPLACE ALL PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES AT THE END OF CONSTRUCTION.
CONTRACTOR TO PROVIDE PHOTO DOCUMENTATION OF EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
3. CONTRACTOR SHALL PROVIDE BARRICADES, FENCING OR OTHER DEVICES TO KEEP UNAUTHORIZED PERSONNEL OUT OF
PROJECT SITE.
4. CONTRACTOR WILL BE REQUIRED TO HAVE STEEL PLATES OR TEMPORARY ROCK ON SITE TO MAINTAIN EMERGENCY ACCESS AT ALL TIMES. ANYTIME THE CONTRACTOR IS NOT ON SITE THE DRIVES MUST BE LEFT IN A CONDITION THAT
EMERGENCY ACCESS CAN BE PROVIDED.
TRAFFIC AND PEDESTRIAN CONTROL NOTES
1. CONTRACTOR TO COORDINATE WITH FACILITY PRIOR TO CLOSING DOWN GATES DURING CONSTRUCTION. ACCESS TO ADJACENT BUILDINGS, DRIVES, PARKING AND SIDEWALKS ARE TO BE MAINTAINED THROUGHOUT CONSTRUCTION UNLESS
APPROVED BY OWNER.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL TRAFFIC DURING CONSTRUCTION AND PROVIDE ADEQUATE
TRAFFIC AND PEDESTRIAN CONTROL AND SIGNAGE.
3. CONTRACTOR TO INSTALL AND MAINTAIN CONSTRUCTION FENCE AROUND ALL AREAS OF ACTIVE CONSTRUCTION.
CONTRACTOR SHALL ASSUME PEDESTRIAN TRAFFIC WILL BE IN THE AREA THROUGHOUT THE PROJECT DURATION.
4. CONTRACTOR TO COORDINATE CONSTRUCTION ACCESS, STAGING AND PARKING AREAS WITH FACILITY AND
CONSTRUCTION MANAGER AND MINIMIZE IMPACTS TO FACILITY'S OPERATIONS.
DEMOLITION NOTES
1. REMOVAL REQUIREMENTS SHOWN ON THE PLANS SHOULD BE CONSIDERED MINIMUM REMOVAL AND REPLACEMENT REQUIREMENTS. CONTRACTORS SHALL ADJUST REMOVAL LIMITS AND DIMENSIONS AS REQUIRED BY CONSTRUCTION MEANS AND METHODS AND ACTUAL SITE CONDITIONS. CONTRACTORS SHOULD FACTOR ADDITIONAL ANTICIPATED REMOVAL AND REPLACEMENT REQUIREMENTS INTO THEIR BIDS AS ADDITIONAL COMPENSATION REQUESTS FOR ADJUSTED OR EXPANDED REMOVAL LIMITS REQUIRED BY CONTRACTOR MEANS AND METHODS WILL NOT BE APPROVED.
2. CONTRACTOR SHALL REPLACE AT NO COST TO THE STATE ALL DAMAGED STREETS, DRIVES, SIDEWALKS, CURB AND GUTTER, SIGNS, PAVEMENT MARKINGS, LIGHTS, FENCES AND ALL OTHER SURFACE STRUCTURES NOT SCHEDULED TO BE
REMOVED DURING THE COURSE OF THE WORK.
3. WHERE A SECTION OF PAVEMENT, CURB AND GUTTER OR SIDEWALK IS CUT OR OTHERWISE DAMAGED BY THE CONTRACTOR, THE ENTIRE SECTION SHALL BE REMOVED AND REPLACED. PAVEMENT, CURBS AND GUTTERS AND SIDEWALKS SHALL BE REMOVED TO THE NEAREST JOINT A MINIMUM OF TWO FEET BEYOND THE EDGE OF ALL EXCAVATIONS. CONTRACTOR SHALL DOCUMENT (OR PHOTOGRAPH) ALL CRACKED PCC PAVEMENT OR DAMAGED HMA PAVEMENT PRIOR TO CONSTRUCTION. IF NEW CRACKS IN PCC PAVEMENT DEVELOP OR HMA PAVEMENT IS DAMAGED DUE TO CONSTRUCTION TRAFFIC (EXTENDS BEYOND CONSTRUCTION LIMITS), THE CONTRACTOR SHALL REPLACE THE
DAMAGED AREA AT NO ADDITIONAL COST TO STATE.
GRADING AND EROSION CONTROL NOTES
1. THE DISTURBED CONSTRUCTION AREA IS LESS THAN 1 ACRE, SO AN NPDES GENERAL PERMIT NO. 2 AND STORMWATER
POLLUTION PREVENTION PLAN (SWPPP) ARE NOT REQUIRED.
2. BEST MANAGEMENT PRACTICES (BMPs) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY CONSTRUCTION
MANAGER OR OWNER'S REPRESENTATIVE.
3. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED AND
PROPERLY TREATED OR DISPOSED.
4. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN
AND CLEAN UP FUEL OR CHEMICAL SPILLS AND LEAKS.
5. DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS
FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
6. RUBBISH, TRASH, GARBAGE, LITTER OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS.
MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER
DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
7. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS
MUST BE REMOVED IMMEDIATELY.
8. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE IOWA DNR, US EPA AND LOCAL REGULATIONS DEALING WITH
STORMWATER RUNOFF AND EROSION CONTROL.
9. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL EXCESS SOIL MATERIAL CREATED BY THE PROJECT
PAVEMENT GENERAL NOTES
1. ALL PROPOSED PAVEMENT PATCHES ARE APPROXIMATE ONLY AND SHOULD BE CONSIDERED MINIMUM REMOVAL EXTENTS. EXTEND AND ADJUST PAVEMENT PATCHES AS REQUIRED WITH PRIOR APPROVAL BY ENGINEER.
2. ALL SLOPES IN PAVEMENT SHALL BE UNIFORM TO AVOID PONDING. ANY PONDING ON PAVEMENT PATCHES, NEW PAVING
OR ADJACENT PAVING WILL BE CONSIDERED UNACCEPTABLE AND SHALL BE REPLACED.
3. USE TYPE "A" COMPACTION PER IOWA DOT STANDARD SPECIFICATIONS ON SUBGRADE AND SUBBASE.
SPECIFICATIONS
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) SHALL APPLY TO ALL SITE
WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN.
A. CONCRETE PAVING
CONCRETE: MATERIALS AND MIXING FOR ALL CONCRETE WORK, UNLESS OTHERWISE SPECIFIED, SHALL CONFORM TO IOWA
DOT SPECIFICATIONS FOR AIR-ENTRAINED TYPE M-4 OR C-4 MIX WITH TYPE I CEMENT.
FLY ASH (CONTRACTOR'S OPTION): ASTM C618, TYPE C, NOT TO EXCEED 15% OF CEMENTITIOUS MATERIAL.
COARSE AGGREGATE: DURABILITY SHALL BE CLASS III, 3/4" MAX.
COMPRESSIVE STRENGTH: 2800 PSI @ 7 DAYS AND 4000 PSI @ 28 DAYS
SLUMP: 3" ± 1" or 8" MAXIMUM WITH SUPER PLASTICIZER OR AS APPROVED BY GEOTECHNICAL ENGINEER
AIR CONTENT: 7.0% ± 1.0% OR AS APPROVED BY GEOTECHNICAL ENGINEER
WATER/CEMENT RATIO: NOT TO EXCEED 0.488 FOR TYPE C-4 MIX AND NOT TO EXCEED .400 FOR TYPE M-4 MIX
FINISH: HEAVY BROOM FINISH
TESTING: ONE SET OF TEST CYLINDERS REQUIRED FOR EACH 100 CY, OR PORTION THEREOF, OF CONCRETE POURED PER WORK LOCATION. CONCRETE TESTING TO BE DONE AND PAID FOR BY OWNER. CONTRACTOR SHALL COORDINATE AND
SCHEDULE ALL REQUIRED TESTING AND GEOTECHNICAL WORK WITH CONSTRUCTION MANAGER.
SURFACE CURING: CONTRACTOR SHALL APPLY WHITE PIGMENT LIQUID CURING COMPOUND IN A FINE SPRAY TO FORM CONTINUOUS UNIFORM FILM AFTER FINISHING AND SURFACE MOISTURE HAS DISAPPEARED OR WITHIN 30 MINUTES AFTER
FORMS ARE REMOVED.
SUBMIT CONCRETE MIX DESIGN FOR APPROVAL.
COLD WEATHER CONCRETE: WHEN THE ATMOSPHERIC AIR TEMPERATURE MAY BE EXPECTED TO DROP BELOW 40°F AT THE TIME CONCRETE IS DELIVERED TO THE WORK SITE, DURING PLACEMENT OR AT ANY TIME DURING CURING PERIOD, CONCRETE SHALL BE MIXED, PLACED AND PROTECTED IN ACCORDANCE WITH ACI STANDARD 306, "RECOMMENDED PRACTICE FOR COLD WEATHER CONCRETING." IT IS THE OWNER'S PREFERENCE TO AVOID COLD WEATHER CONCRETE AND PROVIDE TEMPORARY
GRANULAR SURFACING FOR SIDEWALK AND PAVING AS REQUIRED.
B. JOINT SEALANT
PAVING JOINTS SHALL BE SEALED PER IOWA DOT SPECIFICATIONS. BACKER ROD SHALL NOT BE USED FOR JOINT SEALING.
C. PAVEMENT JOINTING
PROVIDE IDOT TYPE 'C' JOINTS FOR JOINTS IN DRIVES AND PAVEMENT. PROVIDE JOINTS AT A MAXIMUM SPACING OF 12 FEET
FOR PAVING OR SQUARE PANELS FOR SIDEWALKS.
PROVIDE IDOT TYPE 'RD' OR TYPE 'BT' JOINTS TO TIE INTO EXISTING CONCRETE PAVING.
PROVIDE IDOT TYPE 'DW' JOINTS FOR END OF DAY PAVING.
SAW CUTTING TO BE COMPLETED A MAXIMUM OF 24 HOURS FROM CONCRETE PLACEMENT. RANDOM CRACKING CAUSED BY
DELAYED SAW CUTTING MAY REQUIRE REMOVAL AND REPLACEMENT.
CONTRACTOR TO PROVIDE OWNER'S REPRESENTATIVE WITH A POURING SEQUENCE AND JOINTING PLAN FOR APPROVAL
PRIOR TO PAVING.
NORTH
1 8" REINFORCED PCC PAVING
TUNNEL CAP, SEE STRUCTURAL
PLANS AND DETAILS
SEE STRUCTURAL
DETAIL FOR DOWELING
BARS INTO TUNNEL CAP
6" MODIFIED SUBBASE
(IDOT GRADATION 14)
12" SCARIFIED AND
RECOMPACTED SUBGRADE (95%
STANDARD PROCTOR DENSITY)
#5 TRANSVERSE
BARS AT 18" O.C.
#5 LONGITUDINAL
BARS AT 18" O.C.
8" PCC PAVING
TUNNEL WALL
/0
8/
1. CODES:
A. INTERNATIONAL BUILDING CODE (IBC) 2024
B. AMERICAN CONCRETE INSTITUTE - BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE (ACI 318)
C. AMERICAN SOCIETY OF CIVIL ENGINEERS AND STRUCTURAL ENGINEERING INSTITUTE
(ASCE/SEI 7) - MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
2. DESIGN LOADS PER THE 2024 IBC (RISK CATEGORY II)
A. DEAD LOADS
STRUCTURE SELF WEIGHT AS SHOWN
B. LIVE LOADS
ROOF LID HS-20
C. ROOF SNOW LOAD
GROUND SNOW LOAD, Pg 25 PSF FLAT ROOF SNOW LOAD, Pf 21 PSF SNOW EXPOSURE FACTOR, Ce 1.0 SNOW IMPORTANCE FACTOR, Is 1.2 THERMAL FACTOR, Ct 1.0
D. DEFLECTION CRITERIA
a. FLOOR LIVE LOAD L/360
DESIGN INFORMATION
1. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ALL PROJECT DRAWINGS AND
SPECIFICATIONS. REFER TO ALL DRAWINGS FOR THE COORDINATION OF THE WORK IN THIS
PROJECT.
2. THE INTENT OF THESE PLANS AND NOTES IS TO PRESENT THE PROJECT REQUIREMENTS.
MAJOR DETAILS HAVE BEEN SHOWN ON THE DRAWINGS. HOWEVER, CERTAIN MINOR DETAILS
MUST BE WORKED OUT IN THE FIELD OR SHOP DRAWING PROCESS BY THE CONTRACTOR.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN ON DRAWINGS ARE TO BE CONSIDERED TYPICAL
FOR ALL SIMILAR CONDITIONS.
4. THE STRUCTURE IS DESIGNED TO BE STABLE AND SELF-SUPPORTING AFTER THE STRUCTURE
IS FULLY ERECTED AND ALL CONNECTIONS ARE COMPLETED. UNLESS NOTED OTHERWISE, THE
DRAWINGS DO NOT INDICATE THE MEANS AND METHODS OF CONSTRUCTION. IT IS SOLELY THE
CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ERECTION PROCEDURE AND SEQUENCING
TO ENSURE THE SAFETY OF THE STRUCTURE AND ITS COMPONENT PARTS DURING ERECTION.
THIS INCLUDES THE ADDITION TEMPORARY BRACING, GUYS AND TIE-DOWNS NECESSARY FOR
THE ERECTION PROCESS.
5. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW THE APPLICABLE SAFETY CODES
AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION.
6. CONTRACTOR'S CONSTRUCTION AND ERECTION SEQUENCE SHALL CONSIDER THE EFFECTS OF
THERMAL MOVEMENTS OF THE STRUCTURAL ELEMENTS DURING THE CONSTRUCTION PERIOD.
7. EXISTING CONDITIONS:
A. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS AND CONDITIONS
RELATING TO EXISTING CONSTRUCTION AND EXISTING SERVICES ON SITE. THE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOCATIONS OF EXISTING COLUMNS,
WALLS, OPENINGS, ETC, WITH THE DRAWINGS PRIOR TO PROCEEDING WITH THE WORK.
ANY DISCREPANCIES WITH THE CONTRACT DOCUMENTS SHALL BE REPORTED TO THE
ENGINEER BEFORE PROCEEDING WITH THE AFFECTED PART OF THE WORK.
B. DURING CONSTRUCTION THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH
ARE NOT KNOWN OR ARE AT VARIANCE WITH PROJECT DOCUMENTATION (DISCOVERY).
SUCH CONDITIONS MAY INTERFERE WITH THE NEW CONSTRUCTION OR REQUIRE
PROTECTION AND/OR SUPPORT OF EXISTING WORK DURING CONSTRUCTION. IT MAY ALSO
CONSIST OF DAMAGED OR DETERIORATION OF STRUCTURAL MATERIALS OR COMPONENTS
WHICH COULD JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE STRUCTURE. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF ALL DISCOVERIES WHICH MAY INTERFERE
WITH THE PROPER EXECUTION OF THE WORK OR JEOPARDIZE THE STRUCTURAL INTEGRITY
OF THE STRUCTURE PRIOR TO PROCEEDING WITH THE WORK RELATED TO SUCH
DISCOVERIES.
C. DURING THE CONSTRUCTION PROCESS, IT SHALL BE SOLELY THE CONTRACTOR'S
RESPONSIBILITY TO MAINTAIN THE INTEGRITY OF THE EXISTING STRUCTURE AND TO
PROTECT IT FROM DAMAGE ANY PORTIONS THAT ARE TO REMAIN.
D. CONTRACTOR SHALL INVESTIGATE THE SITE DURING EARTHWORK OPERATIONS FOR FILL
MATERIAL OR BURIED STRUCTURES. IMMEDIATELY, NOTIFY THE ENGINEER IF ANY SUCH
MATERIALS OR STRUCTURES ARE DISCOVERED.
8. STRUCTURAL COORDINATION
A. EXCESS COST DUE TO VARIATION IN THE STRUCTURE TO ACCOMMODATE A SUBSTITUTION
OR ALTERNATE MANUFACTURER(S) FROM THE LISTED BASIS OF DESIGN SHALL BE BORNE
BY THE CONTRACTOR.
9. BEFORE SUBMITTING A BID, EACH BIDDER SHALL VISIT THE SITE AND BECOME FULLY
ACQUAINTED WITH THE EXISTING CONDITIONS, CONSTRUCTION REQUIREMENTS,
RESTRICTIONS, QUANTITIES AND EQUIPMENT NECESSARY TO COMPLETE THE WORK. THE BID
SHALL INCLUDE ALL ITEMS REQUIRED TO COMPLETE THE WORK WITHIN THE EXISTING
CONDITIONS. DISRUPTION OF THE OWNERS NORMAL ACTIVITIES AROUND THE CONSTRUCTION
SITE SHALL BE KEPT TO A MINIMUM.
10. THE COST OF ADDITIONAL DESIGN WORK DUE TO ERRORS AND OMISSIONS BY THE
CONTRACTOR DURING CONSTRUCTION SHALL BE BORNE BY THE RESPONSIBLE CONTRACTOR.
11. ANY ENGINEERING DESIGN PROVIDED BY OTHER AND SUBMITTED FOR REVIEW OR RECORD
SHALL BEAR THE STAMP AND SIGNATURE OF A PROFESSIONAL STRUCTURAL ENGINEER
REGISTERED IN THE STATE WHERE THE PROJECT EXISTS.
12. CONTRACTOR SHALL COORDINATE WORK SCHEDULES WITH THE OWNER TO ESTABLISH
CONSTRUCTION SEQUENCING AROUND ANY OCCUPIED AREAS. CONTRACTOR SHALL NOT
PROCEED TO OCCUPIED AREAS UNTIL AUTHORIZED BY THE OWNER.
13. ALL ELEMENTS AND SURFACES DAMAGED BY DEMOLITION, BUT NOT SCHEDULED FOR REMOVAL
SHALL BE REPAIRED AND REFINISHED TO MATCH THE ADJACENT SURFACES AT NO ADDITIONAL
COST TO THE OWNER.
14. CONTRACTOR SHALL REMOVE ALL DEBRIS AND WASTE MATERIALS RESULTING FROM
CONSTRUCTION FROM THE SITE, UNLESS NOTED OTHERWISE.
15. CONTRACTOR SHALL MINIMIZE CREATION OF DUST, DIRT AND WINDBORNE DEBRIS FROM
BLOWING ACROSS THE SITE AND ONTO ADJACENT SITES.
16. CONTRACTOR SHALL COVER ANY EXTERIOR OPENING WITH TEMPORARY CLOSURES WHEN NOT
WORKING ON SITE TO PROTECT THE INTERIOR SPACES FROM WEATHER, INSECTS, RODENTS
AND INTRUDERS.
17. TUNNELS CANNOT BE LEFT OPEN OVERNIGHT. AT END OF WORKDAY, ANY DEMOLISHED LID
EITHER HAS TO BE REPLACED WITH NEW CONCRETE LID OR TEMPORARY STEEL PLATE
SCREWED DOWN.
18. ANY EQUIPMENT BROUGHT IN AT THE BEGINNING OF THE WORK DAY NEEDS TO TAKEN OUT AT
THE END OF THE WORK DAY AND NOT LEFT INSIDE THE SECURED PERIMETER.
19. CONCRETE TRUCKS CANNOT LEAVE THE DRIVEWAY INSIDE THE SECURED PERIMETER.
CONCRETE BUGGIES NEED TO BE USED TO CARRY CONCRETE BEYOND THE DRIVEWAY TO THE
LID POURS.
20. PROVIDE A CONCRETE POUR SCHEDULE THAT SHOWS HOW PEDESTRIAN ACCESS IS
MAINTAINED TO ALL LOCATIONS. CONTRACTOR CANNOT BLOCK ALL ENTRANCES TO ANY ONE
BUILDING AT ONE TIME.
GENERAL NOTES
1. ALL CONCRETE SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE AMERICAN
CONCRETE INSTITUTES PUBLICATIONS: ACI 301, ACI 305.1, ACI 306.1, ACI 315, AND ACI 318
UNLESS NOTED OTHERWISE.
2. CONCRETE COMPRESSIVE STRENGTH (28 DAY)(F'c)
FOUNDATION WALLS 4000 PSI
ELEVATED SLAB 4000 PSI
3. CONCRETE REINFORCEMENT STANDARDS:
DEFORMED BARS ASTM A615 Fy = 60 KSI EPOXY COATED REINFORCING ASTM A775 Fy = 60 KSI
4. ALL CONCRETE SHALL BE STONE AGGREGATE UNLESS NOTED OTHERWISE. SUBMIT MIX DESIGN
AND DOCUMENTATION FOR APPROVAL PER ACI 318.
5. REINFORCEMENT PROTECTION
A. CONCRETE PLACED AGAINST EARTH - 3"
B. CONCRETE PLACED IN FORMS BUT EXPOSED TO WEATHER OR EARTH:
a. BARS #5 AND SMALLER - 1 1/2"
b. BARS LARGER THAN #5 - 2"
C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
a. SLABS, WALLS, AND JOISTS - 3/4"
b. BEAMS, COLUMNS - 1 1/2"
6. WHERE REQUIRED, DOWELS SHALL MATCH THE SIZE, NUMBER AND SPACING OF THE MAIN
REINFORCING UNLESS NOTED OTHERWISE.
7. ALL SPLICES, STANDARD HOOKS, AND DEVELOPMENT LENGTHS TO BE PER THE REFERENCED
EDITION OF ACI 318. MAKE BARS CONTINUOUS AROUND CORNERS. ALL SPLICES SHALL BE BY
CONTACT LAP.
8. ALL SPLICES SHALL BE A CLASS "B" TENSION SPLICE AS DEFINED IN ACI 318. PROVIDE LAP
SPLICES LENGTHS AS FOLLOWS:
LAP SPLICE LENGTHS GIVEN, ASSUME CLEAR SPACING BETWEEN BARS OF 2 BAR DIAMETERS,
AND A MINIMUM CLEAR COVER OF 1 BAR DIAMETER. TOP BARS ARE DEFINED AS HORIZONTAL
BARS WITH MORE THAN 12" ON FRESH CONCRETE BENEATH THE BARS.
9. WALLS SHALL NOT HAVE JOINTS IN A HORIZONTAL PLANE, UNLESS APPROVED BY THE
ENGINEER.
10. CONSTRUCTION JOINTS IN STRUCTURAL CONCRETE WORK MUST BE MADE AT CENTER OF
SPAN OR AT CENTER OF SUPPORT WITH VERTICAL BULKHEADS AND HORIZONTAL KEYS,
UNLESS OTHERWISE SHOWN.
11. THERE SHALL BE NO ADDITIONAL OPENINGS LARGER THAN 10" IN CONCRETE WALLS AND SLABS
NOT SHOWN. REFER TO CONCRETE OPENING DETAIL FOR ADDITIONAL REINFORCEMENT
AROUND OPENINGS.
12. REINFORCING STEEL SHALL BE SECURELY FASTENED INTO FORMS PRIOR TO POURING
CONCRETE. WET SETTING OF REINFORCING STEEL WILL NOT BE ACCEPTED PER ACI.
13. CONCRETE MIX
COARSE AGGREGATE 100% PASSING 1" SIEVE
FINE AGGREGATE 100% PASSING 3/8" SIEVE
WATER/CEMENT RATIO 0.5
SLUMP (WITH WATER REDUCER) 4" TO 6"
AIR CONTENT 6% +/- 1.5%
14. ALL CONCRETE SHALL HAVE INTEGRAL CRYSTALLINE WATERPROOFING ADMIXTURE AND SALT
GUARD, PER SPECIFICATIONS.
15. ALL REINFORCING STEEL FOR STEAM TUNNEL SHALL BE EPOXY-COATED AND 60 KSI YIELD
STRENGTH, UNLESS NOTED OTHERWISE.
16. ALL EXPANSION ANCHORS SHALL BE STAINLESS STEEL KWIK BOLT TZ BY HILTI OR APPROVED
EQUIVALENT, 4" EMBED.
17. ALL EPOXY-DRILLED REBAR SHALL BE INSTALLED WITH C6 EPOXY ADHESIVE BY RED HEAD OR
APPROVED EQUIVALENT. ALL THREADED ROD TO BE STAINLESS STEEL.
18. WHERE CONCRETE IS TO BE CAST AGAINST EXISTING CONCRETE, PREPARE SURFACE OF
EXISTING BY REMOVING ALL SPALLS, CORROSION, AND LOOSE CONCRETE.
BAR SIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
TYPICAL
19"
25"
31"
37"
54"
62"
70"
79"
87"
TOP BARS
25"
33"
41"
49"
71"
81"
91"
102"
114"
4000 PSI
CAST-IN-PLACE CONCRETE
1. STRUCTURAL STEEL SHALL CONFORM TO THE REFERENCED EDITION OF THE AISC
"SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS".
2. STRUCTURAL STEEL MATERIAL STANDARDS
WIDE FLANGE SECTIONS ASTM A992 Fy = 50 KSI ANGLES, CHANNELS & PLATES ASTM A36 Fy = 36 KSI SQUARE AND RECTANGULAR HSS ASTM A500, GR C Fy = 50 KSI ROUND HSS ASTM A500, GR C Fy = 46 KSI STANDARD PIPE SECTIONS ASTM A53, GR B Fy = 35 KSI
3. STRUCTURAL STEEL CONNECTION STANDARDS:
HIGH STRENGTH BOLTS ASTM F3125 GRADE A325
HEAVY HEX NUT ASTM A563
WASHERS ASTM F436
ANCHOR RODS ASTM F1554 GRADE 36
HEADED WELDED STUDS ASTM A108 TYPE B
WELDING ELECTRODES (CARBON STEEL) AWS 5.1, E70XX
4. WELDING SHALL BE IN ACCORDANCE WITH STRUCTURAL WELDING CODE, AWS D1.1, LATEST
EDITION, AND SHALL BE PERFORMED BY CERTIFIED WELDERS ONLY USING PROPER
ELECTRODES FOR MATERIAL BEING WELDED. PROVIDE WELD SIZE IN ACCORDANCE WITH AISC
SPECIFICATIONS, BUT NOT LESS THAN 3/16" FILLET, CONTINUOUS UNLESS OTHERWISE NOTED.
5. ALL HIGH STRENGTH BOLTS SHALL BE INSTALLED IN ACCORDANCE WITH RCSC -
"SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS." SEE DRAWINGS
FOR BOLTS SIZES. USE 3/4" DIAMETER, A325 BOLTS UNLESS NOTED OTHERWISE.
6. ALL BOLTED CONNECTIONS ARE BEARING TYPE, UNLESS INDICATED AS TENSION CONTROLLED
(TC) OR SLIP CRITICAL (SC). PROVIDE STANDARD HOLES FOR BEARING TYPE CONNECTION
WHICH ARE 1/16" WIDER DIAMETER THAN THE BOLT.
7. ALL EXTERIOR EXPOSURE STEEL FRAMING, STEEL LINTEL ASSEMBLIES, BRICK RELIEF ANGLES
AND CONNECTORS SHALL BE HOT DIPPED GALVANIZED. ITEMS INDICATED TO BE GALVANIZED
SHALL BE HOT-DIP GALVANIZED IN COMPLIANCE WITH ASTM A123.
8. AFTER FABRICATION, ALL STEEL SHALL BE CLEANED OF ALL RUST, LOOSE MILL SCALE AND
OTHER FOREIGN MATERIALS. STEEL SHALL BE HAND TOOLED CLEANED (SSPC-SP2) OR POWER
TOOL CLEANED (SSPC-SP3).
9. ALL STRUCTURAL STEEL WILL HAVE ONE COAT OF FABRICATOR'S STANDARD LEAD AND
CHROMATE-FREE RUST INHIBITIVE PRIMER APPLIED PRIOR TO DELIVERY TO THE JOB SITE
UNLESS NOTED OTHERWISE. ALL AREAS OF STRUCTURAL STEEL MEMBERS IN WHICH THE
PRIMER COATED SURFACE IS DAMAGED DURING CONSTRUCTION SHALL BE TOUCHED UP WITH
MATCHING PRIMER.
10. THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL STEEL MEMBERS FOR THE WORK OF
OTHER TRADES WITHOUT PRIOR WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER OF
RECORD.
11. CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORES, GUYS, BRACES AND OTHER
SUPPORTS DURING ERECTION TO KEEP STRUCTURAL STEEL SECURE, PLUMB AND IN
ALIGNMENT AGAINST TEMPORARY CONSTRUCTION LOADS AND LOADS EQUAL TO DESIGN
LOADS. REMOVE ALL TEMPORARY SUPPORTS WHEN PERMANENT STRUCTURAL STEEL
FRAMING AND CONNECTIONS ARE COMPLETED.
12. MAINTAIN ERECTION TOLERANCES OF STRUCTURAL STEEL WITHIN AISC 303, "CODE OF
STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES."
13. DO NOT ENLARGE MISALIGNED BOLT HOLES BY BURNING OR THERMAL CUTTING. REAM HOLES
THAT MUST BE ENLARGED TO INSTALL BOLTS.
STRUCTURAL STEEL
1. CONTRACTOR SHALL SUBMIT FOR REVIEW AND APPROVAL THE FOLLOWING SUBMITTALS FOR
EACH MATERIAL INDICATED BELOW.
2. CONCRETE REINFORCING
A. SUBMIT CONCRETE REINFORCEMENT SHOP DRAWINGS IN ACCORDANCE WITH ACI 315 FOR
APPROVAL.
a. DETAIL BARS IN ACCORDANCE WITH "ACI DETAILING MANUAL", PUBLICATION SP-66 AND
THE LATEST EDITION OF ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE".
3. CAST-IN-PLACE CONCRETE
A. SUBMIT CONCRETE MIX DESIGNS FOR EACH APPLICATION LOCATION INDICATED IN THE
DRAWINGS.
4. CONCRETE POUR SCHEDULE
A. SUBMIT CONCRETE POUR SCHEDULE FOR REVIEW BY FACILITY AND EOR PRIOR TO
POURING ANY CONCRETE.
SUBMITTALS
6. THE SPECIAL INSPECTION AND QUALITY ASSURANCE PROGRAM DOES NOT RELIEVE THE CONTRACTOR OF HIS OR HER RESPONSIBILITY TO
PERFORM QUALITY CONTROL.
INTERIM REPORTS SHALL BE SUBMITTED TO THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. A FINAL REPORT OF SPECIAL INSPECTIONS DOCUMENTING COMPLETION OF ALL REQUIRED SPECIAL INSPECTIONS, TESTING AND CORRECTIONS OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS SHALL BE SUBMITTED PRIOR TO ISSUANCE OF A CERTIFICATE OF USE AND OCCUPANCY. JOB SITE SAFETY AND MEANS AND METHODS OF CONSTRUCTION ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
QUALIFICATIONS OF INSPECTORS AND TESTING TECHNICIANS
THE QUALIFICATIONS OF ALL PERSONNEL PERFORMING SPECIAL INSPECTION AND TESTING ACTIVITIES ARE SUBJECT TO THE APPROVAL OF THE BUILDING OFFICIAL. THE CREDENTIALS OF ALL INSPECTORS AND TESTING TECHNICIANS SHALL BE PROVIDED IF REQUESTED.
KEY FOR MINIMUM QUALIFICATIONS OF INSPECTION AGENTS:
WHEN THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE DEEMS IT APPROPRIATE THAT THE INDIVIDUAL PERFORMING A STIPULATED TEST OR INSPECTION HAVE A SPECIFIC CERTIFICATION OR LICENSE AS INDICATED BELOW, SUCH DESIGNATIONS SHALL APPEAR
BELOW THE AGENT ON THE SCHEDULE.
ICC-PCSI PRESTRESSED CONCRETE SPECIAL INSPECTOR
NATIONAL INSTITUTE OF CERTIFICATION IN ENGINEERING TECHNOLOGIES (NICET)
NICET-CT CONCRETE TECHNICIAN - LEVELS I, II, III, & IV
NICET-ST SOILS TECHNICIAN - LEVELS I, II, III & IV
NICET-GET GEOTECHNICAL ENGINEERING TECHNICIAN - LEVEL I, II, III & IV
EXTERIOR DESIGN INSTITUTE (EDI) CERTIFICATION
EDI-EIFS EIFS THIRD PARTY INSPECTOR
CONTRACTOR'S RESPONSIBILITY REGARDING INSPECTIONS
1. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING A PRE-CONSTRUCTION MEETING (SCHEDULED AT LEAST 5 BUSINESS DAYS BEFORE START OF CONSTRUCTION). MEETING SHOULD INCLUDE ALL RESPONSIBLE PARTIES (A/E, SI'S, FIELD INSPECTOR). MEETING IS FOR ENTIRE
PROJECT, NOT PHASE OF WORK.
2. PRE-CONSTRUCTION MEETING IS TO BE CONDUCTED BY THE CONTRACTOR WITH MEETING MINUTES TO BE TAKEN AND DISTRIBUTED TO ALL
MEMBERS ATTENDING. MEETING MINUTES TO INCLUDE A SIGN-IN SHEET FOR ALL PARTIES.
3. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING INSPECTIONS AND TESTS. SUFFICIENT NOTICE AND LEAD TIME MUST BE ALLOWED FOR THE INSPECTION AND TESTING TO BE PERFORMED WITHOUT IMPENDING CONSTRUCTION OPERATIONS.
4. THE CONTRACTOR MUST COOPERATE WITH THE INSPECTIONS AND TESTING AGENCIES. SAFE ACCESS MUST BE PROVIDED TO ALL INSPECTION AND TEST TO BE PERFORMED. THIS MAY REQUIRE THE CONTRACTOR TO PROVIDE SCAFFOLDING, LADDERS OR LIFTS.
5. WHEN DEFICIENCIES ARE IDENTIFIED, THE CONTRACTOR MUST TAKE CORRECTIVE ACTIONS TO COMPLY WITH THE CONTRACT DOCUMENTS
OR REMEDY THE DEFICIENCIES AS DIRECTED BY THE REGISTERED DESIGN PROFESSIONAL.
STATEMENT OF SPECIAL INSPECTIONS
THIS STATEMENT OF SPECIAL INSPECTIONS IS SUBMITTED AS A CONDITION FOR PERMIT ISSUANCE IN ACCORDANCE WITH THE SPECIAL INSPECTION AND STRUCTURAL TESTING REQUIREMENTS OF THE BUILDING CODE. IT INCLUDES A SCHEDULE OF SPECIAL INSPECTION SERVICES APPLICABLE TO THE STRUCTURAL COMPONENTS OF THIS PROJECT. IF APPLICABLE, IT INCLUDES REQUIREMENTS FOR SEISMIC RESISTANCE AND/OR REQUIREMENTS FOR WIND RESISTANCE. THIS STATEMENT OF SPECIAL INSPECTIONS ENCOMPASSES THE FOLLOWING DISCIPLINES:
[X] STRUCTURAL [ ] MECHANICAL / ELECTRICAL / PLUMBING
[ ] ARCHITECTURAL [ ] OTHER
THE SPECIAL INSPECTION COORDINATOR SHALL KEEP RECORDS OF ALL INSPECTIONS AND SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. DISCOVERED DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF SUCH DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE.
THE SPECIAL INSPECTION PROGRAM DOES NOT RELIEVE THE CONTRACTOR OF HIS OR HER RESPONSIBILITIES.
AWS-CWI CERTIFIED WELDING INSPECTOR
AWS/AISC-SSI CERTIFIED STRUCTURAL STEEL INSPECTOR
AMERICAN SOCIETY OF NON-DESTRUCTIVE TESTING (ASNT) INSPECTION
ASNT NON-DESTRUCTIVE TESTING TECHNICIAN - LEVEL II OR III
INTERNATIONAL CODE COUNCIL (ICC) CERTIFICATION
ICC-SMSI STRUCTURAL MASONRY SPECIAL INSPECTOR
ICC-SFSI SPRAY-APPLIED FIREPROOFING SPECIAL INSPECTOR
ICC-RCSI REINFORCED CONCRETE SPECIAL INSPECTOR
ICC-SWSI STRUCTURAL STEEL AND WELDING SPECIAL INSPECTOR
PE/SE STRUCTURAL ENGINEER - A LICENSED SE OR PE SPECIALIZING IN THE DESIGN OF BUILDING STRUCTURE
EIT ENGINEER-IN-TRAINING - A GRADUATE ENGINEER WHO HAS PASSED THE FUNDAMENTS OF ENGINEERING EXAMINATION
AMERICAN CONCRETE INSTITUTE (ACI) CERTIFICATION
ACI-CFTT CONCRETE FIELD TESTING TECHNICIAN - GRADE 1
ACI-CCI CONCRETE CONSTRUCTION INSPECTOR
ACI-LTT LABORATORY TESTING TECHNICIAN - GRADE 1 & 2
ACI-STT STRENGTH TESTING TECHNICIAN
AMERICAN WELDING SOCIETY (AWS) CERTIFICATION
FIELD INSPECTION ACI-CCI
ICC-RCSI
ICC-RCSI
6. INSPECTION FOR MAINTENANCE OF
SPECIFIED CURING TEMPERATURE AND
TECHNIQUES
FIELD INSPECTION PERIODIC ACI-CCI
3. REVIEW CONCRETE BATCH TICKETS AND
VERIFY COMPLIANCE WITH APPROVED MIX
DESIGN. VERIFY THAT WATER ADDED AT
THE SITE DOES NOT EXCEED THAT
ALLOWED BY THE MIX DESIGN
FIELD INSPECTION PERIODIC ACI-CCI
ICC-RCSI
4. TEST CONCRETE COMPRESSIVE
STRENGTH (ASTM C31 & C39), SLUMP
(ASTM C143), AIR-CONTENT (ASTM C231 OR
C173) AND TEMPERATURE (ASTM C1064).
FIELD INSPECTION CONTINUOUS ACI-CFTT
ACI-STT
5. INSPECT PLACEMENT OF CONCRETE.
VERIFY THAT CONCRETE CONVEYANCE
AND DEPOSITING AVOIDS SEGREGATION
OR CONTAMINATION. VERIFY THAT
CONCRETE IS PROPERLY CONSOLIDATED.
FIELD INSPECTION CONTINUOUS ACI-CCI
2. INSPECTION OF ANCHORS AND
REINFORCING STEEL POST-INSTALLED IN
HARDENED CONCRETE: PER RESEARCH
REPORTS INCLUDING VERIFICATION OF
ANCHOR TYPE, ANCHOR DIMENSIONS,
HOLE DIMENSIONS, HOLE CLEANING
PROCEDURES, ANCHOR SPACING, EDGE
DISTANCES, CONCRETE MINIMUM
THICKNESS, ANCHOR EMBEDMENT AND
TIGHTENING TORQUE
PERIODIC OR AS
REQUIRED BY THE
RESEARCH REPORT
ISSUED BY AN
APPROVED SOURCE
CONCRETE CONSTRUCTION SERVICE EXTENT AGENT
1. INSPECT SIZE, SPACING, COVER,
POSITIONING AND GRADE OF
REINFORCING STEEL. VERIFY THAT
REINFORCING BARS ARE FREE OF FORM
OIL OR OTHER DELETERIOUS MATERIALS.
INSPECT BAR LAPS AND MECHANICAL
SPLICES. VERIFY THAT BARS ARE
ADEQUATELY TIED AND SUPPORTED OF
CHAIRS OR BOLSTERS.
FIELD INSPECTION PERIODIC
ACI-CCI
ICC-RCSI
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
C L
IE
N T
P R
O J E
C T
N U
M B
E R
A B C D E F
A B C D E F9 /3
/2
:0 :2
P
M
A u to d e s k D o c s
/I D
A S
D
O C
A n a m o s a S a lly p o rt
T u n n e l R e p a ir
/2 -S
-R .r v t
S T
R U
C T
U R
A L
G E
N E
R A
L
IN
F O
R M
A T
IO
N
A N
D S
P E
C
IA
L
IN
S P
E C
T
IO
N S
.0
M M
B T
S
S000
D O
C A
S P
S A
L L
Y P
O R
T T
U N
N E
L
L
IV
IN
G
U N
IT
B
T U
N N
E L
R E
P A
IR
D A
S P
R O
J E
C T
N O
.0
N
H
IG
H S
T R
E E
T A
N A
M O
S A
IA
B
ID
/0
/2
.7
.0
S
H
IV
E -H
A T
T E
R Y
.C O
M
/0
8/
MAX ROOF OPENING ALONG
TUNNEL WITHOUT INTERIOR
WALL SHORING IS 8'-0"
FIELD VERIFY ROOF
THICKNESS DURING
DEMOLITION
REMOVE PORTION OF WALL
WITH LOOSE STONE OR
MASONRY - APPROX 20'-0"
PROVIDE TEMPORARY
SUPPORT FOR EXISTING
UTILITIES DURING
CONSTRUCTION
3'-10"
F V
EXISTING STONE
MASONRY WALLS
TO REMAIN
F V
#5 AT 9" OC
TRANSVERSE BARS
C L R
#5 DOWEL AT 18" OC, DRILL AND
EPOXY INTO STONE WALL WITH
SIMPSON SET-3G (5" EMBED)
AS
REQ'D
#5 DOWEL AT 18" OC,
DRILL AND EPOXY,
WRAPPED IN BUILDING
C L R
#5 AT 12" OC
LONGITUDINAL BARS
PROVIDE NEW WALL MOUNTED
SUPPORT BRACKET FOR 6
CABLES @ 8'-0" OC
TEMPORARILY REMOVE
EXISTING LIGHT FIXTURE AND
REMOUNT INTO NEW
CONCRETE AT TWO LOCATIONS
REINFORCED PAVEMENT
PER CIVIL, TYP
#5 BARS @ 12" OC
SAWCUT AND REMOVE EXISTING
TUNNEL LID AND PORTION OF
EAST WALL - REFER TO 5/S101
EXISTING TUNNEL
TO REMAIN
CONCRETE CORNER
REPAIR - REFER TO
3/S102 AND 4/S102
EXISTING TUNNEL TO REMAIN
MAXIMUM ROOF OPENING
ALONG TUNNEL WITHOUT
INTERIOR WALL SHORING IS 8'-0"
TEMPORARILY REMOVE
EXISTING LIGHT FIXTURE AND
REMOUNT INTO NEW CONCRETE
AT 2 LOCATIONS
PROVIDE NEW WALL MOUNTED
SUPPORT BRACKET FOR 6
CABLES @ 8'-0" OC
TRAPEZE SUPPORT
TO BE REPLACED AT
2 LOCATIONS
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
C L
IE
N T
P R
O J E
C T
N U
M B
E R
A B C D E F
A B C D E F9 /3
/2
:0 :2
P
M
A u to d e s k D o c s
/I D
A S
D
O C
A n a m o s a S a lly p o rt
T u n n e l R e p a ir
/2 -S
-R .r v t
S A
L L Y
P O
R T
T U
N N
E L P
L A
N
S E
C T
IO
N
S
A N
D D
E T
A
IL
S
.0
M M
B T
S
S101
D O
C A
S P
S A
L L
Y P
O R
T T
U N
N E
L
L
IV
IN
G
U N
IT
B
T U
N N
E L
R E
P A
IR
D A
S P
R O
J E
C T
N O
.0
N
H
IG
H S
T R
E E
T A
N A
M O
S A
IA
B
ID
/0
/2
01" = 1'-0"
TYPICAL SALLYPORT TUNNEL DEMOLITION SECTION
1'-6" 01" = 1'-0"
TYPICAL SALLYPORT TUNNEL NEW LID AND WALL
SECTION
1'-6"
NOT TO SCALE2
PHOTO OF TUNNEL AT SALLYPORT
01" = 20'-0"
SALLYPORT TUNNEL EXISTING CONDITIONS AND
DEMOLITION PLAN
30'
.7
.0
S
H
IV
E -H
A T
T E
R Y
.C O
M
NOT TO SCALE5
EXISTING UTILITIES TO SUPPORT
01/4" = 1'-0"
EXISTING UTILITIES TO SUPPORT
6'
/0
8/
EXISTING TUNNEL WALL
(66" HEIGHT)
2'-0"
CORE DRILL THROUGH PAVEMENT
ABOVE TO POUR BULKHEAD AND
INSTALL BACKFILL. PATCH
PAVEMENT TO MATCH EXISTING
BACKFILL VOID WITH FREE
DRAINING GRANULAR FILL
EXISTING TUNNEL STONE WALL
POUR BULKHEAD AGAINST MISSING
STONES, ALLOW CONCRETE TO
FILL IN MISSING STONES
(2) #5 VERTICAL BARS, DRILL AND
EPOXY INTO FLOOR WITH
SIMPSON SET-3G (4" EMBED)
#5 DOWELS AT 12" OC, DRILL AND
EPOXY INTO MASONRY WALL
WITH SIMPSON SET-3G (4" EMBED)
COORDINATE DISRUPTION
WITH FACILITY
EXISTING TUNNEL WALL
EXISTING TUNNEL
STONE WALL
POUR AGAINST MISSING
STONES, ALLOW
CONCRETE TO FILL IN
MISSING STONES
(55" HEIGHT)
1'-2"
CORE DRILL THROUGH
PAVEMENT ABOVE TO POUR
BULKHEAD AND INSTALL
BACKFILL. PATCH PAVEMENT
TO MATCH EXISTING
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
C L
IE
N T
P R
O J E
C T
N U
M B
E R
A B C D E F
A B C D E F9 /3
/2
:0 :2
P
M
A u to d e s k D o c s
/I D
A S
D
O C
A n a m o s a S a lly p o rt
T u n n e l R e p a ir
/2 -S
-R .r v t
L
IV
IN
G
U N
IT
B
T U
N N
E L
P H
O T
O S
A N
D D
E T
A
IL
S
.0
M M
B T
S
S102
D O
C A
S P
S A
L L
Y P
O R
T T
U N
N E
L
L
IV
IN
G
U N
IT
B
T U
N N
E L
R E
P A
IR
D A
S P
R O
J E
C T
N O
.0
N
H
IG
H S
T R
E E
T A
N A
M O
S A
IA
B
ID
/0
/2
.7
.0
S
H
IV
E -H
A T
T E
R Y
.C O
M
01" = 1'-0"
PHOTO OF TUNNEL EAST CORNER TO REPAIR
1'-6" 01" = 1'-0"
PHOTO OF TUNNEL WEST CORNER TO REPAIR
1'-6"
01" = 1'-0"
TUNNEL WEST CORNER REPAIR PLAN
1'-6"01" = 1'-0"
TUNNEL EAST CORNER REPAIR PLAN
1'-6"
/0
8/
| 2026-09-09T15:37:12+0000 | |
| SignNow | |
| Digitially Signed Read Only PDF Created by SignNow for Document ID : b78abbb5ba2a46458d1230257791cccdf620103e |
File details come from the government source that posted it. Updated .