RFB952400-01 - Addendum 01.pdf
PDF 13 MB Posted
- Solicitation number
- RFB952400-01
- Issued by
- Jasper County, Iowa
About this file
This Addendum 01 document modifies the Request for Bids (RFB 952400-01) for concrete repairs to the Sallyport and Living Unit B utility tunnel structures at Anamosa State Penitentiary, issued by the Iowa Department of Administrative Services. The project involves demolition and replacement of tunnel lids, concrete repairs to tunnel walls, installation of 8-inch reinforced PCC paving with #5 bars at 18-inch spacing, and associated structural work. Two mandatory pre-bid meetings were held on September 21-22, 2026, with site walks conducted for all prospective bidders. The addendum clarifies project requirements, answers a budget inquiry (estimated construction budget of $103,350), and provides revised structural drawings (C101 Site Plan and S000 Structural General Information). Bids are due Monday, October 5, 2026, by 2:00 p.m. via the IMPACS Electronic Procurement System, with bid opening scheduled for 3:00 p.m. the same day. Construction is anticipated to begin October 23, 2026, and conclude November 13, 2026, with work hours restricted to Thursday-Sunday, 7:00 a.m. to 4:00 p.m., unless otherwise coordinated with facility staff. A pull-plan session will be held with the successful bidder to finalize the construction schedule.
The addendum specifies significant technical modifications to concrete specifications, including revision of compressive strength testing to 24-hour and 48-hour intervals with a minimum requirement of 4,000 psi at 48 hours, specification of epoxy-coated reinforcing bars (ASTM A775/A775M and ASTM A934/A934M, Grade 60), and use of Type III high early strength concrete to minimize drive closures. Concrete for tunnel roof and walls must include integral crystalline waterproofing admixture. All drawings have been updated to reflect these changes, including pavement removal modifications west of the tunnel reduced to a half panel and replacement of existing concrete at the southwest corner with sod. Site-specific requirements include maintaining emergency vehicle access at all times through the use of steel plates rated for emergency vehicle traffic, tunnels must be capped daily with either new concrete lids or temporary steel plates to prevent overnight access, and all tools and equipment must be inventoried and removed from the facility at shift end. Bid security of 5 percent of the total bid amount is required, and the successful bidder must submit subcontractor and supplier lists within 48 hours of bid opening. No substitutions were received during the pre-bid period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB952400-01 - Bid Form.pdf | ||
| RFB952400-01 - Project Manual.pdf | ||
| RFB952400-01 - Notice to Bidders.pdf | ||
| RFB952400-01 - Drawings.pdf | ||
| 1444262-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1 for RFB 952400-01
Project Name: DOC ASP Sallyport Tunnel & LUB Tunnel Repair
RFB#952400-01
DAS Project #: 9524.00
Date: 9/28/2026
Bids Due: Monday October 5th, 2026 by 2:00pm
TO ALL PROSPECTIVE BIDDERS
Where the requirements of this Addendum conflict with the previously issued Bidding and Contract
Documents, this Addendum shall govern. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid Form.
This Addendum consists of this cover page and the following attachments:
1. RFB Pre-Bid Meeting #01 and #02 Minutes, including attendee/sign-in documentation and site-walk photographs.
2. Section 00 9111 - Addendum Number 01, prepared by Shive-Hattery, Inc.
3. Revised Drawing C101 - Site Plan.
4. Revised Drawing S000 - Structural General Information and Special Inspections.
BID CLARIFICATIONS
1. RFB Pre-Bid Meeting #01 & #02 Meeting Minutes & Sign-In Sheet
a. Attached are the meeting minutes and attendee/sign-in documentation from the mandatory pre-bid meetings.
b. Site-walk photographs are included with this Addendum.
2. QUESTIONS & SUBSTITUTIONS
a. All questions received from Construction.Procurement@das.iowa.gov
i. Question #01: What is the budget for this project
ii. Answer #01: Estimated construction budget $103,350
b. No substitutions were received.
3. DRAWING & SPECIFICATION CHANGES
a. See attached addendum with changes provided by Shive Hattery.
i. Attachments include revised drawing sheets C101 and S000.
END OF ADDENDUM
mailto:Construction.Procurement@das.iowa.gov
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9524.00 DOC ASP SallyPort Tunnel & Living Unit B Tunnel Repair
406 N High St Anamosa, Iowa 52205
RFB Pre-Bid #01 & #02 Minutes: Meeting #1
Meeting Date Sep 21, 2026 Meeting Time 10:00 am - 11:00 am Central Time (US & Canada)
Meeting Location Anamosa State Penitentiary Video Conferencing Link
Join Meeting
Overview Meeting to allow prospective bidders to visit the site, when possible, and learn more about the project.
Microsoft Teams meeting Join:
https://teams.microsoft.com/meet/293365909995427?p=CYB2Seep WlwL1rytaD Meeting ID: 293 365 909 995 427 Passcode: AS6Gm6Gq
Notes
Attachments 2026-09-08_IFB-Dwgs.pdf, RFB952400-01 Project Manual_Final.pdf
Scheduled Attendees
Name Company Phone Number Email Attendance
Jeremy Burds Anamosa State Penitentiary jeremy.burds@iowa.gov Present
Lisa Oswald Anamosa State Penitentiary P: (319) 251-7809 lisa.oswald@iowa.gov
Derick Rasmussen McGough Construction P: (605) 940-5488 derick.rasmussen@mcgough.com Present
Noah Thelen McGough Construction P: (515) 639-3853 noah.thelen@mcgough.com Present
Cara Lindell Shive Hattery Inc. P: (515) 223-8104 clindell@shive-hattery.com
Matt Mettemeyer Shive Hattery Inc. P: (515) 223-8104 mmettemeyer@shive-hattery.com Present
Brandon Adams State of Iowa - Department of Administrative Services brandon.adams@das.iowa.gov Present
Introduction
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description Attendees
Attachments IMG_4081.jpeg, IMG_4080.jpeg
Official Documented Meeting Minutes See attached sign in sheets for meeting #01 on 9/21 & Meeting #02 on 9/22
State of Iowa - Department of Administrative Services Page 1 of 6 Printed On: Sep 28, 2026 10:40 AM CDT https://teams.microsoft.com/meet/293365909995427?p=CYB2SeepWlwL1rytaD https://teams.microsoft.com/meet/293365909995427?p=CYB2SeepWlwL1rytaD https://teams.microsoft.com/meet/293365909995427?p=CYB2SeepWlwL1rytaD https://teams.microsoft.com/meet/293365909995427?p=CYB2SeepWlwL1rytaD https://storage.procore.com/api/v5/files/us-east-1/pro-core.com/42578-c/3024643-p/7861c75d4cadf6d095b84311eb07399bfd45?companyId=87524&projectId=3464203&sig=755d5fe4f6431d292cc038c3e3789a911edda86bc388aec2c8aab0f3f2338d25 https://storage.procore.com/api/v5/files/us-east-1/pro-core.com/42578-c/3024643-p/01M28RB11VFX9PDQVCJBX44GAD?companyId=87524&projectId=3464203&sig=7fa6bf5ff3070311a97deabd0033abe0b8ac5237882980b8fe7327d8551047b7 https://storage.procore.com/api/v5/files/us-east-1/pro-core.com/42578-c/3024643-p/01M3MA05QSS21EDV1120WH6QSX?companyId=87524&projectId=3464203&sig=9f53447eefa74e45e869ca4bd758fd15f07224459e83dd705086124480fa3e52 https://storage.procore.com/api/v5/files/us-east-1/pro-core.com/42578-c/3024643-p/01M3MA03H82H9FE5C5WXZEY93Z?companyId=87524&projectId=3464203&sig=19d3ced3a353f4cc620709f8919e1bc91afb3b4ca646909028bb00d64b13308c
Meeting #01 Colin Pratt - NB Koch Gen Const.
Mark L. - BiState Matt M. - Shive Hattery Tim K - M2 Construcion Noah T. - McGough Jeremy B - ASP Online:
Brandon A - DAS Derek R. - McGough
Meeting #02 Whitney C. - Iowa Bridge Culvert Jeff F - Tricon Luis L. - Minturn Derek R. - McGough Noah T - McGough Brandon A. - DAS Jeremy B - ASP
Project Overview
2.1 1 Project Description Open
Description Concrete repairs to the Sallyport and LUB utility tunnel lid and wall. Sallyport tunnel repair work involves removing and replacement of pavement directly in front of the main vehicle entrance. Work will need to take place in 2 phases so that access is not blocked and road plates will be used to span over any open excavations and allow for emergency EMS access. Maximum tunnel opening without shoring will be 8'-0" and open tunnel lids will need to be secured daily prior to leaving. Work for the LUB tunnel repairs involves concrete repairs to the tunnel wall corners. The plan is to core drill through pavement above and pour to backfill void space after tunnel wall patching has been completed underneath.
Work schedule Thursday-Sunday (7:00am-4:00pm) unless otherwise planned. ASP will hold deliveries during this time at the sallyport, only EMS will have access.
• Base bid - Bid Package #01 - Complete o All material, labor and equipment associated with all work shown on contract documents.
• Alternates - None
• Unit prices - None
Official Documented Meeting Minutes Access to the LUB utility tunnel for concrete pouring will need to be Bugged or skid loader due to limited access.
Pour samples and rebar inspections will be handled by DAS via third party and requesting on site coordination with testing agency.
Crystalline admix will be utilized in the tunnel lid, but not required in the pavement. Due to weather and schedule it is a possibility that cold weather concrete mixes will be needed and pricing. Overnight lows will need to be reviewed and blanketing considered. ASP plans to turn on steam lines November 15th down in tunnels, weather pending.
ASP adjusting deliveries into the facility for work at the sallyport, by 3:00pm on Thursday they will hold deliveries until Monday AM. EMS/Fire services might need emergency access into facility and contractor needs to be prepared with steel plates on site for access.
Confined Space permit will not be required. ASP will have a Hot Work permit that contractors will need to fill out and keep copies.
Meeting #1 - RFB Pre-Bid #01 & #02 Project: 9524.00 DOC ASP SallyPort Tunnel & Living Unit B Tunnel Repair
State of Iowa - Department of Administrative Services Page 2 of 6 Printed On: Sep 28, 2026 10:40 AM CDT
No limitations on working hours into the night or weekends due to limited work schedule already (Thursday-Sunday). ASP was OK with working at night, lighting is currently in place around the area of the sallyport. Schedules will still need to be coordinated so ASP staff can supervise and escort workers.
2.2 1 Project Schedule Open
Description
• Contract(s) Issued: October 6-8th (Need P&P Bonds and COI)
• Submittals: October 9th - 22nd
• Construction: October 23rd-November 13th
• Closeout: November 12th-December 28th
Work hours and days for Sallyport will be Thursday-Sunday (7:00am-4:00pm)
A pull-plan session will be held with the successful bid package contractors to finalize the construction schedule.
State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving and day after Thanksgiving, Christmas Day
Official Documented Meeting Minutes Construction anticipated to start this fall/winter. Submittals needed will be mix design and rebar, work can start sooner once approved and contracts issued.
Work hours can extend into the PM time as long as ASP is aware of this ahead of time.
2.3 1 Site Rules Open
Description
• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.
• Contractors shall provide daily logs for each day they are on site.
• Construction progress meeting will be established once construction starts.
• It is of the utmost importance to show respect and courtesy to all staff at all times.
• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.
• Dumpster removal needs to happen daily, ASP has location for storing spoils outside facility until ready to be hauled at a later date.
Coordinate with ASP if this is acceptable.
• No smoking, vaping or smokeless tobacco use onsite.
• Temporary facilities by contractor.
• Tool control - Contractor shall provide all equipment and tools for Contractor’s own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner’s operations, and at the discretion of the Construction Manager.
o Workers will be required to bring a list of tools they will be taking inside the facility. These tools will be inventoried going into the facility and again when the worker is leaving the facility. All tools will be accounted for throughout the day.
o All tools brought in will need to be with crews at all time and not left unattended.
o Any broken blades or bits will be required to be held onto and present at tool checkout.
• Cell phones - Cell phones, weapons, and cameras/camcorders are not allowed inside the facility.
o Foreman will be allowed to have one cell phone.
State of Iowa - Department of Administrative Services Page 3 of 6 Printed On: Sep 28, 2026 10:40 AM CDT
• Background checks o Must be performed on all on site employees, including sub-contractors.
o The Contractor hereby explicitly authorizes the Iowa DAS to conduct criminal history and/or other background investigation(s) of the Contractor, its officers, supervisory personnel, employees, and other staff retained by the Contractor or their sub-contractors for the performance of the contract.
o A State of Iowa record check request form will be provided at the pre-construction meeting of successful bidder.
• In addition to background checks all contractors who will be working onsite will need to take the PREA test which can be found here: https://docs.google.com/presentation/d/1_8IcvvpMCYdqasseVuOxzY2ISqjS3RUi6Oups7t6-zA/pub?start=false&loop=false&delayms=3000&slide=id.p
• Work hours: 7am - 4pm, Thursday-Sunday unless arrangements are made in advance.
o Gates close during count hours and no one is able to enter or exit until count is completed. Count starts at 12:00pm o Work underneath tunnel and not blocking sallyport gate can take place Monday-Friday. restricted work hours are for blocking access to sallyport entrance and will need to be scheduled during Thursday-Sunday.
• View Specification 01 1200 - Contract Summary for more information.
Official Documented Meeting Minutes If working later on site a PM count will take place at 5:30pm and a few times thought the night. Afternoon count will be the main impact as no entry or exit for manpower or deliveries. All work will be supervised/escorted by ASP staff. Coordination with working schedule is needed.
One cell phone will be allowed by foreman but must be checked in and out prior with a locking screen.
No RED or BLue clothing, Highvis is preferred.
Emergency access will be needed for EMS or Fire, steel plates need to be on site with equipment to place them if needed.
RFB Overview
3.1 1 Bid Submission Open
Description
• Bids are due Monday, October 5th, 2026 no later than 2:00pm.
• The Bid shall be submitted to the Issuing Officer through the IMPACS Electronic Procurement System.
o Link and information is in the project manual o Contractors will need to register prior to bidding o Bidders will need to register regardless of whether it has already done business with the State of Iowa.
o Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
• Bid Opening will be held via conference call on Monday, October 5th, 2026 at 3:00pm o https://teams.microsoft.com/meet/261639584145534?p=gVn258daNG76HK6asJ teleconference number Meeting ID: 261 639 584 145 534 Passcode: Ft2Yn6vN
• Contractor shall reference section 00 0116 for the bid submittal checklist o Bid Proposal Information o Non Discrimination Clause Information o Contractor Targeted Small Business Enterprise Pre-Bid Contract Information
State of Iowa - Department of Administrative Services Page 4 of 6 Printed On: Sep 28, 2026 10:40 AM CDT https://protect-us.mimecast.com/s/AmLdCjRv4AcYNrkJfWlxTi https://protect-us.mimecast.com/s/AmLdCjRv4AcYNrkJfWlxTi https://teams.microsoft.com/meet/261639584145534?p=gVn258daNG76HK6asJ o Bid Security – 5% of total Bid amount
• Apparent low bidder will be required to submit subcontractor/supplier list 48hrs after the bid opening
3.2 1 Bid Schedule Open
Description
• Questions/Substitutions Due in Writing to Construction.Procurement@das.iowa.gov: September 25th, 2026 by 2:00pm
• Addendum Issued: September 29th (Pending Questions)
• Bids Due: October 5th, by 2:00pm
• Tentative NOI Issued: October 6th
3.3 1 Administrative Details Open
Description
• Contractors will sign a modified ConsensusDocs 802. Example in the project manual.
• Project-specific Certificate of Insurance must be provided prior to contract execution. Follow example in the project manual and limits in the 802.
• Project-specific P&P bonds must be provided prior to contract execution.
• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours of the bid.
• DAS will provide tax exempt certificates upon request.
• Procore will be used for all project management, at no cost to the trade contractor.
o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign
• Contractor Schedule of Values shall be broken out as specified in the project manual.
o SOV must contain a closeout line item for at least 1% of the total contract value.
o This line item can only be invoiced once the certificate of final completion has been signed by all parties.
Official Documented Meeting Minutes Please review COI and Bond requirements to speed up contract execution. Bonds will be needed prior to finalizing contracts.
This is a mandatory bid meeting, please include certificate of site visit form "Signed" when submitting bid forms.
3.4 1 Pre-Bid Site Visits Open
Description Site walk as needed.
Official Documented Meeting Minutes Site visit walk performed with all contractors on site. Questions in field will be recorded as best as possible, but formal questions need to be submitted to Procurement.
Questions
State of Iowa - Department of Administrative Services Page 5 of 6 Printed On: Sep 28, 2026 10:40 AM CDT mailto:Construction.Procurement@das.iowa.gov:
4.1 1 Questions Open
Description Submit all questions in writing to construction.procurement@das.iowa.gov.
These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.
Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.
State of Iowa - Department of Administrative Services Page 6 of 6 Printed On: Sep 28, 2026 10:40 AM CDT noah.thelen Image
ASP Sallyport Tunnel and LUB
Tunnel Repairs
IDAS Project # 9524.00
SH Project # 2260011410
Issued for Addendum 01
September 25, 2026
ADDENDUM NUMBER 01
00 9111 - 1
SECTION 00 9111
PARTICULARS:
DATE: September 25, 2026
PROJECT: ASP Sallyport Tunnel and LUB Tunnel Repairs
PROJECT NUMBER: 2260011410
OWNER: Iowa Department of Administrative Services
ARCHITECT: Shive-Hattery, Inc.
TO: PROSPECTIVE BIDDERS:
THIS ADDENDUM FORMS A PART OF THE BIDDING AND CONTRACT DOCUMENTS AND
MODIFIES THE BIDDING DOCUMENTS DATED 09-25-2026 WITH AMENDMENTS AND
ADDITIONS NOTED BELOW. THIS ADDENDUM SUPERSEDES AND SUPPLEMENTS ALL
PORTIONS OF THE ORIGINAL BIDDING AND CONTRACT DOCUMENTS WITH WHICH IT
CONFLICTS.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED IN THE BID
FORM. FAILURE TO DO SO MAY DISQUALIFY THE BIDDER.
CHANGES TO THE SPECIFICATIONS
03 3000 – CAST-IN-PLACE CONCRETE
1. REVISE section 1.1.A.1 to: Tunnel roof and walls.
2. REMOVE section 1.5.B.10.
3. REVISE section 2.2.A to: Epoxy coated reinforcing bars: ASTM A775/A775M, Grade 60 (Grade 420), deformed and straight and ASTM A934A934M, Grade 60 (Grade 420), deformed and bent and cut prior to coating.
4. REMOVE section 2.2.B.
5. REVISE section 2.4.A.1 to include Type III, high early strength in lieu of Type I/II.
6. REVISE section 2.12.A to: Tunnel Roof and Walls: Proportion normal-weight concrete mixture as follows:
7. REVISE section 2.12.A.1 to: Minimum Compressive Strength: 4000 psi (27.6 MPa) at 48 hours.
8. REVISE section 2.12.B.1 to: Minimum Compressive Strength: 4000 psi (27.6 MPa) at 48 hours.
9. REVISE section 3.14.C.6 to: Compressive-Strength Tests: ASTM C39/C39M; test one set of laboratory-cured specimens at 24 hours and one set of specimens at 48 hours.
10. REVISE section 3.14.C.8 to: Test results shall be reported in writing to Architect/Engineer, concrete manufacturer, and Contractor withing 24 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 48 hours, concrete mixture portions and materials, compressive breaking strength, and type of break for both 24- and 48-hours tests.
ASP Sallyport Tunnel and LUB Tunnel Repairs
IDAS Project # 9524.00
SH Project # 2260011410
00 9111 - 2
Issued for Addendum 01
September 25, 2026
CHANGES TO THE DRAWINGS
C101 – SITE PLAN
11. REVISE pavement removal and replacement west of the tunnel to be a half panel.
12. REVISE existing concrete section at the southwest corner of the project to be replaced with sod.
S000 – STRUCTURAL GENERAL INFORMATION AND SPECIAL INSPECTIONS
13. REVISE cast-in-place concrete notes as shown on attached.
ATTACHMENTS: C101, S000
PREPARED BY: SHIVE-HATTERY, INC.
END OF ADDENDUM NUMBER 01
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
09/25/2026
Signature Date
Printed or Typed Name Matthew Mettemeyer
License Number 20396
My License Renewal Date is: 2028
Pages, Sheets, or Divisions covered by this Seal: All
METAL STAIRS
CONCRETE
HIGH BARBED WIRE FENCE
CONCRETE
CONCRETE
CONCRETE
GRASS
GRASS
STANDARD CURB
ROLLED CURB
UNKNOWN UTILITY
8" PCC REINFORCED PAVING - #5 BARS AT
18" SPACING. CONTRACTOR TO USE HIGH
EARLY STRENGTH (M-MIX) CONCRETE TO
MINIMIZE DRIVE CLOSURES (TYP)
MATCH EXISTING GRADES AT
REMOVAL LIMITS (TYP)
7.8'
COORDINATE BARRICADE
RELOCATION WITH FACILITY
PROVIDE POSITIVE DRAINAGE AND
CONSISTENT SLOPES THROUGH
PAVEMENT REPLACEMENT AREA (TYP)
PROTECT EXISTING
PCC PAVING (TYP)
ANAMOSA STATE PENITETIARY
REMOVE AND DISPOSE OF
EXISTING PAVING FULL
DEPTH TO NEAREST JOINT
OR HALF JOINT (TYP)
REMOVE AND REPLACE EXISTING
ROLLED CURB (TYP). MATCH
EXISTING HEIGHT AND STYLE
REMOVE AND REPLACE EXISTING
ROLLED CURB (TYP). MATCH
EXISTING HEIGHT AND STYLE
PROTECT EXISTING BUILDING (TYP)
PROTECT EXISTING FENCING (TYP)
SIDEWALK
CLOSED SIGN
SIDEWALK
CLOSED SIGN
EXISTING OPERABLE GATE (FOR REFERENCE ONLY)
TUNNEL LID - SEE SHEET
S101 FOR DETAILS (TYP)
INSTALL WALKING MAT OVER
TRENCHES AND GRASS TO
CONNECT EXISTING SIDEWALKS
CONTRACTOR TO LOCATE WATER
LINE AND UNKNOWN UTILITY PRIOR
TO CONSTRUCTION AND TO PROTECT
DURING CONSTRUCTION
8" PCC REINFORCED PAVING - #5 BARS AT
18" SPACING. CONTRACTOR TO USE HIGH
EARLY STRENGTH (M-MIX) CONCRETE TO
MINIMIZE DRIVE CLOSURES (TYP)31
.2
5.0' 3.6'
PAVEMENT TO BE REMOVED AND
REPLACED WITH SOD
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C101
SI
TE
P
LA
N
BD
D
KA
L
BI
D
/0
4/
.0
N
HI
G H
ST
RE
ET
D O
C A
SP
S
AL
LY
PO
R
T
TU
N N
EL
L
IV
IN
G
U N
IT
B
T U
N N
EL
R
EP
AI
R
DA
S
PR
O
JE
CT
N O
: 9
4.
AN
AM
O
SA
, I A
\\s h.
sh ive
-h at te ry
.c om
\D
AT
A\ Pr oj ec ts \2
6\
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
- S
IT
E
PL
AN
.d wg 9/
/2
:0
3:
A M
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B
A B C D E F
C D E F
PHASING NOTES:
1. EMERGENCY VEHICLE ACCESS SHALL BE
PROVIDED TO THE FACILITY AT ALL TIMES.
2. CONTRACTOR TO PROVIDE MEANS TO
ALLOW EMERGENCY VEHICLE ACCESS
THROUGH PROJECT AREA. GRANULAR
MATERIAL AND STEEL PLATES SHALL BE
MADE AVAILABLE ADJACENT TO ACTIVE
TRENCHING AND CONCRETE REMOVAL
AREAS THROUGHOUT THE PROJECT.
3. STEEL PLATES SHALL BE EMERGENCY
VEHICLE TRAFFIC RATED (1.5" THICK
MINIMUM), SHALL EXTEND AT LEAST 18"
PAST OPENING IN EACH DIRECTION AND
SHALL HAVE EYE BOLTS THAT A CHAIN CAN
EASILY CONNECT TO.
4. CONSTRUCTION SHALL BE PHASED IN A WAY
THAT MAINTAINS EMERGENCY ACCESS
THROUGHOUT THE PROJECT.
CONSTRUCTION STAGING NOTES
1. CONTRACTOR SHALL COORDINATE ALL STAGING AREAS WITH THE FACILITY AND CONSTRUCTION MANAGER.
2. CONTRACTOR SHALL REPLACE ALL PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES AT THE END OF CONSTRUCTION.
CONTRACTOR TO PROVIDE PHOTO DOCUMENTATION OF EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
3. CONTRACTOR SHALL PROVIDE BARRICADES, FENCING OR OTHER DEVICES TO KEEP UNAUTHORIZED PERSONNEL OUT OF
PROJECT SITE.
4. CONTRACTOR WILL BE REQUIRED TO HAVE STEEL PLATES OR TEMPORARY ROCK ON SITE TO MAINTAIN EMERGENCY ACCESS AT ALL TIMES. ANYTIME THE CONTRACTOR IS NOT ON SITE THE DRIVES MUST BE LEFT IN A CONDITION THAT
EMERGENCY ACCESS CAN BE PROVIDED.
TRAFFIC AND PEDESTRIAN CONTROL NOTES
1. CONTRACTOR TO COORDINATE WITH FACILITY PRIOR TO CLOSING DOWN GATES DURING CONSTRUCTION. ACCESS TO ADJACENT BUILDINGS, DRIVES, PARKING AND SIDEWALKS ARE TO BE MAINTAINED THROUGHOUT CONSTRUCTION UNLESS
APPROVED BY OWNER.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL TRAFFIC DURING CONSTRUCTION AND PROVIDE ADEQUATE
TRAFFIC AND PEDESTRIAN CONTROL AND SIGNAGE.
3. CONTRACTOR TO INSTALL AND MAINTAIN CONSTRUCTION FENCE AROUND ALL AREAS OF ACTIVE CONSTRUCTION.
CONTRACTOR SHALL ASSUME PEDESTRIAN TRAFFIC WILL BE IN THE AREA THROUGHOUT THE PROJECT DURATION.
4. CONTRACTOR TO COORDINATE CONSTRUCTION ACCESS, STAGING AND PARKING AREAS WITH FACILITY AND
CONSTRUCTION MANAGER AND MINIMIZE IMPACTS TO FACILITY'S OPERATIONS.
DEMOLITION NOTES
1. REMOVAL REQUIREMENTS SHOWN ON THE PLANS SHOULD BE CONSIDERED MINIMUM REMOVAL AND REPLACEMENT REQUIREMENTS. CONTRACTORS SHALL ADJUST REMOVAL LIMITS AND DIMENSIONS AS REQUIRED BY CONSTRUCTION MEANS AND METHODS AND ACTUAL SITE CONDITIONS. CONTRACTORS SHOULD FACTOR ADDITIONAL ANTICIPATED REMOVAL AND REPLACEMENT REQUIREMENTS INTO THEIR BIDS AS ADDITIONAL COMPENSATION REQUESTS FOR ADJUSTED OR EXPANDED REMOVAL LIMITS REQUIRED BY CONTRACTOR MEANS AND METHODS WILL NOT BE APPROVED.
2. CONTRACTOR SHALL REPLACE AT NO COST TO THE STATE ALL DAMAGED STREETS, DRIVES, SIDEWALKS, CURB AND GUTTER, SIGNS, PAVEMENT MARKINGS, LIGHTS, FENCES AND ALL OTHER SURFACE STRUCTURES NOT SCHEDULED TO BE
REMOVED DURING THE COURSE OF THE WORK.
3. WHERE A SECTION OF PAVEMENT, CURB AND GUTTER OR SIDEWALK IS CUT OR OTHERWISE DAMAGED BY THE CONTRACTOR, THE ENTIRE SECTION SHALL BE REMOVED AND REPLACED. PAVEMENT, CURBS AND GUTTERS AND SIDEWALKS SHALL BE REMOVED TO THE NEAREST JOINT A MINIMUM OF TWO FEET BEYOND THE EDGE OF ALL EXCAVATIONS. CONTRACTOR SHALL DOCUMENT (OR PHOTOGRAPH) ALL CRACKED PCC PAVEMENT OR DAMAGED HMA PAVEMENT PRIOR TO CONSTRUCTION. IF NEW CRACKS IN PCC PAVEMENT DEVELOP OR HMA PAVEMENT IS DAMAGED DUE TO CONSTRUCTION TRAFFIC (EXTENDS BEYOND CONSTRUCTION LIMITS), THE CONTRACTOR SHALL REPLACE THE
DAMAGED AREA AT NO ADDITIONAL COST TO STATE.
GRADING AND EROSION CONTROL NOTES
1. THE DISTURBED CONSTRUCTION AREA IS LESS THAN 1 ACRE, SO AN NPDES GENERAL PERMIT NO. 2 AND STORMWATER
POLLUTION PREVENTION PLAN (SWPPP) ARE NOT REQUIRED.
2. BEST MANAGEMENT PRACTICES (BMPs) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY CONSTRUCTION
MANAGER OR OWNER'S REPRESENTATIVE.
3. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED AND
PROPERLY TREATED OR DISPOSED.
4. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN
AND CLEAN UP FUEL OR CHEMICAL SPILLS AND LEAKS.
5. DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS
FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
6. RUBBISH, TRASH, GARBAGE, LITTER OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS.
MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER
DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
7. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS
MUST BE REMOVED IMMEDIATELY.
8. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE IOWA DNR, US EPA AND LOCAL REGULATIONS DEALING WITH
STORMWATER RUNOFF AND EROSION CONTROL.
9. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL EXCESS SOIL MATERIAL CREATED BY THE PROJECT
PAVEMENT GENERAL NOTES
1. ALL PROPOSED PAVEMENT PATCHES ARE APPROXIMATE ONLY AND SHOULD BE CONSIDERED MINIMUM REMOVAL EXTENTS. EXTEND AND ADJUST PAVEMENT PATCHES AS REQUIRED WITH PRIOR APPROVAL BY ENGINEER.
2. ALL SLOPES IN PAVEMENT SHALL BE UNIFORM TO AVOID PONDING. ANY PONDING ON PAVEMENT PATCHES, NEW PAVING
OR ADJACENT PAVING WILL BE CONSIDERED UNACCEPTABLE AND SHALL BE REPLACED.
3. USE TYPE "A" COMPACTION PER IOWA DOT STANDARD SPECIFICATIONS ON SUBGRADE AND SUBBASE.
SPECIFICATIONS
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) SHALL APPLY TO ALL SITE
WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN.
A. CONCRETE PAVING
CONCRETE: MATERIALS AND MIXING FOR ALL CONCRETE WORK, UNLESS OTHERWISE SPECIFIED, SHALL CONFORM TO IOWA
DOT SPECIFICATIONS FOR AIR-ENTRAINED TYPE M-4 OR C-4 MIX WITH TYPE I CEMENT.
FLY ASH (CONTRACTOR'S OPTION): ASTM C618, TYPE C, NOT TO EXCEED 15% OF CEMENTITIOUS MATERIAL.
COARSE AGGREGATE: DURABILITY SHALL BE CLASS III, 3/4" MAX.
COMPRESSIVE STRENGTH: 2800 PSI @ 7 DAYS AND 4000 PSI @ 28 DAYS
SLUMP: 3" ± 1" or 8" MAXIMUM WITH SUPER PLASTICIZER OR AS APPROVED BY GEOTECHNICAL ENGINEER
AIR CONTENT: 7.0% ± 1.0% OR AS APPROVED BY GEOTECHNICAL ENGINEER
WATER/CEMENT RATIO: NOT TO EXCEED 0.488 FOR TYPE C-4 MIX AND NOT TO EXCEED .400 FOR TYPE M-4 MIX
FINISH: HEAVY BROOM FINISH
TESTING: ONE SET OF TEST CYLINDERS REQUIRED FOR EACH 100 CY, OR PORTION THEREOF, OF CONCRETE POURED PER WORK LOCATION. CONCRETE TESTING TO BE DONE AND PAID FOR BY OWNER. CONTRACTOR SHALL COORDINATE AND
SCHEDULE ALL REQUIRED TESTING AND GEOTECHNICAL WORK WITH CONSTRUCTION MANAGER.
SURFACE CURING: CONTRACTOR SHALL APPLY WHITE PIGMENT LIQUID CURING COMPOUND IN A FINE SPRAY TO FORM CONTINUOUS UNIFORM FILM AFTER FINISHING AND SURFACE MOISTURE HAS DISAPPEARED OR WITHIN 30 MINUTES AFTER
FORMS ARE REMOVED.
SUBMIT CONCRETE MIX DESIGN FOR APPROVAL.
COLD WEATHER CONCRETE: WHEN THE ATMOSPHERIC AIR TEMPERATURE MAY BE EXPECTED TO DROP BELOW 40°F AT THE TIME CONCRETE IS DELIVERED TO THE WORK SITE, DURING PLACEMENT OR AT ANY TIME DURING CURING PERIOD, CONCRETE SHALL BE MIXED, PLACED AND PROTECTED IN ACCORDANCE WITH ACI STANDARD 306, "RECOMMENDED PRACTICE FOR COLD WEATHER CONCRETING." IT IS THE OWNER'S PREFERENCE TO AVOID COLD WEATHER CONCRETE AND PROVIDE TEMPORARY
GRANULAR SURFACING FOR SIDEWALK AND PAVING AS REQUIRED.
B. JOINT SEALANT
PAVING JOINTS SHALL BE SEALED PER IOWA DOT SPECIFICATIONS. BACKER ROD SHALL NOT BE USED FOR JOINT SEALING.
C. PAVEMENT JOINTING
PROVIDE IDOT TYPE 'C' JOINTS FOR JOINTS IN DRIVES AND PAVEMENT. PROVIDE JOINTS AT A MAXIMUM SPACING OF 12 FEET
FOR PAVING OR SQUARE PANELS FOR SIDEWALKS.
PROVIDE IDOT TYPE 'RD' OR TYPE 'BT' JOINTS TO TIE INTO EXISTING CONCRETE PAVING.
PROVIDE IDOT TYPE 'DW' JOINTS FOR END OF DAY PAVING.
SAW CUTTING TO BE COMPLETED A MAXIMUM OF 24 HOURS FROM CONCRETE PLACEMENT. RANDOM CRACKING CAUSED BY
DELAYED SAW CUTTING MAY REQUIRE REMOVAL AND REPLACEMENT.
CONTRACTOR TO PROVIDE OWNER'S REPRESENTATIVE WITH A POURING SEQUENCE AND JOINTING PLAN FOR APPROVAL
PRIOR TO PAVING.
NORTH
1 8" REINFORCED PCC PAVING
TUNNEL CAP, SEE STRUCTURAL
PLANS AND DETAILS
SEE STRUCTURAL
DETAIL FOR DOWELING
BARS INTO TUNNEL CAP
6" MODIFIED SUBBASE
(IDOT GRADATION 14)
12" SCARIFIED AND
RECOMPACTED SUBGRADE (95%
STANDARD PROCTOR DENSITY)
#5 TRANSVERSE
BARS AT 18" O.C.
#5 LONGITUDINAL
BARS AT 18" O.C.
8" PCC PAVING
TUNNEL WALL
AD
D
9/
/2
AD
D
EN
D
U M
1. CODES:
A. INTERNATIONAL BUILDING CODE (IBC) 2024
B. AMERICAN CONCRETE INSTITUTE - BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE (ACI 318)
C. AMERICAN SOCIETY OF CIVIL ENGINEERS AND STRUCTURAL ENGINEERING INSTITUTE
(ASCE/SEI 7) - MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
2. DESIGN LOADS PER THE 2024 IBC (RISK CATEGORY II)
A. DEAD LOADS
STRUCTURE SELF WEIGHT AS SHOWN
B. LIVE LOADS
ROOF LID HS-20
C. ROOF SNOW LOAD
GROUND SNOW LOAD, Pg 25 PSF FLAT ROOF SNOW LOAD, Pf 21 PSF SNOW EXPOSURE FACTOR, Ce 1.0 SNOW IMPORTANCE FACTOR, Is 1.2 THERMAL FACTOR, Ct 1.0
D. DEFLECTION CRITERIA
a. FLOOR LIVE LOAD L/360
DESIGN INFORMATION
1. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ALL PROJECT DRAWINGS AND
SPECIFICATIONS. REFER TO ALL DRAWINGS FOR THE COORDINATION OF THE WORK IN THIS
PROJECT.
2. THE INTENT OF THESE PLANS AND NOTES IS TO PRESENT THE PROJECT REQUIREMENTS.
MAJOR DETAILS HAVE BEEN SHOWN ON THE DRAWINGS. HOWEVER, CERTAIN MINOR DETAILS
MUST BE WORKED OUT IN THE FIELD OR SHOP DRAWING PROCESS BY THE CONTRACTOR.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN ON DRAWINGS ARE TO BE CONSIDERED TYPICAL
FOR ALL SIMILAR CONDITIONS.
4. THE STRUCTURE IS DESIGNED TO BE STABLE AND SELF-SUPPORTING AFTER THE STRUCTURE
IS FULLY ERECTED AND ALL CONNECTIONS ARE COMPLETED. UNLESS NOTED OTHERWISE, THE
DRAWINGS DO NOT INDICATE THE MEANS AND METHODS OF CONSTRUCTION. IT IS SOLELY THE
CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ERECTION PROCEDURE AND SEQUENCING
TO ENSURE THE SAFETY OF THE STRUCTURE AND ITS COMPONENT PARTS DURING ERECTION.
THIS INCLUDES THE ADDITION TEMPORARY BRACING, GUYS AND TIE-DOWNS NECESSARY FOR
THE ERECTION PROCESS.
5. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW THE APPLICABLE SAFETY CODES
AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION.
6. CONTRACTOR'S CONSTRUCTION AND ERECTION SEQUENCE SHALL CONSIDER THE EFFECTS OF
THERMAL MOVEMENTS OF THE STRUCTURAL ELEMENTS DURING THE CONSTRUCTION PERIOD.
7. EXISTING CONDITIONS:
A. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS AND CONDITIONS
RELATING TO EXISTING CONSTRUCTION AND EXISTING SERVICES ON SITE. THE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOCATIONS OF EXISTING COLUMNS,
WALLS, OPENINGS, ETC, WITH THE DRAWINGS PRIOR TO PROCEEDING WITH THE WORK.
ANY DISCREPANCIES WITH THE CONTRACT DOCUMENTS SHALL BE REPORTED TO THE
ENGINEER BEFORE PROCEEDING WITH THE AFFECTED PART OF THE WORK.
B. DURING CONSTRUCTION THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH
ARE NOT KNOWN OR ARE AT VARIANCE WITH PROJECT DOCUMENTATION (DISCOVERY).
SUCH CONDITIONS MAY INTERFERE WITH THE NEW CONSTRUCTION OR REQUIRE
PROTECTION AND/OR SUPPORT OF EXISTING WORK DURING CONSTRUCTION. IT MAY ALSO
CONSIST OF DAMAGED OR DETERIORATION OF STRUCTURAL MATERIALS OR COMPONENTS
WHICH COULD JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE STRUCTURE. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF ALL DISCOVERIES WHICH MAY INTERFERE
WITH THE PROPER EXECUTION OF THE WORK OR JEOPARDIZE THE STRUCTURAL INTEGRITY
OF THE STRUCTURE PRIOR TO PROCEEDING WITH THE WORK RELATED TO SUCH
DISCOVERIES.
C. DURING THE CONSTRUCTION PROCESS, IT SHALL BE SOLELY THE CONTRACTOR'S
RESPONSIBILITY TO MAINTAIN THE INTEGRITY OF THE EXISTING STRUCTURE AND TO
PROTECT IT FROM DAMAGE ANY PORTIONS THAT ARE TO REMAIN.
D. CONTRACTOR SHALL INVESTIGATE THE SITE DURING EARTHWORK OPERATIONS FOR FILL
MATERIAL OR BURIED STRUCTURES. IMMEDIATELY, NOTIFY THE ENGINEER IF ANY SUCH
MATERIALS OR STRUCTURES ARE DISCOVERED.
8. STRUCTURAL COORDINATION
A. EXCESS COST DUE TO VARIATION IN THE STRUCTURE TO ACCOMMODATE A SUBSTITUTION
OR ALTERNATE MANUFACTURER(S) FROM THE LISTED BASIS OF DESIGN SHALL BE BORNE
BY THE CONTRACTOR.
9. BEFORE SUBMITTING A BID, EACH BIDDER SHALL VISIT THE SITE AND BECOME FULLY
ACQUAINTED WITH THE EXISTING CONDITIONS, CONSTRUCTION REQUIREMENTS,
RESTRICTIONS, QUANTITIES AND EQUIPMENT NECESSARY TO COMPLETE THE WORK. THE BID
SHALL INCLUDE ALL ITEMS REQUIRED TO COMPLETE THE WORK WITHIN THE EXISTING
CONDITIONS. DISRUPTION OF THE OWNERS NORMAL ACTIVITIES AROUND THE CONSTRUCTION
SITE SHALL BE KEPT TO A MINIMUM.
10. THE COST OF ADDITIONAL DESIGN WORK DUE TO ERRORS AND OMISSIONS BY THE
CONTRACTOR DURING CONSTRUCTION SHALL BE BORNE BY THE RESPONSIBLE CONTRACTOR.
11. ANY ENGINEERING DESIGN PROVIDED BY OTHER AND SUBMITTED FOR REVIEW OR RECORD
SHALL BEAR THE STAMP AND SIGNATURE OF A PROFESSIONAL STRUCTURAL ENGINEER
REGISTERED IN THE STATE WHERE THE PROJECT EXISTS.
12. CONTRACTOR SHALL COORDINATE WORK SCHEDULES WITH THE OWNER TO ESTABLISH
CONSTRUCTION SEQUENCING AROUND ANY OCCUPIED AREAS. CONTRACTOR SHALL NOT
PROCEED TO OCCUPIED AREAS UNTIL AUTHORIZED BY THE OWNER.
13. ALL ELEMENTS AND SURFACES DAMAGED BY DEMOLITION, BUT NOT SCHEDULED FOR REMOVAL
SHALL BE REPAIRED AND REFINISHED TO MATCH THE ADJACENT SURFACES AT NO ADDITIONAL
COST TO THE OWNER.
14. CONTRACTOR SHALL REMOVE ALL DEBRIS AND WASTE MATERIALS RESULTING FROM
CONSTRUCTION FROM THE SITE, UNLESS NOTED OTHERWISE.
15. CONTRACTOR SHALL MINIMIZE CREATION OF DUST, DIRT AND WINDBORNE DEBRIS FROM
BLOWING ACROSS THE SITE AND ONTO ADJACENT SITES.
16. CONTRACTOR SHALL COVER ANY EXTERIOR OPENING WITH TEMPORARY CLOSURES WHEN NOT
WORKING ON SITE TO PROTECT THE INTERIOR SPACES FROM WEATHER, INSECTS, RODENTS
AND INTRUDERS.
17. TUNNELS CANNOT BE LEFT OPEN OVERNIGHT. AT END OF WORKDAY, ANY DEMOLISHED LID
EITHER HAS TO BE REPLACED WITH NEW CONCRETE LID OR TEMPORARY STEEL PLATE
SCREWED DOWN.
18. ANY EQUIPMENT BROUGHT IN AT THE BEGINNING OF THE WORK DAY NEEDS TO TAKEN OUT AT
THE END OF THE WORK DAY AND NOT LEFT INSIDE THE SECURED PERIMETER.
19. CONCRETE TRUCKS CANNOT LEAVE THE DRIVEWAY INSIDE THE SECURED PERIMETER.
CONCRETE BUGGIES NEED TO BE USED TO CARRY CONCRETE BEYOND THE DRIVEWAY TO THE
LID POURS.
20. PROVIDE A CONCRETE POUR SCHEDULE THAT SHOWS HOW PEDESTRIAN ACCESS IS
MAINTAINED TO ALL LOCATIONS. CONTRACTOR CANNOT BLOCK ALL ENTRANCES TO ANY ONE
BUILDING AT ONE TIME.
GENERAL NOTES
1. ALL CONCRETE SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE AMERICAN
CONCRETE INSTITUTES PUBLICATIONS: ACI 301, ACI 305.1, ACI 306.1, ACI 315, AND ACI 318
UNLESS NOTED OTHERWISE.
2. CONCRETE COMPRESSIVE STRENGTH (48 HR)(F'c)
TUNNEL ROOF AND WALLS 4000 PSI
SLAB ON GRADE 4000 PSI
3. CONCRETE REINFORCEMENT STANDARDS:
EPOXY COATED BENT AND CUT BARS ASTM A934 Fy = 60 KSI EPOXY COATED REINFORCING ASTM A775 Fy = 60 KSI
4. ALL CONCRETE SHALL BE STONE AGGREGATE UNLESS NOTED OTHERWISE. SUBMIT MIX DESIGN
AND DOCUMENTATION FOR APPROVAL PER ACI 318.
5. REINFORCEMENT PROTECTION
A. CONCRETE PLACED AGAINST EARTH - 3"
B. CONCRETE PLACED IN FORMS BUT EXPOSED TO WEATHER OR EARTH:
a. BARS #5 AND SMALLER - 1 1/2"
b. BARS LARGER THAN #5 - 2"
C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
a. SLABS, WALLS, AND JOISTS - 3/4"
b. BEAMS, COLUMNS - 1 1/2"
6. WHERE REQUIRED, DOWELS SHALL MATCH THE SIZE, NUMBER AND SPACING OF THE MAIN
REINFORCING UNLESS NOTED OTHERWISE.
7. ALL SPLICES, STANDARD HOOKS, AND DEVELOPMENT LENGTHS TO BE PER THE REFERENCED
EDITION OF ACI 318. MAKE BARS CONTINUOUS AROUND CORNERS. ALL SPLICES SHALL BE BY
CONTACT LAP.
8. ALL SPLICES SHALL BE A CLASS "B" TENSION SPLICE AS DEFINED IN ACI 318. PROVIDE LAP
SPLICES LENGTHS AS FOLLOWS:
LAP SPLICE LENGTHS GIVEN, ASSUME CLEAR SPACING BETWEEN BARS OF 2 BAR DIAMETERS,
AND A MINIMUM CLEAR COVER OF 1 BAR DIAMETER. TOP BARS ARE DEFINED AS HORIZONTAL
BARS WITH MORE THAN 12" ON FRESH CONCRETE BENEATH THE BARS.
9. WALLS SHALL NOT HAVE JOINTS IN A HORIZONTAL PLANE, UNLESS APPROVED BY THE
ENGINEER.
10. CONSTRUCTION JOINTS IN STRUCTURAL CONCRETE WORK MUST BE MADE AT CENTER OF
SPAN OR AT CENTER OF SUPPORT WITH VERTICAL BULKHEADS AND HORIZONTAL KEYS,
UNLESS OTHERWISE SHOWN.
11. THERE SHALL BE NO ADDITIONAL OPENINGS LARGER THAN 10" IN CONCRETE WALLS AND SLABS
NOT SHOWN. REFER TO CONCRETE OPENING DETAIL FOR ADDITIONAL REINFORCEMENT
AROUND OPENINGS.
12. REINFORCING STEEL SHALL BE SECURELY FASTENED INTO FORMS PRIOR TO POURING
CONCRETE. WET SETTING OF REINFORCING STEEL WILL NOT BE ACCEPTED PER ACI.
13. CONCRETE MIX
COARSE AGGREGATE 100% PASSING 1" SIEVE
FINE AGGREGATE 100% PASSING 3/8" SIEVE
WATER/CEMENT RATIO 0.45 MAXIMUM
SLUMP (WITH WATER REDUCER) 4" TO 6"
AIR CONTENT 6% +/- 1.5%
14. ALL CONCRETE SHALL BE COATED WITH SALT GUARD, PER SPECIFICATIONS. CONCRETE FOR
TUNNEL ROOF AND WALLS SHALL INCLUDE INTEGRAL CRYSTALLINE WATERPROOFING
ADMIXTURE, PER SPECIFICATIONS.
15. ALL REINFORCING STEEL SHALL BE EPOXY-COATED AND 60 KSI YIELD STRENGTH, UNLESS
NOTED OTHERWISE.
16. ALL EXPANSION ANCHORS SHALL BE STAINLESS STEEL KWIK BOLT TZ BY HILTI OR APPROVED
EQUIVALENT, 4" EMBED.
17. ALL EPOXY-DRILLED REBAR SHALL BE INSTALLED WITH C6 EPOXY ADHESIVE BY RED HEAD OR
APPROVED EQUIVALENT. ALL THREADED ROD TO BE STAINLESS STEEL.
18. WHERE CONCRETE IS TO BE CAST AGAINST EXISTING CONCRETE, PREPARE SURFACE OF
EXISTING BY REMOVING ALL SPALLS, CORROSION, AND LOOSE CONCRETE.
BAR SIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
TYPICAL
19"
25"
31"
37"
54"
62"
70"
79"
87"
TOP BARS
25"
33"
41"
49"
71"
81"
91"
102"
114"
4000 PSI
CAST-IN-PLACE CONCRETE
1. STRUCTURAL STEEL SHALL CONFORM TO THE REFERENCED EDITION OF THE AISC
"SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS".
2. STRUCTURAL STEEL MATERIAL STANDARDS
WIDE FLANGE SECTIONS ASTM A992 Fy = 50 KSI ANGLES, CHANNELS & PLATES ASTM A36 Fy = 36 KSI SQUARE AND RECTANGULAR HSS ASTM A500, GR C Fy = 50 KSI ROUND HSS ASTM A500, GR C Fy = 46 KSI STANDARD PIPE SECTIONS ASTM A53, GR B Fy = 35 KSI
3. STRUCTURAL STEEL CONNECTION STANDARDS:
HIGH STRENGTH BOLTS ASTM F3125 GRADE A325
HEAVY HEX NUT ASTM A563
WASHERS ASTM F436
ANCHOR RODS ASTM F1554 GRADE 36
HEADED WELDED STUDS ASTM A108 TYPE B
WELDING ELECTRODES (CARBON STEEL) AWS 5.1, E70XX
4. WELDING SHALL BE IN ACCORDANCE WITH STRUCTURAL WELDING CODE, AWS D1.1, LATEST
EDITION, AND SHALL BE PERFORMED BY CERTIFIED WELDERS ONLY USING PROPER
ELECTRODES FOR MATERIAL BEING WELDED. PROVIDE WELD SIZE IN ACCORDANCE WITH AISC
SPECIFICATIONS, BUT NOT LESS THAN 3/16" FILLET, CONTINUOUS UNLESS OTHERWISE NOTED.
5. ALL HIGH STRENGTH BOLTS SHALL BE INSTALLED IN ACCORDANCE WITH RCSC -
"SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS." SEE DRAWINGS
FOR BOLTS SIZES. USE 3/4" DIAMETER, A325 BOLTS UNLESS NOTED OTHERWISE.
6. ALL BOLTED CONNECTIONS ARE BEARING TYPE, UNLESS INDICATED AS TENSION CONTROLLED
(TC) OR SLIP CRITICAL (SC). PROVIDE STANDARD HOLES FOR BEARING TYPE CONNECTION
WHICH ARE 1/16" WIDER DIAMETER THAN THE BOLT.
7. ALL EXTERIOR EXPOSURE STEEL FRAMING, STEEL LINTEL ASSEMBLIES, BRICK RELIEF ANGLES
AND CONNECTORS SHALL BE HOT DIPPED GALVANIZED. ITEMS INDICATED TO BE GALVANIZED
SHALL BE HOT-DIP GALVANIZED IN COMPLIANCE WITH ASTM A123.
8. AFTER FABRICATION, ALL STEEL SHALL BE CLEANED OF ALL RUST, LOOSE MILL SCALE AND
OTHER FOREIGN MATERIALS. STEEL SHALL BE HAND TOOLED CLEANED (SSPC-SP2) OR POWER
TOOL CLEANED (SSPC-SP3).
9. ALL STRUCTURAL STEEL WILL HAVE ONE COAT OF FABRICATOR'S STANDARD LEAD AND
CHROMATE-FREE RUST INHIBITIVE PRIMER APPLIED PRIOR TO DELIVERY TO THE JOB SITE
UNLESS NOTED OTHERWISE. ALL AREAS OF STRUCTURAL STEEL MEMBERS IN WHICH THE
PRIMER COATED SURFACE IS DAMAGED DURING CONSTRUCTION SHALL BE TOUCHED UP WITH
MATCHING PRIMER.
10. THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL STEEL MEMBERS FOR THE WORK OF
OTHER TRADES WITHOUT PRIOR WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER OF
RECORD.
11. CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORES, GUYS, BRACES AND OTHER
SUPPORTS DURING ERECTION TO KEEP STRUCTURAL STEEL SECURE, PLUMB AND IN
ALIGNMENT AGAINST TEMPORARY CONSTRUCTION LOADS AND LOADS EQUAL TO DESIGN
LOADS. REMOVE ALL TEMPORARY SUPPORTS WHEN PERMANENT STRUCTURAL STEEL
FRAMING AND CONNECTIONS ARE COMPLETED.
12. MAINTAIN ERECTION TOLERANCES OF STRUCTURAL STEEL WITHIN AISC 303, "CODE OF
STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES."
13. DO NOT ENLARGE MISALIGNED BOLT HOLES BY BURNING OR THERMAL CUTTING. REAM HOLES
THAT MUST BE ENLARGED TO INSTALL BOLTS.
STRUCTURAL STEEL
1. CONTRACTOR SHALL SUBMIT FOR REVIEW AND APPROVAL THE FOLLOWING SUBMITTALS FOR
EACH MATERIAL INDICATED BELOW.
2. CONCRETE REINFORCING
A. SUBMIT CONCRETE REINFORCEMENT SHOP DRAWINGS IN ACCORDANCE WITH ACI 315 FOR
APPROVAL.
a. DETAIL BARS IN ACCORDANCE WITH "ACI DETAILING MANUAL", PUBLICATION SP-66 AND
THE LATEST EDITION OF ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE".
3. CAST-IN-PLACE CONCRETE
A. SUBMIT CONCRETE MIX DESIGNS FOR EACH APPLICATION LOCATION INDICATED IN THE
DRAWINGS.
4. CONCRETE POUR SCHEDULE
A. SUBMIT CONCRETE POUR SCHEDULE FOR REVIEW BY FACILITY AND EOR PRIOR TO
POURING ANY CONCRETE.
SUBMITTALS
6. THE SPECIAL INSPECTION AND QUALITY ASSURANCE PROGRAM DOES NOT RELIEVE THE CONTRACTOR OF HIS OR HER RESPONSIBILITY TO
PERFORM QUALITY CONTROL.
INTERIM REPORTS SHALL BE SUBMITTED TO THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. A FINAL REPORT OF SPECIAL INSPECTIONS DOCUMENTING COMPLETION OF ALL REQUIRED SPECIAL INSPECTIONS, TESTING AND CORRECTIONS OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS SHALL BE SUBMITTED PRIOR TO ISSUANCE OF A CERTIFICATE OF USE AND OCCUPANCY. JOB SITE SAFETY AND MEANS AND METHODS OF CONSTRUCTION ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
QUALIFICATIONS OF INSPECTORS AND TESTING TECHNICIANS
THE QUALIFICATIONS OF ALL PERSONNEL PERFORMING SPECIAL INSPECTION AND TESTING ACTIVITIES ARE SUBJECT TO THE APPROVAL OF THE BUILDING OFFICIAL. THE CREDENTIALS OF ALL INSPECTORS AND TESTING TECHNICIANS SHALL BE PROVIDED IF REQUESTED.
KEY FOR MINIMUM QUALIFICATIONS OF INSPECTION AGENTS:
WHEN THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE DEEMS IT APPROPRIATE THAT THE INDIVIDUAL PERFORMING A STIPULATED TEST OR INSPECTION HAVE A SPECIFIC CERTIFICATION OR LICENSE AS INDICATED BELOW, SUCH DESIGNATIONS SHALL APPEAR
BELOW THE AGENT ON THE SCHEDULE.
ICC-PCSI PRESTRESSED CONCRETE SPECIAL INSPECTOR
NATIONAL INSTITUTE OF CERTIFICATION IN ENGINEERING TECHNOLOGIES (NICET)
NICET-CT CONCRETE TECHNICIAN - LEVELS I, II, III, & IV
NICET-ST SOILS TECHNICIAN - LEVELS I, II, III & IV
NICET-GET GEOTECHNICAL ENGINEERING TECHNICIAN - LEVEL I, II, III & IV
EXTERIOR DESIGN INSTITUTE (EDI) CERTIFICATION
EDI-EIFS EIFS THIRD PARTY INSPECTOR
CONTRACTOR'S RESPONSIBILITY REGARDING INSPECTIONS
1. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING A PRE-CONSTRUCTION MEETING (SCHEDULED AT LEAST 5 BUSINESS DAYS BEFORE START OF CONSTRUCTION). MEETING SHOULD INCLUDE ALL RESPONSIBLE PARTIES (A/E, SI'S, FIELD INSPECTOR). MEETING IS FOR ENTIRE
PROJECT, NOT PHASE OF WORK.
2. PRE-CONSTRUCTION MEETING IS TO BE CONDUCTED BY THE CONTRACTOR WITH MEETING MINUTES TO BE TAKEN AND DISTRIBUTED TO ALL
MEMBERS ATTENDING. MEETING MINUTES TO INCLUDE A SIGN-IN SHEET FOR ALL PARTIES.
3. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING INSPECTIONS AND TESTS. SUFFICIENT NOTICE AND LEAD TIME MUST BE ALLOWED FOR THE INSPECTION AND TESTING TO BE PERFORMED WITHOUT IMPENDING CONSTRUCTION OPERATIONS.
4. THE CONTRACTOR MUST COOPERATE WITH THE INSPECTIONS AND TESTING AGENCIES. SAFE ACCESS MUST BE PROVIDED TO ALL INSPECTION AND TEST TO BE PERFORMED. THIS MAY REQUIRE THE CONTRACTOR TO PROVIDE SCAFFOLDING, LADDERS OR LIFTS.
5. WHEN DEFICIENCIES ARE IDENTIFIED, THE CONTRACTOR MUST TAKE CORRECTIVE ACTIONS TO COMPLY WITH THE CONTRACT DOCUMENTS
OR REMEDY THE DEFICIENCIES AS DIRECTED BY THE REGISTERED DESIGN PROFESSIONAL.
STATEMENT OF SPECIAL INSPECTIONS
THIS STATEMENT OF SPECIAL INSPECTIONS IS SUBMITTED AS A CONDITION FOR PERMIT ISSUANCE IN ACCORDANCE WITH THE SPECIAL INSPECTION AND STRUCTURAL TESTING REQUIREMENTS OF THE BUILDING CODE. IT INCLUDES A SCHEDULE OF SPECIAL INSPECTION SERVICES APPLICABLE TO THE STRUCTURAL COMPONENTS OF THIS PROJECT. IF APPLICABLE, IT INCLUDES REQUIREMENTS FOR SEISMIC RESISTANCE AND/OR REQUIREMENTS FOR WIND RESISTANCE. THIS STATEMENT OF SPECIAL INSPECTIONS ENCOMPASSES THE FOLLOWING DISCIPLINES:
[X] STRUCTURAL [ ] MECHANICAL / ELECTRICAL / PLUMBING
[ ] ARCHITECTURAL [ ] OTHER
THE SPECIAL INSPECTION COORDINATOR SHALL KEEP RECORDS OF ALL INSPECTIONS AND SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. DISCOVERED DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF SUCH DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE.
THE SPECIAL INSPECTION PROGRAM DOES NOT RELIEVE THE CONTRACTOR OF HIS OR HER RESPONSIBILITIES.
AWS-CWI CERTIFIED WELDING INSPECTOR
AWS/AISC-SSI CERTIFIED STRUCTURAL STEEL INSPECTOR
AMERICAN SOCIETY OF NON-DESTRUCTIVE TESTING (ASNT) INSPECTION
ASNT NON-DESTRUCTIVE TESTING TECHNICIAN - LEVEL II OR III
INTERNATIONAL CODE COUNCIL (ICC) CERTIFICATION
ICC-SMSI STRUCTURAL MASONRY SPECIAL INSPECTOR
ICC-SFSI SPRAY-APPLIED FIREPROOFING SPECIAL INSPECTOR
ICC-RCSI REINFORCED CONCRETE SPECIAL INSPECTOR
ICC-SWSI STRUCTURAL STEEL AND WELDING SPECIAL INSPECTOR
PE/SE STRUCTURAL ENGINEER - A LICENSED SE OR PE SPECIALIZING IN THE DESIGN OF BUILDING STRUCTURE
EIT ENGINEER-IN-TRAINING - A GRADUATE ENGINEER WHO HAS PASSED THE FUNDAMENTS OF ENGINEERING EXAMINATION
AMERICAN CONCRETE INSTITUTE (ACI) CERTIFICATION
ACI-CFTT CONCRETE FIELD TESTING TECHNICIAN - GRADE 1
ACI-CCI CONCRETE CONSTRUCTION INSPECTOR
ACI-LTT LABORATORY TESTING TECHNICIAN - GRADE 1 & 2
ACI-STT STRENGTH TESTING TECHNICIAN
AMERICAN WELDING SOCIETY (AWS) CERTIFICATION
FIELD INSPECTION ACI-CCI
ICC-RCSI
ICC-RCSI
6. INSPECTION FOR MAINTENANCE OF
SPECIFIED CURING TEMPERATURE AND
TECHNIQUES
FIELD INSPECTION PERIODIC ACI-CCI
3. REVIEW CONCRETE BATCH TICKETS AND
VERIFY COMPLIANCE WITH APPROVED MIX
DESIGN. VERIFY THAT WATER ADDED AT
THE SITE DOES NOT EXCEED THAT
ALLOWED BY THE MIX DESIGN
FIELD INSPECTION PERIODIC ACI-CCI
ICC-RCSI
4. TEST CONCRETE COMPRESSIVE
STRENGTH (ASTM C31 & C39), SLUMP
(ASTM C143), AIR-CONTENT (ASTM C231 OR
C173) AND TEMPERATURE (ASTM C1064).
FIELD INSPECTION CONTINUOUS ACI-CFTT
ACI-STT
5. INSPECT PLACEMENT OF CONCRETE.
VERIFY THAT CONCRETE CONVEYANCE
AND DEPOSITING AVOIDS SEGREGATION
OR CONTAMINATION. VERIFY THAT
CONCRETE IS PROPERLY CONSOLIDATED.
FIELD INSPECTION CONTINUOUS ACI-CCI
2. INSPECTION OF ANCHORS AND
REINFORCING STEEL POST-INSTALLED IN
HARDENED CONCRETE: PER RESEARCH
REPORTS INCLUDING VERIFICATION OF
ANCHOR TYPE, ANCHOR DIMENSIONS,
HOLE DIMENSIONS, HOLE CLEANING
PROCEDURES, ANCHOR SPACING, EDGE
DISTANCES, CONCRETE MINIMUM
THICKNESS, ANCHOR EMBEDMENT AND
TIGHTENING TORQUE
PERIODIC OR AS
REQUIRED BY THE
RESEARCH REPORT
ISSUED BY AN
APPROVED SOURCE
CONCRETE CONSTRUCTION SERVICE EXTENT AGENT
1. INSPECT SIZE, SPACING, COVER,
POSITIONING AND GRADE OF
REINFORCING STEEL. VERIFY THAT
REINFORCING BARS ARE FREE OF FORM
OIL OR OTHER DELETERIOUS MATERIALS.
INSPECT BAR LAPS AND MECHANICAL
SPLICES. VERIFY THAT BARS ARE
ADEQUATELY TIED AND SUPPORTED OF
CHAIRS OR BOLSTERS.
FIELD INSPECTION PERIODIC
ACI-CCI
ICC-RCSI
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
C L
IE
N T
P R
O J E
C T
N U
M B
E R
A B C D E F
A B C D E F9 /2
/2
:0
:1
A
M
A u to d e s k D o c s
/I D
A S
D
O C
A n a m o s a S a lly p o rt
T u n n e l R e p a ir
/2 -S
-R .r v t
S T
R U
C T
U R
A L
G E
N E
R A
L
IN
F O
R M
A T
IO
N
A N
D S
P E
C
IA
L
IN
S P
E C
T
IO
N S
.0
M M
B T
S
S000
D O
C A
S P
S A
L L
Y P
O R
T T
U N
N E
L
L
IV
IN
G
U N
IT
B
T U
N N
E L
R E
P A
IR
D A
S P
R O
J E
C T
N O
.0
N
H
IG
H S
T R
E E
T A
N A
M O
S A
IA
B
ID
/0
/2
.7
.0
S
H
IV
E -H
A T
T E
R Y
.C O
M
A D
D
/2 /2
A
D D
E N
D U
M
ADD
ADD
ADD
| Addendum 1 for RFB 952400-01 |
| 9524.00-DOC_ASP_SallyPort_Tunnel_Living_Unit_B_Tunnel_Repair-1-RFB_Pre-Bid_01_amp_02-2026-09-28 |
| IMG_4080 |
| IMG_4081 |
| 2026-09-25_Add01 |
File details come from the government source that posted it. Updated .