RFB950300-01 Drawings.pdf
PDF 2 MB Posted
- Attached to
- HHS WRC CDC Freezer Repair
- Solicitation number
- RFB950300-01
- Issued by
- Dallas County, Iowa
About this file
Summary: RFB950300-01 Drawings.pdf
This file contains technical drawings for a structural repair project at the Woodward Resource Center, managed by the Iowa Department of Administrative Services. The project addresses heaving and structural issues at the freezer facility located at 1251 334th Street, Woodward, Iowa 50276. The scope of work includes re-grading the site, replacing concrete, providing structural steel repairs, roof patching, and installing sealant, flashing, and downspout modifications. Bids are due November 17, 2026 at 2:00 PM CDT via the IMPACS Electronic Procurement System, with bid opening scheduled for 3:00 PM the same day via Microsoft Teams and teleconference. An optional pre-bid meeting is scheduled for October 28, 2026 at 10:00 AM at the facility. Questions and product substitution requests must be submitted by 10:00 AM on November 4, 2026. Construction is anticipated to begin December 21, 2026 and conclude by June 30, 2027.
Each bid must be accompanied by bid security equal to five percent of the total bid amount in the form of a bid bond, cashier's check, or certified check drawn on a solvent U.S. bank. Bidders must comply with Subcontractor Targeted Small Business Enterprise requirements and Iowa Executive Order 18 regarding Prohibited Companies as defined in Iowa Code section 12K.1(4). The project is exempt from Iowa Sales Tax and Davis Bacon Wages are not applicable. Successful bidders must complete the Project Subcontractor and Supplier List within five days of the Notice of Intent to Award, along with additional required forms including the Construction Project Signatory Authorization Form, Conditional Waiver and Release Upon Progress Payment Form, and Proposed Change Estimate Form. Bidding documents are available from Rapids Reproductions at www.rapidsrepro.com or by calling (515) 251-3222. Contact information is provided by Issuing Officer Katelyn Howells.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB950300-01 Project Manual.pdf | ||
| RFB950300-01 Notice to Bidders.pdf | ||
| RFB950300-01 Bid Form.pdf | ||
| 1461201-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTRAL DISTRIBUTION CENTER
EARTH
PLYWOOD
GYPSUM WALLBOARD
CONCRETE BLOCK
CONCRETE
RIGID INSULATION
BATT INSULATION
DIMENSION LUMBER
WOOD
SAND & GRAVEL
EXPANSION JOINT
DOOR IDENTIFICATION
NOTE REFERENCE
ROOM IDENTIFICATION
BUILDING SECTION
WINDOW IDENTIFICATION
ROOM NAME
DETAIL NUMBER
DRAWING SHEET NUMBER
ELEVATION REFERENCE
ELEVATION NUMBER
DRAWING SHEET NUMBER
A1 A1.1
MATCHLINE
STRUCTURAL GRIDLINE
WALL SECTION
DETAIL NUMBER
DRAWING SHEET NUMBER
A1
A1.1
A1.1
DETAIL SECTION/ DETAIL CALLOUT
DETAIL NUMBER
DRAWING SHEET NUMBER
A1
A1.1
ROOM NAME
ROOM NUMBER
A1
CEILING IDENTIFICATION1
WALL IDENTIFICATION1
LEVELLEVEL 1
SPOT ELEVATION
0'-0"
0'-0"
LEVEL IDENTIFICATION
ELEVATION
FLOORING FINISH TRANSITION
CORNER GUARDS, TYP.
CG
CASEWORK IDENTIFICATION
WIDTH
HEIGHT (INCLUDES COUNTERTOP)
DEPTH
MODEL NUMBER ('M' DENOTES MODIFICATION
100M
EXTRA SHELF MODIFICATION DESCRIPTION
(E) SUBDRAIN OUTLET AT DITCH
MAINTAIN OWNER ACCESS
LANE BETWEEN BUILDINGS.
COORDINATE CLOSURES
WITH OWNER.
YARD AREA AVAILABLE FOR
CONSTRUCTION LAY-DOWN AND ACCESS.
REPAIR, RE-SEED, RETURN ANY DISTURBED
AREA BACK TO ORIGINAL STATE.
NOTE: FREEZER NO. 1, 2 & 3 MUST REMAIN IN OPERATION THROUGHOUT
CONSTRUCTION. CONTRACTOR TO ANTICIPATE WORKING TEMPERATURES
BETWEEN (0-20) DEGREES FAHRENHEIT. CONTRACTOR TO COORDINATE
DAILY WITH OWNER ON TIME TEMPERATURE SCHEDULE.
STAGING AREA FOR
WELDING USING THE
EXISTING EXTERIOR
FREEZER DOORNO.1 NO.2
NO.3
WAREHOUSE
PROJECT NUMBER:
DATE:
DRAWING INDEX:
BID DOCUMENTS
10-09-2026
DAS - WRC CDC FREEZER REPAIR
2347 N Ave, Woodward, IA 50276
IOWA DEPT OF HEALTH AND HUMAN SERVICES
9503.00
.0
D A
S
W R
C C
D C
F R
E E
Z E
R R
E P
IR
B
ID
D
O C
U M
E N
T S
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly registered architect under the laws of the State of Iowa.
Registration Expires
Reg. #
Pages or Sheets covered by this seal:
Signature
Date issued
O L
N AE
ROF
N S
C E
E
WOI A
I D
L P
T C
E C
TI
H
A R
SS I
ERIC J. BADDING 07511
ARCHITECT
As listed above
6-30-2028
ERIC J.
BADDING
07511
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed
Professional Engineer under the laws of the State of Iowa.
My license renewal date is:
IA Reg. #
Pages or Sheets covered by this seal:
Date
O
L
N A E
ROF
N S
C E
E
WOI A
I D
L
P
G E
R E
NI
E
N
SS I
12-31-2027
ERIC E. VERMEER 19938
STRUCTURAL ENGINEER
As listed above
ERIC E.
VERMEER
19938
ARCHITECTURE
AD1 DEMO PLAN FIRST FLOOR
A1.0 FIRST FLOOR PLAN
A4.0 ROOF PLAN
A5.0 EXTERIOR ELEVATIONS
GENERAL
G0.0 COVER
STRUCTURAL
S1.0 STRUCTURAL FRAMING PLAN AND DETAILS
MATERIALS LEGEND SYMBOLS LEGEND ABBREVIATIONS
ACT Acoustical Ceiling Tile
AFF After Finish Floor
ALUM Aluminum
ADA Americans with Disabilities Act
& And
L Angle
@ At
BCS Baby Changing Station
BOL Bollard
CIP Cast In Place
CBB Cement Backer Board
CL Center Line
CLR Clear
CONC Concrete
CONF Conference
CJ Construction Joint
CONT Continuous
CLJ Control Joint
CG Corner Guard
DIA Diameter
DS Downspout
EA Each
EHD Electric Hand Dryer
EWC Electric Water Cooler
EL Elevation
ELEV Elevation
ENG Engineered
EQ Equal
ETC Etcetera
EPDM Ethylene Propylene DieneTerpolymer
EXP Expansion
EJ Expansion Joint
EXT Exterior
EIFS Exterior Insulation Finish System
FRP Fiberglass Reinforced Panel
FF Finish Floor
FE Fire Extinguisher
FEC Fire Extinguisher Cabinet
FD Floor Drain
FT Foot or Feet
GA Gage
GT Glazing Type
GB Grab Bar
GYP Gypsum
GYP BD Gypsum Board
HM Hollow Metal
HSS Hollow Structural Sections
IR Impact Resistant
IT Information Technology
IMP Insulated Metal Panel
INSUL Insulation
INT Interior
JT Joint
MFR Manufacturer
MAX Maximum
MECH Mechanical
MEPT Mechanical/ Electrical/ Plumbing/ Technology
MTL Metal
MIN Minimum
MIR Mirror
NIC Not In Contract
OC On Center
OHS Overhead Sectional Door
PT Paint
PTD Paper Towel Dispenser
PLAM Plastic Laminate
PVC Polyvinyl Chloride
LB Pound
RCP Reflected Ceiling Plan
REQD Required
REV Reversed
RTU Roof Top Unit
SNR Sanitary Napkin Receptacle
SJ Saw Joint
SIM Similar
SDS Soap Dispenser
STL Steel
STRUCT Structure
TKSP Tack Strip
MIL Thousands of an Inch
TP Toilet Paper Dispenser
TOW Top of Wall
TYP Typical
VERT Vertical w/ With
WD Wood
VICINITY MAP
SCALE:
TRUE
1" = 60'-0"4 SITE PLAN
below below
10-09-2026
10-09-2026
UP
89'-9"
61'-4"
24'-9" 8'-7" 28'-0"
71'-4" 8'-7" 9'-10"
46'-4" 43'-5"
FREEZER NO.1 FREEZER NO.2
FREEZER NO.3
'-1
1 1 1
A2 S1.0
A3 S1.0
A3 S1.0
A2 S1.0
SIM
A1 S1.0
TYP
TYP
TYP
NOTE: FREEZER NO. 1, 2 & 3 MUST REMAIN IN OPERATION THROUGHOUT
CONSTRUCTION. CONTRACTOR TO ANTICIPATE WORKING TEMPERATURES
BETWEEN (0-20) DEGREES FAHRENHEIT. CONTRACTOR TO COORDINATE
DAILY WITH OWNER ON TIME TEMPERATURE SCHEDULE.
EXISTING INSULATED ROOF PANEL.
EXISTING ROOF MEMBRANE.
EXISTING STEEL JOIST SEAT.
EXISTING STEEL COLUMN, BEAMS,
AND BOLTED CONNECTION.
DEMOLISH EXISTING STEEL PLATE
(BOTH SIDES OF BEAM WEB) AND
BOLTS.
(2) PL12X9X3/8 WITH (4) 3/4" A325
BOLTS. OVERSIZE HOLES IN
EXISTING BEAM WEB BY 1/8". SNUG
TIGHT BOLTS.
3 SIDES
3/16
EXISTING INSULATED ROOF
PANEL.
EXISTING ROOF MEMBRANE.
CUT EXISTING JOIST SEAT FREE
FROM WELDED CONNECTION
TO BEAM.
EXISTING STEEL COLUMN,
BEAMS, AND BOLTED
CONNECTION.
DEMOLISH EXISTING DOUBLE
STEEL ANGLE AND BOLTS.
(2) PL12X9X3/8 WITH (3) 3/4" A325
BOLTS. OVERSIZE HOLES IN
EXISTING BEAM WEB BY 1/8".
SNUG TIGHT BOLTS.
RE-ALIGN JOIST SEAT AND TOP
CHORD WITH INSULATED ROOF
PANEL JOINT AND RE-FASTEN
TO PANEL.
2 3/16
3 SIDES
3/16
2 3/16
EXISTING INSULATED ROOF
PANEL.
EXISTING ROOF MEMBRANE.
EXISTING STEEL COLUMN,
BEAMS, AND BOLTED
CONNECTION.
AFTER CUTTING JOIST SEAT
FREE, RE-ALIGN JOIST SEAT
AND TOP CHORD WITH
INSULATED ROOF PANEL JOINT
PARALLEL TO JOIST AND RE-
FASTEN TO PANEL.
B ACDE
FG
B ACDEFG
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo g g ve m es , I
A
P h on e
: 5
.2
.0
F a x:
5.
.0
A R
C H
IT
E
C T
F
O
LD
K el lo g g es , I
A on e
: 5
.2
.0 x:
5.
.0
S1.0
STRUCTURAL FRAMING
PLAN AND DETAILS
D A
S
W R
C C
D C
F R
E E
Z E
R R
E P
A
IR
IO
W
A D
EP
T
O F
H
EA
LT
H
A N
D H
U M
AN
S
ER
VI
C
ES
N A ve , W oo dw ar d, IA
10-09-2026 9503.00
BID DOCUMENTS
SCALE: 1/8" = 1'-0"1 FRAMING PLAN
SCALE: 1" = 1'-0"A3 BEAM CONNECTION
SCALE: 1" = 1'-0"A2 BEAM CONNECTION
SCALE: 1" = 1'-0"A1 JOIST CONNECTION
FRAMING PLAN NOTES
1 RE-ALIGN AND WELD ALL HORIZONTAL ANGLE BRIDGING SEGMENTS. ENSURE THAT
BRIDGING EXTENDS TO THE STEEL BEAM AT THE ENDS AND IS WELDED TO THE
BEAM/BOTTOM FLANGE CONNECTION.
2 HATCHED AREA INDICATES - CUT WELDED OR BOLTED CONNECTION AT JOIST SEAT
CONNECTION TO STEEL BEAM. STRAIGHTEN JOIST SEAT AND TOP CHORD AND
RE-WELD OR RE-BOLT CONNECTION. PROVIDE (4) PAIRS OF FASTENERS PER JOINT
BETWEEN (2) INSULATED ROOF PANELS.
3 REMOVE AND REPLACE SPLICE PLATE AT BEAM-TO-BEAM CONNECTION. DRILL NEW
BOLT HOLES IN EXISTING BEAM WEB.
GENERAL PARAMETERS
1 THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE REQUIREMENTS FROM THESE
DRAWINGS INTO THEIR SHOP DRAWINGS AND WORK.
2 VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO FABRICATION OF ANY ITEMS.
3 DRAWINGS SHALL BE COORDINATED WITH OPENINGS, ELECTRICAL COMPONENTS, FLOOR
DEPRESSIONS, ETC. NOT SHOWN ON DRAWINGS. COORDINATE LOCATION, SIZE AND
REINFORCEMENT OF ALL OPENINGS WITH RESPECTIVE TRADES BEFORE FABRICATION. REPORT
ANY DISCREPANCIES AND/OR INTERFERENCE PROBLEMS TO THE ARCHITECT AND STRUCTURAL
ENGINEER OF RECORD.
4 THESE GENERAL NOTES SUPPLEMENT THE PROJECT SPECIFICATIONS. REFER TO THE
PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. NOTES AND DETAILS ON THE
STRUCTURAL DRAWINGS SHALL TAKE PRECEDENCE OVER THE GENERAL NOTES AND TYPICAL
DETAILS. WHERE NO DETAILS ARE PROVIDED, CONSTRUCTION SHALL BE AS SHOWN FOR
SIMILAR WORK.
5 THE BUILDING IS NOT STRUCTURALLY STABLE UNTIL ALL CONNECTIONS, FRAMING, SHEAR
WALLS, X-BRACING, AND EXTERIOR WALLS ARE COMPLETE AND HAVE ACHIEVED FINAL DESIGN
STRENGTH. CONTRACTOR IS SOLELY RESPONSIBLE TO MAINTAIN STRUCTURAL STABILITY
DURING ERECTION AND CONSTRUCTION. TEMPORARY BRACING SYSTEMS ARE NOT TO BE
REMOVED UNTIL STRUCTURAL WORK IS COMPLETE.
6 CONTRACTOR'S CONSTRUCTION AND/OR ERECTION SEQUENCES SHALL RECOGNIZE AND
CONSIDER THE EFFECTS OF THERMAL EFFECTS AND MOVEMENTS OF STRUCTURAL ELEMENTS
DURING THE CONSTRUCTION PERIOD.
7 THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL MEANS, METHODS, TECHNIQUES,
SEQUENCING, AND PROCEDURES NECESSARY FOR CONSTRUCTING, OVERSEEING, AND
COORDINATION THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND ALL
APPLICABLE HEALTH AND SAFETY STANDARDS. THE CONTRACTOR IS SOLELY RESPONSIBLE
FOR JOB SITE SAFETY.
DESIGN PARAMETERS
1 THE STRUCTURE IS DESIGNED IN ACCORDANCE WITH THE ICC INTERNATIONAL BUILDING
CODE, 2024 EDITION.
2 UNIFORM ROOF LIVE LOADS:
TYPICAL ROOF (GOVERNED BY SNOW) 20 PSF+DRIFT
DRIFT LOAD AS SHOWN IN DIAGRAMS
3 UNIFORM FLOOR LIVE LOADS:
SLAB ON GRADE 100 PSF
4 SNOW DESIGN PARAMETERS:
GROUND SNOW LOAD (Pg) 25 PSF FLAT ROOF SNOW LOAD (Pf) 20 PSF
SNOW EXPOSURE FACTOR (C/E) 1.0
SNOW LOAD IMPORTANCE FACTOR (I) 1.0
SNOW LOAD THERMAL FACTOR (Ct) 1.0
5 EARTHQUAKE DESIGN PARAMETERS:
SEISMIC IMPORTANCE FACTOR (I/E) 1.00
Ss 0.06g S1 0.043g
SEISMIC SITE CLASS D
Sds 0.064g Sd1 0.069g SHORT-PERIOD SITE COEFFICIENT (Fa) 1.6 LONG-PERIOD SITE COEFFICIENT (Fv) 2.4
SEISMIC DESIGN CATEGORY A
SEISMIC-FORCE-RESISTING SYSTEM:
ORDINARY LIGHT GAUGE SHEAR WALLS AND MOMENT FRAMES
SEISMIC BASE SHEAR (V), ADDITION AREA NORTH 0.18 K
SEISMIC BASE SHEAR (V), ADDITION AREA SOUTH 0.29 K
SEISMIC RESPONSE COEFFICIENT (Cs) N-S 0.01 SEISMIC RESPONSE COEFFICIENT (Cs) E-W 0.01
SEISMIC ANALYSIS PROCEDURE:
EQUIVALENT LATERAL FORCE ANALYSIS (WIND LOAD GOVERNS DESIGN)
6 WIND DESIGN PARAMETERS:
BASIC WIND SPEED (V) (3 SECOND GUST) 115 MPH
RISK CATEGORY II
WIND EXPOSURE CATEGORY B
INTERNAL PRESSURE COEFFICIENT +/-.18
BASIC DESIGN PRESSURE @ ROOF 18 PSF (SERVICE)
NET WIND UPLIFT @ ROOF 15 PSF (SERVICE)
NET WIND UPLIFT @ ROOF OVERHANGS 30 PSF (SERVICE)
BASIC DESIGN PRESSURE AT WALL 18 PSF (SERVICE)
7 ALLOWABLE WALL DEFLECTIONS:
MAIN FRAME DEFLECTION L/240
GIRT DEFLECTION L/360
HORIZONTAL DEFLECTION L/240
8 ASSUMED FUTURE CONSTRUCTION:
VERTICAL NONE
HORIZONTAL NONE
FOUNDATION PARAMETERS
1 THE INTERIOR FOUNDATIONS AND SLABS ARE TO REMAIN. TAKE INTO ACCOUNT THE SLAB
DEFLECTION WHEN COORDINATING WORK.
SUBMITTALS
1 CONTRACTOR TO PROVIDE A SHOP DRAWING SUBMITTAL LOG ITEMIZING ALL PROPOSED
SUBMITTALS FOR APPROVAL BY STRUCTURAL ENGINEER OF RECORD.
2 ALL SHOP DRAWINGS SHALL BE CHECKED BY THE FABRICATOR AND APPROVED BY THE
CONTRACTOR PRIOR TO SUBMITTAL TO THE STRUCTURAL ENGINEER OF RECORD. SHOP
DRAWING REVIEW BY ENGINEER IS LIMITED TO VERIFYING GENERAL CONFORMANCE TO THE
CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES FROM THE
CONTRACT DOCUMENTS, DIMENSIONAL ERRORS, COORDINATION ERRORS, OR OMISSIONS IN
SHOP DRAWINGS.
3 SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT PRIOR TO FABRICATION AND
CONSTRUCTION REGARDING ALL STRUCTURAL ITEMS, INCLUDING, BUT NOT LIMITED TO, THE
FOLLOWING:
● CONCRETE MIX DESIGNS (5 DAYS BEFORE POUR, MIN.)
● CONCRETE REINFORCEMENT
● EMBEDDED STEEL ITEMS
● STRUCTURAL STEEL
4 SHOP DRAWINGS SHALL INCLUDE CONNECTIONS AS WELL AS SIZE, SPACING, AND GRADE OF
ALL MEMBERS. PLANS AND ANY DETAILING NECESSARY FOR DETERMINING FIT AND PLACEMENT
SHALL ALSO BE INCLUDED.
5 IF THE SHOP DRAWINGS DIFFER FROM OR ADD TO THE DESIGN OF THE STRUCTURAL
DRAWINGS, THEY SHALL BEAR THE SEAL AND SIGNATURE OF AN ENGINEER REGISTERED IN THE
APPROPRIATE STATE. ANY CHANGES TO THE STRUCTURAL DRAWINGS SHALL BE SUBMITTED TO
THE ARCHITECT AND ARE SUBJECT TO REVIEW AND APPROVAL OF THE STRUCTURAL
6 DESIGN DRAWINGS, SHOP DRAWINGS, AND CALCULATIONS FOR THE DESIGN AND
FABRICATION OF ITEMS THAT ARE DESIGNED BY THE CONTRACTOR, INCLUDE:
● TEMPORARY BRACING AND SHORING
SHALL BEAR THE SEAL AND SIGNATURE OF AN ENGINEER REGISTERED IN THE APPROPRIATE
STATE AND SHALL BE SUBMITTED TO THE ARCHITECT PRIOR TO FABRICATION AND
CONSTRUCTION. CALCULATIONS SHALL BE INCLUDED FOR ALL CONNECTIONS TO THE
STRUCTURE, CONSIDERING LOCALIZED EFFECTS ON STRUCTURAL ELEMENTS INDUCED BY THE
CONNECTION LOADS.
7 ITEMS THAT ARE DESIGNED BY THE CONTRACTOR SHALL BE DESIGNED TO RESIST THE LIVE
LOADS INDICATED IN STRUCTURAL NOTES, DEAD LOAD, SELF WEIGHT, ANY ADDITIONAL
LOADING INDICATED ON PLANS AND DETAILS, SNOW DRIFT, AND A NET WIND UPLIFT.
8 ITEMS THAT ARE DESIGNED BY THE CONTRACTOR SHALL INCLUDE ANY RELEVANT
TECHNICAL LITERATURE FROM MANUFACTURER. ALSO PROVIDE A CERTIFICATION FROM THE
MANUFACTURER SHOWING THE PRODUCT IS IN COMPLIANCE WITH ALL APPLICABLE CODES AND
STANDARDS.
9 THE CONTRACTOR SHALL COORDINATE SEISMIC RESTRAINTS OF MECHANICAL, PLUMBING,
AND ELECTRICAL EQUIPMENT, MACHINERY, AND ASSOCIATED PIPING WITH THE STRUCTURE.
ANY CONNECTIONS TO STRUCTURE SHALL CONFORM TO ASCE 7-10 CHAPTER 13 AND SHALL BE
DESIGNED BY AN ENGINEER REGISTERED IN THE APPROPRIATE STATE, AND SHALL BE
SUBMITTED TO THE ARCHITECT PRIOR TO FABRICATION.
10 FIELD ENGINEERED DETAILS DEVELOPED BY THE CONTRACTOR THAT DIFFER FROM OR ADD
TO THE STRUCTURAL DRAWINGS SHALL BEAR THE SEAL AND SIGNATURE OF AN ENGINEER
REGISTERED IN THE APPROPRIATE STATE AND SHALL BE SUBMITTED TO THE ARCHITECT PRIOR
TO CONSTRUCTION.
11 ALL SHOP DRAWINGS SHALL BE CHECKED BY THE FABRICATOR AND APPROVED BY THE
CONTRACTOR PRIOR TO SUBMITTAL TO THE ARCHITECT, WHOSE REVIEW OF THE SHOP
DRAWINGS IS LIMITED TO VERIFYING GENERAL CONFORMANCE TO THE CONTRACT
DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES FROM CONTRACT
DOCUMENTS, DIMENSIONAL ERRORS, COORDINATION ERRORS, OR OMISSIONS IN SHOP
DRAWINGS.
12 VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO FABRICATION OF ANY ITEMS. DRAWINGS
SHALL BE COORDINATED WITH MECHANICAL/ELECTRICAL EXISTING CONDITIONS FOR
ADDITIONAL COMPONENTS, FLOOR DEPRESSIONS, ETC. NOT SHOWN ON DRAWINGS.
COORDINATE LOCATION, SIZE, AND REINFORCING OF ALL OPENINGS WITH RESPECTIVE TRADES
BEFORE FABRICATION. FURNISH LINTELS OVER ALL WALL PENETRATIONS WHETHER INDICATED
ON THE DRAWINGS OR NOT.
13 FIELD VERIFY EXISTING DIMENSIONS, MEMBER SIZES AND ELEVATIONS SHOWN ON THE
DRAWINGS PRIOR TO STARTING CONSTRUCTION. ALL DISCREPANCIES SHALL BE IMMEDIATELY
BROUGHT TO THE ATTENTION OF THE ARCHITECT.
CONCRETE NOTES
1 CONCRETE WORK SHALL CONFORM TO CHAPTER 19 OF THE IBC.
2 WHERE NEW CONCRETE IS PLACED DIRECTLY AGAINST EXISTING CONCRETE, THE EXISTING
CONCRETE SURFACE SHALL BE CLEANED AND ROUGHENED TO A MINIMUM OF 1/4" AMPLITUDE.
SEE PLAN FOR DOWELING REQUIREMENTS.
3 ALL EXPOSED EDGES OF CONCRETE MEMBERS SHALL BE CHAMFERED 1/2" U.N.O.
4 CONCRETE FORMWORK:
4.1 SLEEVES, OPENINGS, CONDUIT, AND OTHER EMBEDDED ITEMS NOT SHOWN ON THE
STRUCTURAL DRAWINGS SHALL BE APPROVED BY THE STRUCTURAL ENGINEER PRIOR TO
POURING CONCRETE. CONDUITS EMBEDDED IN SLABS SHALL NOT BE LARGER IN OUTSIDE
DIMENSION THAN ONE THIRD OF THE THICKNESS OF THE SLAB AND SHALL NOT BE SPACED
CLOSER THAN THREE DIAMETERS ON CENTER.
4.2 VERIFY ALL BLOCK OUTS WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND
PLUMBING REQUIREMENTS PRIOR TO POURING.
5 CONCRETE REINFORCEMENT:
5.1 DETAILING, FABRICATION, AND PLACEMENT OR REINFORCEMENT SHALL CONFORM TO
ACI-315.
5.2 ALL REINFORCEMENT TO BE ASTM A615 GRADE 60 U.N.O. WELDED WIRE FABRIC TO BE
ASTM A185 WITH WIRE CONFORMING TO ASTM A82. REINFORCING STEEL SHALL BE SECURELY
TIED IN PLACE USING #16 ANNEALED IRON WIRE. REINFORCEMENT SHALL BE CONTINUOUS
THROUGH ALL CONSTRUCTION JOINTS UNLESS NOTED OTHERWISE.
5.3 ALL CONTINUOUS REINFORCING SHALL BE SPLICED USING CLASS B TENSION SPLICES,
U.N.O.
5.4 BARS IN BEAMS AND SLABS SHALL BE SUPPORTED ON WELL-CURED CONCRETE BLOCKS
OR APPROVED METAL CHAIRS, AS SPECIFIED BY THE CRSI MANUAL OF STANDARD PRACTICE,
MSP-1.
5.5 NOT USED.
5.6 ADD TWO DIAGONAL #5 BARS, FOUR FEET LONG, CENTERED, AT EACH CORNER OF
FOUNDATION OR SLAB OPENING, U.N.O.
5.7 U.N.O., INSTALL WWF 1 1/2" FROM TOP OF ALL SLABS ON GRADE, TOPPING SLABS ON
DECK, OR TOPPING SLABS ON PRECAST. LAP JOINTS TWO FULL MESHES BUT NOT LESS THAN
8". AT CONSTRUCTION JOINTS, LOCATE WWF AT MID-DEPTH OF SLAB.
6 COVERAGE FOR REINFORCEMENT:
6.1 CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
6.2 CONCRETE EXPOSED TO EARTH AND WEATHER:
#6 THRU #18 BARS 2"
#5 BAR, W31 OR D31 WIRE AND SMALLER 1 1/2"
6.3 CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
SLABS, WALLS, JOISTS:
#11 BAR AND SMALLER ...................................................................................3/4"
PIERS:
PRIMARY REINFORCEMENT,
TIES, STIRRUPS, SPIRALS ..............................................................................1 1/2"
7 CONCRETE COMPRESSIVE STRENGTHS SHALL BE VERIFIED BY STANDARD 28-DAY
CYLINDER TESTS PER ASTM C39 AND SHALL BE AS FOLLOWS:
SLABS ON GRADE ............................................................................................... f'c = 4,000 PSI
8 SPECIAL INSPECTOR SHALL BE NOTIFIED IF ANY WATER IS TO BE ADDED IN FIELD.
9 NOT USED.
10 NOT USED.
11 MINIMUM 4" CONCRETE SLAB ON GRADE WITH WWF 6X6-W2.1 X W2.1 OVER A MINIMUM 4"
COMPACTABLE, TRIMMABLE, GRANULAR FILL, TYP. U.N.O. ON DRAWINGS AND GEOTECHNICAL
REPORT. GRANULAR FILL TO BE QUALIFIED BY THE GEOTECHNICAL ENGINEER.
12 PROVIDE CONTROL JOINTS AS FOLLOWS, U.N.O.:
12.1 SLABS (ON GRID LINE WHERE PRACTICAL) AND:
SLAB-ON-GRADE ................................. 10' ± 2'
12.2 CONTROL JOINT LAYOUT SHOULD MAINTAIN AN APPROXIMATE ASPECT RATIO OF 1:1
13 EXPOSED SLAB ON GRADE:
13.1 ALL SLAB ON GRADE CONTROL JOINTS & COLD JOINTS SHALL BE COORDINATED WITH
THE ARCHITECT WHERE THE SLAB IS EXPOSED.
13.2 CONTRACTOR SHALL PARTICIPATE IN A PRE-CONSTRUCTION MEETING PRIOR TO ANY
EXPOSED CONCRETE SLAB ON GRADE POUR. CONTRACTOR SHALL PROVIDE ENGINEER WITH
ANTICIPATED EXPOSED SLAB ON GRADE CONTROL AND COLD JOINT LOCATIONS. ENGINEER
MUST APPROVE CONTROL AND COLD JOINT LOCATIONS PRIOR TO ANY EXPOSED CONCRETE
SLAB POUR.
13.3 SLABS SHALL BE SUPPORTED BY 6" GRANULAR FILL OVER REWORKED ENGINEERED
COMPACTED FILL IN THICKNESS AS NOTED ABOVE. SLABS ON GRADE SHALL BE AS INDICATED
ON DRAWINGS. WHERE REQUIRED BY GEOTECHNICAL ENGINEER, OVER-EXCAVATE AND
RECOMPACT USING STRUCTURAL FILL. FOLLOW GEOTECHNICAL ENGINEER'S
RECOMMENDATIONS FOR SPECIFIC REQUIREMENTS. PROVIDE 98% PROCTOR DENSITY ON
COMPACTED STRUCTURAL FILL. PROVIDE NO MORE THAN 15% FLY ASH FOR ALL FLOOR SLABS.
13.4 SAWN CONTROL JOINTS IN SLABS ON GRADE SHALL BE 1/8" WIDE AND 1/4 OF THE SLAB
THICKNESS DEEP. CUTTING OPERATIONS SHALL BE FROM 4 TO 12 HOURS AFTER PLACING
CONCRETE. MAXIMUM SPACING OF JOINTS SHALL BE 30 TIMES THE SLAB THICKNESS OR AS
SHOWN ON THE DRAWINGS. SEE SPECIFICATION REGARDING CUTTING REQUIREMENTS AND
EDGE RAVELING. CONTRACTOR TO SUBMIT SAWN JOINT LAYOUT TO ENGINEER FOR APPROVAL
PRIOR TO POURING SLABS.
14 NOT USED.
15 NOT USED.
16 EPOXY REPAIR ADHESIVE SHALL CONFORM TO ASTM C881 AND SHALL BE A TWO-
COMPONENT, LIQUID EPOXY WITH NON-SAG CONSISTENCY AND A LONG POT LIFE. THE EPOXY
ADHESIVE SHALL BE SUITABLE FOR USE IN DRY OR DAMP CONDITIONS. MINIMUM SHEAR
STRENGTH SHALL BE 5,000 PSI; MINIMUM TENSILE STRENGTH SHALL BE 4,000 PSI. HOLE SIZES
AND INSTALLATION SHALL BE IN STRICT COMPLIANCE WITH THE APPROVED ICC
REQUIREMENTS. DO NOT CUT REINFORCING IN NEW OR EXISTING CONCRETE DURING
PLACEMENT.
17 COLD WEATHER PROTECTION
17.1 DURING COLD WEATHER CONSTRUCTION, CONTRACTOR IS RESPONSIBLE FOR
PROTECTING CURING CONCRETE PER THE RQMTS. OF ACI 306.
STEEL FRAMING NOTES
1 STEEL FRAMING WORK SHALL COMPLY WITH CHAPTER 22 OF THE IBC.
2 STEEL FRAMING MATERIALS:
2.3 CHANNELS, ANGLES, BARS ASTM A36 FY=36,000 PSI
2.4 PLATES (NON-MOMENT CONNECTIONS) ASTM A36 FY=36,000 PSI
2.8 WELDING ELECTRODES E7018
3 STEEL ERECTION SHALL COMPLY WITH ALL OSHA AND STATE REGULATIONS. IN ADDITION, AT
THE END OF THE WORK DAY, ALL COLUMNS ADEQUATELY GUYED OR BRACED IN ALL
DIRECTIONS. TEMPORARY GUYING/BRACING IS THE RESPONSIBILITY OF THE ERECTOR (DESIGN
AND INSTALLATION).
4 DESIGN, FABRICATION, AND ERECTION SHALL BE IN ACCORDANCE WITH THE AISC STEEL
CONSTRUCTION MANUAL, AISC 360-10 INCLUDING COMMENTARY, AND THE AISC 303-10.
5 ALL BOLTS FOR STRUCTURAL STEEL CONNECTIONS PER ASTM A325-N U.N.O. AND SHALL
CONFORM TO THE RCSC SPECIFICATION. BOLTS FOR STEEL JOISTS MAY BE A307. BOLTS SHALL
BE SNUG-TIGHT U.N.O.
6 WELDING SHALL CONFORM TO THE AWS CODES FOR ARC AND GAS WELDING IN BUILDING
CONSTRUCTION. WELDING SHALL BE PERFORMED IN ACCORDANCE WITH A WELDED
PROCEDURE SPECIFICATION (WPS) AS REQUIRED IN AWS D1.1 AND APPROVED BY THE
STRUCTURAL ENGINEER. THE WPS VARIABLES SHALL BE WITHIN THE PARAMETERS
ESTABLISHED BY THE FILLER-METAL MANUFACTURER.
7 WELDS SHALL BE MADE USING E70XX ELECTRODES AND SHALL BE 3/16" MINIMUM, U.N.O. ALL
WELDING FOR STRUCTURAL STEEL CONNECTIONS TO BE PERFORMED BY CERTIFIED WELDERS
IN ACCORDANCE WITH AWS D1.1. PROTECT ALL SURFACES SURROUNDING WELDING
OPERATIONS.
8 NOT USED.
9 FOLLOW ALL COLD WEATHER WELDING REQUIREMENTS IN AWS D1.1 2025, BY REFERENCE
FROM THE AISC. COORDINATE MINIMUM AMBIENT TEMPERATURES WITH THE OWNER'S STAFF,
ALLOWING ADEQUATE TIME FOR AMBIENT TEMPERATURE ADJUSTMENT. FOLLOW ALL
REQUIREMENTS INCLUDING, BUT NOT LIMITED TO, PREHEATING PRESCRIBED AREAS
SURROUNDING THE WELD AND UTILIZING LOW HYDROGEN ELECTRODES.
9 NOT USED
10 NOT USED.
11 NOT USED.
12 NOT USED.
13 LATERAL BRACING
13.1 ENSURE THAT ALL STEEL FRAMES, BEAMS, AND COLUMNS HAVE PROPER LATERAL
BRACING AS CONNECTIONS ARE CUT AND REPAIRED. DO NOT COMPROMISE ANY EXISTING
LATERAL BRACING.
SPECIAL INSPECTION SCHEDULE
1 SPECIAL INSPECTION PROGRAM SHALL CONFORM TO CHAPTER 17 OF THE IBC.
2 THE OWNER SHALL EMPLOY A SPECIAL INSPECTOR TO PERFORM THE REQUIRED TESTS AND
SPECIAL INSPECTIONS WITH QUALIFICATIONS DESCRIBED PER IBC CHAPTER 17 AND THE
PROJECT SPECIFICATIONS.
3 SPECIAL INSPECTION REPORTS SHALL BE FURNISHED TO BUILDING OFFICIAL, OWNER,
ARCHITECT, STRUCTURAL ENGINEER, AND CONTRACTOR.
4 SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT STATING THAT THE STRUCTURAL WORK
WAS, TO THE BEST OF THE SPECIAL INSPECTOR'S KNOWLEDGE, PERFORMED IN ACCORDANCE
WITH THE CONSTRUCTION DOCUMENTS.
5 SPECIAL INSPECTION PROGRAM:
PROGRAM FOOTNOTES
1. THE ITEMS INDICATED ABOVE SHALL BE INSPECTED IN ACCORDANCE WITH CHAPTER
17 OF THE IBC BY A CERTIFIED SPECIAL INSPECTOR FROM AN ESTABLISHED TESTING
AGENCY. FOR MATERIAL SAMPLING AND TESTING REQUIREMENTS, REFER TO THE
PROJECT SPECIFICATIONS & THE SPECIFIC STRUCTURAL NOTES SECTIONS. THE
TESTING AGENCY SHALL SEND COPIES OF ALL STRUCTURAL TESTING & INSPECTION
REPORTS DIRECTLY TO THE ARCHITECT, STRUCTURAL ENGINEER, CONTRACTOR, &
BUILDING OFFICIAL. ANY MATERIALS WHICH FAIL TO MEET THE PROJECT
SPECIFICATIONS SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT. SPECIAL INSPECTION TESTING REQUIREMENTS APPLY EQUALLY TO ALL
BIDDER DESIGNED COMPONENTS.
2. CONT. - CONTINUOUS SPECIAL INSPECTION. SPECIAL INSPECTOR IS PRESENT
WHEN & WHERE THE WORK TO BE INSPECTED IS BEING PERFORMED. (IBC SECTION 1702).
3. PERIODIC - PERIODIC SPECIAL INSPECTION. SPECIAL INSPECTOR IS
INTERMITTENTLY PRESENT WHERE THE WORK TO BE INSPECTED HAS BEEN OR IS BEING
PERFORMED.
4. OBSERVE - SPECIAL INSPECTOR SHALL OBSERVE THESE ITEMS ON A RANDOM
BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS (AISC 360
SECTION N5).
5. PERFORM - SPECIAL INSPECTOR SHALL PERFORM THESE TASKS FOR EACH JOINT,
CONNECTION, ELEMENT OR MEMBER (AISC 360 SECTION N5).
6. ALL WELDS SHALL BE VISUALLY INSPECTED.
7. ALL COMPLETE PENETRATION WELDS SHALL BE TESTED ULTRASONICALLY OR BY
USE OF A COMPARABLE APPROVED METHOD.
8. INSPECTION FOR PREFABRICATED CONSTRUCTION SHALL BE THE SAME AS IF THE
MATERIAL USED IN THE CONSTRUCTION TOOK PLACE ON SITE. CONTINUOUS INSPECTION
WILL NOT BE REQUIRED DURING PREFABRICATION IF THE APPROVED AGENCY CERTIFIES
THE CONSTRUCTION AND FURNISHES EVIDENCE OF COMPLIANCE.
VERIFICATION AND INSPECTION FREQ/TASK
STEEL (IBC SECTION 1702 AND AISC 360 SECTION N5)
1. INSPECTION TASKS PRIOR TO WELDING:
A. WELDING PROCEDURE SPECIFICATIONS (WPS) AVAILABLE. PERFORM
B. MANUFACTURER'S CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE. PERFORM
C. MATERIAL IDENTIFICATION (TYPE/GRADE). OBSERVE
D. WELDER IDENTIFICATION SYSTEM. OBSERVE
E. FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY):
• JOINT PREPARATION
• DIMS. (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL)
• CLEANLINESS (CONDITION OF STEEL SURFACES) OBSERVE
• TACKING (TACK WELD QUALITY & LOCATION)
• BACKING TYPE & FIT (IF APPLICABLE)
F. CONFIGURATION & FINISH OF ACCESS HOLES. OBSERVE
G. FIT-UP OF FILLET WELDS:
• DIMS. (ALIGNMENT, GAPS AT ROOT) OBSERVE
• CLEANLINESS (CONDITION OF STEEL SURFACES)
• TACKING (TACK WELD QUALITY & LOCATION)
2. INSPECTION TASKS DURING WELDING:
A. STRUCTURAL STEEL & COLD-FORMED STEEL DECK: PERFORM
1) COMPLETE & PARTIAL PENETRATION GROOVE WELDS. PERFORM
2) MULTIPASS FILLET WELDS. PERFORM
3) SINGLE-PASS FILLET WELDS > 5/16". PERFORM
4) PLUG & SLOT WELDS. OBSERVE
5) SINGLE-PASS FILLET WELDS ≤ 5/16". OBSERVE
6) FLOOR & DECK WELDS. OBSERVE
B. USE OF QUALIFIED WELDERS. OBSERVE
C. CONTROL & HANDLING OF WELDING CONSUMABLES: OBSERVE
• EXPOSURE CONTROL • PACKAGING
D. NO WELDING OVER CRACKED TACK WELDS. OBSERVE
E. ENVIRONMENTAL CONDITIONS: OBSERVE
• WIND SPEED WITHIN LIMITS • PRECIPITATION & TEMP.
F. WPS FOLLOWED:
• SETTINGS ON WELDING EQPT. • TRAVEL SPEED
• SELECTED WELDING MATERIALS • PREHEAT APPLIED OBSERVE
• SHIELDING GAS TYPE/FLOW RATE • PROPER POSITION (F, V, H, OH)
• INTERPASS TEMP. MAINTAINED (MIN / MAX)
G. WELDING TECHNIQUES:
• INTERPASS & FINAL CLEANING
• EACH PASS WITHIN PROFILE LIMITATIONS OBSERVE
• EACH PASS MEETS QUALITY REQUIREMENTS
3. INSPECTION TASKS AFTER WELDING.
A. WELDS CLEANED. OBSERVE
B. SIZE, LENGTH, & LOCATION OF WELDS. PERFORM
C. WELDS MEET VISUAL ACCEPTANCE CRITERIA:
• CRACK PROHIBITION • WELD SIZE
• WELD / BASE-METAL FUSION • UNDERCUT PERFORM
• CRATER CROSS SECTION • POROSITY
• WELD PROFILES
D. ARC STRIKES. PERFORM
E. k-AREA. PERFORM
F. BACKING & WELD TABS REMOVED (IF REQ'D.). PERFORM
G. REPAIR ACTIVITIES. PERFORM
H. DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER. PERFORM
4. INSPECTION TASKS PRIOR TO BOLTING:
A. MFR. CERTS. AVAILABLE FOR FASTENER MATERIALS. PERFORM
B. FASTENERS MARKED IN ACCORDANCE w/ ASTM RQMTS. OBSERVE
C. PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, OBSERVE
BOLT LENGTH, EXCLUDED THREADS).
D. PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL. OBSERVE
E. CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE OBSERVE
CONDITION & HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE RQMTS.
F. PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION OBSERVE
PERSONNEL OBSERVED & DOCUMENTED FOR FASTENER
ASSEMBLIES & METHODS USED.
G. PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS & OTHER OBSERVE
FASTENER COMPONENTS.
5. INSPECTION TASKS DURING BOLTING:
A. FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES OBSERVE
& WASHERS (IF REQ'D) ARE POSITIONED AS REQ'D.
B. JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE OBSERVE
PRETENSIONING OPERATION.
C. FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED OBSERVE
FROM ROTATING.
D. FASTENERS ARE PRETENSIONED IN ACCORDANCE w/ THE RCSC OBSERVE
SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID
POINT TOWARD THE FREE EDGES.
6. INSPECTION TASKS AFTER BOLTING:
A. DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNS. PERFORM
7. INSPECTION OF STEEL ELEM. OF COMP. CONST. PRIOR TO CONC. PLACEMENT:
A. PLACEMENT & INSTALLATION OF STEEL DECK. PERFORM
B. PLACEMENT & INSTALLATION OF STEEL HEADED STUD ANCHORS. PERFORM
C. DOCUMENT ACCEPTANCE OR REJECTION OF STEEL ELEMENTS. PERFORM
8. INSPECTION OF STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL:
A. MATERIAL VERIFICATION OF COLD-FORMED STEEL DECK:
1) IDENTIFICATION MARKINGS TO CONFORM TO ASTM STANDARDS PERIODIC
SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS.
2) MANUFACTURER'S CERTIFIED TEST REPORTS. PERIODIC
B. INSPECTION OF WELDING:
1) FLOOR & ROOF DECK WELDS. PERIODIC
2) VERIFICATION OF WELDABILITY OF REINF. STEEL OTHER THAN ASTM A706. PERIODIC
3) REINFORCING STEEL RESISTING FLEXURAL & AXIAL FORCES IN
INTERMEDIATE & SPECIAL MOMENT FRAMES, & BOUNDARY ELEMENTS OF CONT.
SPECIAL STRUCTURAL WALLS OF CONCRETE & SHEAR REINFORCEMENT.
4) SHEAR REINFORCING STEEL. CONT.
5) OTHER REINFORCING STEEL. PERIODIC
CONCRETE
1. INSPECTION OF REINFORCING STEEL, INCLUDING PRESTRESSING TENDONS, PERIODIC
& PLACEMENT.
2. INSPECTION OF REINFORCING STEEL WELDING IN ACCORDANCE w/ IBC TABLE 1705.2.2, ITEM 2b.
3. INSPECTION OF ANCHORS TO BE INSTALLED IN CONCRETE WHERE ALLOWABLE PERIODIC
LOADS HAVE BEEN INCREASED OR WHERE STRENGTH DESIGN IS USED.
4. INSPECTION OF ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS. PERIODIC
5. VERIFYING USE OF REQUIRED DESIGN MIX. PERIODIC
6. AT THE TIME FRESH CONCRETE IS SAMPLED TO FABRICATE SPECIMENS FOR
STRENGTH TESTS, PERFORM SLUMP & AIR CONTENT TESTS, & DETERMINE THE CONT.
TEMPERATURE OF THE CONCRETE.
7. INSPECTION OF CONCRETE & SHOTCRETE PLACEMENT FOR PROPER CONT.
APPLICATION TECHNIQUES.
8. INSPECTION FOR MAINTENANCE OF SPECIFIED CURING TEMP. & TECHNIQUES. PERIODIC
9. INSPECTION OF PRESTRESSED CONCRETE: CONT.
A. APPLICATION OF PRESTRESSING FORCES. CONT.
B. GROUTING OF BONDED PRESTRESSING TENDONS IN THE SEISMIC-FORCE- CONT.
RESISTING SYSTEM.
10. ERECTION OF PRECAST CONCRETE MEMBERS. PERIODIC
11. VERIFICATION OF IN-SITU CONCRETE STRENGTH, PRIOR TO STRESSING OF
TENDONS IN POST TENSIONED CONCRETE & PRIOR TO REMOVAL OF PERIODIC
SHORES & FORMS FROM BEAMS & STRUCTURAL SLABS.
12. INSPECT FORMWORK FOR SHAPE, LOCATION & DIMENSIONS OF THE PERIODIC
CONCRETE MEMBER BEING FORMED.
SOILS
1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO PERIODIC
ACHIEVE THE DESIGN BEARING CAPACITY.
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH & HAVE REACHED PERIODIC
PROPER MATERIAL.
3. PERFORM CLASSIFICATION & TESTING OF COMPACTED FILL MATERIALS. PERIODIC
4. VERIFY USE OF PROPER MATERIALS, DENSITIES & LIFT THICKNESSES DURING CONT.
PLACEMENT & COMPACTION OF COMPACTED FILL.
5. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE & VERIFY PERIODIC
THAT SITE HAS BEEN PREPARED PROPERLY.
STEEL PLATE CONNECTION TO BE
REPLACED AS SHOWN IN DETAIL A3/S1.0.
TYPICAL JOIST TOP CHORD TO BE
STRAIGHTENED AND RECONNECTED.
DETAILS A1/S1.0 AND A2/S1.0.
BEAM CONNECTION TO BE REPLACED AS
SHOWN IN DETAIL A2/S1.0.
2 2
FREEZER NO.1 FREEZER NO.2
FREEZER NO.3
DISTRIBUTION
WAREHOUSE
DEMOLISH CONCRETE
EXISTING CONCRETE
4 4
TYP.
0"
-2"
-3 1/4" -4 1/2"
-2 3/4"
-1 3/4"
-2"
-3 1/2" -8 1/4" -11 3/4" -5 1/4"
-4 1/4"
-4 1/4"
-10 1/2"
-7"
-4 3/4"-7 1/4"-4 3/4"
-2"
-3 1/4" -3 1/4" -4 1/4"
-4 3/4"
-3 1/4"
-4 3/4"
-5 1/4"
-2 1/2"
-1 1/4"
-1 1/2"-1/2"
-4 5/8"
-4 3/4"
-4 3/4"-3 1/4"-1 3/4"
10 10
-6"
-6"
-2'-0"
-3'-0"
-4'-0"
-5'-0"
-9"
-7"
-5"
+/- 184 SF CONC.
+/- 90 SF CONC.
A. CREATE SWALE AT NORTH AND EAST SIDE OF FREEZER NO. 1 & 2 TO DRAIN TO THE
EAST.
B. CONTRACTOR TO VERIFY ALL QUANTIFIED AREAS PROVIDED IN THE CONSTRUCTION
DOCUMENTS, NOTIFY ARCHITECT WITH ANY DISCREPENCIES.
B ACDE
FG
B ACDEFG
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo g g es , I
A on e
: 5
.2
.0 x:
5.
.0
A R
C H
IT
E
C T
F
O
LD
K el lo g g es , I
A on e
: 5
.2
.0 x:
5.
.0
AD1
DEMO PLAN FIRST
FLOOR
D A
S
W R
C C
D C
F R
E E
Z E
R R
E P
A
IR
IO
W
A D
EP
T
O F
H
EA
LT
H
A N
D H
U M
AN
S
ER
VI
C
ES
N A ve , W oo dw ar d, IA
10-09-2026 9503.00
BID DOCUMENTS
DEMO PLAN NOTES
1 DEMOLISH CONCRETE. COORDINATE SUB-GRADE TESTING WITH GEOTECHNICAL
ENGINEER. REGRADE AND PROVIDE GRANULAR FILL TO ACHIEVE SLAB ELEVATIONS
INDICATED. +/- 2,814 SF (IF OVER EXCAVATION IS REQUIRED, THEN UNIT PRICE WILL BE
INITIATED.
2 STRIP TURF AND REGRADE TOP SOIL TO THE EXTENT NECESSARY TO ACHIEVE FINAL
ELEVATIONS INDICATED. ENSURE POSITIVE ON-GRADE DRAINAGE AWAY FROM
STRUCTURES AT ALL TIMES. +/- 7,000 SF
3 EXISTING SOIL AREA. COORDINATE TESTING WITH GEOTECHNICAL ENGINEER.
PREPARE TO REGRADE TO ACHIEVE NEW SLAB ELEVATIONS INDICATED. +/- 322 SF
4 DEMOLISH EXISTING MECHANICAL UNITS.
5 EXISTING WOOD LANDING AND STAIRS TO BE DEMOLISHED BY OWNER. COORDINATE
TIMING AND REQUIRED CONSTRUCTION ACCESS THROUGH THIS DOOR.
6 DEMOLISH EXISTING DOWNSPOUT AND EXTENSION. PREPARE FOR NEW DOWNSPOUT
AND NEW SUB-DRAIN CONNECTION.
7 DEMOLISH EXISTING INTAKE DRAIN AND STRAINER, MODIFY EXISTING 6" PIPE TO
RECIEVE NEW PARTS.
8 DEMOLISH INSULATED PANEL FREEZER DOOR, FRAME, THRESHOLD, AND RELATED
HEATING COMPONENTS. PREPARE TO RECEIVE NEW DOOR FRAME.
9 DEMOLISH CONCRETE PAD AND FOOTINGS +/- 274 SF.
10 DEMOLISH INSIDE CORNER FLASHING.
11 DEMOLISH PVC VENT PIPE EXTENSION BACK TO FACE OF FOUNDATION WALL.
12 REMOVE AND PULL BACK ROOF EDGE AND MEMBRANE FOR ACCESS TO SEALANT
JOINTS BELOW. REMOVAL AREA TO BE REPLACED AND PATCHED AT THE COMPLETION
OF THE WORK IN THE AREA. +/- 700 SF
13 DEMOLISH COUNTER FLASHING AT THE BASE OF THE INSULATED METAL PANELS.
14 PROTECT EXISTING CONCRETE FOOTINGS, STEEL COLUMNS AND MECHANICAL
MEZZANINE ABOVE DURING CONSTRUCTION
15 PROTECT EXISTING ELECTRICAL PANEL AND CONDUIT DURING CONSTRUCTION
16 PROTECT EXISTING METAL STAIRS AND CONCRETE BELOW DURING CONSTRUCTION
SCALE:
TRUE
1/8" = 1'-0"E1 DEMOLITION PLAN
DEMOLITION PLAN GENERAL NOTES
A. CONTRACTOR TO REPAIR HOLES (TYPE A SEALANT) IN THE INSULATED METAL
PANELS AT EXTERIOR PERIMETER OF FREEZER NO. 1 &2. (FIGURE A TOTAL OF 5
HOLES PER WALL)
B. CONTRACTOR TO TIGHTEN ALL BOLTS (HIGH AND LOW) AT EXTERIOR PERIMETER OF
FREEZER NO. 3 AND CONNECTOR.
C. 17,000 SF OF SURFACE AREA CALCULATED TIMES 4.5 INCHES PER HOUR FOR IOWA
DIVIDED BY THE CONSTANT 96.23 TO CONVERT INTO FLOW RATE (GPM) EQUALS 795
GPM < 885 GPM 8" PIPE AT 1/4" SLOPE. CALCULATION CONFIRMS THAT THE EXISTING
8" PIPE CAN HANDLE THE CAPTURED WATER AMOUNT FROM THE ROOF.
D. AT LOCATIONS OF THERMAL BREAKS (ICE ACCUMULATION AT THE INTERIOR) THE
GOAL IS TO FIX THE THERMAL BREAK BY REMOVING EXISTING SEALANT, PREP THE
METAL SURFACES AND APPLY NEW SEALANT AT THE INTERIOR AND EXTERIOR.
ADDITIONAL TERM BAR AND MEMBRANE WILL BE ADDED OVER THE SEALANT AT
BUILDING JOINTS AND CORNERS CALLED OUT IN THE DRAWINGS.
E. FREEZER NO. 1, 2 & 3 MUST REMAIN IN OPERATION THROUGHOUT CONSTRUCTION.
CONTRACTOR TO ANTICIPATE WORKING TEMPERATURES BETWEEN (0-20) DEGREES
FAHRENHEIT. CONTRACTOR TO COORDINATE DAILY WITH OWNER ON TIME
TEMPERATURE SCHEDULE.
F. ALTERNATE NO. 1 AT ALL FREEZER NO. 3 WALLS INCLUDING THE CONNECTOR TO
FREEZER NO. 2, PROVIDE SEALANT AT THE INTERIOR AND EXTERIOR REMAINING
HORIZONTAL IMP SEAMS UP HIGH AND REMAINING VERTICAL SEAMS ABOVE THIS
LINE (IMP SEAMS BELOW THIS LINE ARE NOT SHOWING ANY THERMAL BRIDGING)
SEE EXTERIOR ELEVATIONS FOR THESE IMP SEAMS. IF ALTERNATE IS EXCEPTED
ALL ROOF EDGE WILL NEED REPLACED WHILE THE GUTTER AND DOWNSPOUTS BE
SALVAGED AND REINSTALLED.
A5.0
D3
A5.0G2
A5.0
G3
A5.0
G4
A5.0 G1
A5.0
D4
4'-0" 89'-9"
'-1
0"
'-0
'-2
61'-4"
'-2
24'-9" 8'-7" 28'-0"
4'-0" 71'-4" 8'-7" 9'-10"
'-0
'-6
'-4
46'-4" 43'-5"
FREEZER NO.1 FREEZER NO.2
FREEZER NO.3
DISTRIBUTION
WAREHOUSE
6 6 6 6 6 6 6 6 6 6
10 11
'-5
'-5
'-1
'-1
NEW CONCRETE
EXISTING CONCRETE
EXISTING CONCRETE
BELOW STAIRS TO
REMAIN AS IS
15 15
A1.0 F4
A1.0
F4 SIM
F5 A1.0
APPROXIMATE LOCATION
OF NEW 6" TO (E) 8"
SUBDRAIN CONNECTION
-7"
-2"
-2"
-2"
-3 1/2" -8 1/4" -11 3/4" -5 1/4"
-4 1/4"
-4 1/4"
-10 1/2"
-7"
-4 3/4"
-7 1/4" -4 3/4"
-2"
-4 1/4"
-4 3/4"
-2"
-1"
-4 5/8"
-2" -4" -4" -4 1/2"
-3 1/2"-3 1/2"
-4"
0" 0"
-3 1/2"
-2"
-1"
A1.0 F4
A1.0 F4
19191919
-5" -6"
-3"
-3"-3 1/4"
-4 3/4"-6 1/4"
-5 1/2"
-4"
-5"
-4 1/2"
-6"
20 20
6" PIPE
6" PIPE
6" PIPE
6" PIPE
6" PIPE
6" PIPE
6" PIPE
6" PIPE
6" PIPE
(E) 8" PIPE
(E) 8" PIPE
12 12
-2'-0"
-3'-0"
-4'-0"
-9"
-7"
-5"
F1 A1.0 A1.0
F1
1/ 2"
3/ 4"
THROUGH BOLT
VERIFY
V E
R
IF
Y
1/ 2"
(E) INSULATED METAL PANEL
METAL DRIP, EXTEND 2" PAST CASING
5 1/2" VERIFY 5 1/2"
THERMALLY BROKEN THRESHOLD
SWEEP
INSIDE
OUTSIDE
GASKET AT THE PERIMETER
GASKET AT THE PERIMETER
NON-WOOD JAMB, BUCK AND
CASING SET IN A BED OF SEALANT
HEAVY DUTY SPRING
TENSION BARREL CLOSER
INSIDE OUTSIDE
(E) CONCRETE STOOP
(E) CONCRETE CURB
(E) INSULATED CONCRETE FREEZER FLOOR
56 SAFEGUARD LATCH
PUSH BUTTON EXIT DEVICE
56 SAFEGUARD LATCH
(3) HEAVY DUTY METAL HINGE
PUSH BUTTON EXIT DEVICE
INSETTING INSULATED METAL DOOR
INSETTING INSULATED METAL DOOR
THERMALLY BROKEN THRESHOLD
SET IN A BED OF SEALANT
NON-WOOD JAMB, BUCK AND
CASING SET IN A BED OF SEALANT
NON-WOOD JAMB, BUCK AND
CASING SET IN A BED OF SEALANT
KEY
HEAD & SILL SECTION DETAIL
JAMB PLAN DETAIL
TERM BAR AND FULLY ADHERED EPDM
MEMBRANE TO CONTINUE FULL HEIGHT
OVER (E) INSULATED METAL PANELS
SEALANT INTERIOR AND EXTERIOR
(E) INSULATED METAL PANEL
(E) INSULATED METAL PANEL SLIDING DOOR
(E) CONCRETE CURB
(E) STEEL POST
INSIDE
OUTSIDE
INSIDE
Level 1 0"
NEW PVC BOOT WITH CAP
NEW PREFINISHED OPEN DOWNSPOUT
NEW GALVANIZED ONE PIECE
COUNTER FLASHING WITH LOCKSTRIP
(E) INSULATED METAL PANEL
TYPE A SEALANT
TERM BAR WITH SEALANT OVER
FULLY ADHERED EPDM MEMBRANE
B ACDE
FG
B ACDEFG
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo g g es , I
A on e
: 5
.2
.0 x:
5.
.0
A R
C H
IT
E
C T
F
O
LD
K el lo g g es , I
A on e
: 5
.2
.0 x:
5.
.0
A1.0
FIRST FLOOR PLAN
D A
S
W R
C C
D C
F R
E E
Z E
R R
E P
A
IR
IO
W
A D
EP
T
O F
H
EA
LT
H
A N
D H
U M
AN
S
ER
VI
C
ES
N A ve , W oo dw ar d, IA
10-09-2026 9503.00
BID DOCUMENTS
FLOOR PLAN NOTES
1 NEW INSETTING (NON WOOD JAMB AND CASING BOTH SIDES WITH THROUGH WALL
FASTENERS) 6" INSULATED GALVANIZED METAL PANEL FREEZER DOOR WITH
GASKETING AT THE JAMB AND HEAD, THERMALLY BROKEN SILL SET IN A BED OF
SEALANT WITH HEAT CABLES IN THE FRAME AND SILL OF DOOR. ADD METAL DRIP
ABOVE FRAME AT EXTERIOR SIDE OF DOOR. WHERE THE MANUFACTURER CALLS FOR
SEALANT USE TYPE A.
2 NEW VERTICAL INTAKE METAL DRAIN, CLAMP AND STRAINER. NEW DRAIN TO RECEIVE
NEW 6" PIPE AND CONNECT TO EXISTING 6" PIPE.
3 NEW PREFINISHED OPEN DOWNSPOUT TO TIE INTO PVC BOOT TO NEW 6" SUBDRAIN
SYSTEM TO CONNECT TO (E) 6" AREA INTAKE.
4 NEW PREFINISHED DOWNSPOUT TO TIE INTO PVC BOOT TO NEW 6" SUBDRAIN SYSTEM
TO CONNECT TO (E) 8" SUBDRAIN TO (E) DAYLIGHT.
5 NEW PREFINISHED OPEN DOWNSPOUT TO TIE INTO PVC BOOT TO NEW 6" SUBDRAIN
SYSTEM TO CONNECT TO (E) 8" SUBDRAIN TO (E) DAYLIGHT.
6 DIG OUT, CUT AND REPAIR EXISTING PVC VENT/DRAIN PIPE, ADD TURN DOWN TO
MATCH FREEZER NO.3 PIPES.
7 NEW 5" CONCRETE SLAB OVER 6" GRANULAR FILL WITH NO. 5 BAR AT 16" O.C., SWALE
TO EXISTING INTAKE - SEE PLAN FOR SPOT ELEVATIONS AND SLOPES. +/-3,200 SF.
8 REWORK GRADE TO HAVE PROPER SLOPE AWAY FROM THE WAREHOUSE, FREEZER
NO. 1, NO. 2 AND NO. 3 CREATE SWALE TO DRAIN EAST INTO THE ADJACENT FIELD,
HYDRO SEED DISTURBED AREAS. +/- 7,000
9 (NIC) NEW TREATED WOOD LANDING, STAIRS AND RAILING BY OWNER.
10 THERMAL BREAK AT ENVELOPE UP HIGH - PROVIDE TYPE A SEALANT AT SEPARATED
INSULATED PANELS AT EXTERIOR & INTERIOR.
11 THERMAL BREAK AT ENVELOPE UP HIGH - PROVIDE TYPE A SEALANT AT SEPARATED
INSULATED PANELS EXTERIOR & INTERIOR AND ADD FULLY ADHERED EPDM
MEMBRANE WITH TERM BAR AT BOTH SIDES AT INTERIOR (LOW) AND EXTERIOR (HIGH)
CORNERS
12 EXTERIOR AND INTERIOR CORNER PANEL - PROVIDE TYPE A SEALANT AT INSULATED
PANEL SEAMS AT EXTERIOR & INTERIOR.
13 THERMAL BREAK AT THROUGH WALL PIPE PENETRATION UP HIGH - CONTRACTOR TO
PROVIDE NEW EXTERIOR PIPE COVER AND TYPE A SEALANT AT EXTERIOR & INTERIOR.
14 THERMAL BREAK AT DOOR PERIMETER - CONTRACTOR TO PROVIDE NEW GASKETING
AND ADJUST DOORS. TYPE A SEALANT AT THE EXTERIOR AND INTERIOR PERIMETER
OF DOOR FRAME JAMB AND CASING.
15 SEE GENERAL NOTE A
16 SEE GENERAL NOTE B
17 NEW GALVANIZED COUNTER FLASHING OVER TERM BAR AND FULLY ADHERED
MEMBRANE OVER INSULATED METAL PANEL BASE AND TOP OF CONCRETE
FOUNDATION WALL.
18 TYPE A SEALANT AT BUILDING TO CONCRETE INTERSECTION AT WAREHOUSE,
FREEZER NO. 1,2 & 3 INCLUDING MECHANICAL MEZZANINE FOOTINGS.
19 CONTROL JOINT IN CONCRETE DRIVE
20 SMOOTH GREASED DOWELS NO. 5 BAR AT 24" O.C.
21 (NIC) THERMAL BREAK AT THROUGH WALL VENT UP HIGH BY OWNER.
GENERAL NOTES
SCALE:
TRUE
1/8" = 1'-0"E1 FLOOR PLAN
SCALE: 1" = 1'-0"F1 DOOR DETAIL
INSETTING INSULATED METAL DOOR
SCALE: 1" = 1'-0"F4 EXTERIOR PLAN DETAIL
LOW
SCALE: 1" = 1'-0"F5 EXTERIOR SECTION DETAIL
PANELS AT EXTERIOR PERIMETER OF FREEZER NO. 1 &2. (FIGURE A TOTAL OF 5
HOLES PER WALL)
B. CONTRACTOR TO TIGHTEN ALL BOLTS (HIGH AND LOW) AT EXTERIOR PERIMETER OF
FREEZER NO. 3 AND CONNECTOR.
C. 17,000 SF OF SURFACE AREA CALCULATED TIMES 4.5 INCHES PER HOUR FOR IOWA
DIVIDED BY THE CONSTANT 96.23 TO CONVERT INTO FLOW RATE (GPM) EQUALS 795
GPM < 885 GPM 8" PIPE AT 1/4" SLOPE. CALCULATION CONFIRMS THAT THE EXISTING
8" PIPE CAN HANDLE THE CAPTURED WATER AMOUNT FROM THE ROOF.
D. AT LOCATIONS OF THERMAL BREAKS (ICE ACCUMULATION AT THE INTERIOR) THE
GOAL IS TO FIX THE THERMAL BREAK BY REMOVING EXISTING SEALANT, PREP THE
METAL SURFACES AND APPLY NEW SEALANT AT THE INTERIOR AND EXTERIOR.
ADDITIONAL TERM BAR AND MEMBRANE WILL BE ADDED OVER THE SEALANT AT
BUILDING JOINTS AND CORNERS CALLED OUT IN THE DRAWINGS.
E. FREEZER NO. 1, 2 & 3 MUST REMAIN IN OPERATION THROUGHOUT CONSTRUCTION.
CONTRACTOR TO ANTICIPATE WORKING TEMPERATURES BETWEEN (0-20) DEGREES
FAHRENHEIT. CONTRACTOR TO COORDINATE DAILY WITH OWNER ON TIME
TEMPERATURE SCHEDULE.
F. ALTERNATE NO. 1 AT ALL FREEZER NO. 3 WALLS INCLUDING THE CONNECTOR TO
FREEZER NO. 2, PROVIDE SEALANT AT THE INTERIOR AND EXTERIOR REMAINING
HORIZONTAL IMP SEAMS UP HIGH AND REMAINING VERTICAL SEAMS ABOVE THIS
LINE (IMP SEAMS BELOW THIS LINE ARE NOT SHOWING ANY THERMAL BRIDGING)
SEE EXTERIOR ELEVATIONS FOR THESE IMP SEAMS. IF ALTERNATE IS EXCEPTED
ALL ROOF EDGE WILL NEED REPLACED WHILE THE GUTTER AND DOWNSPOUTS BE
SALVAGED AND REINSTALLED.
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/2" / 12"
3 1/4" / 12"
3 1/4" / 12"
1/ 4"
1/
4"
3 4
4 4
'-0
'-8
'-8
A4.0 F5 A4.0
F5
SIM
F4 A4.0
F2 A4.0
F3 A4.0
F3 A4.0
F3 A4.0
F3 A4.0
(E) EPDM ROOF MATERIAL
(E) TPO ROOF MATERIAL
NO WORK (E) TPO ROOF
'-0
'-0
10'-0"
10'-0"
10'-0"
TERM BAR AND FULLY ADHERED EPDM
MEMBRANE TO CONTINUE FULL HEIGHT
OVER (E) INSULATED METAL PANELS
SEALANT INTERIOR AND EXTERIOR
(E) INSULATED METAL PANEL
(E) CONCRETE CURB
(E) STEEL POST
NEW FULLY ADHERED MEMBRANE
NEW PREFINISHED GALVANIZED ROOF EDGE
METAL WITH EDGE GUARD, PROVIDE PROPER
MEMBRANE FLASHING TO EXISTING MEMBRANE
1'-0"
(E) STEEL STRUCTURE (BEAM OR JOIST)
(E) STEEL STRUCTURE (BEAM OR JOIST)
NEW FULLY ADHERED EPDM MEMBRANE
(E) EPDM MEMBRANE
(E) TPO MEMBRANE
NEW PREFINISHED METAL ROOF EDGE
WITH LOCKSTRIP AND TPO MEMBRANE
FLASHING
REINFORCED MEMBRANE FLASHING
(E) STEEL STRUCTURE
(BEAM OR JOIST)
NEW PREFINISHED ONE PIECE
CONTINUOUS METAL 6" BOX GUTTER
WITH EPDM MEMBRANE FLASHING
NEW PREFINISHED OPEN DOWNSPOUT
(E) INSULATED METAL PANEL
(E) EPDM MEMBRANE
(E) INSULATED METAL ROOF PANEL
(E) EPDM MEMBRANE
NEW PREFINISHED METAL ROOF EDGE
WITH LOCKSTRIP AND EPDM
MEMBRANE FLASHING
(E) STEEL STRUCTURE (BEAM OR JOIST)
(E) INSULATED METAL PANEL
(E) INSULATED METAL ROOF PANEL
AT THERMAL BREAKS REMOVE AND REPLACE
EXTERIOR AND INTERIOR SEALANT AT IMP SEAMS
AT THERMAL BREAKS REMOVE AND
REPLACE EXTERIOR AND INTERIOR
SEALANT AT IMP SEAMS
B ACDE
FG
B ACDEFG
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo g g es , I
A on e
: 5
.2
.0 x:
5.
.0
A R
C H
IT
E
C T
F
O
LD
K el lo g g es , I
A on e
: 5
.2
.0 x:
5.
.0
A4.0
ROOF PLAN
D A
S
W R
C C
D C
F R
E E
Z E
R R
E P
A
IR
IO
W
A D
EP
T
O F
H
EA
LT
H
A N
D H
U M
AN
S
ER
VI
C
ES
N A ve , W oo dw ar d, IA
10-09-2026 9503.00
BID DOCUMENTS
ROOF PLAN NOTES
1 NEW PREFINISHED ONE PIECE CONTINUOUS METAL 6" BOX GUTTER WITH EPDM
MEMBRANE FLASHING
2 REPAIR FREEZER THERMAL BREECHES (700 SF) BY LOCALIZED DEMOLITION OF ROOF
EDGE, SALVAGE GUTTERS AND DOWNSPOUTS, CUT MEMBRANE, PEEL-BACK ROOF,
PROVIDE SEALANT AT SEPARATED INSULATED ROOF PANELS AT EXTERIOR &
INTERIOR, APPLY NEW ADHESIVE & SEALANT TO EXISTING MEMBRANE AND MEMBRANE
FLASHING, INSTALL NEW ROOF EDGE AND MEMBRANE FLASHING AND REINSTALL
GUTTERS AND DOWNSPOUTS. +/- 700 SF
3 NEW PREFINISHED GALVANIZED ROOF EDGE METAL WITH EDGE GUARD, PROVIDE
PROPER MEMBRANE FLASHING TO EXISTING MEMBRANE
4 NEW FULLY ADHERED MEMBRANE WRAPPED AROUND EXTERIOR CORNER WITH
CONTINUOUS VERTICAL TERM BAR AT EACH SIDE
5 NEW FULLY ADHERED MEMBRANE TO OVERLAP EXISTING MEMBRANE, PROVIDE
PROPER MEMBRANE FLASHING
6 (E) PREFINISHED METAL ROOF EDGE TO BE REPLACED, MATCH EXISTING PROFILE, SIZE
AND COLOR, CONTRATOR TO DETERMINE LENGTH OF ROOF EDGE TO BE REPLACED
BASED ON EXISTING SEAMS.
7 (E) PREFINISHED METAL GUTTER AND DOWNSPOUT, CONTRATOR TO DETERMINE
LENGTH OF GUTTER TO BE REMOVED AND REINSTALLED BASED ON EXISTING SEAMS.
8 CUT EXISTING MEMBRANE, PLACE SEALANT AT IMP SEAMS, FULLY ADHERE MEMBRANE
TO IMP AND MEMBRANE FLASHING OVER CUT MEMBRANE.
GENERAL NOTES
SCALE:
TRUE
1/8" = 1'-0"E1 ROOF PLAN
NO WORK AT (E) METAL ROOF
SCALE: 1" = 1'-0"F5 EXTERIOR PLAN DETAIL
HIGH
SCALE: 1" = 1'-0"F4 ROOF DETAIL
SCALE: 1" = 1'-0"F2 ROOF DETAIL
SCALE: 1" = 1'-0"F3 ROOF DETAIL
PANELS AT EXTERIOR PERIMETER OF FREEZER NO. 1 &2. (FIGURE A TOTAL OF 5
HOLES PER WALL)
B. CONTRACTOR TO TIGHTEN ALL BOLTS (HIGH AND LOW) AT EXTERIOR PERIMETER OF
FREEZER NO. 3 AND CONNECTOR.
C. 17,000 SF OF SURFACE AREA CALCULATED TIMES 4.5 INCHES PER HOUR FOR IOWA
DIVIDED BY THE CONSTANT 96.23 TO CONVERT INTO FLOW RATE (GPM) EQUALS 795
GPM < 885 GPM 8" PIPE AT 1/4" SLOPE. CALCULATION CONFIRMS THAT THE EXISTING
8" PIPE CAN HANDLE THE CAPTURED WATER AMOUNT FROM THE ROOF.
D. AT LOCATIONS OF THERMAL BREAKS (ICE ACCUMULATION AT THE INTERIOR) THE
GOAL IS TO FIX THE THERMAL BREAK BY REMOVING EXISTING SEALANT, PREP THE
METAL SURFACES AND APPLY NEW SEALANT AT THE INTERIOR AND EXTERIOR.
ADDITIONAL TERM BAR AND MEMBRANE WILL BE ADDED OVER THE SEALANT AT
BUILDING JOINTS AND CORNERS CALLED OUT IN THE DRAWINGS.
E. FREEZER NO. 1, 2 & 3 MUST REMAIN IN OPERATION THROUGHOUT CONSTRUCTION.
CONTRACTOR TO ANTICIPATE WORKING TEMPERATURES BETWEEN (0-20) DEGREES
FAHRENHEIT. CONTRACTOR TO COORDINATE DAILY WITH OWNER ON TIME
TEMPERATURE SCHEDULE.
F. ALTERNATE NO. 1 AT ALL FREEZER NO. 3 WALLS INCLUDING THE CONNECTOR TO
FREEZER NO. 2, PROVIDE SEALANT AT THE INTERIOR AND EXTERIOR REMAINING
HORIZONTAL IMP SEAMS UP HIGH AND REMAINING VERTICAL SEAMS ABOVE THIS
LINE (IMP SEAMS BELOW THIS LINE ARE NOT SHOWING ANY THERMAL BRIDGING)
SEE EXTERIOR ELEVATIONS FOR THESE IMP SEAMS. IF ALTERNATE IS EXCEPTED
ALL ROOF EDGE WILL NEED REPLACED WHILE THE GUTTER AND DOWNSPOUTS BE
SALVAGED AND REINSTALLED.
Level 1 0"
8 8 8 8 8 8 8 8 8 8 4
15 1515
SEE NORTH 1 ELEVATION FOR
MORE DETAIL AT FREEZER NO. 3
Level 1 0"
15 15 15
Level 1 0"
16 16
Level 1 0"
5 5
9 9
15 15
17 1717
16 16 1616
Level 1 0"
1616161616
5 3
Level 1 0"
B ACDE
FG
B ACDEFG
©2026REVISIONS:
PROJECT NUMBER
PROJECT ISSUE DATE
REV DATE DESCRIPTION
S T
R U
C T
U R
A L
E N
G
IN
E E
R
F O
LD
K el lo g g es , I
A on e
: 5
.2
.0 x:
5.
.0
A R
C H
IT
E
C T
F
O
LD
K el lo g g es , I
A on e
: 5
.2
.0 x:
5.
.0
A5.0
EXTERIOR ELEVATIONS
D A
S
W R
C C
D C
F R
E E
Z E
R R
E P
A
IR
IO
W
A D
EP
T
O F
H
EA
LT
H
A N
D H
U M
AN
S
ER
VI
C
ES
N A ve , W oo dw ar d, IA
10-09-2026 9503.00
BID DOCUMENTS
EXTERIOR ELEVATION NOTES
1 NEW INSETTING (NON WOOD JAMB AND CASING BOTH SIDES WITH THROUGH WALL
FASTENERS) 6" INSULATED GALVANIZED METAL PANEL FREEZER DOOR WITH
GASKETING AT THE JAMB AND HEAD, THERMALLY BROKEN SILL SET IN A BED OF
SEALANT WITH HEAT CABLES IN THE FRAME AND SILL OF DOOR. ADD METAL DRIP
ABOVE FRAME AT EXTERIOR SIDE OF DOOR. TYPE A SEALANT AT THE EXTERIOR AND
INTERIOR PERIMETER OF DOOR FRAME JAMB AND CASING.
2 (E) 6" INTAKE
3 NEW PREFINISHED OPEN DOWNSPOUT TO TIE INTO PVC BOOT TO NEW 6" SUBDRAIN
SYSTEM TO CONNECT TO (E) 6" AREA INTAKE.
4 (E) DOWNSPOUT TO TIE INTO NEW SUBDRAIN TO CONNECT TO (E) 8" SUBDRAIN TO
DAYLIGHT.
5 NEW PREFINISHED DOWNSPOUT (MATCH FREEZER NO. 3 DOWNSPOUTS) TO TIE INTO
NEW SUBDRAIN TO CONNECT TO (E) 8" SUBDRAIN TO DAYLIGHT.
6 NEW PREFINISHED GUTTER (MATCH FREEZER NO. 3 GUTTERS) TO TIE INTO NEW
DOWNSPOUTS.
7 NEW PREFINISHED GALVANIZED ROOF EDGE METAL WITH EDGE GUARD, PROVIDE
PROPER MEMBRANE FLASHING TO EXISTING MEMBRANE
8 NEW PVC VENT/DRAIN PIPE, ADD TURN DOWN TO MATCH FREEZER NO.3 PIPES. SPLICE
TO EXISTING PVC PIPE AT FACE OF FOUNDATION WALL.
9 THERMAL BREAK AT ENVELOPE UP HIGH - REMOVE EXISTING SEALANT AND PROVIDE
NEW TYPE A SEALANT AT SEPARATED INSULATED PANELS AT EXTERIOR & INTERIOR.
10 PROVIDE SEALANT FULL HEIGHT AT SEPARATED INSULATED PANELS/TRIM AT
EXTERIOR & INTERIOR AND ADD FULLY ADHERED EPDM MEMBRANE WITH TERM BAR AT
BOTH SIDES OF INTERIOR CORNERS
11 THERMAL BREAK AT DOOR PERIMETER - CONTRACTOR TO PROVIDE NEW GASKETING
AND ADJUST DOORS. TYPE A SEALANT AT THE EXTERIOR AND INTERIOR PERIMETER
OF DOOR FRAME JAMB AND CASING.
12 THERMAL BREAK AT THROUGH WALL PIPE PENETRATION UP HIGH - CONTRACTOR TO
PROVIDE NEW EXTERIOR PIPE COVER ANDTHERMAL BREAK AT ENVELOPE UP HIGH -
PROVIDE TYPE A SEALANT AT INSULATED PANELS AT EXTERIOR & INTERIOR.
13 (NIC) THERMAL BREAK AT THROUGH WALL VENT, REPAIR BY OWNER
14 (NIC) NEW TREATED WOOD LANDING, STAIRS AND RAILING BY OWNER
15 NEW GALVANIZED COUNTER FLASHING OVER TERM BAR AND FULLY ADHERED
MEMBRANE OVER INSULATED METAL PANEL BASE AND TOP OF CONCRETE
FOUNDATION WALL.
16 SEE GENERAL NOTE F FOR ALTERNATE NO 1 - SEAMS INDICATED BY DASHED LINE
17 (E) PREFINISHED METAL GUTTER AND DOWNSPOUT, CONTRATOR TO DETERMINE
LENGTH OF GUTTER TO BE REMOVED AND REINSTALLED BASED ON EXISTING SEAMS.
18 (E) PREFINISHED METAL ROOF EDGE TO BE REPLACED, MATCH EXISTING PROFILE, SIZE
AND COLOR, CONTRATOR TO DETERMINE LENGTH OF ROOF EDGE TO BE REPLACED
BASED ON EXISTING SEAMS.
19 NEW 5" CONCRETE SLAB OVER 6" GRANULAR FILL WITH NO. 5 BAR AT 16" O.C., SWALE
TO EXISTING INTAKE - SEE PLAN FOR SPOT ELEVATIONS AND SLOPES. TYPE A SEALANT
AT BUILDING TO CONCRETE INTERSECTION AT WAREHOUSE, FREEZER NO. 1,2 & 3
INCLUDING MECHANICAL MEZZANINE FOOTINGS.
GENERAL NOTES
SCALE: 1/8" = 1'-0"G4 EXTERIOR ELEVATION
NORTH FREEZER 1 AND 2
SCALE: 1/8" = 1'-0"G3 EXTERIOR ELEVATION
SOUTH FREEZER 1 AND 2
SCALE: 1/8" = 1'-0"D3 EXTERIOR ELEVATION
SOUTH FREEZER 3
SCALE: 1/8" = 1'-0"G2 EXTERIOR ELEVATION
EAST
SCALE: 1/8" = 1'-0"G1 EXTERIOR ELEVATION
WEST
SCALE: 1/8" = 1'-0"D4 EXTERIOR ELEVATION
NORTH FREEZER 3
File details come from the government source that posted it. Updated .