Summary of RFB949100-01 Drawings - Department of Corrections 7th District RTU-2 Replacement
This file contains engineering drawings and technical specifications prepared by KCL Engineering L.L.C. for the Iowa Department of Corrections 7th District RTU-2 Replacement project located at 605 Main Street, Davenport, Iowa 52803. The project encompasses the complete replacement of Rooftop Unit-2 (RTU-2), which currently serves the 2nd, 3rd, and 4th (West) floors of the facility. The scope of work includes demolition of the existing RTU, installation of a new outdoor VAV air handling unit (Model GVBAC-2B6MA-2A60A manufactured by Johnson Controls), mechanical and electrical infrastructure modifications, and integration with the existing JCI Metasys Building Automation System. The new RTU will feature an 8,000 CFM supply fan with 7.5 HP motor, 8,000 CFM exhaust fan with 10 HP motor, DX cooling coil with R-454B refrigerant providing 310 MBH net total capacity, and indirect natural gas furnace heating with 500 MBH input capacity. The unit dimensions are 298" x 96" x 60" with a weight of 6,557 lbs and will operate on 480/3-phase power with a 125-amp breaker. Installation requirements include a new curb adapter on the existing roof curb, reconnection of supply and return ductwork, extension of conduit and conductors (three #1 and one #8 ground conductor in 1-1/2" liquid-tight flexible conduit), provision of an access platform with stairs and railings, and relocation of the existing EBTRON outside air flow measuring station.
The engineering drawings consist of a cover sheet, mechanical and electrical general notes with symbols, roof plan details, and mechanical details and schedules. All work must comply with the specifications and coordinated with mechanical and electrical trades, building structure, and architectural assemblies. The mechanical contractor is responsible for providing a complete HVAC system meeting all city and state codes, conducting testing and adjusting and balancing upon completion, and providing a minimum five-year non-prorated warranty on air conditioning and refrigeration system components (compressors, evaporators, condenser coils, piping, valves, and filter-dryers) from the date of occupancy or substantial completion. The electrical contractor must verify existing conductor sizing and install new conductors matching the existing configuration, maintain the existing 125-amp breaker from Panel DPN7, ensure integral overcurrent protection on the new unit, and integrate existing fire alarm duct smoke detectors with the new RTU. All installations must follow manufacturer recommendations and obtain approval from the architect/engineer for any deviations from the indicated duct locations and configurations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th St West Des Moines, IA 50265 515-724-7938
/1
/2
:3 :4
A
M
MC
100% CD
12/12/25
25294
D E
P A
R T
M E
N T
O F
C O
R R
E C
T
IO
N S
D
R T
U -2
R E
P L
A C
E M
E N
T
M
A
IN
S T
R E
E T
D A
V E
N T
P O
R T
IO
W A
COVER SHEET
SHEET INDEX
SHEET NUMBER SHEET DESCRIPTION
MC COVER SHEET
ME000 MECHANICAL AND ELECTRICAL GENERAL NOTES AND SYMBOLS
ME108 ROOF PLAN - MECHANICAL AND ELECTRICAL
M300 MECHANICAL DETAILS AND SCHEDULES
DEPARTMENT OF CORRECTIONS - SEVENTH DISTRICT
RTU-2 REPLACEMENT
DAS PROJECT NUMBER 9491.00
COVER SHEET
RTU-2 LOCATION
PREFERRED CRANE LOCATION
# Revision Date
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that i am a duly licensed Professional Engineer under the laws of the State of Iowa
(signature)
License Number :
Pages or sheets covered by this seal:
(date)
My license renewal date is December 31, E N
G N
E E
R I
AOFESSION
S E
D
PR
AI O W
L
IC
E N
L
ERIC HEYNEN, P.E.
ERIC
HEYNEN
Divisions 26, 27, and 28.
P24706P24706
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that i am a duly licensed Professional Engineer under the laws of the State of Iowa
(signature)
License Number :
Pages or sheets covered by this seal:
(date)
My license renewal date is December 31, CHAD D. BASS, P.E.
CHAD D.
BASS
E N
G N
E E
R I
AOFESSION
S E
D
PR
AI O W
L
IC
E N
L
21397
21397
12/15/2025 12/15/2025
NEW CONNECTION POINT
POINT OF DISCONNECT
EQUIPMENT IDENTIFICATION TAG
SHEET REFERENCE
SECTION CUT REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE
EXISTING = HALFTONE LINEWORK
NEW = DARK LINEWORK
DEMO = DASHED DARK LINEWORK
KEYNOTE
GENERAL SYMBOLS
SHEET REFERENCE
DETAIL DRAWING REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE
A101
SIM
INTERIOR ELEVATION DRAWING REFERENCE TAGA101 1
R e f
XXX
X
A101
SIM
1. MECHANICAL DEMOLITION DRAWINGS SHOWING EXISTING CONDITIONS HAVE BEEN
PREPARED BASED ON NON-DESTRUCTIVE FIELD OBSERVATION AND AS-BUILT DRAWINGS
PROVIDED BY THE OWNER. FIELD VERIFY EXISTING SYSTEMS BEFORE BEGINNING WORK.
NOTIFY ARCHITECT/ENGINEER IF EXISTING CONDITIONS ARE MATERIALLY DIFFERENT THAN
THOSE SHOWN ON THE PLANS.
2. BE FAMILIAR WITH EXISTING MECHANICAL SYSTEMS THAT WILL BE AFFECTED BY THE
DEMOLITION WORK. OBTAIN PERMISSION FROM THE OWNER'S REPRESENTATIVE TO SHUT
OFF SERVICES OR SYSTEMS THAT AFFECT AREAS BEYOND THE LIMITS OF THE IMMEDIATE
DEMOLITION AREA. INFORM THE OWNER’S REPRESENTATIVE OF THE REASON FOR AND
DURATION OF THE SHUTDOWN. MINIMIZE IMPACT TO OTHER AREAS. PROCEED WITH THE
SHUT-DOWN AFTER PERMISSION FROM THE OWNER IS GRANTED.
3. REMOVE EQUIPMENT, DUCTWORK THAT ARE INDICATED TO BE REMOVED IN A TIMELY
MANNER IN ACCORDANCE WITH THE GENERAL DEMOLITION SPECIFICATIONS. COORDINATE
WITH THE OWNER AND OTHER CONTRACTORS.
4. UNLESS EQUIPMENT TO BE REMOVED IS NOTED AS OWNER’S SALVAGE, DISPOSE OF
EQUIPMENT AND/OR MATERIALS INDICATED TO BE REMOVED PROMPTLY.
MECHANICAL – DEMOLITION NOTES
1. COORDINATE WORK WITH ALL OTHER TRADES AS DESCRIBED IN MECHANICAL GENERAL
NOTE #1.
2. PROVIDE A COMPLETE HVAC SYSTEM, INCLUDING SUPPLY, RETURN, EXHAUST, AND
VENTILATION DUCTWORK; MECHANICAL EQUIPMENT, SUPPORTS, AND ALL APPURTENANCES.
INSTALL ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. INSTALL SYSTEM TO
MEET ALL CITY AND STATE CODES AND REQUIREMENTS.
3. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND
ARRANGEMENT OF DUCT SYSTEM. INDICATED DUCT LOCATIONS, CONFIGURATIONS, AND
ARRANGEMENTS WERE USED TO SIZE DUCTS AND CALCULATE FRICTION LOSS FOR AIR-
HANDLING EQUIPMENT SIZING AND FOR OTHER DESIGN CONSIDERATIONS. INSTALL DUCT
SYSTEMS AS INDICATED UNLESS DEVIATIONS TO LAYOUT ARE APPROVED BY
ARCHITECT/ENGINEER.
4. ALL DUCT DIMENSIONS INDICATED ARE INTERIOR FREE AREA DUCT DIMENSIONS AND DO
NOT INCLUDE INSULATION REQUIREMENTS.
HVAC - NOTES
ABSOR
ACU
AD
AFF
AFG
AHU
AV
BOT
BTU
BTUH
BV
CA
CB
CENT
CFM
CI
CL
COND
CO
CONC
CONTR
CP
CU
CUH
CWP
DDC
DN
DR
DS
EA
EAT
EC
EDBT
EEW
EF
EJ
EQUIP
ESE
EST
EWBT
EWC
EWT
EX
EXH
EXP
FAI
FCU
FD
FDC
FLEX
FLR
FPM
FPS
FS
FSEC
FT
FTG
GA
GAL
GALV
GC
GW
GPH
GPM
HR
HTG
HB
ISP
JR
LAV
LDBT
LWT
LWBT
MB
MBH
MC
MECH
MH
NTS
OA
OD
PC
PSI
PRV
PRV
PV
PVC
RA
RD
RH
RTU
RV
RVT
SK
SA
SH
SO
ST
TCC
TYP
UH
UR
UV
VA
VTR
WB
WC
WHA
WH
ABSORPTION
AIR CONDITIONING UNIT
ACCESS DOOR OR AREA DRAIN
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
AIR VENT
BOTTOM
BRITISH THERMAL UNIT
BTU PER HOUR
BALL VALVE
COMPRESSED AIR
CATCH BASIN
CENTRIFUGAL
CUBIC FEET PER MINUTE
CAST IRON
CENTER LINE
CONDENSATE
CLEAN OUT
CONCRETE
CONTRACTOR
CONDENSATE PUMP/CIRC. PUMP
COPPER
CABINET UNIT HEATER
CIRCULATING WATER PUMP
DIRECT DIGITAL CONTROLS
DOWN
DRAIN
DOWNSPOUT
EXHAUST AIR
EXHAUST AIR TEMPERATURE
ELECTRICAL CONTRACTOR
ENTERING DRY BULB
TEMPERATURE
EMERGENCY EYE WASH
EXHAUST FAN
EXPANSION JOINT
EQUIPMENT
EMERGENCY SHOWER/EYEWASH
EXTERNAL STATIC PRESSURE
ENTERING WET BULB
TEMPERATURE
ELECTRIC WATER COOLER
ENTERING WATER
TEMPERATURE
EXISTING
EXHAUST
EXPANSION
FRESH AIR INTAKE
FAN COIL UNIT
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FLEXIBLE
FLOOR
FEET PER MINUTE
FEET PER SECOND
FLOOR SINK
FOOD SERVICE EQUIPMENT CONSULTANT
FINTUBE
FOOTING
GAGE
GALLON
GALVANIZED
GENERAL CONTRACTOR
GREASE WASTE
GALLONS PER HOUR
GALLONS PER MINUTE
HOUR
HEATING
HOSE BIBB
INTERNAL STATIC PRESSURE
JANITOR RECEPTOR
LAVATORY
LEAVING DRY BULB
TEMPERATURE
LEAVING WATER
TEMPERATURE
LEAVING WET BULB
TEMPERATURE
MOP BASIN
1000 BTUH
MECHANICAL CONTRACTOR
MECHANICAL
MANHOLE
NOT TO SCALE
OUTSIDE AIR
OVERFLOW ROOF DRAIN
PLUMBING CONTRACTOR
POUNDS PER SQUARE INCH
POWER ROOF VENTILATOR
PRESSURE REDUCING VALVE
PRESSURE VENT
POLYVINYL CHLORIDE
RETURN AIR
ROOF DRAIN
RELATIVE HUMIDITY
ROOF TOP UNIT
RELIEF VALVE
ROOF VENT TERMINATION
SINK
SUPPLY AIR
SHOWER
STORM OVERFLOW
STORM
TEMPERATURE CONTROL
CONTRACTOR
TYPICAL
UNIT HEATER
URINAL
UNIT VENTILATOR
VENTILATION AIR
VENT THROUGH ROOF
WALL BOX – CONDENSATE
WATER CLOSET
WATER HAMMER ARRESTOR
WATER HEATER
MECHANICAL ABBREVIATIONS
45° ELBOW
ELBOW
PIPE FITTINGS
SINGLE LINE DOUBLE LINE
ELBOW - DOUBLE BRANCH
ELBOW - OUTLET DOWN
ELBOW - OUTLET UP
ELBOW - LONG RADIUS
ELBOW - SHORT RADIUS
TEE - VENT
TEE - SANITARY
TEE - OUTLET DOWN
TEE - OUTLET UP
TEE - SIDE OUTLET DOWN
TEE - SIDE OUTLET UP
CROSS - VENT
CROSS - SANITARY
LATERAL
TEE - SINGLE SWEEP
"COMBO WYE"
REDUCER - CONCENTRIC
REDUCER - ECCENTRIC
CAPPED CONNECTION
FLANGED CONNECTION
45° ELBOW
ELBOW
ELBOW - DOUBLE BRANCH
ELBOW - OUTLET DOWN
ELBOW - OUTLET UP
ELBOW - LONG RADIUS
ELBOW - SHORT RADIUS
TEE - VENT
TEE - SANITARY
TEE - OUTLET DOWN
TEE - OUTLET UP
TEE - SIDE OUTLET DOWN
TEE - SIDE OUTLET UP
CROSS - VENT
CROSS - SANITARY
LATERAL
REDUCER - CONCENTRIC
REDUCER - ECCENTRIC
CAPPED CONNECTION
FLANGED CONNECTION
TEE - SINGLE SWEEP
"COMBO WYE"
ROUND DUCT (DIAMETER / SYSTEM)
RECTANGULAR DUCT (WIDTH / HEIGHT / SYSTEM)
VOLUME DAMPER
OPPOSED BLADE DAMPER
FIRE/SMOKE DAMPER
SMOKE DAMPER
FIRE DAMPER
PARALLEL BLADE DAMPER
FD
SD
FSD
R
FLAT OVAL DUCT (WIDTH / HEIGHT / SYSTEM)
BACKDRAFT DAMPER
ELEVATION CHANGE (RISE OR DROP)
HIGH EFF. TAKE OFF FITTING w/ VOLUME DAMPER
FLEXIBLE DUCTWORK
SUPPLY (SA), OUTSIDE (OA), VENTILATION (VA) AIR DUCT (UP / DOWN /
SECTION)
BD
DUCT END CAP
DUCT ACCESS DOOR
RETURN (RA) AIR DUCT (UP / DOWN / SECTION)
EXHAUST (EA) AIR DUCT (UP / DOWN / SECTION)
SUPPLY DIFFUSER
LINEAR SLOT DIFFUSER
SUPPLY REGISTER OR GRILLE
SIDE WALL DIFFUSER
EXHAUST REGISTER OR GRILLE
HUMIDISTAT
CARBON MONOXIDE SENSOR
ROUND DIFFUSER
EXTERIOR LOUVER
RETURN REGISTER OR GRILLE
MOTORIZED ACTUATOR
THERMOSTAT
X-#
#x#/CFM
FIXTURE IDENTIFICATION TAG
NECK SIZE / CFM
VAV TERMINAL UNIT
RECT. RND. OVAL
TURNING VANES
H.V.A.C. / DUCTWORK SYMBOLS
10/6 SA
10 Ø SA
10/6 Ø SA
AD
H
C
M
T
NATURAL GASG
PIPING LEGEND - PLUMBING
1. COORDINATE MECHANICAL AND ELECTRICAL WORK WITH ALL OTHER TRADES. BEGIN
INSTALLATION AND ROUGH-IN AFTER COORDINATION WITH ALL TRADES ASSOCIATED WITH
THE INSTALLATION IS COMPLETE. COORDINATE BUILDING STRUCTURE, ARCHITECTURAL
ASSEMBLIES, SHEET METAL, ALL PIPING SYSTEMS, LIGHT FIXTURES, CONDUITS, CABLE
TRAYS, ETC. REFER TO ALL GENERAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND
SPECIFICATIONS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REWORK
ASSOCIATED WITH FAILURE TO COORDINATE.
2. INCORPORATE MECHANICAL SPECIFICATIONS, DRAWINGS, STATE AND LOCAL CODES, AND
OWNER STANDARDS INTO WORK.
3. CREATE OPENINGS IN THE BUILDING THAT ARE REQUIRED TO REMOVE EXISTING ITEMS AND
TO BRING IN NEW EQUIPMENT. PATCH ALL OPENINGS CREATED AND FINISHED WITH
MATERIALS TO MATCH EXISTING CONDITIONS. INCLUDE THIS WORK IN BID.
4. ON COMPLETION OF THE INSTALLATION, COOPERATE WITH THE OWNER TO PROVIDE
TESTING, ADJUSTING, AND BALANCING TO OBTAIN PROPER OPERATION OF ALL EQUIPMENT
AND SYSTEMS. PROVIDE ALL FACILITIES AND EQUIPMENT AND COMPLETE ALL TESTS
REQUIRED FOR ADJUSTMENTS AND BALANCING TO ESTABLISH THE PROPER PERFORMANCE
OF EQUIPMENT.
5. PROVIDE WARRANTIES FOR ALL EQUIPMENT AND INSTALLATION PER THE CONTRACT
DOCUMENTS. CONDITIONING REFRIGERATION SYSTEMS SHALL BE WARRANTED FOR A
MINIMUM OF 5 YEARS, PARTS ONLY, NON-PRORATED, FROM THE DATE OF OCCUPANCY OR
SUBSTANTIAL COMPLETION, OR WHICHEVER OCCURS FIRST. THE WARRANTY SHALL COVER
COMPRESSORS, EVAPORATORS, CONDENSER COILS, HIGH AND LOW SIDE PIPING, AND
PIPING SPECIALTIES INCLUDING EXPANSION AND SOLENOID VALVES, RELIEF VALVES, FILTER-
DRYER, AND SIGHT GLASSES. PRESSURE GAUGES AND PRESSURE SWITCHES ARE NOT
UNDER THE EXTENDED WARRANTY EXCEPT FOR LOSS OF REFRIGERANT AND
CONSEQUENTIAL DAMAGE TO THE SYSTEM WHICH WILL BE AN EXTENDED WARRANTY
OBLIGATION. ALL DEFECTS THAT BECOME APPARENT WITHIN THE WARRANTY PERIOD SHALL
BE REPAIRED BY THE MECHANICAL CONTRACTOR AS DIRECTED BY THE ENGINEER THROUGH
THE OWNER’S REPRESENTATIVE. WARRANTY DOES NOT OBLIGATE THE MECHANICAL
CONTRACTOR TO REPAIR DAMAGE RESULTING FROM THE OWNER’S ACCIDENT, IMPROPER
OPERATION, OR FAILURE TO PROVIDE MAINTENANCE. WARRANTY COVERS DEFECTIVE
MATERIAL AND INSTALLATION. REFER TO SPECIFICATIONS FOR ADDITIONAL DETAILS AND
OTHER WARRANTY INFORMATION.
MECHANICAL - GENERAL NOTES
**NOTE: ALL SYMBOLS MAY NOT APPLY TO THIS PROJECT**
1. PROVIDE ELECTRICAL INSTALLATION IN ACCORDANCE WITH ALL LOCAL, STATE, AND
NATIONAL CODES.
2. THE CURRENT ADOPTED EDITION OF THE ELECTRICAL CODE IS THE STANDARD FOR THE
ELECTRICAL INSTALLATION. VERIFY WITH LOCAL OFFICIALS WHEN PERMITS ARE OBTAINED.
NOTIFY DESIGN TEAM OF ANY DISCREPANCIES BETWEEN THE PROJECT MANUAL OR
DRAWINGS AND THE GOVERNING CODE.
3. INSTALLATION SHALL FOLLOW REQUIREMENTS OF THE ADAAG –AMERICANS WITH
DISABILITIES ACT.
4. REFER TO PROJECT MANUAL AND PROJECT CODE REVIEW SHEET FOR LIST OF APPLICABLE
CODES.
5. PER NEC EVERY CIRCUIT AND CIRCUIT MODIFICATION SHALL BE LEGIBLY IDENTIFIED AS TO
ITS CLEAR, EVIDENT AND SPECIFIC PURPOSE OR USE. CONTRACTOR TO PROVIDE FINAL
CIRCUIT IDENTIFICATION FOR ALL NEW AND MODIFIED CIRCUITS AT PROJECT COMPLETION.
CODE NOTES - ELECTRICAL
1. COORDINATE LOCATION/INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WITH ALL
OTHER TRADES. BEGIN INSTALLATION AND ROUGH-IN ONLY AFTER PROPER AND TIMELY
COORDINATION WITH ALL TRADES ASSOCIATED WITH THE INSTALLATION IS COMPLETE.
COORDINATE WITH BUILDING STRUCTURE, ARCHITECTURE, MECHANICAL SHEET METAL, ALL
PIPING SYSTEMS, LIGHT FIXTURES, CONDUITS, CABLE TRAYS, EQUIPMENT
ACCESS/CLEARANCE, ETC. REFER TO ALL GENERAL, MECHANICAL, AND ELECTRICAL
DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR
REWORK OF INSTALLED EQUIPMENT RESULTING FROM INSUFFICIENT COORDINATION.
2. ELECTRICAL DRAWINGS ARE ONLY A PORTION OF THE COMPLETE SET OF PLANS AND
CONTRACT DOCUMENTS. THE ELECTRICAL SCOPE OF WORK IS DEFINED BY THE COMPLETE
SET OF CONTRACT DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED TO REFERENCING;
ARCHITECTURAL PLANS FOR DIMENSIONS AND DETAILS; EQUIPMENT PLANS FOR ROUGH-IN
REQUIREMENTS, MECHANICAL PLANS FOR EQUIPMENT SIZES AND LOCATIONS.
3. PROVIDE A DEDICATED GREEN INSULATED GROUND CONDUCTOR TO ALL DEVICES. DO NOT
USE CONDUIT SYSTEM AS THE ONLY EQUIPMENT GROUNDING METHOD.
GENERAL NOTES - ELECTRICAL
POWER SYMBOLS
DUPLEX GFCI WEATHER RESISTANT RECEPTACLE WITH WEATHER-PROOF
IN-USE COVER, TAMPER-RESISTANT, WALL MOUNT
EQUIPMENT CONNECTION,
REFER TO EQUIPMENT CONNECTION SCHEDULE FOR CONNECTION TYPE.
REFER TO PANEL SCHEDULES FOR GFCI PROTECTION WHERE REQUIRED
W
SAFETY DISCONNECT SWITCH
PANELBOARD - SURFACE MOUNTED
FIRE DETECTION AND ALARM SYMBOLS
DUCT SMOKE DETECTOR
ADDRESSABLE INPUT MODULE; FS - SPRINKLER WATER FLOW SWITCH,
TS - TAMPER SWITCH, PIV - POST INDICATOR VALVE
FIRE ALARM CONTROL PANEL + EMERGENCY COMMUNICATIONS PANEL
COMBINATION FIRE/SMOKE DAMPER
SMOKE DAMPER
S
AIM
ADDRESSABLE OUTPUT MODULE; SD - FAN SHUT DOWN RELAY, AM - AUDIO MUTEAOM
SD
FSD
FACP
XX
XX
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th St West Des Moines, IA 50265 515-724-7938
/1
/2
:3 :4
A
M
ME000
100% CD
12/5/25
25294
D E
P A
R T
M E
N T
O F
C O
R R
E C
T
IO
N S
D
R T
U -2
R E
P L
A C
E M
E N
T
M
A
IN
S T
R E
E T
D A
V E
N T
P O
R T
IO
W A
MECHANICAL AND
ELECTRICAL GENERAL
NOTES & SYMBOLS
# Revision Date
S SAOM
S
S SAOM
S
A. REFER TO M000 FOR GENERAL NOTES & SYMBOLS.
B. REFER TO M300 FOR MECHANICAL DETAILS AND SCHEDULES.
GENERAL NOTES:
A. EXISTING BREAKER FEEDING RTU-2 IS 125A FROM PANEL
DPN7.
B. EXISTING CONDUCTORS NOTED ON PREVIOUS DRAWINGS
ARE (3) #1 AND (1) #8 GND IN 1-1/2" CONDUIT. EC TO VERIFY
SIZING AND INSTALL NEW CONDUCTORS TO MATCH THIS
SIZE FOR EXTENSION TO NEW UNIT.
C. EXISTING RTU INCLUDES OVERCURRENT PROTECTION ON
UNIT. NEW UNIT WILL ALSO REQUIRE INTEGRAL
OVERCURRENT PROTECTION.
D. EXISTING UNIT IS SHUTDOWN WITH DUCT SMOKE
DETECTORS. DETECTORS ARE TO REMAIN INTACT AND FIRE
ALARM TO BE INTEGRATED INTO THE NEW RTU. EXTEND
EXISTING CONDUIT AND CONDUCTORS FOR THE FIRE ALARM
AS NECESSARY FOR EXTENSION OF THE CURB AND NEW
UNIT.
ELECTRICAL SCOPE OF WORK:
REMOVE EXISTING
RTU. COORDINATE
SALVAGE OF EQUIPMENT
WITH OWNER. PREPARE
DUCT FOR NEW CONNECTIONS.
REMOVE EXISTING FLEXIBLE CONDUIT/CONDUCTORS TO RTU
BACK TO ABOVE CEILING IN FLOOR BELOW
E EE
E
NEW RTU INSTALLED
ON EXISTING CURB
WITH CURB ADAPTER.
RECONNECT SA/RA DUCT,
RECONNECT ALL OTHER
UTILITIES AND APPURTENANCES.
INSTALL 1-1/2" NEW LIQUID TIGHT
FLEXIBLE CONDUIT WITH (3)#1 AND #8 GND
FROM CEILING IN LEVEL BELOW INTO
NEW RTU.
E E E
4" G (EXIST) 3" G (EXIST)
2" G (EXIST)
EXISTING 4" G THRU ROOF.
RTU (EXIST)
RTU (EXIST)
RTU (EXIST)
SERVICE CLEARANCE
(TYP.)
THE RTU SHALL HAVE FACTORY VAV CONTROLS THAT CAN
CONNECT TO THE EXISTING JCI METASYS BUILDING AUTOMATION
SYSTEM. CONTROLS SHALL BE THE SAME AS EXISTING. THE
CONNECTION TO THE EXISTING JCI METASYS SYSTEM CAN BE VIA
BACNET WITH POINTS MAPPED TO MATCH EXISTING. REMOVE
THE EXISTING EBTRON OUTSIDE AIR FLOW MEASURING STATION
AND REINSTALL IN THE NEW RTU. COORDINATE WITH EBTRON IF
SIZE OF THE AIR FLOW MEASURING STATION NEEDS TO BE
MODIFIED. CALIBRATE THE AIR FLOW MEASURING STATION AFTER
IT IS REINSTALLED.
ANY BUILDING AUTOMATION SENSORS LOCATED IN THE EXISTING
RTU, IF ANY, SHALL BE RELOCATED TO THE NEW RTU.
ACCESS PLATFORM PROVIDED AS
PART OF ADAPTER CURB. THE
PLATFORM WILL BE ATTACHED
TO THE ADAPTER CURB AND
HAVE SUPPORTS TO THE ROOF.
PROVIDE ROOF PROTECTION FOR
SUPPORT FEET. STAIRS SHALL
BE PROVIDED TO ACCESS THE PLATFORM.
PROVIDE RAILINGS FOR STAIRS
AND ACCESS PLATFORM.
PROVIDE 6" DIRT LEG, UNION,
AND REDUCER (IF REQUIRED)
AT CONNECTION TO RTU.
2" G
E
A. DEMOLITION DRAWINGS PRESENT LAYOUT OF EXISTING
CONDITIONS AND MAJOR MECHANICAL/ELECTRICAL ITEMS.
FIELD VERIFY EXISTING CONDITIONS AND BECOME FAMILIAR
WITH EXISTING ELECTRICAL SYSTEM AND DEMOLITION SCOPE
BEFORE WORK BEGINS.
B. REMOVE ELECTRICAL FACILITIES AND CLEAR THE AREA TO
RECEIVE THE NEW WORK.
a. IDENTIFY THE LOCATION OR ITEMS SERVED FOR ALL
DISCONNECTED BRANCH CIRCUITS BEFORE
DEMOLITION. MAINTAIN CIRCUITS SERVING AREAS
BEYOND THE DEMOLITION AREA.
b. KEEP EXISTING SYSTEMS OPERATIONAL DURING ALL
PHASES OF CONSTRUCTION UNLESS NECESSARY FOR
DEMOLITION.
c. OBTAIN OWNER'S PERMISSION TO SHUT OFF SERVICES
OR SYSTEMS WHICH MAY AFFECT OTHER AREAS
BEYOND DEMOLITION AREA. INFORM OWNER AS TO THE
REASON FOR AND THE DURATION OF THE SHUTDOWN.
d. REPAIR AT CONTRACTORS EXPENSE ANY DAMAGED
CONDUIT OR WIRE NOT IDENTIFIED FOR DEMOLITION.
e. INSTALL BLANK COVERPLATES/COVERS OVER
OPENINGS AT REMOVED DEVICE LOCATIONS.
C. PLAN ABBREVIATIONS
E - EXISTING ITEM TO REMAIN
R - EXISTING ITEM TO BE REMOVED
RN - REPLACE EXISTING ITEM WITH NEW
ELECTRICAL DEMOLITION NOTES
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th St West Des Moines, IA 50265 515-724-7938
/1
/2
:3 :4
A
M
ME108
100% CD
12/5/25
25294
D E
P A
R T
M E
N T
O F
C O
R R
E C
T
IO
N S
D
R T
U -2
R E
P L
A C
E M
E N
T
M
A
IN
S T
R E
E T
D A
V E
N T
P O
R T
IO
W A
ROOF PLAN -
MECHANICAL AND
ELECTRICAL
1/8" = 1'-0"
ROOF PLAN - HVAC DEMOLITION
1/8" = 1'-0"
ROOF PLAN - MECHANICAL AND ELECTRICAL
DETAIL IS FOR REFERENCE ONLY
INSTALL PER MFR RECOMMENDATIONS
VERIFY INSTALLATIONS WITH AHU AND
CURB MFRS TO ENSURE WARRANTY
COMPLIANCE.
ROOF DECK
2" SQ TUBING FOR
CURB ADAPTER
2" SQ TUBING FOR
CURB ADAPTER
FASTEN NEW TUBING
TO EXISTING CURB
TRANSITION NEW RA AND SA
AS NEEDED TO CONNECT
TO EXISTING RA AND SA
CONNECTIONS.
EXISTING ROOF CURB
TO REMAIN.
ROOF SUPPORT RAIL. FLASH
PER ROOF MANUFACTURERS
WARRANTY.
END LINE OF
EXISTING CURB
EXISTING CURB
TO REMAIN.
ROOF JOIST
EXISTING CONDUIT AND CONDUCTOR
FEED IN JOIST SPACE BACK TO PANEL
DPN7 TO REMAIN INTACT.
EXISTING BREAKER IN PANEL IS 125A
AND CAN REMAIN INTACT FOR NEW UNIT.
EXISTING NEAREST JUNCTION
BOX TO RTU TO REMAIN IN
CEILING SPACE BELOW. ADD
JUNCTION BOX IF THERE IS
NONE EXISTING.
REMOVE EXISTING FLEXIBLE CONDUIT FROM RTU
BACK TO NEAREST JUNCTION BOX.
INSTALL NEW 1-1/2" NEW LIQUID TIGHT
FLEXIBLE CONDUIT WITH (3)#1 AND #8 GND
FROM CEILING IN SPACE BELOW INTO
NEW RTU.
NEW RTU
TERMINATE NEW
CONDUIT/CONDUCTORS
IN NEW RTU DISCONNECT
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th St West Des Moines, IA 50265 515-724-7938
/1
/2
:3 :4
A
M
M300
100% CD
12/5/25
25294
D E
P A
R T
M E
N T
O F
C O
R R
E C
T
IO
N S
D
R T
U -2
R E
P L
A C
E M
E N
T
M
A
IN
S T
R E
E T
D A
V E
N T
P O
R T
IO
W A
MECHANICAL DETAILS
AND SCHEDULES
NTS
NEW RTU CURB ADAPTER DETAIL
4. PROVIDE CONVENIENCE OUTLET.
3. PROVIDE WITH FUSED DISCONNECT SWITCH.
2. REFER TO SPECIFICATIONS FOR FILTER REQUIREMENTS.
1. THE RTU SHALL HAVE FACTORY VAV CONTROLS AND BE CONNECTED TO THE EXISTING JCI METASYS BUILDING AUTOMATION SYSTEM.
NOTES:
NOTES 1,2,3, 4
MOCP 100
MCA 89
VOLTAGE - PHASE 480/3
ELECTRICAL DATA
RETURN TYPE MERV8
FILTERS
1ST STAGE COMPRESSOR TYPE SCROLL
NUMBER OF STAGES 11
NET SENSIBLE CAPACITY (MBH) 222
NET TOTAL CAPACITY (MBH) 310
LAT (DB/WB) °F 52.2/52.1
EAT (DB/WB) °F 79.8/65.9
AMBIANT AIR TEMP (DB) 95
REFRIGERANT R-454B
TYPE DX COIL WITH SPLIT CU
COOLING
OPERATING PRESSURE (IN. W.C.) 6-11" WC
OUTPUT CAPACITY (MBH) 405
INPUT CAPACITY (MBH) 500
CONTROL MODULATING
TURNDOWN 2 TO 1
LAT (DB) °F 98.7
EAT (DB) °F 50
TYPE INDIRECT FURNACE - NAT. GAS
HEATING
MOTOR HP 7.5
ESP (IN. W.C.) 1.0
AIRFLOW (CFM) 8,000
EXHAUST FAN
MOTOR HP 10
ESP (IN. W.C.) 2.00
AIRFLOW (CFM) 8,000
SUPPLY FAN
DIMENSIONS (LxDxH) 298" X 96" X 60"
WEIGHT (LBS) 6,557
SERVES 2ND, 3RD, 4TH (WEST) FLOORS
MODEL # GVBAC-2B6MA-2A60A
TYPE OUTDOOR VAV
MANUFACTURER JCI
REFERENCE RTU-2
AIR HANDLING UNIT (OUTDOOR)
NOT TO SCALE
ELECTRICAL RTU INSTALL
| Sheets |
| MC - COVER SHEET |
| ME000 - MECHANICAL AND ELECTRICAL GENERAL NOTES & SYMBOLS |
| ME108 - ROOF PLAN - MECHANICAL AND ELECTRICAL |
| M300 - MECHANICAL DETAILS AND SCHEDULES |
File details come from the government source that posted it. Updated .