DOC 7th Judicial District RTU #2 Replacement
Solicitation number
RFB949100-01
Issued by
Scott County, Iowa

About this file

This is an engineering drawing set prepared by KCL Engineering for the Iowa Department of Corrections Seventh Judicial District RTU-2 Replacement project located at 605 Main Street, Davenport, Iowa 52803. The project involves the removal of an existing rooftop unit (RTU) and installation of a new outdoor air handling unit (AHU) model GVBAC-2B6MA-2A60A on the existing roof curb. The new RTU-2 will serve the second, third, fourth (west) floors and includes an indirect natural gas furnace for heating with a capacity of 500 MBH input, a DX coil cooling system with R-454B refrigerant providing 310 MBH total net capacity, and an 8,000 CFM supply fan with 7.5 HP motor and matching exhaust fan with 10 HP motor. The unit operates at 480/3 phase voltage with a 100 MOCP and 89 MCA electrical rating. Work includes demolition of the existing RTU, preparation of ductwork for new connections, installation of new 1.5-inch liquid-tight flexible conduit with three #1 and one #8 ground conductors extending from panel DPN7, reconnection of supply and return air ducts, relocation of the existing EBTRON outside air flow measuring station to the new unit, provision of a curb adapter with access platform and stairs with railings, and integration with the existing JCI Metasys building automation system using BACnet protocol with factory VAV controls.

The electrical scope requires verification and extension of existing 125-amp feeder conductors from panel DPN7, installation of integral overcurrent protection on the new unit, integration of existing duct smoke detectors with the new unit's fire alarm system, provision of a 6-inch dirt leg with union and reducer at the RTU connection point, and a convenience outlet at the unit. The project documentation includes a complete 100-percent construction document drawing set dated December 5-15, 2025, with sheets covering mechanical and electrical general notes and symbols, roof plan layout, and mechanical details and schedules. Sealed bids were due February 12, 2026, at 2:00 PM CST, with bid opening scheduled for January 25, 2026, at 1:30 PM CST, and bid security of five percent of the total bid amount required. Michael Bradbury (michael.bradbury@iowa.gov; 515-823-9327) serves as the primary contact for inquiries, and the State of Iowa encourages participation from Targeted Small Businesses in accordance with Chapter 73 of the Iowa Code.

View the file

Other files

File Type Posted
RFB949100-01 - Project Manual.pdf PDF
RFB949100-01 - Notice to Bidders.pdf PDF
RFB949100-01 - Bid Form.pdf PDF
1367205-event.pdf PDF
RFB949100-01 - Drawings.pdf PDF
RFB949100-01 - Notice to Bidders.pdf PDF
RFB949100-01 - Bid Form.pdf PDF
RFB949100-01 - Project Manual.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing #:

Date:

Project No:

© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.

P lo t D a te

T im e

Drawing Name:

info@kclengineering.com

300 4th St West Des Moines, IA 50265 515-724-7938

/1

/2

:3 :4

A

M

MC

100% CD

12/12/25

25294

D E

P A

R T

M E

N T

O F

C O

R R

E C

T

IO

N S

D

R T

U -2

R E

P L

A C

E M

E N

T

M

A

IN

S T

R E

E T

D A

V E

N T

P O

R T

IO

W A

COVER SHEET

SHEET INDEX

SHEET NUMBER SHEET DESCRIPTION

MC COVER SHEET

ME000 MECHANICAL AND ELECTRICAL GENERAL NOTES AND SYMBOLS

ME108 ROOF PLAN - MECHANICAL AND ELECTRICAL

M300 MECHANICAL DETAILS AND SCHEDULES

DEPARTMENT OF CORRECTIONS - SEVENTH DISTRICT

RTU-2 REPLACEMENT

DAS PROJECT NUMBER 9491.00

COVER SHEET

RTU-2 LOCATION

PREFERRED CRANE LOCATION

# Revision Date

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that i am a duly licensed Professional Engineer under the laws of the State of Iowa

(signature)

License Number :

Pages or sheets covered by this seal:

(date)

My license renewal date is December 31, E N

G N

E E

R I

AOFESSION

S E

D

PR

AI O W

L

IC

E N

L

ERIC HEYNEN, P.E.

ERIC

HEYNEN

Divisions 26, 27, and 28.

P24706P24706

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that i am a duly licensed Professional Engineer under the laws of the State of Iowa

(signature)

License Number :

Pages or sheets covered by this seal:

(date)

My license renewal date is December 31, CHAD D. BASS, P.E.

CHAD D.

BASS

E N

G N

E E

R I

AOFESSION

S E

D

PR

AI O W

L

IC

E N

L

21397

21397

12/15/2025 12/15/2025

NEW CONNECTION POINT

POINT OF DISCONNECT

EQUIPMENT IDENTIFICATION TAG

SHEET REFERENCE

SECTION CUT REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE

EXISTING = HALFTONE LINEWORK

NEW = DARK LINEWORK

DEMO = DASHED DARK LINEWORK

KEYNOTE

GENERAL SYMBOLS

SHEET REFERENCE

DETAIL DRAWING REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE

A101

SIM

INTERIOR ELEVATION DRAWING REFERENCE TAGA101 1

R e f

XXX

X

A101

SIM

1. MECHANICAL DEMOLITION DRAWINGS SHOWING EXISTING CONDITIONS HAVE BEEN

PREPARED BASED ON NON-DESTRUCTIVE FIELD OBSERVATION AND AS-BUILT DRAWINGS

PROVIDED BY THE OWNER. FIELD VERIFY EXISTING SYSTEMS BEFORE BEGINNING WORK.

NOTIFY ARCHITECT/ENGINEER IF EXISTING CONDITIONS ARE MATERIALLY DIFFERENT THAN

THOSE SHOWN ON THE PLANS.

2. BE FAMILIAR WITH EXISTING MECHANICAL SYSTEMS THAT WILL BE AFFECTED BY THE

DEMOLITION WORK. OBTAIN PERMISSION FROM THE OWNER'S REPRESENTATIVE TO SHUT

OFF SERVICES OR SYSTEMS THAT AFFECT AREAS BEYOND THE LIMITS OF THE IMMEDIATE

DEMOLITION AREA. INFORM THE OWNER’S REPRESENTATIVE OF THE REASON FOR AND

DURATION OF THE SHUTDOWN. MINIMIZE IMPACT TO OTHER AREAS. PROCEED WITH THE

SHUT-DOWN AFTER PERMISSION FROM THE OWNER IS GRANTED.

3. REMOVE EQUIPMENT, DUCTWORK THAT ARE INDICATED TO BE REMOVED IN A TIMELY

MANNER IN ACCORDANCE WITH THE GENERAL DEMOLITION SPECIFICATIONS. COORDINATE

WITH THE OWNER AND OTHER CONTRACTORS.

4. UNLESS EQUIPMENT TO BE REMOVED IS NOTED AS OWNER’S SALVAGE, DISPOSE OF

EQUIPMENT AND/OR MATERIALS INDICATED TO BE REMOVED PROMPTLY.

MECHANICAL – DEMOLITION NOTES

1. COORDINATE WORK WITH ALL OTHER TRADES AS DESCRIBED IN MECHANICAL GENERAL

NOTE #1.

2. PROVIDE A COMPLETE HVAC SYSTEM, INCLUDING SUPPLY, RETURN, EXHAUST, AND

VENTILATION DUCTWORK; MECHANICAL EQUIPMENT, SUPPORTS, AND ALL APPURTENANCES.

INSTALL ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. INSTALL SYSTEM TO

MEET ALL CITY AND STATE CODES AND REQUIREMENTS.

3. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND

ARRANGEMENT OF DUCT SYSTEM. INDICATED DUCT LOCATIONS, CONFIGURATIONS, AND

ARRANGEMENTS WERE USED TO SIZE DUCTS AND CALCULATE FRICTION LOSS FOR AIR-

HANDLING EQUIPMENT SIZING AND FOR OTHER DESIGN CONSIDERATIONS. INSTALL DUCT

SYSTEMS AS INDICATED UNLESS DEVIATIONS TO LAYOUT ARE APPROVED BY

ARCHITECT/ENGINEER.

4. ALL DUCT DIMENSIONS INDICATED ARE INTERIOR FREE AREA DUCT DIMENSIONS AND DO

NOT INCLUDE INSULATION REQUIREMENTS.

HVAC - NOTES

ABSOR

ACU

AD

AFF

AFG

AHU

AV

BOT

BTU

BTUH

BV

CA

CB

CENT

CFM

CI

CL

COND

CO

CONC

CONTR

CP

CU

CUH

CWP

DDC

DN

DR

DS

EA

EAT

EC

EDBT

EEW

EF

EJ

EQUIP

ESE

EST

EWBT

EWC

EWT

EX

EXH

EXP

FAI

FCU

FD

FDC

FLEX

FLR

FPM

FPS

FS

FSEC

FT

FTG

GA

GAL

GALV

GC

GW

GPH

GPM

HR

HTG

HB

ISP

JR

LAV

LDBT

LWT

LWBT

MB

MBH

MC

MECH

MH

NTS

OA

OD

PC

PSI

PRV

PRV

PV

PVC

RA

RD

RH

RTU

RV

RVT

SK

SA

SH

SO

ST

TCC

TYP

UH

UR

UV

VA

VTR

WB

WC

WHA

WH

ABSORPTION

AIR CONDITIONING UNIT

ACCESS DOOR OR AREA DRAIN

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AIR HANDLING UNIT

AIR VENT

BOTTOM

BRITISH THERMAL UNIT

BTU PER HOUR

BALL VALVE

COMPRESSED AIR

CATCH BASIN

CENTRIFUGAL

CUBIC FEET PER MINUTE

CAST IRON

CENTER LINE

CONDENSATE

CLEAN OUT

CONCRETE

CONTRACTOR

CONDENSATE PUMP/CIRC. PUMP

COPPER

CABINET UNIT HEATER

CIRCULATING WATER PUMP

DIRECT DIGITAL CONTROLS

DOWN

DRAIN

DOWNSPOUT

EXHAUST AIR

EXHAUST AIR TEMPERATURE

ELECTRICAL CONTRACTOR

ENTERING DRY BULB

TEMPERATURE

EMERGENCY EYE WASH

EXHAUST FAN

EXPANSION JOINT

EQUIPMENT

EMERGENCY SHOWER/EYEWASH

EXTERNAL STATIC PRESSURE

ENTERING WET BULB

TEMPERATURE

ELECTRIC WATER COOLER

ENTERING WATER

TEMPERATURE

EXISTING

EXHAUST

EXPANSION

FRESH AIR INTAKE

FAN COIL UNIT

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FLEXIBLE

FLOOR

FEET PER MINUTE

FEET PER SECOND

FLOOR SINK

FOOD SERVICE EQUIPMENT CONSULTANT

FINTUBE

FOOTING

GAGE

GALLON

GALVANIZED

GENERAL CONTRACTOR

GREASE WASTE

GALLONS PER HOUR

GALLONS PER MINUTE

HOUR

HEATING

HOSE BIBB

INTERNAL STATIC PRESSURE

JANITOR RECEPTOR

LAVATORY

LEAVING DRY BULB

TEMPERATURE

LEAVING WATER

TEMPERATURE

LEAVING WET BULB

TEMPERATURE

MOP BASIN

1000 BTUH

MECHANICAL CONTRACTOR

MECHANICAL

MANHOLE

NOT TO SCALE

OUTSIDE AIR

OVERFLOW ROOF DRAIN

PLUMBING CONTRACTOR

POUNDS PER SQUARE INCH

POWER ROOF VENTILATOR

PRESSURE REDUCING VALVE

PRESSURE VENT

POLYVINYL CHLORIDE

RETURN AIR

ROOF DRAIN

RELATIVE HUMIDITY

ROOF TOP UNIT

RELIEF VALVE

ROOF VENT TERMINATION

SINK

SUPPLY AIR

SHOWER

STORM OVERFLOW

STORM

TEMPERATURE CONTROL

CONTRACTOR

TYPICAL

UNIT HEATER

URINAL

UNIT VENTILATOR

VENTILATION AIR

VENT THROUGH ROOF

WALL BOX – CONDENSATE

WATER CLOSET

WATER HAMMER ARRESTOR

WATER HEATER

MECHANICAL ABBREVIATIONS

45° ELBOW

ELBOW

PIPE FITTINGS

SINGLE LINE DOUBLE LINE

ELBOW - DOUBLE BRANCH

ELBOW - OUTLET DOWN

ELBOW - OUTLET UP

ELBOW - LONG RADIUS

ELBOW - SHORT RADIUS

TEE - VENT

TEE - SANITARY

TEE - OUTLET DOWN

TEE - OUTLET UP

TEE - SIDE OUTLET DOWN

TEE - SIDE OUTLET UP

CROSS - VENT

CROSS - SANITARY

LATERAL

TEE - SINGLE SWEEP

"COMBO WYE"

REDUCER - CONCENTRIC

REDUCER - ECCENTRIC

CAPPED CONNECTION

FLANGED CONNECTION

45° ELBOW

ELBOW

ELBOW - DOUBLE BRANCH

ELBOW - OUTLET DOWN

ELBOW - OUTLET UP

ELBOW - LONG RADIUS

ELBOW - SHORT RADIUS

TEE - VENT

TEE - SANITARY

TEE - OUTLET DOWN

TEE - OUTLET UP

TEE - SIDE OUTLET DOWN

TEE - SIDE OUTLET UP

CROSS - VENT

CROSS - SANITARY

LATERAL

REDUCER - CONCENTRIC

REDUCER - ECCENTRIC

CAPPED CONNECTION

FLANGED CONNECTION

TEE - SINGLE SWEEP

"COMBO WYE"

ROUND DUCT (DIAMETER / SYSTEM)

RECTANGULAR DUCT (WIDTH / HEIGHT / SYSTEM)

VOLUME DAMPER

OPPOSED BLADE DAMPER

FIRE/SMOKE DAMPER

SMOKE DAMPER

FIRE DAMPER

PARALLEL BLADE DAMPER

FD

SD

FSD

R

FLAT OVAL DUCT (WIDTH / HEIGHT / SYSTEM)

BACKDRAFT DAMPER

ELEVATION CHANGE (RISE OR DROP)

HIGH EFF. TAKE OFF FITTING w/ VOLUME DAMPER

FLEXIBLE DUCTWORK

SUPPLY (SA), OUTSIDE (OA), VENTILATION (VA) AIR DUCT (UP / DOWN /

SECTION)

BD

DUCT END CAP

DUCT ACCESS DOOR

RETURN (RA) AIR DUCT (UP / DOWN / SECTION)

EXHAUST (EA) AIR DUCT (UP / DOWN / SECTION)

SUPPLY DIFFUSER

LINEAR SLOT DIFFUSER

SUPPLY REGISTER OR GRILLE

SIDE WALL DIFFUSER

EXHAUST REGISTER OR GRILLE

HUMIDISTAT

CARBON MONOXIDE SENSOR

ROUND DIFFUSER

EXTERIOR LOUVER

RETURN REGISTER OR GRILLE

MOTORIZED ACTUATOR

THERMOSTAT

X-#

#x#/CFM

FIXTURE IDENTIFICATION TAG

NECK SIZE / CFM

VAV TERMINAL UNIT

RECT. RND. OVAL

TURNING VANES

H.V.A.C. / DUCTWORK SYMBOLS

10/6 SA

10 Ø SA

10/6 Ø SA

AD

H

C

M

T

NATURAL GASG

PIPING LEGEND - PLUMBING

1. COORDINATE MECHANICAL AND ELECTRICAL WORK WITH ALL OTHER TRADES. BEGIN

INSTALLATION AND ROUGH-IN AFTER COORDINATION WITH ALL TRADES ASSOCIATED WITH

THE INSTALLATION IS COMPLETE. COORDINATE BUILDING STRUCTURE, ARCHITECTURAL

ASSEMBLIES, SHEET METAL, ALL PIPING SYSTEMS, LIGHT FIXTURES, CONDUITS, CABLE

TRAYS, ETC. REFER TO ALL GENERAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

SPECIFICATIONS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REWORK

ASSOCIATED WITH FAILURE TO COORDINATE.

2. INCORPORATE MECHANICAL SPECIFICATIONS, DRAWINGS, STATE AND LOCAL CODES, AND

OWNER STANDARDS INTO WORK.

3. CREATE OPENINGS IN THE BUILDING THAT ARE REQUIRED TO REMOVE EXISTING ITEMS AND

TO BRING IN NEW EQUIPMENT. PATCH ALL OPENINGS CREATED AND FINISHED WITH

MATERIALS TO MATCH EXISTING CONDITIONS. INCLUDE THIS WORK IN BID.

4. ON COMPLETION OF THE INSTALLATION, COOPERATE WITH THE OWNER TO PROVIDE

TESTING, ADJUSTING, AND BALANCING TO OBTAIN PROPER OPERATION OF ALL EQUIPMENT

AND SYSTEMS. PROVIDE ALL FACILITIES AND EQUIPMENT AND COMPLETE ALL TESTS

REQUIRED FOR ADJUSTMENTS AND BALANCING TO ESTABLISH THE PROPER PERFORMANCE

OF EQUIPMENT.

5. PROVIDE WARRANTIES FOR ALL EQUIPMENT AND INSTALLATION PER THE CONTRACT

DOCUMENTS. CONDITIONING REFRIGERATION SYSTEMS SHALL BE WARRANTED FOR A

MINIMUM OF 5 YEARS, PARTS ONLY, NON-PRORATED, FROM THE DATE OF OCCUPANCY OR

SUBSTANTIAL COMPLETION, OR WHICHEVER OCCURS FIRST. THE WARRANTY SHALL COVER

COMPRESSORS, EVAPORATORS, CONDENSER COILS, HIGH AND LOW SIDE PIPING, AND

PIPING SPECIALTIES INCLUDING EXPANSION AND SOLENOID VALVES, RELIEF VALVES, FILTER-

DRYER, AND SIGHT GLASSES. PRESSURE GAUGES AND PRESSURE SWITCHES ARE NOT

UNDER THE EXTENDED WARRANTY EXCEPT FOR LOSS OF REFRIGERANT AND

CONSEQUENTIAL DAMAGE TO THE SYSTEM WHICH WILL BE AN EXTENDED WARRANTY

OBLIGATION. ALL DEFECTS THAT BECOME APPARENT WITHIN THE WARRANTY PERIOD SHALL

BE REPAIRED BY THE MECHANICAL CONTRACTOR AS DIRECTED BY THE ENGINEER THROUGH

THE OWNER’S REPRESENTATIVE. WARRANTY DOES NOT OBLIGATE THE MECHANICAL

CONTRACTOR TO REPAIR DAMAGE RESULTING FROM THE OWNER’S ACCIDENT, IMPROPER

OPERATION, OR FAILURE TO PROVIDE MAINTENANCE. WARRANTY COVERS DEFECTIVE

MATERIAL AND INSTALLATION. REFER TO SPECIFICATIONS FOR ADDITIONAL DETAILS AND

OTHER WARRANTY INFORMATION.

MECHANICAL - GENERAL NOTES

**NOTE: ALL SYMBOLS MAY NOT APPLY TO THIS PROJECT**

1. PROVIDE ELECTRICAL INSTALLATION IN ACCORDANCE WITH ALL LOCAL, STATE, AND

NATIONAL CODES.

2. THE CURRENT ADOPTED EDITION OF THE ELECTRICAL CODE IS THE STANDARD FOR THE

ELECTRICAL INSTALLATION. VERIFY WITH LOCAL OFFICIALS WHEN PERMITS ARE OBTAINED.

NOTIFY DESIGN TEAM OF ANY DISCREPANCIES BETWEEN THE PROJECT MANUAL OR

DRAWINGS AND THE GOVERNING CODE.

3. INSTALLATION SHALL FOLLOW REQUIREMENTS OF THE ADAAG –AMERICANS WITH

DISABILITIES ACT.

4. REFER TO PROJECT MANUAL AND PROJECT CODE REVIEW SHEET FOR LIST OF APPLICABLE

CODES.

5. PER NEC EVERY CIRCUIT AND CIRCUIT MODIFICATION SHALL BE LEGIBLY IDENTIFIED AS TO

ITS CLEAR, EVIDENT AND SPECIFIC PURPOSE OR USE. CONTRACTOR TO PROVIDE FINAL

CIRCUIT IDENTIFICATION FOR ALL NEW AND MODIFIED CIRCUITS AT PROJECT COMPLETION.

CODE NOTES - ELECTRICAL

1. COORDINATE LOCATION/INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WITH ALL

OTHER TRADES. BEGIN INSTALLATION AND ROUGH-IN ONLY AFTER PROPER AND TIMELY

COORDINATION WITH ALL TRADES ASSOCIATED WITH THE INSTALLATION IS COMPLETE.

COORDINATE WITH BUILDING STRUCTURE, ARCHITECTURE, MECHANICAL SHEET METAL, ALL

PIPING SYSTEMS, LIGHT FIXTURES, CONDUITS, CABLE TRAYS, EQUIPMENT

ACCESS/CLEARANCE, ETC. REFER TO ALL GENERAL, MECHANICAL, AND ELECTRICAL

DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR

REWORK OF INSTALLED EQUIPMENT RESULTING FROM INSUFFICIENT COORDINATION.

2. ELECTRICAL DRAWINGS ARE ONLY A PORTION OF THE COMPLETE SET OF PLANS AND

CONTRACT DOCUMENTS. THE ELECTRICAL SCOPE OF WORK IS DEFINED BY THE COMPLETE

SET OF CONTRACT DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED TO REFERENCING;

ARCHITECTURAL PLANS FOR DIMENSIONS AND DETAILS; EQUIPMENT PLANS FOR ROUGH-IN

REQUIREMENTS, MECHANICAL PLANS FOR EQUIPMENT SIZES AND LOCATIONS.

3. PROVIDE A DEDICATED GREEN INSULATED GROUND CONDUCTOR TO ALL DEVICES. DO NOT

USE CONDUIT SYSTEM AS THE ONLY EQUIPMENT GROUNDING METHOD.

GENERAL NOTES - ELECTRICAL

POWER SYMBOLS

DUPLEX GFCI WEATHER RESISTANT RECEPTACLE WITH WEATHER-PROOF

IN-USE COVER, TAMPER-RESISTANT, WALL MOUNT

EQUIPMENT CONNECTION,

REFER TO EQUIPMENT CONNECTION SCHEDULE FOR CONNECTION TYPE.

REFER TO PANEL SCHEDULES FOR GFCI PROTECTION WHERE REQUIRED

W

SAFETY DISCONNECT SWITCH

PANELBOARD - SURFACE MOUNTED

FIRE DETECTION AND ALARM SYMBOLS

DUCT SMOKE DETECTOR

ADDRESSABLE INPUT MODULE; FS - SPRINKLER WATER FLOW SWITCH,

TS - TAMPER SWITCH, PIV - POST INDICATOR VALVE

FIRE ALARM CONTROL PANEL + EMERGENCY COMMUNICATIONS PANEL

COMBINATION FIRE/SMOKE DAMPER

SMOKE DAMPER

S

AIM

ADDRESSABLE OUTPUT MODULE; SD - FAN SHUT DOWN RELAY, AM - AUDIO MUTEAOM

SD

FSD

FACP

XX

XX

Drawing #:

Date:

Project No:

© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.

P lo t D a te

T im e

Drawing Name:

info@kclengineering.com

300 4th St West Des Moines, IA 50265 515-724-7938

/1

/2

:3 :4

A

M

ME000

100% CD

12/5/25

25294

D E

P A

R T

M E

N T

O F

C O

R R

E C

T

IO

N S

D

R T

U -2

R E

P L

A C

E M

E N

T

M

A

IN

S T

R E

E T

D A

V E

N T

P O

R T

IO

W A

MECHANICAL AND

ELECTRICAL GENERAL

NOTES & SYMBOLS

# Revision Date

S SAOM

S

S SAOM

S

A. REFER TO M000 FOR GENERAL NOTES & SYMBOLS.

B. REFER TO M300 FOR MECHANICAL DETAILS AND SCHEDULES.

GENERAL NOTES:

A. EXISTING BREAKER FEEDING RTU-2 IS 125A FROM PANEL

DPN7.

B. EXISTING CONDUCTORS NOTED ON PREVIOUS DRAWINGS

ARE (3) #1 AND (1) #8 GND IN 1-1/2" CONDUIT. EC TO VERIFY

SIZING AND INSTALL NEW CONDUCTORS TO MATCH THIS

SIZE FOR EXTENSION TO NEW UNIT.

C. EXISTING RTU INCLUDES OVERCURRENT PROTECTION ON

UNIT. NEW UNIT WILL ALSO REQUIRE INTEGRAL

OVERCURRENT PROTECTION.

D. EXISTING UNIT IS SHUTDOWN WITH DUCT SMOKE

DETECTORS. DETECTORS ARE TO REMAIN INTACT AND FIRE

ALARM TO BE INTEGRATED INTO THE NEW RTU. EXTEND

EXISTING CONDUIT AND CONDUCTORS FOR THE FIRE ALARM

AS NECESSARY FOR EXTENSION OF THE CURB AND NEW

UNIT.

ELECTRICAL SCOPE OF WORK:

REMOVE EXISTING

RTU. COORDINATE

SALVAGE OF EQUIPMENT

WITH OWNER. PREPARE

DUCT FOR NEW CONNECTIONS.

REMOVE EXISTING FLEXIBLE CONDUIT/CONDUCTORS TO RTU

BACK TO ABOVE CEILING IN FLOOR BELOW

E EE

E

NEW RTU INSTALLED

ON EXISTING CURB

WITH CURB ADAPTER.

RECONNECT SA/RA DUCT,

RECONNECT ALL OTHER

UTILITIES AND APPURTENANCES.

INSTALL 1-1/2" NEW LIQUID TIGHT

FLEXIBLE CONDUIT WITH (3)#1 AND #8 GND

FROM CEILING IN LEVEL BELOW INTO

NEW RTU.

E E E

4" G (EXIST) 3" G (EXIST)

2" G (EXIST)

EXISTING 4" G THRU ROOF.

RTU (EXIST)

RTU (EXIST)

RTU (EXIST)

SERVICE CLEARANCE

(TYP.)

THE RTU SHALL HAVE FACTORY VAV CONTROLS THAT CAN

CONNECT TO THE EXISTING JCI METASYS BUILDING AUTOMATION

SYSTEM. CONTROLS SHALL BE THE SAME AS EXISTING. THE

CONNECTION TO THE EXISTING JCI METASYS SYSTEM CAN BE VIA

BACNET WITH POINTS MAPPED TO MATCH EXISTING. REMOVE

THE EXISTING EBTRON OUTSIDE AIR FLOW MEASURING STATION

AND REINSTALL IN THE NEW RTU. COORDINATE WITH EBTRON IF

SIZE OF THE AIR FLOW MEASURING STATION NEEDS TO BE

MODIFIED. CALIBRATE THE AIR FLOW MEASURING STATION AFTER

IT IS REINSTALLED.

ANY BUILDING AUTOMATION SENSORS LOCATED IN THE EXISTING

RTU, IF ANY, SHALL BE RELOCATED TO THE NEW RTU.

ACCESS PLATFORM PROVIDED AS

PART OF ADAPTER CURB. THE

PLATFORM WILL BE ATTACHED

TO THE ADAPTER CURB AND

HAVE SUPPORTS TO THE ROOF.

PROVIDE ROOF PROTECTION FOR

SUPPORT FEET. STAIRS SHALL

BE PROVIDED TO ACCESS THE PLATFORM.

PROVIDE RAILINGS FOR STAIRS

AND ACCESS PLATFORM.

PROVIDE 6" DIRT LEG, UNION,

AND REDUCER (IF REQUIRED)

AT CONNECTION TO RTU.

2" G

E

A. DEMOLITION DRAWINGS PRESENT LAYOUT OF EXISTING

CONDITIONS AND MAJOR MECHANICAL/ELECTRICAL ITEMS.

FIELD VERIFY EXISTING CONDITIONS AND BECOME FAMILIAR

WITH EXISTING ELECTRICAL SYSTEM AND DEMOLITION SCOPE

BEFORE WORK BEGINS.

B. REMOVE ELECTRICAL FACILITIES AND CLEAR THE AREA TO

RECEIVE THE NEW WORK.

a. IDENTIFY THE LOCATION OR ITEMS SERVED FOR ALL

DISCONNECTED BRANCH CIRCUITS BEFORE

DEMOLITION. MAINTAIN CIRCUITS SERVING AREAS

BEYOND THE DEMOLITION AREA.

b. KEEP EXISTING SYSTEMS OPERATIONAL DURING ALL

PHASES OF CONSTRUCTION UNLESS NECESSARY FOR

DEMOLITION.

c. OBTAIN OWNER'S PERMISSION TO SHUT OFF SERVICES

OR SYSTEMS WHICH MAY AFFECT OTHER AREAS

BEYOND DEMOLITION AREA. INFORM OWNER AS TO THE

REASON FOR AND THE DURATION OF THE SHUTDOWN.

d. REPAIR AT CONTRACTORS EXPENSE ANY DAMAGED

CONDUIT OR WIRE NOT IDENTIFIED FOR DEMOLITION.

e. INSTALL BLANK COVERPLATES/COVERS OVER

OPENINGS AT REMOVED DEVICE LOCATIONS.

C. PLAN ABBREVIATIONS

E - EXISTING ITEM TO REMAIN

R - EXISTING ITEM TO BE REMOVED

RN - REPLACE EXISTING ITEM WITH NEW

ELECTRICAL DEMOLITION NOTES

Drawing #:

Date:

Project No:

© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.

P lo t D a te

T im e

Drawing Name:

info@kclengineering.com

300 4th St West Des Moines, IA 50265 515-724-7938

/1

/2

:3 :4

A

M

ME108

100% CD

12/5/25

25294

D E

P A

R T

M E

N T

O F

C O

R R

E C

T

IO

N S

D

R T

U -2

R E

P L

A C

E M

E N

T

M

A

IN

S T

R E

E T

D A

V E

N T

P O

R T

IO

W A

ROOF PLAN -

MECHANICAL AND

ELECTRICAL

1/8" = 1'-0"

ROOF PLAN - HVAC DEMOLITION

1/8" = 1'-0"

ROOF PLAN - MECHANICAL AND ELECTRICAL

DETAIL IS FOR REFERENCE ONLY

INSTALL PER MFR RECOMMENDATIONS

VERIFY INSTALLATIONS WITH AHU AND

CURB MFRS TO ENSURE WARRANTY

COMPLIANCE.

ROOF DECK

2" SQ TUBING FOR

CURB ADAPTER

2" SQ TUBING FOR

CURB ADAPTER

FASTEN NEW TUBING

TO EXISTING CURB

TRANSITION NEW RA AND SA

AS NEEDED TO CONNECT

TO EXISTING RA AND SA

CONNECTIONS.

EXISTING ROOF CURB

TO REMAIN.

ROOF SUPPORT RAIL. FLASH

PER ROOF MANUFACTURERS

WARRANTY.

END LINE OF

EXISTING CURB

EXISTING CURB

TO REMAIN.

ROOF JOIST

EXISTING CONDUIT AND CONDUCTOR

FEED IN JOIST SPACE BACK TO PANEL

DPN7 TO REMAIN INTACT.

EXISTING BREAKER IN PANEL IS 125A

AND CAN REMAIN INTACT FOR NEW UNIT.

EXISTING NEAREST JUNCTION

BOX TO RTU TO REMAIN IN

CEILING SPACE BELOW. ADD

JUNCTION BOX IF THERE IS

NONE EXISTING.

REMOVE EXISTING FLEXIBLE CONDUIT FROM RTU

BACK TO NEAREST JUNCTION BOX.

INSTALL NEW 1-1/2" NEW LIQUID TIGHT

FLEXIBLE CONDUIT WITH (3)#1 AND #8 GND

FROM CEILING IN SPACE BELOW INTO

NEW RTU.

NEW RTU

TERMINATE NEW

CONDUIT/CONDUCTORS

IN NEW RTU DISCONNECT

Drawing #:

Date:

Project No:

© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.

P lo t D a te

T im e

Drawing Name:

info@kclengineering.com

300 4th St West Des Moines, IA 50265 515-724-7938

/1

/2

:3 :4

A

M

M300

100% CD

12/5/25

25294

D E

P A

R T

M E

N T

O F

C O

R R

E C

T

IO

N S

D

R T

U -2

R E

P L

A C

E M

E N

T

M

A

IN

S T

R E

E T

D A

V E

N T

P O

R T

IO

W A

MECHANICAL DETAILS

AND SCHEDULES

NTS

NEW RTU CURB ADAPTER DETAIL

4. PROVIDE CONVENIENCE OUTLET.

3. PROVIDE WITH FUSED DISCONNECT SWITCH.

2. REFER TO SPECIFICATIONS FOR FILTER REQUIREMENTS.

1. THE RTU SHALL HAVE FACTORY VAV CONTROLS AND BE CONNECTED TO THE EXISTING JCI METASYS BUILDING AUTOMATION SYSTEM.

NOTES:

NOTES 1,2,3, 4

MOCP 100

MCA 89

VOLTAGE - PHASE 480/3

ELECTRICAL DATA

RETURN TYPE MERV8

FILTERS

1ST STAGE COMPRESSOR TYPE SCROLL

NUMBER OF STAGES 11

NET SENSIBLE CAPACITY (MBH) 222

NET TOTAL CAPACITY (MBH) 310

LAT (DB/WB) °F 52.2/52.1

EAT (DB/WB) °F 79.8/65.9

AMBIANT AIR TEMP (DB) 95

REFRIGERANT R-454B

TYPE DX COIL WITH SPLIT CU

COOLING

OPERATING PRESSURE (IN. W.C.) 6-11" WC

OUTPUT CAPACITY (MBH) 405

INPUT CAPACITY (MBH) 500

CONTROL MODULATING

TURNDOWN 2 TO 1

LAT (DB) °F 98.7

EAT (DB) °F 50

TYPE INDIRECT FURNACE - NAT. GAS

HEATING

MOTOR HP 7.5

ESP (IN. W.C.) 1.0

AIRFLOW (CFM) 8,000

EXHAUST FAN

MOTOR HP 10

ESP (IN. W.C.) 2.00

AIRFLOW (CFM) 8,000

SUPPLY FAN

DIMENSIONS (LxDxH) 298" X 96" X 60"

WEIGHT (LBS) 6,557

SERVES 2ND, 3RD, 4TH (WEST) FLOORS

MODEL # GVBAC-2B6MA-2A60A

TYPE OUTDOOR VAV

MANUFACTURER JCI

REFERENCE RTU-2

AIR HANDLING UNIT (OUTDOOR)

NOT TO SCALE

ELECTRICAL RTU INSTALL

Sheets
MC - COVER SHEET
ME000 - MECHANICAL AND ELECTRICAL GENERAL NOTES & SYMBOLS
ME108 - ROOF PLAN - MECHANICAL AND ELECTRICAL
M300 - MECHANICAL DETAILS AND SCHEDULES