RFB948500-01 - Drawings.pdf
PDF 10 MB Posted
- Solicitation number
- RFB948500-01
- Issued by
- Polk County, Iowa
About this file
This document set comprises architectural and engineering construction drawings for the DAS - SHB - Archives Storage Renovation (DAS# 9485.00) located at 600 E. Locust St., Des Moines, IA 50319. The project is overseen by the Department of Administrative Services (DAS) with Neumann Monson Architects serving as the Architect of Record and IMEG Corp providing MEP (mechanical, electrical, and plumbing) consulting services. The scope encompasses renovation of the first floor to create modernized archive storage (Room 151), general storage (Room 152), and a digitization laboratory (Room 157), including demolition of existing systems, installation of high-density mobile shelving units with fixed shelving alternatives, new lighting and HVAC systems, fire protection modifications, plumbing relocations, electrical and technology infrastructure upgrades, and interior finishes. The construction documents are at 100% completion stage (issued 09/19/25) and include comprehensive floor plans, demolition routes, reflected ceiling plans, building sections, and detailed specifications for all systems.
The project involves substantial systems coordination across multiple disciplines, with specific requirements including: modification of the existing preaction fire protection system (served by a fire pump rated at 45 PSI/1000 GPM with water supply at 106 PSI static/86 PSI residual as of 7/23/2021 testing), removal and replacement of all sprinkler heads within the work areas to accommodate ordinary hazard group 2 coverage, installation of LED lighting (troffers, high bays, linear pendants, and shelf lighting), new plumbing with floor drains and vent riser relocations, HVAC modifications including existing equipment reinstallation, and technology infrastructure including access control and data cabling. Interior finishes include gypsum board assemblies per specification Section 09 2116, Sherwin-Williams paint (SW 7004 Snowbound), Forbo Marmoleum flooring, Johnsonite resilient base, and Corian countertops. The contract requires coordination among general, mechanical, electrical, technology, and specialty contractors with strict adherence to ADA accessibility standards, fire-rated wall penetration sealing per ASTM E814, and all existing systems protection during phased construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB948500-01 - Notice to Bidders.pdf | ||
| RFB948500-01 - Bid Form.pdf | ||
| 1350664-event.pdf | ||
| RFB948500-01 - Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DETAIL SECTION
ELEVATION
WALL SECTION
BUILDING SECTION
WALL TYPE
DOOR NUMBER
WINDOW TAG
ADDENDUM TAG
ELEVATIONS
ROOM IDENTIFICATION
DETAIL IDENTIFICATION
SHEET WHERE SHOWN
SHEET WHERE SHOWN
ELEVATION IDENTIFICATION
SECTION IDENTIFICATION
SHEET WHERE SHOWN
SECTION IDENTIFICATION
SHEET WHERE SHOWN
ROOM NAME
ROOM NUMBER
77724" 36"
24"
A-401
1 Ref
R ef
1 Ref
R ef
CASEWORK ELEVATION TAG
AWS SERIES
HEIGHT
WIDTH
DEPTH
NOTE:
HEIGHT IS TO TOP OF
COUNTER
G1
Issued by
1132 A
Room name
A-101 A1
SIM
A1 A-101
SIM
Name Elevation
A1 A-101
SIM
A1
A-101
SIM
ROOF TAG
FLOOR TAG
F1
R1
REFERENCE INDICATIONS
GENERAL FILL
BATT INSULATION
CONCRETE
GYPSUM BOARD
WOOD BLOCKING
RIGID INSULATION
STEEL
PLYWOOD
GROUT
BRICK
CONCRETE
MASONRY UNIT
WOOD SHIM
GRANULAR
DRAINAGE FILL
FOAM-IN-PLACE
INSULATION
MATERIAL SYMBOLS
A.
B.
C.
ALL DIMENSIONS ARE ACTUAL AND ARE TO FACE OF METAL STUDS, FACE OF
MASONRY, OR CENTERLINE OF COLUMN, UNLESS NOTED OTHERWISE.
FLOOR SPOT ELEVATIONS ARE SHOWN THUS: 0'-0"
ALL WALLS AND EXPOSED CEILINGS TO BE PAINTED PT-1 UNLESS
OTHERWISE NOTED.
GENERAL NOTES
09 2116; MTL
FRAMING
09 2116; GYP BD
09 2116; GYP BD
ASSEMBLY WIDTH
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303 Iowa City, Iowa 52240 319.338.7878
111 East Grand Avenure, Suite 105 Des Moines, Iowa 50309 515.339.7800
VICINITY MAPS
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322 515.334.4326
TB
V er si on
6.
G-001
TITLE SHEET AND
DRAWING INDEX
22035
STATE OF IOWA
DAS No. 9485.00
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION
DAS# 9485.00
DAS - SHB - ARCHIVES STORAGE RENOVATION DAS#
9485.00
600 E. Locust St., Des Moines IA 50319
100% CONSTRUCTION DOCUMENTS09/ /25
GENERAL INFORMATION DRAWINGS
G-001 TITLE SHEET AND DRAWING INDEX
G-002 CODE INFORMATION
G-100 DEMOLITION ROUTE(S)
ARCHITECTURAL DEMO DRAWINGS
AD101 DEMOLITION FLOOR PLAN AND REFLECTED CEILING PLAN
ARCHITECTURAL DRAWINGS
A-101 FLOOR PLAN AND REFLECTED CEILING PLAN
A-101B FLOOR PLAN AND REFLECTED CEILING PLAN
A-211 BUILDING SECTIONS
A-411 ENLARGED PLANS AND ELEVATIONS
A-501 DOOR SCHEDULE, FINISH SCHEDULE, AND INTERIOR DETAILS
FIRE PROTECTION DRAWINGS
F-000 FIRE PROTECTION COVERSHEET
FD101 FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION
F-201 FIRST FLOOR PLAN - FIRE PROTECTION
PLUMBING DRAWINGS
P-000 PLUMBING COVERSHEET
PD101 FIRST FLOOR DEMOLITION PLAN - PLUMBING
P-201 FIRST FLOOR PLAN - PLUMBING
MECHANICAL DRAWINGS
M-000 MECHANICAL COVERSHEET
MD101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL
M-201 FIRST FLOOR PLAN - MECHANICAL
ELECTRICAL DRAWINGS
E-000 ELECTRICAL COVERSHEET
ED101 FIRST FLOOR WEST DEMOLITION PLAN - LIGHTING
ED111 FIRST FLOOR DEMOLITION PLAN - POWER
ED121 FIRST FLOOR DEMOLITION PLAN - SYSTEMS
E-201 FIRST FLOOR PLAN - LIGHTING
LOCUST STREET
GRAND AVENUE
EAST 6TH AVENUE
PE
N
N A
VE
N
U E
PROJECT SITE
I hereby certify that the portion of this technical I hereby certify that the portion of this technical submission described herein was prepared by me submission described herein was prepared by me or under my direct supervision and responsible or under my direct supervision and responsible charge. I am a duly registered Architect under the charge. I am a duly registered Architect under the laws of the State of Iowa.laws of the State of Iowa.
SignatureSignature DateDate
Registration expires:
Pages or sheets covered by this Pages or sheets covered by this seal:seal:
BRIAN R. WARTHEN
@ AT
AC ACOUSTICAL COMPONENT
ACST ACOUSTICAL
ADJ ADJACENT OR ADJUSTABLE
AFF ABOVE FINISH FLOOR
AL ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
APCC ARCHITECTURAL PRECAST CONCRETE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ATC ACOUSTICAL TILE CEILING
AV AUDIO VISUAL
AW ARCHITECTURAL WOODWORK
BD BOARD
BEJ BRICK EXPANSION JOINT
BLDG BUILDING
BLKG BLOCKING
BO_ BOTTOM OF ____
BRG BEARING
CG CORNER GUARD
CIPC CAST-IN-PLACE CONCRETE
CJ CONTROL JOINT
CL CENTER LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CPT CARPETING / CARPET TILE
CW CURTAIN WALL
DBL DOUBLE
DEMO DEMOLITION / DEMOLISH
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING(S)
EA EACH
LIST OF ABBREVIATIONS
SignatureSignature DateDate
Pages or sheets covered by this Pages or sheets covered by this seal:seal:
I hereby certify that the portion of this technical I hereby certify that the portion of this technical submission described herein was prepared by me submission described herein was prepared by me or under my direct supervision and responsible or under my direct supervision and responsible charge and that I am a duly licensed Professional charge and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.Engineer under the laws of the State of Iowa.
License Renewal Date: 01.01.2021
TONY E. DELOUIS
SignatureSignature DateDate
Pages or sheets covered by this Pages or sheets covered by this seal:seal:
I hereby certify that the portion of this technical I hereby certify that the portion of this technical submission described herein was prepared by me submission described herein was prepared by me or under my direct supervision and responsible or under my direct supervision and responsible charge and that I am a duly licensed Professional charge and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.Engineer under the laws of the State of Iowa.
License Renewal Date: 01.01.2021
PETER J. ERNZEN
INDEX OF DRAWINGS
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EX EXPOSED
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER ON BRACKET
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FACE OR FLOOR
FIN FINISH
FLEX FLEXIBLE
FLR FLOOR
FTG FOOTING
FURN FURNITURE/FURNISHINGS
G GROUT
GA GAGE
GALV GALVANIZED
GFR GLASS-FIBER-REINFORCED
GYP GYPSUM
GYP BD GYPSUM BOARD
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
IB INTEGRAL BASE
INSUL INSULATION
INT INTERIOR
JT JOINT
LKR LOCKER
MAS MASONRY
MAT ENTRY WALK-OFF MAT
MAX MAXIMUM
1.
2.
3.
REFER TO SPECIFICATION SECTION 09 2116 - GYPSUM BOARD ASSEMBLIES FOR
MINIMUM STUD THICKNESS, MAXIMUM STUD SPACING, AND PERFORMANCE CRITERIA
FOR NON-LOAD-BEARING METAL-FRAMED GYPSUM BOARD WALL AND SHAFT WALL
ASSEMBLIES; INCLUDING MAXIMUM DEFLECTION, ACOUSTICAL-RATED, FIRE-
RESISTANCE-RATED, AND SMOKE-RESISTANCE-RATED REQUIREMENTS. CONSTRUCT
ACOUSTICAL-RATED, FIRE-RESISTANCE-RATED, AND SMOKE-RESISTANCE-RATED
WALLS ACCORDING TO THEIR RESPECTIVE ASSEMBLY TEST REPORTS. ENSURE
MATERIALS USED WITHIN AN ASSEMBLY COMPLIES WITH MANUFACTURER ’S DATA
AND THE PRODUCT QUALITIES INDICATED IN THEIR RESPECTIVE ASSEMBLY
SPECIFICATIONS AND TEST REPORTS.
PENETRATIONS THROUGH, AND THE PERIMETER OF FIRE-RESISTANCE-RATED WALLS,
SHALL BE FILLED WITH AN APPROPRIATE FIRESTOPPING SYSTEM MEETING
PERFORMANCE REQUIREMENTS INDICATED ON DRAWINGS AND AS SPECIFIED IN
SECTION 07 8400 - FIRESTOPPING.
EXTEND WALL FRAMING TO BOTTOM OF ROOF/FLOOR DECK ABOVE IN ALL
LOCATIONS, UNLESS SPECIFICALLY NOTED OTHERWISE, ALLOWING FOR DEFLECTION
WHILE MAINTAINING APPROPRIATE ACOUSTICAL-RATED, AND FIRE-RESISTANCE-
RATED, AND SMOKE-RESISTANCE-RATED REQUIREMENTS.
L3.X METAL STUD ASSEMBLIES W/ 1 LAYER GYP BD
EACH SIDE
Mark Stud Size
Assembly Width
UL Design Rating Comments
L3.1 1 5/8" 2 7/8" L3.3 3 5/8" <varies> L3.5 5 1/2" 6 3/4"
GENERAL WALL TYPES NOTES
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MIRR MIRROR OR MIRRORED
MTL METAL
MTLP METAL PANEL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR DIMENSION
OF/CI OWNER FURNISHED, CONTRACTOR
INSTALLED
OF/OI OWNER FURNISHED, OWNER INSTALLED
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
PCC PRECAST CONCRETE
PCONC POLISHED CONCRETE
PEF POURED EPOXY FLOORING
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT(ED)
PR PAIR
R RISER
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCING BAR(S)
REF REFERENCE
REFR REFRIGERATOR
REINF REINFORCE OR REINFORCING
REQD REQUIRE(D)
RF RESILIENT FLOORING
RM ROOM
RO ROUGH OPENING
RST REINFORCING STEEL
RWP RIGID SHEET WALL PROTECTION
SATC SUSPENDED ACOUSTICAL TILE CEILING
SCHED SCHEDULE
SCONC SEALED CONCRETE
SF SQUARE FOOT OR FEET
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SIPS STRUCTURAL INSULATED PANELS
SLNT SEALANT
SLNT/BR SEALANT AND BACKER ROD
SOG SLAB-ON-GRADE
SSM SOLID SURFACING MATERIAL
SST STAINLESS STEEL
STD STANDARD
STF STOREFRONT
STL STEEL
STRUCT STRUCTURAL
SUSP SUSPENDED
T TREAD OR TILE
T&B TOP AND BOTTOM
TAC TACKBOARD
TELECOM TELECOMMUNICATION(S)
TOB TOP OF BEAM
TOC TOP OF CONCRETE/COUNTER
TOF TOP OF FRAME
TOJ TOP OF JOIST
TOM TOP OF MASONRY
TOS TOP OF SLAB OR STEEL
TOW TOP OF WALL
TYP TYPICAL
TZ TERRAZZO
UON UNLESS OTHERWISE NOTED
VAR VARIES
VERT VERTICAL
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
WB WALL BUMPER
WC WALL COVERING
WD WOOD
WDP WOOD PANEL
WWF WELDED WIRE FABRIC
I hereby certify that the portion of this technical submission described herein was prepared by me or under my direct supervision and responsible charge. I am a duly registered Architect under the laws of the State of Iowa.
Signature Date
Registration expires:
Pages or sheets covered by this seal:
BRIAN R. WARTHEN
Signature Date
Pages or sheets covered by this seal:
I hereby certify that the portion of this technical submission described herein was prepared by me or under my direct supervision and responsible charge and that I am a duly licensed Professional
Engineer under the laws of the State of Iowa.
License Renewal Date: 01.01.2021
TONY E. DELOUIS
Signature Date
Pages or sheets covered by this seal:
I hereby certify that the portion of this technical submission described herein was prepared by me or under my direct supervision and responsible charge and that I am a duly licensed Professional
Engineer under the laws of the State of Iowa.
License Renewal Date: 01.01.2021
PETER J. ERNZEN
Signature Date
Pages or sheets covered by this seal:
I hereby certify that the portion of this technical submission described herein was prepared by me or under my direct supervision and responsible charge and that I am a duly licensed Professional
Engineer under the laws of the State of Iowa.
License Renewal Date: 01.01.2027
TONY E. DELOUIS
Signature Date
Pages or sheets covered by this seal:
I hereby certify that the portion of this technical submission described herein was prepared by me or under my direct supervision and responsible charge and that I am a duly licensed Professional
Engineer under the laws of the State of Iowa.
License Renewal Date: 01.01.2027
PETER J. ERNZEN
9. 259. 259. .25
G-001, G-002, G-100, AD101,
A-001, A-101, A-101B, A-211, A-411, A-501
F-000, FD101, F-201, P-000, E-000, ED101, ED111, ED121,
E-201, P-101, P-201, M-000, MD101 , M-201,
19 19. 19.
06.30.2027
E-210 LOWER LEVEL FLOOR PLAN - POWER
E-211 FIRST FLOOR PLAN - POWER
E-221 FIRST FLOOR PLAN - SYSTEMS
E-600 ELECTRICAL SCHEDULES & DETAILS
TECHNOLOGY DRAWINGS
T-000 TECHNOLOGY COVERSHEET
TD101 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY
T-102 FIRST FLOOR PLAN - TECHNOLOGY
T-103 TECHNOLOGY DETAILS
E-210, eets covered by this eets covered by this
E-211, E-221, E-600, T-000, TD101, T-102, T-103
UP
CODE PLAN LEGEND
SYMBOL DESCRIPTION NOTES
DESCRIPTION
FIRE EXTINGUISHER
F.E.C.FIRE EXTINGUISHER
CABINET
COMPLY WITH
IFC906
1 HR RATED
SEPARATION
2 HR RATED SEPARATION
3 HR RATED SEPARATION
1 HOUR FIRE RESISTANCE RATED
CONSTRUCTION.
3/4 HOUR RATED DOOR ASSEMBLIES (UNO)
FIRE & SMOKE DAMPERS.
2 HOUR FIRE RESISTANCE RATED
CONSTRUCTION.
1 1/2 HOUR RATED DOOR ASSEMBLIES (UNO)
FIRE & SMOKE DAMPERS.
3 HOUR FIRE RESISTANCE RATED
CONSTRUCTION.
2 HOUR RATED DOOR ASSEMBLIES
(UNO)
FIRE & SMOKE DAMPERS.
OCCUPANCY SPACE TAG
MEANS OF EGRESS
DOOR TAG
NUMBER OF CALCULATED
OCCUPANTS
OCCUPANT LOAD
FACTOR (SQ. FT. /
PERSON)
TOTAL NUMBER OF
OCCUPANTS EXITING
CAPACITY OF EXIT
ELEMENT
ACTUAL EXIT WIDTH
(INCHES)
SQ. FT. OF SPACE
NUMBER OF ADVANCING
OCCUPANTS
DIRECTION OF TRAVEL
FEC
XX
TRAVEL DISTANCE
TRAVEL PATH
1150 SF
XX
XXX
XXX
XXX
XX.X
STAIR
XXX
XXX
XX.X
TOTAL NUMBER OF
OCCUPANTS EXITING
CAPACITY OF EGRESS
STAIR
ACTUAL STAIR WIDTH
(INCHES)
MEANS OF EGRESS
STAIR TAG
9099 SF
AREA OF WORK
FEC
FEC
AREA OF WORK
4499 SF
777 SF
243'-6
S1- STORAGE (NO CHANGE IN
OCCUPANCY OR USE)
USE AND OCCUPANCY CLASSIFICATION LEGEND
B- BUSINESS (NO CHANGE IN
OCCUPANCY OR USE)
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303 Iowa City, Iowa 52240 319.338.7878
111 East Grand Avenure, Suite 105 Des Moines, Iowa 50309 515.339.7800
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322 515.334.4326
TB
V er si on
6.
G-002
CODE
INFORMATION
22035
STATE OF IOWA
DAS No. 9485.00
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION
DAS# 9485.00
100% CONSTRUCTION DOCUMENTS09/19/25
CODE REVIEW
STATE HISTORICAL BUILDING
600 E Locust St. Des Moines, IA. 50319
APPLICABLE CODES- State of Iowa
2015 International Building Code (IBC) 2015 International Existing Building Code (IEBC) 2021 State Mechanical Code (Based on 2021 International Mechanical Code) 2015 International Fire Code 2020 National Electrical Code 2021 State Plumbing Code (Based on 2021 Uniform Plumbing Code)
Accessibility – 2010 ADA Standards, Iowa state accessibility code
Energy - Iowa state energy code, 2012 international energy conservation code
BASIC INFORMATION
Renovation
9,110 GSF
Construction Type 1-A, Alterations Occupancy Groups S-1
2015 International Existing Building Code:
Chapter 1 – Scope and Administration Demolition work to follow IEBC Chapter 15 All sub-contractors will need to apply for and obtain their own specialty permits.
An approved set of plans including plan review comments is to be kept on the job site and be available to the building inspectors.
Chapter 2 - Definitions See IBC 2015
Chapter 5 – Classification of Work
Proposed Work Type 1-A Alterations – Level 1
9,110 GSF
Fully sprinklered per Section 903 of the 2015 International Fire Code.
504.2 Application
Alterations shall comply with the provisions of Chapter 7 for Level 1 alterations as well as the provisions of Chapter 8
Chapter 6 – Repairs Construction Type: I-A
603 Fire Ratings (Table 601 IBC) REQ. PROVIDED Structural Frame including columns, girders & trusses 3 hr 3 hr Bearing Walls--Exterior 3 hr 3 hr Bearing Walls--Interior 3 hr 3 hr Nonbearing walls & partitions--Exterior 1 hr 1 hr* Nonbearing walls & partitions--Interior 0 hr Varies Floor Construction including supporting beams & joists 2 hr 2 hr Roof Construction including supporting beams & joists 1 hr 1 hr**
* New additions will be rated to 1 hr. Existing exterior walls will meet or exceed a 2hr rating.
Chapter 6 - Classification of Work
602 Alteration Level 1: Scope Level 1 alterations include the removal and replacement or the covering of existing materials, elements, equipment, or fixtures using new materials, elements, equip-ment, or fixtures that serve the same purpose.
603 Alteration Level 2: Scope Level 2 alterations include the reconfiguration of space, the addition or elimination of any door or window, the reconfiguration or extension of any system, or the installation of any additional equipment.
Chapter 7 – Alterations Level 1
701 Scope Level 1 alterations as described in Section 602 shall comply with the requirements of this chapter. Level 1 alterations to historic buildings shall comply with this chapter, except as modified in Chapter 12.
704 Means of Egress Alterations shall be done in a manner that maintains the level of protection provided for the means of egress.
706 Structural Where alteration work includes replacement of equipment that is supported by the building or where a roofing permit is required, the provisions of this section shall apply.
Chapter 8 - Alterations Level 2
801.2 Alteration Level 1 Compliance
In addition to the requirements of this chapter, all work shall comply with the requirements of Chapter 7.
801.3 Compliance
New construction elements, components, systems and spaces shall comply with the requirements of the International Building Code.
802.4 Interior Finish
The Interior finish of walls and ceilings in exits and corridors in any work area shall comply with the requirements of the International Building Code.
803 Fire Protection The requirements of this section shall be limited to work areas in which Level 2 alterations are being performed, and where specified they shall apply throughout the floor on which the work areas are located or otherwise beyond the work area.
2015 International Building Code
Chapter 5 - General Building Heights and Areas
Proposed Renovation Type 1-A
14,376 GSF
508.4 Separated Occupancies per Section (Table 508.4) – Sprinklered Building A/B: 1 hr B/E: 1 hr A/S-1: 1 hr B/S-1: N
Chapter 6 - Types of Construction Construction Type: 1-A
Chapter 9 – Fire Protection Systems
903.3.1.1 NFPA 13 sprinkler systems. Where the provisions of this code require that a building or portion thereof be equipped throughout with an automatic sprinkler system in accordance with this section, sprinklers shall be installed throughout in accordance with NFPA 13 except as provided in Section 903.3.1.1.1.
905.3.1 Exception 1:Class I manual standpipes allowed per section
905.4 Location of Class I standpipe hose connections at every required stairway.
906.1 Portable Fire Extinguishers
Existing locations to remain.
Chapter 10 – Means of Egress
1004 Design Occupant Loads Table 1004.1.2:
Storage (S-1): 300 gross (4499sf + 9099sf = 13,598sf/300) = 45.3 Business: 100 gross (777sf/100) = 7.77 Total Occupants: 54
1005 Egress Widths See life safety plans. All egress width requirements are satisfied. Historic 43” stair is allowed as it is existing historic fabric and occupant loads have been capped.
1006.17.2 Exit Access Travel Distance
Group S-1 250ft 1" = 60'-0"
LEVEL 1 USE & OCCPANCY PLAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
A
B
C
D
E
F
G
H
I
J
6.5
A.5
DEMOLITION ROUTE OPTION 1.
PROVIDE PLYWOOD FLOOR
PROTECTION AND BARRICADES
ALONG PATHWAY FOR
REMOVAL OF DEMOLITION
PLYWOOD FLOOR TO BE
REMOVED DURING HOSTED
EVENTS. CONTRACTOR TO
COORDINATE W/ STATE
HISTORICAL BUILDING.
DUMPSTERS LOCATED IN
LOADING DOCK AT BASEMENT
LEVEL.
AREA OF WORK
TAKE FREIGHT ELEVATOR
DOWN TO LOWER LEVEL.
PATHWAY TO PICK UP ON
LOWER LEVEL.
PROPOSED DUMPSTER
LOCATION. CONTRACTOR
TO COORDINATE ANY
REQUIRED PERMITS FROM
CITY OF DES MOINES.
DEMOLITION ROUTE OPTION
2 - UP EXISTING STAIRS TO
DUMPSTERS LOCATED ON
STREET LEVEL.
FREIGHT
ELEV.
LOADING
DOCK
FREIGHT
ELEV.
SCOPE OF WORK IN THIS ROOM
CONSISTS OF LIGHTING & EXIT
SIGNAGE - NO OTHER WORK
REQUIRED. REFER TO ELECTRICAL
DRAWINGS FOR EXTENTS OF ANY
DEMOLITION REQUIRED.
A-101B A5
PASSENGER
ELEV.
DEMOLITION ROUTE OPTION 2.
TAKE PASSENGER ELEVATOR DOWN
TO LOWER LEVEL. ROUTE USED FOR
SMALL MATERIALS & CARTS. LOADS
ARE NOT TO EXCEED MAX LOAD
CAPACITY OF ELEVATOR. CAB TO BE
BLANKETED / PROTECTED.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
A
B
C
D
E
F
G
H
I
J
6.5
A.5
'-6
/2
" 5' -0
TAKE FREIGHT ELEVATOR
UP TO FIRST LEVEL.
PATHWAY TO PICK UP ON
FIRST LEVEL.
FREIGHT
ELEV.
FREIGHT
ELEV.
PASSENGER
ELEV.
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303 Iowa City, Iowa 52240 319.338.7878
111 East Grand Avenure, Suite 105 Des Moines, Iowa 50309 515.339.7800
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322 515.334.4326
TB
V er si on
6.
G-100
DEMOLITION
ROUTE(S)
22035
STATE OF IOWA
DAS No. 9485.00
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION
DAS# 9485.00
100% CONSTRUCTION DOCUMENTS09/19/25
1" = 30'-0"D1 FIRST LEVEL FLOOR PLAN - DEMOLITION ROUTE
1" = 30'-0"B1 LOWER LEVEL FLOOR PLAN - DEMOLITION ROUTE
13 14 15 16
B
C
D
E
F
G
D1D2
D2
D1
D1
D3D3
D3
D4
D5
D5
D14
D14
D9
D9
D9D9
ARCHIVE
STORAGE
D10
D10
D10
D10
D11
DIGITIZATION LAB
D12
D14
D15
D15
D15
D15
D10
D10 D10
D10
D10
D10
D10
D10
D10
D10
D4
D4
D4
D10
13 14 15 16
B
C
D
E
F
G
D6
D6 D6
D7
D1
EXISTING SOFFIT
TO REMAIN
*NOTE: NOT ALL
EXISTING MEPT
EQUIPMENT IS
SHOWN
EX
IS
TI
N
G D
U C
TW
O
R K
EXISTING DUCTWORK
D13
D13
D13
D1
D8D8
D8
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303 Iowa City, Iowa 52240 319.338.7878
111 East Grand Avenure, Suite 105 Des Moines, Iowa 50309 515.339.7800
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322 515.334.4326
TB
V er si on
6.
AD101
DEMOLITION
FLOOR PLAN AND
REFLECTED
CEILING PLAN
22035
STATE OF IOWA
DAS No. 9485.00
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION
DAS# 9485.00
100% CONSTRUCTION DOCUMENTS09/19/25
1.
2.
3.
4.
REMOVE ALL MEPT SYSTEM COMPONENTS WITHIN AREAS OF THE WORK OF THIS
CONTRACT THAT ARE NOTED AS ABANDONED OR TO BE ABANDONED BY THE WORK
OF THIS CONTRACT.
WHEREVER DEMOLISHED WALLS ABUT WALLS TO REMAIN, PATCH AND PREPARE TO
BE REFNISHED.
REPAIR AND PATCH WALLS AND CONCRETE FLOOR SLAB WHERE DAMAGED OR
UNFINISHED SURFACE RESULTING FROM REMOVE OF CASEWORK, WALL, FIXTURES
OR ANY OTHER ITEMS REQUIRED TO BE REMOVED BY THIS CONTRACT WILL AFFECT
INSTALLATION OF NEW SHELVING UNITS.
ANY DAMAGE DONE TO EXISTING CONDITIONS TO REMAIN TO BE REMEDIED AT
EXPENSE OF CONTRACTOR.
GENERAL DEMOLITION NOTES
1/8" = 1'-0"A1 FIRST LEVEL DEMOLITION PLAN
1/8" = 1'-0"A4 FIRST LEVEL REFLECTED CEILING DEMOLITION PLAN
DEMOLITION KEYNOTES
KEY DESCRIPTION
D1 REMOVE WALL IN ITS ENTIRETY
D2 REMOVE EXISTING DOOR AND FRAME.
D3 REMOVE EXISTING HIGH DENSITY STORAGE IN ITS ENTIRETY, INCLUDING FLOOR
TRACK, CARPET, ACCESSORIES, ETC. (ALT 01).
D4 EXISTING FLAT FILE CABINETS TO BE RELOCATED PRIOR TO CONTRACT (BY
OWNER).
D5 REMOVE EXISTING DOOR PANEL. PROTECT AND SALVAGE HM FRAME TO BE
RE-USED.
D6 REMOVE EXISTING PANEL CEILING LIGHT FIXTURES, AND MECH. SALVAGE
DIFFUSERS FOR REINSTALL.
D7 REMOVE EXISTING PENDANT LIGHT FIXTURES.
D8 REMOVE EXISTING TRACK LIGHTING. PATCH / REPAIR / PAINT DRYWALL TO MATCH
EXISTING. ALL LOCATIONS TO BE VIF.
D9 REMOVE EXISTING STORAGE SHELVING (ALT 01).
D10 REMOVE EXISTING WALL BASE.
D11 REMOVE PORTION OF EXISTING CONCRETE SLAB FOR NEW UNDERFLOOR PIPING,
SEE PLUMBING
D12 REMOVE PORTION OF WALL FOR NEW DOOR INTO DIGITIZATION LAB.
D13 REMOVE EXISTING LIGHT FIXTURES.
D14 REMOVE CARPET WALL, WOOD BACKUP TO REMAIN (ALL SURFACES WITHIN
ROOM).
D15 REMOVE DATA / POWER / WIREMOLD ALONG WALLS - REFER TO ELECTRICAL
DEMO
B
C
D
E
F
G
A3 A-211
A3 A-211
STORAGE
1 1/4"
0"
C3 A-211
C3 A-211
D4 A-501
A1 A-211
A1 A-211
151A
151B
ARCHIVE
STORAGE
D4 A-501
3' -6
3' -6
D
E P
TH
2' -8
3'
-6
'-6
22'-6"
16'-0"
3'-6"
A A A A A A A A A A A A A A A A
'-6
'-6
DEPTH
1'-4"
'-6
DEPTH
2'-8"
DEPTH
1'-4"
DEPTH
1'-4"
3'-6"
'-6
3'-6"
DEPTH
2'-8"
'-6
C
LR
5' -1
0"
CLR
6'-2"
D E
P
TH
2' -8
D E
P
TH
2' -8
3'-6"
UP
UP
AAAAAAAA A A A A A A A A
C
C
C
C
C
C C
C
E
C
D
D
16'-0"
B
B
B
B
B
B
B
B
B
B
B
A
A
A
A
C
9'-8"
27'-6"
C
FURNITURE - OF/OI
A A A A A A A A A A A A A A A A A A A A A A
A-411 A5
A1A1
A2
A4 A4
A4
A4 A4
A4A4
A4
A5
A5
E
C
A6
A6
A6
A6
2'-8"
2'-8"
A7
1 1/4"
1 1/4"
DIGITIZATION LAB
7C
157A
157B A6
A6
A6A6
(4
2"
E A
'-0
5'
-4
(4
2"
E A
'-0
A9
A9
A9
A9
C1 A-501
C1 A-501
C1 A-501
C1 A-501
C1 A-501
C1 A-501
C1 A-501
A9
A3
A3
4'-6"
4'-6"
(6) @ 42" EA
21'-0"
(7) @ 42" EA
24'-6"
REMAINDER
X
5' -4
R E
M A
IN
D
E R
X
R E
M A
IN
D
E R
X
(6
2"
E A
'-0
(5) @ 42" EA
17'-6" 4'-0"
(6
2"
E A
'-0
(6
2"
E A
'-0
(6
2"
E A
'-0
(7
2"
E A
'-6
R E
M A
IN
D
E R
X
(5
2"
E A
'-6
F
(2) @ 42" EA
7'-0"
(7
2"
E A
'-6
R E
M A
IN
D
E R
X
A37' -1
0" 1'
-6
A3
A12
A12
A12
A13
A13A13
A13 A13
A13
A13
A13
A6
A6
A6
A6
3'-6"
3'-6"
13 14 15 16
B
C
D
E
F
G
A3 A-211
A3 A-211
C1 A-211
C1 A-211
C3 A-211
C3 A-211
A1 A-211
A1 A-211
ARCHIVE
STORAGE
STORAGE
EXISTING SOFFIT
TO REMAIN
*NOTE: NOT ALL
EXISTING MEPT
EQUIPMENT IS
SHOWN
EX
IS
TI
N
G D
U C
TW
O
R K
EXISTING DUCTWORK
DIGITIZATION LAB
A8
A11
A10
DIRECT / INDIRECT
FIXTURES - SEE ELEC
11'-4"
LINEAR PENDANT
FIXTURES - SEE E-201.
CEILING LEGEND
SPRINKLER HEAD
SUPPLY DIFFUSER
RETURN DIFFUSER
2'x4' TROFFER LIGHT
SURFACE MOUNTED/PENDANT DOWNLIGHT
2' X 2' SATC
EXISTING LINEAR
DIFFUSER - REUSED
E
Q S
H E
LV
E
S
'-0
" M A
X
E
Q S
H E
LV
E
S
'-0
E
Q S
H E
LV
E
S
'-0
" M A
X
E
Q S
H E
LV
E
S
'-0
EQUAL SHELVING
SEE PLANSEE PLAN
A - MECHANICAL ASSIST - DOUBLE SIDED
16" D SHELVING FOR TOTAL 32" D.
C- FIXED SHELVING
SEE PLAN FOR DEPTH
D- FIXED SHELVING
SEE PLAN FOR DEPTH
SEE PLAN
B - MECHANICAL ASSIST - DOUBLE SIDED
16" D SHELVING FOR TOTAL 32" D.
42" MIN.
" M
IN
" M
IN
EQUAL SHELVING
SEE PLAN
42" MIN.
" M
IN
" M
IN
42" MIN.
E- FIXED SHELVING
32" DEPTH
E
Q S
H E
LV
E
S
'-0
" M A
X
5'-4"
" M
IN
~ 51,400 TOTAL SF OF STORAGE
5'-0" CLR42" MIN.
7' -0
3'-6"
F- FIXED SHELVING
15" DEPTH
A.
B.
C.
ALL DIMENSIONS ARE ACTUAL AND ARE TO FACE OF METAL STUDS, FACE OF
MASONRY, OR CENTERLINE OF COLUMN, UNLESS NOTED OTHERWISE.
FLOOR SPOT ELEVATIONS ARE SHOWN THUS: 0'-0"
ALL WALLS AND EXPOSED CEILINGS, CONDUITS, SPRINKLERS, DUCTS,
GRILLES, ETC. TO BE PAINTED PT-1 UNLESS OTHERWISE NOTED.
GENERAL NOTES
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303 Iowa City, Iowa 52240 319.338.7878
111 East Grand Avenure, Suite 105 Des Moines, Iowa 50309 515.339.7800
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322 515.334.4326
TB
V er si on
6.
A-101
FLOOR PLAN AND
REFLECTED
CEILING PLAN
22035
STATE OF IOWA
DAS No. 9485.00
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION
DAS# 9485.00
100% CONSTRUCTION DOCUMENTS09/19/25
1/8" = 1'-0"A3 ARCHIVES STORAGE - ENLARGED FLOOR PLAN
1/8" = 1'-0"A1 ARCHIVES STORAGE - REFLECTED CEILING PLAN
SHELVING AXON - FOR REFERENCE
1/4" = 1'-0"
SHELVING TYPES
FLOOR & CEILING PLAN NOTES
KEY DESCRIPTION
A1 GRIND ENTIRE EXISTING CONCRETE FLOORING TO LEVEL FINISH WITHIN
HIGH DENSITY STORAGE TOLERANCES. ENTIRETY OF CONCRETE FLOOR
TO BE SEALED.
A2 HEAVY DUTY LADDER (3) IN TOTAL - BASIS OF DESIGN: FS INDUSTRIES
MODEL SW 832
A3 AUTO DOOR ACTUATOR MOUNTED @ 42" AFF. INSTALLATION TO BE
COORDINATED PRIOR TO INSTALLATION.
A4 3/4" (MIN) PLYWOOD SUBFLOOR AND RAMP ENTIRE FOOTPRINT OF
MECHANICAL ASSIST SHELVING FOR RAIL ATTACHEMENT. COVER
PLYWOOD SUBFLOOR WITH L-1.
A5 ALIGN FACE OF SHELVING
A6 NEW WALL BASE, RB-1 AT ALL GWB & CONCRETE WALLS
A7 PATCH CAST IN PLACE CONCRETE FLOOR AS REQUIRED.
A8 PAINT EXISTING GYP CEILING. PROTECT EXISTING WOOD CEILING. NEW
LIGHT FIXTURES TO BE INSTALLED.
A9 INSTALL NEW GYP BD. PNT PER FINISH SCHEDULE.
A10 CONTRACTOR TO COORDINATE ALL MECH DIFFUSERS / SUPPLY AIR
GRILLES & VENTS IN NEW INSTALLED CEILING TILE.
A11 CEILING TILE TO BE CENTERED IN ROOM UNLESS NOTED OTHERWISE.
A12 CARD READER (INSTALLATION TO BE COORDINATED PRIOR TO
INSTALLATION).
A13 ALT #1: LED AISLE LIGHTING @ MOBILE SHELVING SYSTEM.ALT #2:
1 2 3
C
D
E
F
EXISTING RAMP TO
OVERHEAD DOOR
ARCHIVE
STORAGE (WEST)
APPROXIMATE EXTENTS
OF EXISTING SHELVING
(TO REMAIN DURING
INSTALLATION OF NEW
LIGHT FIXTURES.)
1 2 3
C
D
E
F
APPROXIMATE LOCATION
OF EXISTING SHELVING
(TO REMAIN DURING
INSTALLATION OF NEW
LIGHT FIXTURES)
APPROXIMATE LOCATION
OF EXISTING LIGHT
FIXTURES. EXACT
QUANTITIES & LOCATION -
VIF.
NEW LIGHT FIXTURES
(TO BE CENTERED
BETWEEN SHELVING, TYP)
REFER TO E-201.
ARCHIVE
STORAGE (WEST)
TYP
15'-4 3/4"
EXISTING SHELVING
EXISTING LIGHT FIXTURES
(TO BE REMOVED)
NEW LIGHT FIXTURES
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303 Iowa City, Iowa 52240 319.338.7878
111 East Grand Avenure, Suite 105 Des Moines, Iowa 50309 515.339.7800
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322 515.334.4326
TB
V er si on
6.
A-101B
FLOOR PLAN AND
REFLECTED
CEILING PLAN
22035
STATE OF IOWA
DAS No. 9485.00
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION
DAS# 9485.00
100% CONSTRUCTION DOCUMENTS09/19/25
1/8" = 1'-0"A5 ARCHIVE STORAGE (WEST) - ENLARGED FLOOR PLAN
1/8" = 1'-0"C5 ARCHIVE STORAGE (WEST) - REFLECTED CEILING PLAN
LOWER LEVEL
100'-0"
LEVEL 1
116'-0"
LEVEL 2
138'-0"
LEVEL 3E
151'-8"
LEVEL 3W
160'-0"
ROOF LEVEL E
165'-0"
13 14 15 16
LEVEL 1.5
127'-0"
A3 A-211
A3 A-211
COLLECTIONS
LIBRARY
ARCHIVE
STORAGE
C3 A-211
C3 A-211
LEVEL 1
116'-0"
LEVEL 2
138'-0"
LEVEL 3E
151'-8"
LEVEL 3W
160'-0"
ROOF LEVEL E
165'-0"
B C D E F
LEVEL 1.5
127'-0"
C1 A-211
C1 A-211
A1 A-211
A1 A-211
ARCHIVE
STORAGE
COLLECTIONS
LOWER LEVEL
100'-0"
LEVEL 1
116'-0"
LEVEL 2
138'-0"
LEVEL 3E
151'-8"
LEVEL 3W
160'-0"
ROOF LEVEL E
165'-0"
13 14 15 16
LEVEL 1.5
127'-0"
A3 A-211
A3 A-211
C3 A-211
C3 A-211
STORAGE
C1 A-501
LEVEL 1
116'-0"
LEVEL 2
138'-0"
LEVEL 3E
151'-8"
LEVEL 3W
160'-0"
ROOF LEVEL E
165'-0"
B C D E F G
LEVEL 1.5
127'-0"
C1 A-211
C1 A-211
A1 A-211
A1 A-211
ARCHIVE
STORAGE
STORAGE
LIBRARY
READING ROOM
COLLECTIONS
M A
X H
E
IG
H T
'-0
" DIGITIZATION LAB
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303 Iowa City, Iowa 52240 319.338.7878
111 East Grand Avenure, Suite 105 Des Moines, Iowa 50309 515.339.7800
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322 515.334.4326
TB
V er si on
6.
A-211
BUILDING
SECTIONS
22035
STATE OF IOWA
DAS No. 9485.00
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION
DAS# 9485.00
100% CONSTRUCTION DOCUMENTS09/19/25
1/8" = 1'-0"C1 BUILDING SECTION - E/W
1/8" = 1'-0"A3 BUILDING SECTION - N/S 1/8" = 1'-0"A1 BUILDING SECTION - E/W1
1/8" = 1'-0"C3 BUILDING SECTION - N/S1
EF
4' -1
0"
2'-7 1/2" 4'-6 1/4" 4'-6 1/4" 4'-6 1/4" 4'-6 1/4" 4'-6 1/4" 4'-6 1/4" 6" BASE
27'-1 1/4"
4' -1
0"
09 9000; PAINT09 9000; PAINT
*FINAL DIMENSIONS TO BE COORDINATED WITH SUPPLIED PRODUCTS
E F
4' -1
0"
4'-6 1/4" 4'-6 1/4" 4'-6 1/4" 4'-6 1/4" 4'-6 1/4" 4'-6 1/4"
27'-1 1/4"
6" BASE
09 9000; PAINT09 9000; PAINT
*FINAL DIMENSIONS TO BE COORDINATED WITH SUPPLIED PRODUCTS
6" 2'
-1
1/ 2"
3' -6
7'-8" 7'-8"
16'-2 1/8"
12 3600; SSM COUNTERTOP
(SSM1)
*FINAL DIMENSIONS TO BE COORDINATED WITH SUPPLIED PRODUCTS
E4 A-411
3' -6
09 9000;
PAINT, PT-1
12 3600; SSM COUNTERTOP
(SSM1)
09 6500; RESILIENT BASE
RB-2
NORTH: SIM
E
F
G
C3 A-211
C3 A-211
A1 A-211
A1 A-211
A-411D2
A-411D3 D1
B3
STORAGE
VI
F
9' -9
L4.3
C
LR
5' -0
COPIER OF/OI
BULKHEAD ABOVE
L3.3
L3.3
L3.3
BELOW
BELOW
BELOW
ALIGN
7'-0"
A-411 A3
A-411A2
7'-0"
BELOW
L3.3
L3.3
L3.3 BELOW
BELOWDIGITIZATION LAB
7C
E Q
E Q
A-411D3
Si m
157A
157B
OF/OI
MEDIA
CART
OF/OI
SCANNING
STATION
OF/OI
SCANNING
STATION
OF/OI
LARGE
FORMAT
IMAGING
STATION
OF/OI
AUDIO
TRANSFER
STATION
35MM
SLIDE /
TRANSPARENCY
OF/OI
STEENBECK
TABLE
OF/OI
VIDEO
TRANSFER
STATION
A6 A-501
SHELVING
A1
B2
A-411
B3Sim
2 1/2" DIA OPENINGS
IN CORIAN SURFACE.
LOCATIONS TO BE
VERIFIED W/ OWNER.
TYP ALL LOCATIONS.
9" E
Q E
Q 9"
9" E
Q E
Q 9"
E Q
E Q
E Q
E Q
9" 9"
A1 A-501
A1 A-501
SIM
6' -0
'-5
6' -0
A1 A-501
SIM
E4 A-411
1' -4
AL
IG
N
C3
E4 A-411
EQ EQ
AL
IG
N
3' -0
3'
-0
POP-UP OUTLET
RECEPTACLE(S)
BASIS OF DESIGN:
INTERION ARMLESS
MESH STOOL - BLACK
MODEL #: WB695645BK
QTY: (2)
BASIS OF DESIGN:
INTERION ARMLESS
MESH STOOL - BLACK
MODEL #: WB695645BK
QTY: (2)
6"
D
R A
W E
R S
4' -4
4'-6 1/4"
PER MFR
P E
R M
FR
7'-8"
TYPE 1
FIXED
SHELVING
36" D
TYPE 2
FLAT FILE
CABINET
60.75" D
TYPE 3
FLAT FILE
CABINET
40.25" D
6"
ADJUSTABLE
DIVIDERS
D
R A
W E
R S
4' -4
6"
4'-6 1/4"
TYPE 4
FLAT FILE
CABINET
40.25" D
D
R A
W E
R S
3' -5
"ADJUSTABLE
SHELVES
FG
09 9000; PAINT09 9000; PAINT09 9000; PAINT
09 6500; RESILIENT BASE
OF/OI
STEENBECK
TABLE
OF/OI
VIDEO
TRANSFER
STATION
EXISTING LOUVER
PNT TO MATCH WALL
TYP
1'-8"
T.
O
. C O
U N
TE
R
TO
P
2' -6
DIRECT / INDIRECT
FIXTURES - SEE ELEC
F G
09 9000; PAINT09 9000; PAINT
OF/OI
AUDIO
TRANSFER
STATION
OF/OI
LARGE
FORMAT
IMAGING
STATION
OF/OI
SCANNING
STATION
OF/OI
SCANNING
STATION
OF/OI
MEDIA
CART
A1 A-501
TYP
1'-8"
REMAINDER
REMAINDER
TYP
1'-8"
T.
O
. C O
U N
TE
R
TO
P
2' -6
09 6500; RESILIENT BASE
DIRECT / INDIRECT
FIXTURES - SEE ELEC
A6 A-501
09 6500; RESILIENT BASE
09 9000; PAINT09 9000; PAINT
CARD READER
(INSTALLATION TO BE
COORDINATED PRIOR
TO INSTALLATION).
09 9000; PAINT09 9000; PAINT
09 6500; RESILIENT BASE
7' -0
3'-6"
LEVEL 1
116'-0"
3' -6
10 5113; ARCHIVAL FLAT
FILE STORAGE CABINETS
12 3600; SOLID SURFACE (SSM-1)
1'-6"
ALIGN
06 4100; 3/4" SUBSTRATE
POWER/DATA
RECEPTACLE, RE:
ELEC.
L3.3
12 3600;
COUNTER
BRACKET
09 6500; RESILIENT WALL
BASE RB-2
C O
O R
D
IN
A
TE
L O
C A
TA
IO
N W
/ P O
P -U
P R
E C
E P
TA
C
LE
2' -6
AL
IG
N
6"
10 5113; ARCHIVAL FLAT FILE
STORAGE CABINETS FLUSH BASE
1'-0"
POP-UP RECEPTACLE
OPEN / CLOSED POSITION(S)
E4 A-411
09 6500; RESILIENT BASE
RB-2
PAINT, PT-1
12 3600; SSM COUNTERTOP
(SSM1)
3' -6
09 6500; RESILIENT BASE09 6500; RESILIENT BASE
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303 Iowa City, Iowa 52240 319.338.7878
111 East Grand Avenure, Suite 105 Des Moines, Iowa 50309 515.339.7800
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322 515.334.4326
TB
V er si on
6.
A-411
ENLARGED PLANS
AND ELEVATIONS
22035
STATE OF IOWA
DAS No. 9485.00
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION
DAS# 9485.00
100% CONSTRUCTION DOCUMENTS09/19/25
1/4" = 1'-0"D2 STORAGE 152- WEST ELEVATION
1/4" = 1'-0"D1 STORAGE 152 - EAST ELEVATION
1/4" = 1'-0"D3 STORAGE 152 & DIGITIZATION LAB 157 - EAST
1/4" = 1'-0"B3 STORAGE 152 & DIGITIZATION LAB 157 - SOUTH
1/4" = 1'-0"A5 STORAGE 152 & DIGITIZATION LAB 157 - ENLARGED PLAN
1/4" = 1'-0"
FLAT FILE CABINET TYPES
1/4" = 1'-0"A2 DIGITIZATION LAB 157 - WEST ELEVATION
1/4" = 1'-0"A3 DIGITIZATION LAB 157 - EAST ELEVATION
1/4" = 1'-0"A1 DIGITIZATION LAB 157 - NORTH ELEVATION
1/4" = 1'-0"B2 DIGITIZATION LAB 157 - SOUTH ELEVATION
1 1/2" = 1'-0"E4 COUNTER SECTION DETAIL @ STORAGE
1/4" = 1'-0"C3 STORAGE 152 & DIGITIZATION LAB 157 - WEST
LEVEL 1
116'-0"
V.
I.F
1/
4"
EXISTING SLAB
ON GRADE
1/2" / 1'-0"
CLEAN AND PREP EXISTING
FLOOR EDGE TO RECIEVE NEW
STEEL RAMP
3/8" CONCRETE
ANCHOR STUD
WELDED TO STEEL
PLATE, SET IN EPOXY
1/4" STEEL PLATE
2'-6"
FEATHER EDGE OF
STEEL TO LIMIT LIP
GROUT
E
D4 A-501
ADJACENT FIXED
SHELVING UNIT
LINE OF FLOOR ELEVATION CHANGE
STEEL PLATE
TRANSITION
3/8" CONCRETE ANCHOR
STUD BELOW
EXISTING CONCRETE COLUMN
0" 1 1/4"
1/2" / 1'-0"
2'-6"
VE
R
IF
Y
5' -1
0"
F
SEE WALL TYPE
VERIFY
07 9200; JOINT SEALANT
COORDINATE ACTUAL
LINTEL/HEAD CONDITIONS
W/ STRUCTURAL
REQUIREMENTS
09 2116; GYP BD
7'-0" AFF
T.O. FRAME
08 1113; HM DOOR FRAME
1"
EXISTING WALL
PATCH DRYWALL
AS REQUIRED TO
INSTALL HEADER
WIDTH REQUIRED
VERIFTY FRAME
LEVEL 1
116'-0"
3'-0"
2' -6
12 3600;
COUNTERTOP (SSM1)
3/4" PLYWOOD
HEAVY DUTY SHELF BRACKET
20" O.C.
EXISTING CONCRETE WALL
EXISTING 5/8" PLYWOOD
(TO REMAIN)
GYP BD
*CONFIRM SHELF BRACKET TYPE TO
BE USED @ WEST WALL OF
DIGITIZATION LAB 157 BASED ON
WALL TYPE.
EXISTING CONCRETE FLOOR
09 6500; RESILIENT WALL
BASE RB-1
L-1
LEVEL 1
116'-0"
LINE OF OF MECHANICAL ASSIST
MOBILE SHELVING (EXTENTS)
PLYWOOD SUB-FLOORING & RAMP
PER MOBILE SHELVING MFR
L-1 (TO BE INSTALLED BY FLOORING
CONTRACTOR PRIOR TO INSTALL OF
RAIL & SHELVING SYSTEM(S).
DUAL FLANGE GUIDE RAIL
EXISTING CONC FLOOR
SLOPE PER MOBILE
SHELVING MFR
MAX
16" O.C.
LEVELING SCREWS
PERMANENT FLOOR
ANCHORS AS REQUIRED
GROUT PAD (1/4" MIN)
L LOAD RAIL
N
SEE SCHEDULE
S E
E S
C H
E D
U
LE
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303 Iowa City, Iowa 52240 319.338.7878
111 East Grand Avenure, Suite 105 Des Moines, Iowa 50309 515.339.7800
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322 515.334.4326
TB
V er si on
6.
A-501
DOOR SCHEDULE,
FINISH SCHEDULE,
AND INTERIOR
DETAILS
22035
STATE OF IOWA
DAS No. 9485.00
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION
DAS# 9485.00
100% CONSTRUCTION DOCUMENTS09/19/25
3" = 1'-0"D4 FLOOR TRANSITION DETAIL
EXISTING DOOR SCHEDULE
NO. ROOM
DOOR FRAME
NOTESMAT FINISH FINISH
151A ARCHIVE STORAGE EXISTING PLAM PT-1 REUSE EXISTING HM FRAME
151B ARCHIVE STORAGE EXISTING PLAM PT-1 REUSE EXISTING HM FRAME
157A DIGITIZATION LAB EXISTING PLAM PT-1 CHANGE CORE & KEYING, REMAINING ITEMS REQUIRE NO CHANGE, PAINT FRAMES 157B DIGITIZATION LAB EXISTING PLAM PT-1 CHANGE CORE & KEYING, REMAINING ITEMS REQUIRE NO CHANGE, PAINT FRAMES
ROOM SCHEDULE
Room
FLOOR BASE WALL CEILING NOTESNO. NAME
151 ARCHIVE STORAGE - RB-1 PT-1 PT-1 PAINT ALL WALLS AND CEILINGS
152 STORAGE L-1 RB - 1 / RB-2 PT-1 SATC-1 PAINT ALL WALLS AND CEILINGS. RB-2 AT ISLAND.
157 DIGITIZATION LAB L-1 RB - 1 / RB-2 PT-1 PT-1 PROTECT WOOD CEILING ELEMENTS DURING PAINTING EXISTING GYP CEILING. RB-2 AT ISLAND.
1 1/2" = 1'-0"A4 PLAN DETAIL - FLOOR TRANSITION - TYPICAL
INTERIOR FINISHES
Designator Material Manufacturer Description Comments
SATC-1 09 5100; Acoustical Ceiling Armstrong Optima Tegular, 24" x 24" NO. 3251 STORAGE ROOM 105 CEILING RB-1 09 6500; Resilient Base Johnsonite Millwork Wall Base - Mandalay - 2 1/2" Color: 01 Snow White AT ALL EXISTING AND NEW GWB WALLS RB-2 09 6500; Resilient Base Johnsonite Millwork Wall Base - Mandalay - 6 Color: 01 Snow White AT ISLAND STORAGE 152 & DIGITIZATION LAB 157 L-1 09 6500; Resilient Flooring Forbo Flooring Systems Collection: Marmoleum Color: 3367 Alloy STORAGE 152 & DIGITIZATION LAB 157 PT-1 09 9000; Paint Sherwin-Williams SW 7004, Snowbound PRIMARY FIELD COLOR. PAINT ALL EXISTING WALLS, NEW WALLS, AND EXPOSED STRUCTURE.
SSM-1 12 3600; Solid Surface Corian Glacier White - 1/2" STORAGE ROOM 105 COUNTER
NEW DOOR SCHEDULE
NO. ROOM
Door Size DOOR Panel TypeWidth Height
Panel Function MAT FINISH
157C DIGITIZATION LAB 6'-0" 7'-0" PAIR HM PT Panel-NV : N
3" = 1'-0"A6 HEAD DTL @ HM DOOR
3" = 1'-0"A1 SECTION DTL @ DIGITIZATION LAB COUNTERTOP
3" = 1'-0"C1 SECTION DTL @ MOBILE SHELVING
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
CONTACT PERSONS:
PROJECT MANAGER
MECHANICAL
ELECTRICAL
TECHNOLOGY
PETER ERNZEN
PETER ERNZEN
SENKO DIZDAREVIC
ALFONSO ARAULLO
DESCRIPTION: PERSON:
TEMPERATURE CONTROLS CONTRACTORT.C.C.
ASBESTOS ABATEMENT CONTRACTOR
FIRE PROTECTION CONTRACTORF.P.C.
HEATING CONTRACTORH.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
A.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
SECURITY CONTRACTORS.C.
TECHNOLOGY CONTRACTORT.C.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, DUCTWORK AND PLUMBING.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS, EACH CONTRACTOR SHALL PROVIDE ACCESS PANELS
AS REQUIRED FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. THAT
ARE PART OF THEIR WORK. COORDINATE PANEL TYPE AND COLOR WITH ARCHITECT.
10. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
11. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
12. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
13. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
14. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
15. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, DUCTWORK AND PLUMBING.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND
SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.
5. EACH CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF ROOFS,
WALLS, AND FLOORS ASSOCIATED WITH THEIR WORK BEYOND WHAT IS SHOWN ON THE
ARCHITECTURAL PLANS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS,
CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH THEIR AREAS OF WORK BEYOND
WHAT IS SHOWN ON THE ARCHITECTURAL PLANS.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID
TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND
IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL
TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE
BASIS OF DESIGN.
3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.
SPRINKLER HEADS SHALL BE ALIGNED WITH OTHER SPRINKLER HEADS, LIGHTING,
DIFFUSERS, AND ANY OTHER FEATURES IN THE CEILING.
4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.
CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK
RESPONSE SPRINKLERS IN UNPARTITIONED SPACES.
5. PROVIDE COVERAGE ABOVE AND BELOW ALL EXPOSED DUCTWORK GREATER THAN 48"
WIDE.
6. PROVIDE COVERAGE ABOVE (IF APPLICABLE) AND BELOW FLOATING CEILINGS, REFER
TO ARCHITECTURAL PLANS.
7. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT
NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.
8. THE FIRE PROTECTION SYSTEM SHALL BE DESIGNED TO MEET OWNER'S INSURANCE
COMPANY STANDARDS WHERE APPLICABLE. THE MORE STRINGENT OF THE OWNER'S
INSURANCE UNDERWRITER'S DESIGN CRITERIA AND THE NFPA STANDARDS SHALL BE
USED.
9. ALL BUILDING AREA SHALL BE FULLY SPRINKLERED INCLUDING CANOPIES, WALKWAYS,
OVERHANGS, SOFFITS, AND BUILDING PROJECTIONS. ALL ACCESSIBLE COMBUSTIBLE
CONCEALED SPACES SHALL BE FULLY PROTECTED BY THE SPRINKLER SYSTEM.
10. WHERE FEASIBLE INSTALL PIPES HIGH AS POSSIBLE TO AVOID CONFLICT WITH OTHER
DISCIPLINES.
11. INSTALL SYSTEM DRAINS AT LOW POCKET AREAS CONTAINING FIVE GALLONS OF
WATER OR MORE, PROVIDE WITH ISOLATION VALVE AND THREADED HOSE
CONNECTION.
12. MAIN PIPING PASSING BELOW SKYLIGHTS OR CLERESTORIES ARE NOT PERMITTED.
13. FOLLOW STRUCTURAL DETAILS WHEN PENETRATING OR PASSING THROUGH
STRUCTURAL ELEMENTS. ALTERNATE DESIGNS WILL NEED TO BE APPROVED THROUGH
THE STRUCTURAL ENGINEER.
14. PROVIDE INTERMEDIATE TEMPERATURE SPRINKLER HEADS WHERE REQUIRED BY NFPA
13 UNLESS OTHERWISE NOTED.
15. FINAL HEAD LOCATION, TYPE AND FINISH SHALL BE REVIEWED AND APPROVED BY THE
ARCHITECT.
16. PAINT ALL EXPOSED PIPING TO MATCH BACKGROUND OR AS DIRECTED BY THE
ARCHITECT.
17. THE OWNER MUST BE NOTIFIED PRIOR TO EACH AND EVERY DRAINING OR RECHARGING
OF THE SPRINKLER SYSTEM.
18. THE CONTRACTOR SHALL PREPARE A COORDINATED SET OF SHOP DRAWINGS AND
SHALL OBTAIN APPROVAL FROM THE AUTHORITIES HAVING JURISDICTION AND THE
LOCAL FIRE DEPARTMENT PRIOR TO ANY INSTALLATION.
19. DRAWINGS SHOW LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT,
ETC. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
20. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,
SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW
ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
FIRE PROTECTION GENERAL NOTES:
FIRE PROTECTION SHEET INDEX
F-000 FIRE PROTECTION COVERSHEET
FD101 FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION
F-201 FIRST FLOOR PLAN - FIRE PROTECTION
GRAND TOTAL: 3
SHEET NUMBER
SHEET NAME
PROJECT NO.
OWNER
PROJECT NAME
CONSULTANTS
© NEUMANN MONSON INC.
Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.
ARCHITECT OF RECORD
Neumann Monson Architects
221 East College Street | Suite 303
Iowa City, Iowa 52240
319.338.7878
111 East Grand Avenure, Suite 105
Des Moines, Iowa 50309
515.339.7800
ISSUE
DATE DESCRIPTION
IMEG Corp
MEP
2882 106th St.
Des Moines, IA 50322
515.334.4326
T B
V e rs io n
.3
F-000
FIRE PROTECTION
COVERSHEET
22035
DAS - SHB -
ARCHIVES
STORAGE
RENOVATION DAS
# 9485.00
100% CONSTRUCTION DOCUMENTS09/19/25
2882 106TH STREET
DES MOINES, IA 50322
P: 515.334.9906 F: 515.334.9908 www.imegcorp.com
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2025 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
PROJECT #22010338.00
NOTES:
1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.
2. SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.
3. ALL SPRINKLERS SHALL BE UL LISTED.
4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13
REQUIREMENTS.
5. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS.
CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.
6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.
7. SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE
SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL.
FIRE SPRINKLER USAGE SCHEDULE
AREA TYPE
(NOTE 1 & 6)
AREA
HAZARD
SPRINKLER
TEMPERATURE
RATING MANUFACTURER & MODEL NOTES
TAG NAME
(NOTE 4 & 5)
SPRINKLER
TYPE
RESPONSE
CATEGORY FINISH
AREAS WITH FINISHED
CEILINGS
SEE PLANS SPR-1 CONCEALED -
FLAT PLATE
QUICK…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .