RFB944300-01 - Drawings.pdf

PDF 13 MB Posted

Attached to
DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop Window Replacement
Solicitation number
RFB944300-01
Issued by
Harrison County, Iowa

About this file

This is an architectural drawing set for a window replacement project at the Mount Pleasant Correctional Facility (MPCF) under the Iowa Department of Administrative Services. The project encompasses comprehensive window replacement across four facility areas: the Paint Shop, Appliance Shop, Carpentry Shop, and Powerhouse. The scope includes demolition of existing windows and installation of new aluminum windows with associated finishes, trim, and infill work tailored to each location's specific construction type (brick, concrete, wood frame, or stucco). The drawing set contains 41 sheets organized by area, including demolition plans, elevations, floor plans, and detailed construction specifications for window installations. Demolition and installation details address multiple interior finish conditions (brick, plaster, wood paneling, and stucco) and exterior finishes (brick and stucco). The project is designed to commence September 11, 2025, and conclude February 17, 2026. An optional pre-bid meeting is scheduled for April 17, 2025, at 11:00 am at the facility, with questions due by April 22, 2025, at 3:00 pm. All proposals must be submitted by May 1, 2025, at 2:00 PM CDT, with bid opening on April 6, 2025, at 2:30 PM CDT. Bidders must provide bid security equal to 5% of their total bid amount.

The drawings specify window schedules for each area, including quantity, dimensions, and type (fixed, single-hung, awning, casement, or combinations thereof) tailored to each shop's requirements. The Appliance Shop requires approximately 80 windows across multiple types; the Carpentry Shop requires approximately 42 windows including specialty gothic windows; the Paint Shop requires approximately 10 windows; and the Powerhouse requires approximately 118 windows across 18 different types. The project is exempt from Iowa Sales Tax, and Davis Bacon Wages will not apply. The drawings were prepared by Horizon Architecture (Michael Nolan, AIA, License #06926) and issued for bidding and construction on March 30, 2025. The architect's contact is Michael Nolan at Horizon Architecture, (563) 506-4965, michael@horizon-architecture.com. The Owner's Representative is Brandon Adams at the Iowa Department of Administrative Services, (515) 201-2197, brandon.adams@iowa.gov. The Construction Manager is Adam Douglas at McGough, (515) 822-4229, adam.douglas@mcgough.com.

View the file

Other files

File Type Posted
1305669-event.pdf PDF
RFB944300-01 - Addendum 02.pdf PDF
RFB944300-01 - Notice to Bidders.pdf PDF
RFB944300-01 - Bid Form.pdf PDF
RFB944300-01 - Project Manual.pdf PDF
RFB944300-01 - Addendum 01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

C-1

COVER SHEET

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

6" TYPICAL, UNLESSOTHERWISE NOTED

OFFICE

1/A-201

D0 1.1

B2

C3

D4

A1

1.01.01

1.01.01

D01.1

S01

W01

GRAPHIC

SYMBOLS INDICATES SECTION

LOCATION ON SHEET

INDICATES SHEET

ON WHICH DRAWING

IS SHOWN

SECTION / DETAIL MARKER DETAIL / ENLARGED PLAN MARKER

INTERIOR ELEVATION MARKER

INDICATES ELEVATION

LOCATION ON SHEET

INDICATES SHEET

ON WHICH DRAWING

IS SHOWN

ELEVATION / SECTION MARKER

INDICATES ELEVATION

LOCATION ON SHEET

INDICATES SHEET

ON WHICH ELEVATION

IS SHOWN

XX

YY

XX

XX

YY

DETAIL / ENLARGED PLAN MARKER

INDICATES DETAIL

LOCATION ON SHEET

INDICATES SHEET

ON WHICH DETAIL

IS SHOWN

SPACE DESIGNATION

WINDOW MARKER

DOOR IDENTIFIERS

SPACE NAME

SPACE NUMBER

WALL TYPE MARKER 4C

SKYLIGHT MARKER

DOOR IDENTIFIER

(ELEVATIONS/SECTIONS)

ENLARGED PLAN REFERENCE

KEYNOTE IDENTIFIER

XX

YY

DOOR

IDENTIFIER

(PLANS)

KEYNOTE; SEE KEYNOTE LEGEND

ON DRAWING'S LAYOUT

ALTERNATE KEYNOTE;

SEE KEYNOTE LEGEND

ON DRAWING'S LAYOUT

(SEE PARTITION LEGEND)

SHEET INDEX

ID

C-1

A-1

A-2

A-3

A-4

A-5

A-6

A-7

A-8

A-9

A-10

A-11

A-12

A-13

A-14

A-15

A-16

A-17

A-18

A-19

A-20

A-21

A-22

A-23

A-24

A-25

A-26

A-27

A-28

A-29

A-30

A-31

A-32

A-33

A-34

A-35

A-36

A-37

A-38

A-39

A-40

A-41

Name

COVER SHEET

PAINT SHOP DEMOLITION PLAN

PAINT SHOP DEMO ELEVATIONS

PAINT SHOP DEMO ELEVATIONS 2

PAINT SHOP FLOOR PLAN

PAINT SHOP ELEVATIONS

PAINT SHOP ELEVATIONS 2

PAINT SHOP WINDOW DETAILS

PAINT SHOP WINDOW DETAILS 2

APPLIANCE SHOP DEMOLITION MAIN PLAN

APPLIANCE SHOP DEMOLITION LOWER PLAN

APPLIANCE SHOP MAIN PLAN

APPLIANCE SHOP LOWER PLAN

APPLIANCE SHOP ELEVATIONS

APPLIANCE SHOP WINDOW DETAILS

APPLIANCE SHOP WINDOW DETAILS 2

CARPENTRY SHOP DEMOLITION LOWER PL...

CARPENTRY SHOP DEMOLITION MAIN PLAN

CARPENTRY SHOP DEMOLITION UPPER PLAN

CARPENTRY SHOP DEMO ELEVATIONS

CARPENTRY SHOP DEMO ELEVATIONS 2

CARPENTRY SHOP LOWER PLAN

CARPENTRY SHOP MAIN PLAN

CARPENTRY SHOP UPPER PLAN

CARPENTRY SHOP ELEVATIONS

CARPENTRY SHOP ELEVATIONS 2

CARPENTRY SHOP WINDOW DETAILS

CARPENTRY SHOP WINDOW DETAILS 2

POWERHOUSE DEMOLITION MAIN PLAN

POWERHOUSE DEMOLITION UPPER PLAN

POWERHOUSE DEMO ELEVATIONS

POWERHOUSE DEMO ELEVATIONS 2

POWERHOUSE MAIN PLAN

POWERHOUSE UPPER PLAN

POWERHOUSE ELEVATIONS

POWERHOUSE ELEVATIONS 2

POWERHOUSE DETAILS - BRICK INTERIOR

POWERHOUSE DETAILS - WOOD INTERIOR

POWERHOUSE DETAILS - PLASTER INTERIOR

POWERHOUSE DETAILS - STUCCO EXTERIOR

POWERHOUSE DETAILS AT FIREBLOCK

POWERHOUSE INFILL DETAILS

06926

NOLAN

MICHAEL

LI

CE

NS

ED

PROFESS IONAL

ARCH

ITEC

I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED HEREIN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY LICENSED ARCHITECT

UNDER THE LAWS OF THE STATE OF IOWA.

MICHAEL NOLAN DATE

LICENSE NUMBER 06926.

MY LICENSE RENEWAL DATE IS JUNE 30, 2023.

PAGES OR SHEETS COVERED BY THIS SEAL: ALL

I OWA

T

PROJECT LOCATION

PAINT SHOP

POWERHOUSE

APPLIANCE SHOP

CARPENTRY SHOP

VERIFY SCALE

BAR IS ONE (1) INCH LONG ON

ORIGINAL DRAWING

IF BAR IS NOT ONE (1) INCH LONG,

ADJUST SCALE ACCORDINGLY

ABBREVIATIONS

A.D. AREA DRAIN

ABV. ABOVE

ADA ACCESSIBLE / AMERICANS

WITH DISABILITIES ACT

ADJ. ADJUSTABLE

A.o.R. AREA OF REFUGE

ALUM. ALUMINUM

ALT. ALTERNATE

A.F.F. ABOVE FINISHED FLOOR

AC. ACOUSTIC / ACOUSTICAL

A.F. ALUMINUM FACE

APPX. APPROXIMATE /

APPROXIMATELY

BD. BOARD

BLK. BLOCK / BLOCKING

BLDG. BUILDING

B.O. BOTTOM OF

B.O.S. BOTTOM OF STEEL

CAB. CABINET

C.C. CENTER-TO-CENTER

CLG. CEILING

CLOS. CLOSET

C.M. CONSTRUCTION MANAGER

CMU CONCRETE MASONRY UNIT

C.J. CONTROL JOINT

CONC. CONCRETE

CORR. CORRIDOR

COL. COLUMN

CONT. CONTINUE / CONTINUOUS

CONTR. CONTRACTOR

DIA. DIAMETER

DTL. DETAIL

DN DOWN

DWG. DRAWING

DEPT. DEPARTMENT

DBL. DOUBLE

DIM. DIMENSION

DR. DOOR

EXIST. EXISTING

EQ. EQUAL

E.C. ELECTRICAL CONTRACTOR

EL. ELEVATION

ELEV. ELEVATOR

ELEC. ELECTRIC / ELECTRICAL

EXP. EXPANSION

EXT. EXTERIOR

EA. EACH

F.D. FLOOR DRAIN

F.E. FIRE EXTINGUISHER

F.E.C. FIRE EXTINGUISHER

CABINET

FIN. FINISH / FINISHED

FLR. FLOOR

F.O. FACE OF

FT. FEET / FOOT

FLUOR. FLUORESCENT

GYP. GYPSUM

GALV. GALVANIZED

GA. GAUGE

G.C. GENERAL CONTRACTOR

HR. HOUR

H.P. HIGH POINT

HVAC HEAT, VENTILATION, AIR-

CONDITIONING

HORIZ. HORIZONTAL

HT. HEIGHT

INSUL. INSULATION / INSULATING

I.D. INSIDE DIAMETER

INCAND. INCANDESCENT

JAN. JANITOR

JT. JOINT

LBS. POUNDS

LAV. LAVATORY

LAM. LAMINATE

L.P. LOW POINT

MAX. MAXIMUM

MFR. MANUFACTURER /

MANUFACTURED

MTL. METAL

MIN. MINIMUM

MIRR. MIRRORED

MTD. MOUNTED

M.O. MASONRY OPENING

MISC. MISCELLANEOUS

MECH. MECHANICAL

N.I.C. NOT IN CONTRACT

NO. NUMBER

N.T.S. NOT TO SCALE

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

OPP. OPPOSITE

OPG. OPENING

P.C. PLUMBING CONTRACTOR

P.F. PANEL FACE

PR. PAIR

P.T. PRESSURE TREATED

PL. LAM PLASTIC LAMINATE

QTY. QUANTITY

R RISER

R.W.C. RAIN WATER CONDUCTOR

REINF. REINFORCING / REINFORCED

REQ. REQUIRED

R.O. ROUGH OPENING

REV. REVISED / REVISION

REFL. REFLECTED

REC. RECESSED

RAD. RADIUS

S.S. STAINLESS STEEL

ST. STREET

SIM. SIMILAR

STL. STEEL

SQ. SQUARE

SAN. SANITARY

SUSP. SUSPENDED

STD. STANDARD

SPEC. SPECIFICATION

TEL. TELEPHONE

T.O. TOP OF

T.O.S. TOP OF STEEL

T.O.W. TOP OF WALL

TOIL. TOILET

TYP. TYPICAL

THK. THICK

TMP. TEMPERED

T.S.G. TEMPERED SAFETY

GLASS

U.O.N. UNLESS OTHERWISE

NOTED

U.L. UNDERWRITERS

LABORATORIES

VEST. VESTIBULE

V.C.T. VINYL COMPOSITION

TILE

W/ WITH

W.C. WATER CLOSET

WD WOOD

& AND

@ AT

± PLUS OR MINUS

° DEGREE

� ANGLE

[ CHANNEL

# NUMBER

□ SQUARE

Ø ROUND / DIAMETER

� / C.L. CENTER LINE

� / PL. PLATE

∏ U-BAR

∟ LEG-BAR

BUILDING INFORMATION

APPLICABLE BUILDING CODE - 2015 IBC

CLASSIFICATION OF WORK - REPLACEMENT

REPLACEMENT OF WINDOWS

PROJECT DIRECTORY

9443.00 DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop Window Replacement

MOUNT PLEASANT CORRECTIONAL FACILITY

MOUNT PLEASANT, IAOWNER

IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES (DAS)

109 EAST 13TH STREET

DES MOINES, IA 50319

OWNER'S REPRESENTATIVE: BRANDON ADAMS

PHONE: 515.201.2197

EMAIL: BRANDON.ADAMS@IOWA.GOV

CONSTRUCTION MANAGER

ADAM DOUGLAS

217 E 2ND STREET, SUITE 120

DES MOINES, IA, 50309

PHONE: (515) 822-4229

EMAIL: ADAM.DOUGLAS@MCGOUGH.COM

ARCHITECT

HORIZON ARCHITECTURE

3116 ALPINE COURT IOWA CITY IA 52245

PHONE: (563) 506-4965

CONTACT: MICHAEL NOLAN, AIA

EMAIL: MICHAEL@HORIZON-ARCHITECTURE.COM

3/30/2025

C-1 THRU A-41

2025.

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-1

PAINT SHOP

DEMOLITION

PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

A-8

A-7

A-7

A-8

A-2

2A-

A-3

2 A-

TYP

TYP

N

SCALE: 1/4" = 1'-0"1 PAINT SHOP DEMOLITION PLAN

0 2' 4' 8'

GENERAL DEMOLITION NOTES

1) PROTECT SURROUNDING INTERIOR AND EXTERIOR

FINISHES TO REMAIN

2) PROVIDE TEMPORARY DUST PROTECTION AS

REQUIRED. PROTECT EXISTING SPACES AND

EQUIPMENT. COORDINATE EXTENTS OF DUST

PROTECTION REQUIRED WITH OWNER IN FIELD

3) INSTALL TEMPORARY OPENING INFILL IF UNABLE

TO INSTALL NEW UNIT SAME DAY AS EXISTING UNIT

REMOVAL

4) TEMPORARY PROTECTION TO PROVIDE ADEQUATE

WEATHER PROTECTION TO PROTECT INTERIOR

SPACES UNTIL NEW UNIT IS INSTALLED

5) COORDINATE PROTECTION, COVERING AND

UNCOVERING OF FIRE AND SMOKE DETECTION

DEVICES WITH OWNER

INITIALS _______

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-2

PAINT SHOP

DEMO

ELEVATIONS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO PLYWOOD

COVERING ENTIRE PANE

DEMO PLYWOOD COVER

ON BOTTOM PANE

DEMO PLYWOOD COVER ON TOP PANE

DEMO PLYWOOD COVER ON TOP PANE

SCALE: 1/4" = 1'-0"1 PAINT SHOP SOUTH DEMOLITION ELEVATION

0 2' 4' 8'

SCALE: 1/4" = 1'-0"2 PAINT SHOP EAST DEMOLITION ELEVATION

0 2' 4' 8'

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-3

PAINT SHOP

DEMO

ELEVATIONS 2

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

REMOVE AND RETAIN WINDOW MOUNTED A/C

UNIT FOR REINSTALLATION

PLYWOOD COVER W/ AIRVENT

ON TOP PANE

SCALE: 1/4" = 1'-0"1 PAINT SHOP NORTH DEMOLITION ELEVATION

0 2' 4' 8'

SCALE: 1/4" = 1'-0"2 PAINT SHOP WEST DEMOLITION ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-4

PAINT SHOP

FLOOR PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PS01

PS01

PS02 PS02 PS02

PS03

PS02

PS04

PS03

PS03 6

A-7

A-8

A-7

A-7

A-8

2 A- 52A-

A-6

A-5

INFILL

DETAIL

PS02PS02 PS02PS02PS02

PS01

PS02

PS03

PS04

2'-4 1/2"

3'-8"

2'-8"

3'-8"

4'-2"

7'-5"

4'-8"

4'

SINGLE HUNG

SINGLE HUNG

SINGLE HUNG

FIXED

BRICK INTERIOR ON BRICK EXTERIOR FINISH

BRICK INTERIOR ON BRICK EXTERIOR FINISH

DRYWALL INTERIOR ON TOUNGE AND GROOVE EXTERIOR FINISH

FIXED PANEL BELOW INFILL FOR VENT FAL

WINDOW SCHEDULE

ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View

SCALE: 1/4" = 1'-0"1 1 PAINT SHOP FLOOR PLAN

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-5

PAINT SHOP

ELEVATIONS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

SCALE: 1/4" = 1'-0"1 PAINT SHOP SOUTH ELEVATION

0 2' 4' 8'

SCALE: 1/4" = 1'-0"2 PAINT SHOP EAST ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-6

PAINT SHOP

ELEVATIONS 2

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

REINSTALL EXISTING FAN

IN NEW INFILL PARTITION

REINSTALL WINDOW A/C UNIT

SCALE: 1/4" = 1'-0"2 PAINT SHOP WEST ELEVATION

0 2' 4' 8'

SCALE: 1/4" = 1'-0"1 PAINT SHOP NORTH ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-7

PAINT SHOP

WINDOW

DETAILS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO WOOD TRIM

DEMO EXISTING WOOD

FRAME AND GLASS

DEMO WINDOW WEIGHT

REMOVE AND DISPOSE OF

EXISTING WINDOW

DEMO WOOD TRIM

REMOVE AND DISPOSE

OF EXISTING WINDOW

DEMO WOOD TRIM

DEMOLISH AND DISPOSE

OF INFILL FRAMING AND

CASING AT ARCH HEAD

OPTIONAL 2" XPS

INSULATION (COLD

WEATHER)

TAPCON OR SIMILAR

DRILLED ANCHOR2X4 BLOCKING

1/2" OSB OR PLYWOOD

SEALANT

NEW BLOCKING AND TRIM IN

ARCHED OPENING

NEW ALUMINUM

WINDOW

PAINT NEW EXTERIOR TRIM

(COLOR PER OWNER)

SELF ADHERED FLEXIBLE FLASHING

BETWEEN MASONRY AND WOOD BLOCKING

NEW PAINTED PVC JAMB

EXTENSION AND CASING

REPOINT/REPAIR ANY DAMAGED

MASONRY. REPAINT EXTERIOR

HEAD/SILL/JAMB

INFILL ASSEMBLY - 5/8"

PAINTED GWB | 2X6 STUD

WITH FULL CAVITY BATT

INSULATION | 1/2" OSB |

WEATHER BARRIER |

PAINTED LP SMARTSIDE

DRIP EDGE

DRIP EDGE

REINSTALL EXISTING FAN

IN NEW OPENING

LAP WEATHER BARRIER OVER

LOUVER FRAME AND SEAL WITH

FLASHING TAPE

3' -5

" V

IF

NEW PAINTED PVC JAMB

EXTENSION AND CASING

SEALANT

SEALANT

NEW BLOCKING AND TRIM IN

ARCHED OPENING

INSECT SCREEN

NEW ALUMINUM

WINDOW

PAINT NEW EXTERIOR TRIM

(COLOR PER OWNER)

SELF ADHERED FLEXIBLE FLASHING

BETWEEN MASONRY AND WOOD BLOCKING

ALIGN EXTERIOR OF

NEW WINDOW WITH

LOCATION OF EXISTING

REPOINT/REPAIR ANY DAMAGED

MASONRY. REPAINT EXTERIOR

HEAD/SILL/JAMB

NEW PAINTED PVC JAMB

EXTENSION AND CASING

NEW PAINTED

PVC SILL

4 1/2"

3/

4" V

IF

BACKER ROD AND SEALANT

FILL OPENING W/ NEW

WOOD BLOCKING

NEW PAINTED PVC

TRIM

NEW ALUMINUM WINDOW

SELF-ADHERED FLEXIBLE

FLASHING BETWEEN MASONRY

AND WOOD BLOCKING

SCALE: 3" = 1'-0"4 BRICK JAMB DEMOLITION DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"1 BRICK DEMOLITION SECTION

0 3'' 6'' 9''

SCALE: 3" = 1'-0"5 TEMPORARY INFILL DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"2 PAINT SHOP INFILL PANEL SECTION

0 3'' 6'' 9'' SCALE: 3" = 1'-0"3 BRICK WINDOW DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"6 BRICK JAMB DETAIL

0 3'' 6'' 9''

GENERAL NOTE

- PROTECT FINISHES TO REMAIN DURING DEMOLITION. CONTRACTOR

WILL BE RESPONSIBLE FOR RESTORING FINISHES TO ORIGINAL

CONDITION UNLESS OTHERWISE INDICATED.

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-8

PAINT SHOP

WINDOW

DETAILS 2

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMOLISH AND

DISPOSE OF EXISTING

WINDOW UNIT

RETAIN EXTERIOR

WOOD CASING

DEMO INTERIOR

CASING AND SILL

DEMOLISH AND

DISPOSE OF EXISTING

WINDOW UNIT

RETAIN EXTERIOR CASING

DEMO WOOD TRIM

DEMO AND DISPOSE OF

INTERIOR CASING AND

JAMB EXTENSIONS

2X4 BLOCKING

1/2" OSB OR PLYWOOD

OPTIONAL 2" XPS

INSULATION (COLD WEATHER)

REMOVE WOOD FRAME

AND EXISTING GLASS

DEMO AND DISPOSE OF

INTERIOR CASING AND

JAMB EXTENSIONS

1/

2"

1/ 2"

INSECT SCREEN

SEALANT

SEALANT

NEW PAINTED AZEK TRIM AND JAMB EXTENSION

NEW ALUMINUM

WINDOW

RETAIN, REPAINT, AND

MODIFY EXTERIOR

CASING AS NEEDED

NEW PAINTED AZEK TRIM AND JAMB EXTENSION

SEALANT

SEALANT

1/

2"

NEW ALUMINUM

WINDOW

BACKER ROD

AND SEALANT

NEW PAINTED AZEK TRIM

RETAIN, REPAINT,

AND MODIFY

EXTERIOR CASING AS

NEEDED

SCALE: 3" = 1'-0"1 STUD DEMOLITION SECTION

0 3'' 6'' 9''

SCALE: 3" = 1'-0"2 TEMPORARY INFILL DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"4 STUD JAMB DEMOLITION DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"3 STUD WINDOW DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"5 STUD JAMB DETAIL

0 3'' 6'' 9''

GENERAL NOTE

- PROTECT FINISHES TO REMAIN DURING DEMOLITION. CONTRACTOR

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-9

APPLIANCE

SHOP

DEMOLITION

MAIN PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

A-15

A-14

A-13

A-

A-13

A-

N

SCALE: 1/8" = 1'-0"1 APPLIANCE SHOP DEMOLITION MAIN PLAN

0 4' 8' 16'

GENERAL DEMOLITION NOTES

1) PROTECT SURROUNDING INTERIOR AND EXTERIOR

FINISHES TO REMAIN

2) PROVIDE TEMPORARY DUST PROTECTION AS

REQUIRED. PROTECT EXISTING SPACES AND

EQUIPMENT. COORDINATE EXTENTS OF DUST

PROTECTION REQUIRED WITH OWNER IN FIELD

3) INSTALL TEMPORARY OPENING INFILL IF UNABLE

TO INSTALL NEW UNIT SAME DAY AS EXISTING UNIT

REMOVAL

4) TEMPORARY PROTECTION TO PROVIDE ADEQUATE

WEATHER PROTECTION TO PROTECT INTERIOR

SPACES UNTIL NEW UNIT IS INSTALLED

5) COORDINATE PROTECTION, COVERING AND

UNCOVERING OF FIRE AND SMOKE DETECTION

MPCF Window Replacements.pln; A-9 APPLIANCE SHOP DEMOLITION MAIN PLAN; 100%; 3/30/2025 2:11 PM

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-10

APPLIANCE

SHOP

DEMOLITION

LOWER PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

A-15

A-15

A-13

A-

A-13

A-

N

SCALE: 1/8" = 1'-0"1 APPLIANCE SHOP DEMOLITION LOWER PLAN

0 4' 8' 16'

GENERAL DEMOLITION NOTES

1) PROTECT SURROUNDING INTERIOR AND EXTERIOR

FINISHES TO REMAIN

2) PROVIDE TEMPORARY DUST PROTECTION AS

REQUIRED. PROTECT EXISTING SPACES AND

EQUIPMENT. COORDINATE EXTENTS OF DUST

PROTECTION REQUIRED WITH OWNER IN FIELD

3) INSTALL TEMPORARY OPENING INFILL IF UNABLE

TO INSTALL NEW UNIT SAME DAY AS EXISTING UNIT

REMOVAL

4) TEMPORARY PROTECTION TO PROVIDE ADEQUATE

WEATHER PROTECTION TO PROTECT INTERIOR

SPACES UNTIL NEW UNIT IS INSTALLED

5) COORDINATE PROTECTION, COVERING AND

UNCOVERING OF FIRE AND SMOKE DETECTION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-11

APPLIANCE

SHOP MAIN

PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

AS03AS03AS03AS03AS03AS03AS03AS03AS03AS03AS03 AS03 AS03 AS04

AS03

AS03

AS03AS03AS03AS03AS03AS03AS03AS03AS03AS03

AS01 AS01 AS01 AS01 AS01 AS01 AS01 AS01AS01 AS02 AS02

AS01

A-14

A-14

A-13

A-

A-13

A-

WINDOW SCHEDULE

ID

AS01

AS02

AS03

AS04

AS05

AS06

AS07

Quantity

Width (Nominal)

3'-5"

2'-9"

3'-9"

1'-10"

3'-4"

2'-8"

3'-4"

Height (Nominal)

5'-6"

5'-6"

5'-5"

4'-4"

4'

1'-6"

2'-8"

Type

FIXED / AWNING

FIXED/AWNING

FIXED/AWNING

FIXED

FIXED/AWNING

FIXED

FIXED

NOTES

LOWER HALF AWNING

LOWER HALF AWNING

LOWER HALF AWNING

CONCRETE INTERIOR TO CONCRETE EXTERIOR FINISH, TOP 2/3

AWNING

3D Front View

SCALE: 1/8" = 1'-0"1 APPLIANCE SHOP MAIN PLAN

0 4' 8' 16'

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-12

APPLIANCE

SHOP LOWER

PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

AS05AS05AS05 AS05AS05AS05 AS05AS05 AS05AS05AS05AS05AS05AS05AS05AS07AS07AS07AS07

AS05

AS05

AS06 AS06 AS06 AS06

AS06AS06AS06AS06 AS06AS06AS06AS06AS06AS06AS06AS06

AS06

AS06

A-16

A-15

A-13

A-

A-13

A-

WINDOW SCHEDULE

ID

AS01

AS02

AS03

AS04

AS05

AS06

AS07

Quantity

Width (Nominal)

3'-5"

2'-9"

3'-9"

1'-10"

3'-4"

2'-8"

3'-4"

Height (Nominal)

5'-6"

5'-6"

5'-5"

4'-4"

4'

1'-6"

2'-8"

Type

FIXED / AWNING

FIXED/AWNING

FIXED/AWNING

FIXED

FIXED/AWNING

FIXED

FIXED

NOTES

LOWER HALF AWNING

LOWER HALF AWNING

LOWER HALF AWNING

CONCRETE INTERIOR TO CONCRETE EXTERIOR FINISH, TOP 2/3

AWNING

3D Front View

SCALE: 1/8" = 1'-0"1 APPLIANCE SHOP LOWER PLAN

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-13

APPLIANCE

SHOP

ELEVATIONS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

SCALE: 1/8" = 1'-0"1 APPLIANCE SHOP SOUTH ELEVATION

0 4' 8' 16'

SCALE: 1/8" = 1'-0"2 APPLIANCE SHOP EAST ELEVATION

0 4' 8' 16'

SCALE: 1/8" = 1'-0"3 APPLIANCE SHOP NORTH ELEVATION

0 4' 8' 16'

SCALE: 1/8" = 1'-0"4 APPLIANCE SHOP WEST ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-14

APPLIANCE

SHOP WINDOW

DETAILS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO METAL FRAME AND

EXISTING GLASS

DEMO METAL FRAME AND

EXISTING GLASS

DEMO METAL FRAME

AND EXISTING GLASS

LINTEL TO REMAIN

2X4 BLOCKING

1/2" OSB OR PLYWOOD

TAPCON OR SIMILAR

DRILLED ANCHOR

OPTIONAL 2" XPS

INSULATION (COLD

WEATHER)

NEW ALUMINUM

WINDOW

SEALANT

SEALANT

INSECT SCREEN

PREP AND PAINT LINTEL

ALIGN NEW WINDOW

FRAME TO ORGINAL

EXTERIOR LOCATION

REPOINT EXTERIOR

JAMB IF REQUIRED

REPOINT OR REPAINT

INTERIOR JAMB IF

DAMAGED DURING

DEMOLITION

PREP AND PAINT LINTEL

BACKER ROD AND SEALANT

NEW ALUMINUM

WINDOW

REPOINT OR REPAINT

INTERIOR AND EXTERIOR

JAMBS IF DAMAGED DURING

DEMOLITION

SCALE: 3" = 1'-0"4 BRICK JAMB DEMOLITION DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"1 BRICK DEMOLITION SECTION

0 3'' 6'' 9'' SCALE: 3" = 1'-0"2 TEMPORARY INFILL DETAIL

0 3'' 6'' 9'' SCALE: 3" = 1'-0"3 BRICK WINDOW DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"5 BRICK JAMB DETAIL

0 3'' 6'' 9''

GENERAL NOTE

- PROTECT FINISHES TO REMAIN DURING DEMOLITION. CONTRACTOR

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-15

APPLIANCE

SHOP WINDOW

DETAILS 2

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO CAULKING

DEMO METAL FRAME

AND EXISTING GLASS

DEMO METAL FRAME AND

EXISTING GLASS

DEMO METAL FRAME AND

EXISTING GLASS

2X4 BLOCKING

1/2" OSB OR PLYWOOD

TAPCON OR SIMILAR

DRILLED ANCHOR

OPTIONAL 2" XPS

INSULATION (COLD

WEATHER)

BACKER ROD AND SEALANT

NEW ALUMINUM

WINDOW

SELF ADHERED

FLEXIBLE FLASHING

BETWEEN CONCRETE

AND WOOD

PT WOOD SHIM AS

REQUIRED (TAPCON TO

CONCRETE)

PAINTED PVC TRIM (TRIM

SCREW TO BLOCKING)

SCALE: 3" = 1'-0"1 CONCRETE DEMOLITION SECTION

0 3'' 6'' 9''

SCALE: 3" = 1'-0"3 CONCRETE JAMB DEMOLITION DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"2 TEMPORARY INFILL DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"4 CONCRETE JAMB DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"5 CONCRETE WINDOW DETAIL

0 3'' 6'' 9''

GENERAL NOTE

- PROTECT FINISHES TO REMAIN DURING DEMOLITION. CONTRACTOR

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-16

CARPENTRY

SHOP

DEMOLITION

LOWER PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

A-27

A-27

A-27

DEMO SECURITY SCREEN

DEMO SECURITY SCREEN

N

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP DEMOLITION LOWER PLAN

0 2' 4' 8'

GENERAL DEMOLITION NOTES

1) PROTECT SURROUNDING INTERIOR AND EXTERIOR

FINISHES TO REMAIN

2) PROVIDE TEMPORARY DUST PROTECTION AS

REQUIRED. PROTECT EXISTING SPACES AND

EQUIPMENT. COORDINATE EXTENTS OF DUST

PROTECTION REQUIRED WITH OWNER IN FIELD

3) INSTALL TEMPORARY OPENING INFILL IF UNABLE

TO INSTALL NEW UNIT SAME DAY AS EXISTING UNIT

REMOVAL

4) TEMPORARY PROTECTION TO PROVIDE ADEQUATE

WEATHER PROTECTION TO PROTECT INTERIOR

SPACES UNTIL NEW UNIT IS INSTALLED

5) COORDINATE PROTECTION, COVERING AND

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-17

CARPENTRY

SHOP

DEMOLITION

MAIN PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

A-26

A-26

A-20

A-19

A-

A-

WINDOW MOUNTED A/C UNIT - VERIFY REMOVAL OF PLYWOOD WITHIN OFFICE

VERIFY REMOVAL OF PLYWOOD WITHIN OFFICE

DEMO PLYWOOD COVER ON UPPER PANE

DEMO PLYWOOD COVERING WHOLE WINDOWDEMO PLYWOOD COVER ON UPPER PANE

DEMO PLYWOOD COVER ON UPPER PANE

FROSTED APPLIQUE

FROSTED APPLIQUE

N

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP DEMOLITION MAIN PLAN

0 2' 4' 8'

/7

/2

AD

D

EN

D

U M

GENERAL DEMOLITION NOTES

1) PROTECT SURROUNDING INTERIOR AND EXTERIOR

FINISHES TO REMAIN

2) PROVIDE TEMPORARY DUST PROTECTION AS

REQUIRED. PROTECT EXISTING SPACES AND

EQUIPMENT. COORDINATE EXTENTS OF DUST

PROTECTION REQUIRED WITH OWNER IN FIELD

3) INSTALL TEMPORARY OPENING INFILL IF UNABLE

TO INSTALL NEW UNIT SAME DAY AS EXISTING UNIT

REMOVAL

4) TEMPORARY PROTECTION TO PROVIDE ADEQUATE

WEATHER PROTECTION TO PROTECT INTERIOR

SPACES UNTIL NEW UNIT IS INSTALLED

5) COORDINATE PROTECTION, COVERING AND

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-18

CARPENTRY

SHOP

DEMOLITION

UPPER PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO PLYWOOD COVERING WHOLE WINDOW

DEMO PLYWOOD COVERING WHOLE WINDOW

DEMO BOTH CS03 GOTHIC WINDOWS IN ATTIC

N

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP DEMOLITION UPPER PLAN

0 2' 4' 8'

GENERAL DEMOLITION NOTES

1) PROTECT SURROUNDING INTERIOR AND EXTERIOR

FINISHES TO REMAIN

2) PROVIDE TEMPORARY DUST PROTECTION AS

REQUIRED. PROTECT EXISTING SPACES AND

EQUIPMENT. COORDINATE EXTENTS OF DUST

PROTECTION REQUIRED WITH OWNER IN FIELD

3) INSTALL TEMPORARY OPENING INFILL IF UNABLE

TO INSTALL NEW UNIT SAME DAY AS EXISTING UNIT

REMOVAL

4) TEMPORARY PROTECTION TO PROVIDE ADEQUATE

WEATHER PROTECTION TO PROTECT INTERIOR

SPACES UNTIL NEW UNIT IS INSTALLED

5) COORDINATE PROTECTION, COVERING AND

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-19

CARPENTRY

SHOP DEMO

ELEVATIONS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO SECURITY SCREENS DEMO SECURITY SCREENS

DEMO PLYWOOD COVERING WHOLE WINDOW

DEMO PLYWOOD COVER ON UPPER PANEDEMO PLYWOOD COVERING OFFICE WINDOWS

DEMO PLYWOOD COVER ON TOP PANE

DEMO PLYWOOD COVERING

WHOLE WINDOW

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP SOUTH DEMOLITION ELEVATION

0 2' 4' 8'

SCALE: 1/4" = 1'-0"2 CARPENTRY SHOP EAST DEMOLITION ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-20

CARPENTRY

SHOP DEMO

ELEVATIONS 2

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO PLYWOOD COVER ON UPPER PANE

DEMO PLYWOOD COVERING WHOLE WINDOW

DEMO PLYWOOD COVER ON UPPER PANE

DEMO TWO CS03 ATTIC WINDOWS

REMOVE AND RETAIN

WINDOW MOUNTED A/C

UNIT FOR REINSTALLATION

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP NORTH DEMOLITION ELEVATION

0 2' 4' 8'

SCALE: 1/4" = 1'-0"2 CARPENTRY SHOP WEST DEMOLITION ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-21

CARPENTRY

SHOP LOWER

PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

A-27

A-27

CMU INFILL WITH TOOLED STONE VENEER (MATCH EXISTING)

TYP

CS01

CS01A

CS02

CS03

3'-2"

3'-2"

3'-2"

2'-2"

9'

9'

7'-6"

3'-4"

SINGLE HUNG

SINGLE HUNG

SINGLE HUNG

SINGLE HUNG

BRICK INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR TO BRICK EXTERIOR FINISH. PROVIDE

MANUFACTURER INSTALLED FROSTED APPLIQUE.

BRICK INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR TO BRICK EXTERIOR FINISH

WINDOW SCHEDULE

ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP LOWER PLAN

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-22

CARPENTRY

SHOP MAIN

PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

CS01A CS01A CS01A CS01 CS01 CS01 CS01CS01

CS01

CS01A

CS01 CS01 CS01 CS01 CS01 CS01

CS01

CS01A

A-27

A-26

A-24

A-25

A-

25 2 A-

FROSTED APPLIQUE

FROSTED APPLIQUE

CS01

CS01A

CS02

CS03

3'-2"

3'-2"

3'-2"

2'-2"

9'

9'

7'-6"

3'-4"

SINGLE HUNG

SINGLE HUNG

SINGLE HUNG

SINGLE HUNG

BRICK INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR TO BRICK EXTERIOR FINISH. PROVIDE

MANUFACTURER INSTALLED FROSTED APPLIQUE.

BRICK INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR TO BRICK EXTERIOR FINISH

WINDOW SCHEDULE

ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP MAIN PLAN

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-23

CARPENTRY

SHOP UPPER

PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

CS02 CS02 CS02 CS02 CS02 CS02 CS02 CS02

CS02

CS02

CS02

CS02 CS02 CS02 CS02 CS02 CS02 CS02CS02

CS02

CS02

CS02

CS01

CS01A

CS02

CS03

3'-2"

3'-2"

3'-2"

2'-2"

9'

9'

7'-6"

3'-4"

SINGLE HUNG

SINGLE HUNG

SINGLE HUNG

SINGLE HUNG

BRICK INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR TO BRICK EXTERIOR FINISH. PROVIDE

MANUFACTURER INSTALLED FROSTED APPLIQUE.

BRICK INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR TO BRICK EXTERIOR FINISH

WINDOW SCHEDULE

ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP UPPER PLAN

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-24

CARPENTRY

SHOP

ELEVATIONS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

FROSTED APPLIQUE

FROSTED APPLIQUE

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP SOUTH ELEVATION

0 2' 4' 8'

SCALE: 1/4" = 1'-0"2 CARPENTRY SHOP EAST ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-25

CARPENTRY

SHOP

ELEVATIONS 2

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

FROSTED APPLIQUE

CS03

SCALE: 1/4" = 1'-0"2 CARPENTRY SHOP WEST ELEVATION

0 2' 4' 8'

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP NORTH ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-26

CARPENTRY

SHOP WINDOW

DETAILS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO COUNTERWEIGHT AND ROPE

DEMO WOOD TRIM

DEMO WOOD WINDOW FRAME AND GLASS

REMOVE WOOD FRAME AND

EXISITING GLASS

DEMO WOOD TRIM

REMOVE WOOD FRAME AND

EXISITING GLASS

DEMO WOOD TRIM

TAPCON OR SIMILAR

DRILLED ANCHOR

OPTIONAL 2" XPS

INSULATION (COLD

WEATHER)

2X4 WOOD BLOCK

1/2" OSB OR PLYWOOD

1/

2" V

IF

BACKER ROD AND SEALANT

NEW ALUMINUM WINDOW

BLOCKING

SELF-ADHERED

FLEXIBLE FLASHING

NEW PAINTED PVC TRIM

SEALANT

INSECT SCREEN

SEALANT

NEW ALUMINUM

WINDOW

NEW PAINTED PVC TRIM

REPOINT EXTERIOR

JAMB AS REQUIRED

PAINT LINTEL PAINT LINTEL

SCALE: 3" = 1'-0"4 JAMB DEMOLITION DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"1 MAIN LEVEL DEMOLITION SECTION

0 3'' 6'' 9'' SCALE: 3" = 1'-0"2 CARPENTRY SHOP - TEMP INFILL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"5 WINDOW JAMB DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"3 MAIN LEVEL WINDOW DETAIL

0 3'' 6'' 9''

GENERAL NOTE

- PROTECT FINISHES TO REMAIN DURING DEMOLITION. CONTRACTOR

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-27

CARPENTRY

SHOP WINDOW

DETAILS 2

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO EXISTING WINDOW,

BUCK AND SECURITY SCREEN

(WHERE PRESENT)

DEMO WOOD FRAME

AND EXISTING GLASS

DEMO WOOD TRIM

DEMO WOOD FRAME AND

EXISTING GLASS

DEMO WOOD TRIM

8" CMU INFILL BACKUP

GROUT SILL AS

REQUIRED TO OBTAIN

FLAT SURFACE

SLUG BOTTOM COURSE

OF VENEER SOLID

STAINLESS STEEL

THRU-WALL FLASHING

CELLULAR CAVITY VENT

MORTAR NET OR SIMILAR

ADJUSTABLE MASONRY

TIE

TOOLED LIMESTONE

VENEER STONE (MATCH

EXISTING)

STAINLESS STEEL DRIP

EDGE

SCALE: 3" = 1'-0"3 JAMB DEMOLITION DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"1 BASEMENT DEMOLITION SECTION

0 3'' 6'' 9'' SCALE: 3" = 1'-0"2 BASEMENT INFILL DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"4 MASONRY INFILL JAMB DETAIL

0 3'' 6'' 9''

GENERAL NOTE

- PROTECT FINISHES TO REMAIN DURING DEMOLITION. CONTRACTOR

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-28

POWERHOUSE

DEMOLITION

MAIN PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

A-40

A-38

A-39

A-41

A-40

A-39

A-37

A-38

A-41

A-41

A-41

A-30

A-31

A-

31 2 A-

DEMO FROM EXTERIOR

DEMO FROM EXTERIOR

DEMO FOUR (4)

NORTH WINDOWS IN

OFFICE VIA EXTERIOR

DEMO AND REPLACE, FILL IN SURROUNDING AREA WITH BRICKDEMO AND REPLACE WITH CLERESTORY WINDOW, FILL IN

REMAINING SPACE WITH BRICKWORK

DEMO ALL FOUR (4) EAST FACADE WINDOWS VIA EXTERIOR

DEMO WINDOW AND DROP CEILING

DEMO CLERESTORY ABOVE DOOR

DEMO FIVE (5) WEST WINDOWS, REPLACE AND RE-PLASTER EXTERIOR

PATCH, REPAIR AND

REPAINT STUCCO AT

DOOR PERIMETER

TYP

A-37

SCALE: 1/8" = 1'-0"1 POWERHOUSE DEMOLITION MAIN PLAN

0 4' 8' 16'

GENERAL DEMOLITION NOTES

1) PROTECT SURROUNDING INTERIOR AND EXTERIOR

FINISHES TO REMAIN

2) PROVIDE TEMPORARY DUST PROTECTION AS

REQUIRED. PROTECT EXISTING SPACES AND

EQUIPMENT. COORDINATE EXTENTS OF DUST

PROTECTION REQUIRED WITH OWNER IN FIELD

3) INSTALL TEMPORARY OPENING INFILL IF UNABLE

TO INSTALL NEW UNIT SAME DAY AS EXISTING UNIT

REMOVAL

4) TEMPORARY PROTECTION TO PROVIDE ADEQUATE

WEATHER PROTECTION TO PROTECT INTERIOR

SPACES UNTIL NEW UNIT IS INSTALLED

5) COORDINATE PROTECTION, COVERING AND

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-29

POWERHOUSE

DEMOLITION

UPPER PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

A-37

A-

A-

A-34

A-35

A-36

SCALE: 1/8" = 1'-0"1 POWERHOUSE DEMOLITION UPPER PLAN

0 4' 8' 16'

GENERAL DEMOLITION NOTES

1) PROTECT SURROUNDING INTERIOR AND EXTERIOR

FINISHES TO REMAIN

2) PROVIDE TEMPORARY DUST PROTECTION AS

REQUIRED. PROTECT EXISTING SPACES AND

EQUIPMENT. COORDINATE EXTENTS OF DUST

PROTECTION REQUIRED WITH OWNER IN FIELD

3) INSTALL TEMPORARY OPENING INFILL IF UNABLE

TO INSTALL NEW UNIT SAME DAY AS EXISTING UNIT

REMOVAL

4) TEMPORARY PROTECTION TO PROVIDE ADEQUATE

WEATHER PROTECTION TO PROTECT INTERIOR

SPACES UNTIL NEW UNIT IS INSTALLED

5) COORDINATE PROTECTION, COVERING AND

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-30

POWERHOUSE

DEMO

ELEVATIONS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO ALL FOUR (4) EAST FACADE

WINDOWS VIA EXTERIOR

DEMO AND REPLACE WITH CLERESTORY WINDOW, FILL IN

REMAINING SPACE WITH BRICKWORK

DEMO SECURITY BARS

DEMO SECURITY BARSDEMO SECURITY BARS

DEMO PH09 ATTIC WINDOWSDEMO PH09 ATTIC WINDOWS

DEMO AND REPLACE WITH MATCHING CLERESTORY WINDOW, FILL IN

REMAINING SPACE WITH BRICKWORK

DEMO FOUR (4) NORTH

WINDOWS ABOVE OFFICE VIA

EXTERIOR

DEMO PH09 ATTIC WINDOWSDEMO PH09 ATTIC WINDOWS

DEMO SECURITY BARS

DEMO WINDOWS AND DROP CEILINGS WINDOW MOUNTED A/C UNIT DEMO FOUR (4) NORTH WINDOWS IN

OFFICE VIA EXTERIOR

SCALE: 1/8" = 1'-0"1 POWERHOUSE EAST DEMOLITION ELEVATION

0 4' 8' 16'

SCALE: 1/8" = 1'-0"2 POWERHOUSE NORTH DEMOLITION ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-31

POWERHOUSE

DEMO

ELEVATIONS 2

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO FIVE WEST WINDOWS

DEMO VIA EXTERIOR

TO AVOID EXISTING

MECHANICAL

DEMO WINDOW AND DELIVERY DOOR,

REPLACE WITH NEW WINDOW AND DOOR

DEMO EIGHT WEST UPPER WINDOWS FROM EXTERIOR

DEMO SECURITY BARS

DEMO ALL FOUR WINDOWS FROM

EXTERIOR

SCALE: 1/8" = 1'-0"1 POWERHOUSE WEST DEMOLITION ELEVATION

0 4' 8' 16'

SCALE: 1/8" = 1'-0"2 POWERHOUSE SOUTH DEMOLITION ELEVATION

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-32

POWERHOUSE

MAIN PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH04

PH12

PH05

PH15

PH15

PH15

PH15

PH15

PH05

PH04

PH11 PH07PH07PH07 PH07PH07PH07PH11

PH11

PH11

PH03

PH11

PH11

PH17A

PH17A

PH17A

PH17 PH17 PH09 PH17 PH09

PH08

PH15 PH15 PH15 PH15

PH12

PH08 PH13

PD08

PH18 PH18PH18PH18

A-41

A-40

A-38

A-40

A-38

A-41

A-37

A-41

A-40

A-41

A-41

A-41

A-38

A-

A-

A-34

A-35

PATCH, REPAIR AND

REPAINT STUCCO AT

DOOR PERIMETER

A-37

TYP

TYP

TYP

TYP

PH01

PH02

PH03

PH04

PH05

PH06

PH07

PH08

3'-2"

3'-2"

8'-4"

3'-8"

3'-8"

2'-10"

7'-6"

3'-8"

5'-2"

5'-2"

1'-10"

8'-7"

7'

1'-11"

1'-10"

6'-11"

FIXED/AWNING

GANGED

FIXED/AWING

FIXED

AWNING/FIXED

AWNING/FIXED

FIXED

FIXED

AWNING/FIXED

PLASTER INTERIOR TO BRICK EXTERIOR FINISH

PLASTER INTERIOR TO BRICK EXTERIOR FINISH (4 TOTAL MULLED

UNITS)

PLASTER INTERIOR TO BRICK EXTERIOR FINISH

PLASTER INTERIOR TO BRICK EXTERIOR FINISH

WOOD PANEL INTERIOR TO BRICK EXTERIOR FINISH

BRICK EXTERIOR, ATTIC INTERIOR

PLASTER INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR AND EXTERIOR

WINDOW SCHEDULE

ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View

PH09

PH10

PH11

PH12

PH13

PH13

PH14

PH15

PH16

PH17

PH17A

PH18

3'

4'-10"

3'-9"

3'-8"

3'-8"

3'-8"

4'-10"

3'-8"

3'-8"

4'-10"

4'-10"

4'-10"

7'

7'

6'-10"

5'-2"

3'-7"

10'-3"

3'-6"

10'-3"

3'-6"

7'

3'-8"

5'

AWNING/FIXED

FIXED

AWNING/FIXED

GANGED

FIXED

CASEMENT

CASEMENT

FIXED

AWNING/FIXED

FIXED

AWNING/FIXED

FIXED

FIXED

BRICK INTERIOR AND STUCCO EXTERIOR

BRICK INTERIOR AND STUCCO EXTERIOR

PLASTER INTERIOR TO BRICK EXTERIOR FINISH (3 TOTAL MULLED

UNITS)

BRICK EXTERIOR WITH PLASTER INTERIOR

STUCCO INTERIOR TO BRICK EXTERIOR FINISH

PLASTER INTERIOR TO BRICK EXTERIOR FINISH - DIVIDED LITE

BRICK INTERIOR AND STUCCO EXTERIOR

BRICK EXTERIOR WITH BRICK INTERIOR

BRICK INTERIOR AND EXTERIOR

BRICK INTERIOR AND STUCCO EXTERIOR

BRICK INTERIOR AND STUCCO EXTERIOR

BRICK INTERIOR AND STUCCO EXTERIOR

WINDOW SCHEDULE

ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View

DOOR SCHEDULE

ID

PD08

Quantity

W 3'-6"

HT

6'-8"

THK

1 3/4"

FRAME

PANEL

A

GLZ

NONE

HW SET

STENCIL

RECYCLE

NOTES

SINGLE PAINTED STEEL EXTERIOR DOOR

2" AS SCHED 2"

PE

R

S C

H

ED

U

LE

2"

A

DOOR

FRAMES

DOOR

PANELS

TYP

SCALE: 1/8" = 1'-0"1 POWERHOUSE MAIN PLAN

0 4' 8' 16'

HARDWARE SET

SET 1 - EXTERIOR SINGLE DOORS

WITH CLOSER

(3) HEAVY DUTY HINGES

(1) MORTISE DEADLOCK SET

(1) WALL STOP

(2) KICK PLATES

(1) THRESHOLD

(2) WEATHERSTRIPPING

TYP

TYP

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-33

POWERHOUSE

UPPER PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH01

PH01

PH01

PH01

PH01PH02PH01 PH02PH02 PH02PH02 PH02PH02 PH02

PH01

PH01

PH01

PH12

PH12

PH12

PH12

PH12

PH16

PH16

PH16

PH12

PH16

PH16

PH16

PH16

PH16PH16PH16PH16PH16PH16PH16PH16

PH14PH14

PH10

PH10

PH10

A-36

A-

A-

A-34

A-35

A-36

PH01

PH02

PH03

PH04

PH05

PH06

PH07

PH08

3'-2"

3'-2"

8'-4"

3'-8"

3'-8"

2'-10"

7'-6"

3'-8"

5'-2"

5'-2"

1'-10"

8'-7"

7'

1'-11"

1'-10"

6'-11"

FIXED/AWNING

GANGED

FIXED/AWING

FIXED

AWNING/FIXED

AWNING/FIXED

FIXED

FIXED

AWNING/FIXED

PLASTER INTERIOR TO BRICK EXTERIOR FINISH

PLASTER INTERIOR TO BRICK EXTERIOR FINISH (4 TOTAL MULLED

UNITS)

PLASTER INTERIOR TO BRICK EXTERIOR FINISH

PLASTER INTERIOR TO BRICK EXTERIOR FINISH

WOOD PANEL INTERIOR TO BRICK EXTERIOR FINISH

BRICK EXTERIOR, ATTIC INTERIOR

PLASTER INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR AND EXTERIOR

WINDOW SCHEDULE

ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View

PH09

PH10

PH11

PH12

PH13

PH13

PH14

PH15

PH16

PH17

PH17A

PH18

3'

4'-10"

3'-9"

3'-8"

3'-8"

3'-8"

4'-10"

3'-8"

3'-8"

4'-10"

4'-10"

4'-10"

7'

7'

6'-10"

5'-2"

3'-7"

10'-3"

3'-6"

10'-3"

3'-6"

7'

3'-8"

5'

AWNING/FIXED

FIXED

AWNING/FIXED

GANGED

FIXED

CASEMENT

CASEMENT

FIXED

AWNING/FIXED

FIXED

AWNING/FIXED

FIXED

FIXED

BRICK INTERIOR AND STUCCO EXTERIOR

BRICK INTERIOR AND STUCCO EXTERIOR

PLASTER INTERIOR TO BRICK EXTERIOR FINISH (3 TOTAL MULLED

UNITS)

BRICK EXTERIOR WITH PLASTER INTERIOR

STUCCO INTERIOR TO BRICK EXTERIOR FINISH

PLASTER INTERIOR TO BRICK EXTERIOR FINISH - DIVIDED LITE

BRICK INTERIOR AND STUCCO EXTERIOR

BRICK EXTERIOR WITH BRICK INTERIOR

BRICK INTERIOR AND EXTERIOR

BRICK INTERIOR AND STUCCO EXTERIOR

BRICK INTERIOR AND STUCCO EXTERIOR

BRICK INTERIOR AND STUCCO EXTERIOR

WINDOW SCHEDULE

ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View

SCALE: 1/8" = 1'-0"1 POWERHOUSE UPPER PLAN

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-34

POWERHOUSE

ELEVATIONS

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

INSULATED PANEL AT BOTTOM TWO ROWS

TO ACCOMMODATE REINSTALLATION OF

AIR CONDITIONING UNIT

SCALE: 1/8" = 1'-0"1 POWERHOUSE EAST ELEVATION

0 4' 8' 16'

SCALE: 1/8" = 1'-0"2 POWERHOUSE NORTH ELEVATION

0 4' 8' 16'

NEW CLERESTORY WINDOWS,

FILL REMAINING OPENING WITH BRICKNEW HALF-HEIGHT WINDOWS AT BOILER ROOM, FINISH WITH STUCCO

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-35

POWERHOUS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .