RFB944300-01 - Addendum 02.pdf

PDF 667 KB Posted

Attached to
DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop Window Replacement
Solicitation number
RFB944300-01
Issued by
Harrison County, Iowa

About this file

This is Addendum 02 to Request for Bid (RFB944300-01) issued by the Iowa Department of Administrative Services for the DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop Window Replacement project. The addendum, dated April 23, 2025, provides critical clarifications and corrections to the original bidding documents dated January 17, 2025. The project involves the removal and replacement of windows across multiple shop areas at the Mount Pleasant Correctional Facility. Key clarifications address drawing references and detail corrections: Drawing A-22 (Carpentry Shop Main Plan) window jamb detail should reference 5/A-26 instead of 5/A-27; Drawing A-26 (Carpentry Shop Window Details) requires replacement of the window jamb detail 5/A-26 with Detail 6/A-7 for bidding purposes, with actual conditions to be verified during window demolition; and Drawing A-27 (Carpentry Shop Window Details 2) includes Detail 4/A-27 which did not plot on the original bidding set and is now provided. The bid due date remains May 1, 2025, at 2:00 pm CDT, and bidders must acknowledge receipt of this addendum on the bid form to avoid disqualification. Bidders are required to attach this addendum to their project manuals and ensure all submitted bids reflect the corrected drawing details and specifications outlined in this addendum.

The addendum supersedes and supplements all conflicting portions of the original bidding and construction documents and is mandatory for all contract document holders of record. Compliance with the addendum requirements, including acknowledgment of receipt, is essential for bid acceptance. No pricing, set-aside provisions, or funding information is addressed in this addendum, as it serves exclusively as a clarification and correction document to the underlying project specifications and contract requirements.

View the file

Other files

File Type Posted
1305669-event.pdf PDF
RFB944300-01 - Notice to Bidders.pdf PDF
RFB944300-01 - Bid Form.pdf PDF
RFB944300-01 - Project Manual.pdf PDF
RFB944300-01 - Addendum 01.pdf PDF
RFB944300-01 - Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9443.00 DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop Window Replacement

Addendum 2 Page 1 of 1

RFB944300-01 ADDENDUM #02

DATE: April 23, 2025

PROJECT: 9443.00 DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop

Window Replacement

BID DUE DATE: May 1, 2025 @ 2:00 pm

TO: All Contract Document Holders of Record.

This Addendum forms a part of the bidding and construction documents. This Addendum supersedes and supplements all portions of the original bidding and construction documents dated January 17, 2025, with which it conflicts. Please attach this Addendum to the Project Manual(s) in your possession.

ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE BID

FORM. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION.

1. QUESTIONS/CLARIFICATIONS

a. Clarifications

i. Drawing A-22: CARPENTRY SHOP MAIN PLAN

1. Window jamb detail should refer to 5/A-26 not 5/A-27, see marked up drawing below.

ii. Drawing A-26: CARPENTRY SHOP WINDOW DETAILS

1. Window jamb detail 5/A-26 to be replaced with Detail 6/A-7 for bidding. Actual condition will be verified in field with window demolition.

iii. Drawing A-27: CARPENTRY SHOP WINDOW DETAILS 2

1. Detail 4/A-27 did not plot on the original bidding set, see below for detail.

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-22

CARPENTRY

SHOP MAIN

PLAN

G25-001

MSN

3/30/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

CS01A CS01A CS01A CS01 CS01 CS01 CS01CS01

CS01

CS01A

CS01 CS01 CS01 CS01 CS01 CS01

CS01

CS01A

A-27

A-26

A-24

A-25

A-

25 2 A-

FROSTED APPLIQUE

FROSTED APPLIQUE

CS01

CS01A

CS02

CS03

3'-2"

3'-2"

3'-2"

2'-2"

9'

9'

7'-6"

3'-4"

SINGLE HUNG

SINGLE HUNG

SINGLE HUNG

SINGLE HUNG

BRICK INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR TO BRICK EXTERIOR FINISH. PROVIDE

MANUFACTURER INSTALLED FROSTED APPLIQUE.

BRICK INTERIOR TO BRICK EXTERIOR FINISH

BRICK INTERIOR TO BRICK EXTERIOR FINISH

WINDOW SCHEDULE

ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View

SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP MAIN PLAN

0 2' 4' 8'

Detail should refer to 5/A-26.

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

PROJECT NO:

DRAWN BY:

COPYRIGHT

DATE:

SHEET TITLE

A-27

CARPENTRY

SHOP WINDOW

DETAILS 2

G25-001

MSN

4/23/2025

E A S T

W A S H

IN

G

TO

N

S

TR

EE

T

M O

U N

T

PL

EA

S A N

T, I

A

C

U se rs \m ik en

\H or iz on

A rc hi te ct ur e\ H or iz on A rc hi te ct ur e

D oc um en ts

\P ro je ct s\ G en er al P ro je ct s\

G

-0

D A S M

PC

F

Tu ck po in t an d W in do w s\

M od el a nd D es ig n\ M

PC

F

W in do w

R ep la ce m en ts .p ln

.0

D O

C M

P C

F A p p lia n ce S h o p

P o w er h o u se

C ar p en tr y, an d P ai n t S h o p W in d o w

R ep la ce m en t

IS

SU

ED

F

O R

B

ID

D

IN

G A

N D

C O

N

ST

R U

C

TI

O N

M

IC

H A

EL

H

O R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

PH

3)

-4

W

W W

.H O

R

IZ

O N

-A R C H

IT

EC

TU

R E.

C O

M

DEMO EXISTING WINDOW,

BUCK AND SECURITY SCREEN

(WHERE PRESENT)

DEMO WOOD FRAME

AND EXISTING GLASS

DEMO WOOD TRIM

DEMO WOOD FRAME AND

EXISTING GLASS

DEMO WOOD TRIM

8" CMU INFILL BACKUP

GROUT SILL AS

REQUIRED TO OBTAIN

FLAT SURFACE

SLUG BOTTOM COURSE

OF VENEER SOLID

STAINLESS STEEL

THRU-WALL FLASHING

CELLULAR CAVITY VENT

MORTAR NET OR SIMILAR

ADJUSTABLE MASONRY

TIE

TOOLED LIMESTONE

VENEER STONE (MATCH

EXISTING)

STAINLESS STEEL DRIP

EDGE

ADJUSTABLE MASONRY

TIE (MIN 3 PER OPENING)

TOOLED LIMESTONE VENEER STONE (MATCH EXISTING)

ADJUSTABLE MASONRY TIE (MIN 2 PER SIDE)

8" CMU INFILL

GROUT SOLID

SCALE: 3" = 1'-0"3 JAMB DEMOLITION DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"1 BASEMENT DEMOLITION SECTION

0 3'' 6'' 9'' SCALE: 3" = 1'-0"2 BASEMENT INFILL DETAIL

0 3'' 6'' 9''

SCALE: 3" = 1'-0"4 MASONRY INFILL DETAIL

0 3'' 6'' 9''

GENERAL NOTE

- PROTECT FINISHES TO REMAIN DURING DEMOLITION. CONTRACTOR

WILL BE RESPONSIBLE FOR RESTORING FINISHES TO ORIGINAL

CONDITION UNLESS OTHERWISE INDICATED.

File details come from the government source that posted it. Updated .