This Addendum #01, issued April 18, 2025, by the Iowa Department of Administrative Services for the Mount Pleasant Correctional Facility window replacement project (RFB944300-01), supplements the original bidding and construction documents dated January 17, 2025. The project scope encompasses removal and disposal of existing windows in the Appliance Shop, Powerhouse, Carpentry Shop, and Paint Shop, along with proper abatement and disposal of hazardous materials, installation of new window units, and repair or replacement of interior and exterior jamb finishes. The addendum provides critical clarifications including requirements for tempered glazing on two windows in the Carpentry Shop stairwell, removal of specification section 07 9200 line item 2.5.B (Overlay Extrusion for Glazing System Joint Protection), and confirmation that contractors must retain licensed abatement subcontractors for all required abatement work per Section 00 3126. The pre-bid meeting was held April 17, 2025, and questions were due by 3:00 pm on April 22, 2025. Bids are due May 1, 2025, at 2:00 pm through the IMPACS Electronic Procurement System, with bid opening scheduled for 3:00 pm the same day. Construction is scheduled to commence September 11, 2025, and conclude February 17, 2026, with substantial completion targeted for February 17, 2026.
The addendum specifies that all windows in the Appliance Shop contain asbestos-containing window glazing and caulking with lead-based paint on surrounding concrete; all Powerhouse windows (except vinyl replacements) contain asbestos with lead-based paint on metal frames and surrounding concrete; Carpentry Shop wood window trims contain lead-based paint only; and Paint Shop wood trims and surrounding brick contain lead-based paint only. Contractors must provide square foot unit costs for stucco repair, replacement, and repainting for incidental facade damage during demolition, with stucco patching and repainting required within a 12-inch diameter of the door frame on plan page A-35. Bid security of 5% of the total bid amount is required, and the apparent low bidder must submit a subcontractor and supplier list within 48 hours of bid opening. Additional site visits may be coordinated by contacting Tony Kempker at (319) 931-9460. The project requires contractors to comply with site-specific rules including onsite supervision at all times, daily logs, tool control, background checks, PREA training, and adherence to facility work hours established by Mount Pleasant Correctional Facility administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1305669-event.pdf | ||
| RFB944300-01 - Addendum 02.pdf | ||
| RFB944300-01 - Notice to Bidders.pdf | ||
| RFB944300-01 - Bid Form.pdf | ||
| RFB944300-01 - Project Manual.pdf | ||
| RFB944300-01 - Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9443.00 DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop Window Replacement
Addendum 1 Page 1 of 1
RFB944300-01 ADDENDUM #01
DATE: April 18, 2025
PROJECT: 9443.00 DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop
Window Replacement
BID DUE DATE: May 1, 2025 @ 2:00 pm
TO: All Contract Document Holders of Record.
This Addendum forms a part of the bidding and construction documents. This Addendum supersedes and supplements all portions of the original bidding and construction documents dated January 17, 2025, with which it conflicts. Please attach this Addendum to the Project Manual(s) in your possession.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE BID
FORM. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION.
1. QUESTIONS/CLARIFICATIONS
a. Clarifications
i. Contractor to provide tempered glazing on lower sash of (2) windows in the Carpentry
Shop stairwell. See the plan page below for reference.
ii. Contractor to provide a SF unit cost for stucco repair/replacement and re-painting
(incidental damage to façade during demolition).
iii. Specification section 07 9200 – Joint Sealants, line item 2.5.B has been removed from the project. See specification section below for reference.
iv. Per specification section 01 1200 – Contract Summary, line item 1.04.A.1 and 1.04.A.2, the Contractor shall be responsible for all abatement activities as required by the Contract
Documents. Information regarding existing hazardous materials is provided in Section 00
3126 – Existing Hazardous Material Information. The Contractor shall retain a licensed abatement subcontractor to perform the required abatement work per Section 00 3126 –
Existing Hazardous Material Information.
v. See attached meeting minutes and sign-in sheet below from the pre-bid meeting held on
April 17th, 2025.
Q1. Can you advise on which windows openings will require abatement? The survey provided appears to show hazardous materials in a few areas, but not all openings were sampled, so it is unclear which specific locations need to be addressed by a licensed abatement contractor.
A1. All the windows in Appliance Shop have asbestos containing window glazing and caulking, and the concrete surrounding the windows contains lead-based paint. All the windows in the Powerhouse have asbestos containing windows (other than the vinyl replacements) and the metal frames contain lead-based paint (this will be removed with the asbestos) and the concrete surrounding the windows contains lead-based paint. All the wood window trims associated with the windows in the Carpentry
Shop contain lead-based paint, no asbestos. All the wood window trims in the Paint Shop, as well as the brick surrounding them, contain lead-based paint, no asbestos.
Q2. What are the parameters for patching, repairing, and painting the stucco finish at the door perimeter on plan page A-35 Elevation 1?
A2. The contractor shall patch, repair, and paint the stucco finish within a 12” diameter of the door frame.
Q3. Who do we contact if we would like to take an additional site visit?
A3. Contact Tony Kempker for any additional site visits. Tony can be reached at (319) 931-9460.
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-22
CARPENTRY
SHOP MAIN
PLAN
G25-001
MSN
3/30/2025
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
D A S M
PC
F
Tu ck po in t an d W in do w s\
M od el a nd D es ig n\ M
PC
F
W in do w
R ep la ce m en ts .p ln
.0
D O
C M
P C
F A p p lia n ce S h o p
P o w er h o u se
C ar p en tr y, an d P ai n t S h o p W in d o w
R ep la ce m en t
IS
SU
ED
F
O R
B
ID
D
IN
G A
N D
C O
N
ST
R U
C
TI
O N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
CS01A CS01A CS01A CS01 CS01 CS01 CS01CS01
CS01
CS01A
CS01 CS01 CS01 CS01 CS01 CS01
CS01
CS01A
A-27
A-26
A-24
A-25
A-
25 2 A-
FROSTED APPLIQUE
FROSTED APPLIQUE
CS01
CS01A
CS02
CS03
3'-2"
3'-2"
3'-2"
2'-2"
9'
9'
7'-6"
3'-4"
SINGLE HUNG
SINGLE HUNG
SINGLE HUNG
SINGLE HUNG
BRICK INTERIOR TO BRICK EXTERIOR FINISH
BRICK INTERIOR TO BRICK EXTERIOR FINISH. PROVIDE
MANUFACTURER INSTALLED FROSTED APPLIQUE.
BRICK INTERIOR TO BRICK EXTERIOR FINISH
BRICK INTERIOR TO BRICK EXTERIOR FINISH
WINDOW SCHEDULE
ID Quantity Width (Nominal) Height (Nominal) Type NOTES 3D Front View
SCALE: 1/4" = 1'-0"1 CARPENTRY SHOP MAIN PLAN
0 2' 4' 8'
Provide tempered glazing Provide tempered glazing
PROJECT 9443.00 Joint Sealants 07 9200 - 3
1. Wall and Ceiling Joints in Non-Wet Areas: Acrylic emulsion latex sealant.
2.3 JOINT SEALANTS - GENERAL
A. Sealants and Primers: Provide products with levels of volatile organic compound (VOC) content as indicated in Section 01 6000.
B. Sealants and Primers: Provide products having lower volatile organic compound (VOC) content than indicated in SCAQMD 1168.
C. Colors: As selected by Architect from manufacturer's standard colors.
2.4 NONSAG JOINT SEALANTS
A. Non-Staining Silicone Sealant: ASTM C920, Grade NS, Uses M and A; not expected to withstand continuous water immersion or traffic.
1. Movement Capability: Plus and minus 35 percent, minimum.
2. Dirt Pick-Up: Reduced dirt pick-up compared to other silicone sealants.
3. Color: Match adjacent finished surfaces.
B. Acrylic Emulsion Latex: Water-based; ASTM C834, single component, non-staining, non-bleeding, non-sagging; not intended for exterior use.
2.5 ACCESSORIES
A. Backer Rod: Cylindrical cellular foam rod with surface that sealant will not adhere to, compatible with specific sealant used, and recommended by backing and sealant manufacturers for specific application.
B. Overlay Extrusion for Glazing System Joint Protection: Rubber profiled extrusions placed over joints in glazing system and provided with watertight seal.
1. Profile: As required to match existing metal glazing cap requirements.
2. Color: As required to match existing conditions.
3. Durometer Hardness, Type A: 65, minimum, when tested in accordance with ASTM D2240.
4. Tensile Strength: 1139 psi, in accordance with ASTM D412.
5. Manufacturers:
a. Tremco Commercial Sealants & Waterproofing; Spectrem Restoration Overlay: www.tremcosealants.com/#sle.
b. Architect pre-approved equivalent..
C. Preformed Extruded Silicone Joint Seal: Pre-cured low-modulus silicone extrusion, in sizes to fit applications indicated on drawings, combined with a neutral-curing liquid silicone sealant for bonding joint seal to substrates.
1. Size: 1 inch wide, in rolls 100 feet long.
2. Thickness: 0.78 inch, with ridges along outside bottom edges for bonding area.
D. Backing Tape: Self-adhesive polyethylene tape with surface that sealant will not adhere to and recommended by tape and sealant manufacturers for specific application.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify that joints are ready to receive work.
B. Verify that backing materials are compatible with sealants.
C. Verify that backer rods are of the correct size.
3.2 PREPARATION
A. Remove loose materials and foreign matter that could impair adhesion of sealant.
B. Clean joints, and prime as necessary, in accordance with manufacturer's instructions.
C. Perform preparation in accordance with manufacturer's instructions and ASTM C1193.
D. Mask elements and surfaces adjacent to joints from damage and disfigurement due to sealant work; be aware that sealant drips and smears may not be completely removable.
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9443.00 DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop Window
Replacement 1200 East Washington Street Mount Pleasant, Iowa 52641
RFB Pre-Bid Minutes: Meeting #1
Meeting Date Apr 17, 2025 Meeting Time 11:00 am - 12:00 pm Central Time (US & Canada)
Meeting Location 1200 East Washington Street, Mount Pleasant, Iowa 52641
Video Conferencing Link https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmI1NTQxOTktMDllOC00MDN jLTg3MTgtODUxN2E5MjljNzUy%40thread.v2/0?con text=%7b%22Tid%22%3a%22c6c429d4-d18c- 4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2203997c 13-f223-4a6b-bb97-06276296bfeb%22%7d
Overview Meeting to allow prospective bidders to visit the site, when possible, and learn more about the project.
Notes
Attachments RFB944300-01_Bid Drawings_FINAL.pdf, RFB944300-01_Project Manual_FINAL.pdf
Scheduled Attendees
Name Company Phone Number Email Attendance
Michael Nolan Horizon Architecture michael@horizon-architecture.com Present
Parker Badding McGough Construction parker.badding@mcgough.com Present
Adam Douglas McGough Construction adam.douglas@mcgough.com Conference
Greg Evans McGough Construction P: (515) 344-1625 greg.evans@mcgough.com Present
Jeremy Howk Mount Pleasant Correctional Facility
P: (319) 385-9511 jeremy.howk@iowa.gov Present
Tony Kempker Mount Pleasant Correctional Facility
P: (319) 385-9511 ext.
anthony.kempker@iowa.gov Present
Brandon Adams State of Iowa - Department of Administrative Services brandon.adams@iowa.gov Present
Introduction
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description
• DAS - Owner's Rep o Brandon Adams
• McGough - CM o Parking Badding o Adam Douglas o Greg Evans
• Mt. Pleasant Correctional Facility
State of Iowa - Department of Administrative Services Page 1 of 5 Printed On: Apr 18, 2025 09:54 AM CDT https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmI1NTQxOTktMDllOC00MDNjLTg3MTgtODUxN2E5MjljNzUy%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2203997c13-f223-4a6b-bb97-06276296bfeb%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmI1NTQxOTktMDllOC00MDNjLTg3MTgtODUxN2E5MjljNzUy%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2203997c13-f223-4a6b-bb97-06276296bfeb%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmI1NTQxOTktMDllOC00MDNjLTg3MTgtODUxN2E5MjljNzUy%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2203997c13-f223-4a6b-bb97-06276296bfeb%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmI1NTQxOTktMDllOC00MDNjLTg3MTgtODUxN2E5MjljNzUy%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2203997c13-f223-4a6b-bb97-06276296bfeb%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmI1NTQxOTktMDllOC00MDNjLTg3MTgtODUxN2E5MjljNzUy%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2203997c13-f223-4a6b-bb97-06276296bfeb%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmI1NTQxOTktMDllOC00MDNjLTg3MTgtODUxN2E5MjljNzUy%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2203997c13-f223-4a6b-bb97-06276296bfeb%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmI1NTQxOTktMDllOC00MDNjLTg3MTgtODUxN2E5MjljNzUy%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2203997c13-f223-4a6b-bb97-06276296bfeb%22%7d https://storage.procore.com/api/v5/files/us-east-1/pro-core.com/companies/42578/01JR1763SSWBQ9KBWH8JPNS52V?companyId=87524&projectId=3013796&sig=270737259ae66b3a1ae42e9f5122b9a9c678b66523d2f315d4f035545ccb27fc https://storage.procore.com/api/v5/files/us-east-1/pro-core.com/companies/42578/01JR1763MTEYC8MTF4VX20P0KF?companyId=87524&projectId=3013796&sig=d6c119db83c4a18956780f8350214477ad71ec3119356891852cda0df71f63fa o Tony Kempker o Jeremy Howk
• Horizon Architecture o Michael Nolan
Official Documented Meeting Minutes
• The Wilson Group o Joe Doss
• MidAmerican Glazing o Will Sharp
• Bi-State Contracting o Lance Adkisson o AJ Wenck
• Lite Window & Door o Danny Brandt
• Bi-State Masonry o Mark Luebbers
Project Overview
2.1 1 Project Description Open
Description
• Base Bid: Removal and disposal of existing windows in Powerhouse, Appliance Shop, Carpentry Shop, and Paint Shop. Properly abate and dispose of hazardous materials where present. Install new window units as indicated and repair/replace interior and exterior jamb finishes as indicated. Protect existing interior and exterior finishes to remain. Infill select openings with CMU backup and exterior finish (brick or natural stone) where indicated.
• Alternates: Repair existing stucco, install new stucco where not present and re-paint west façade of boiler building.
• Unit Prices: N/A
Official Documented Meeting Minutes
• McGough to address which windows will need to be abated in the Addendum.
• McGough to clarify the alternate for repairing and installing the stucco on the west face of the Powerhouse.
2.2 1 Project Schedule Open
Description
• Contractor Bidding: 04/08 - 04/30
• Bids Due: 05/01 at 2:00 pm
• Contractor NOI to Award: 05/05
• Prepare & Execute Contracts: 05/05 - 05/20
Meeting #1 - RFB Pre-Bid Project: 9443.00 DOC MPCF Appliance Shop, Powerhouse, Carpentry, and Paint Shop Window Replacement
State of Iowa - Department of Administrative Services Page 2 of 5 Printed On: Apr 18, 2025 09:54 AM CDT
• Submittals: 05/21 - 06/13
• Mobilization: 09/11
• Construction: 09/11/25 - 02/09/26
• Substantial Completion - 02/17/26
• Closeout: 02/10/26 - 04/01/26
If needed, a pull-plan session will be held with the successful bid package contractors to finalize the construction schedule.
State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving and day after Thanksgiving, Christmas Day
Official Documented Meeting Minutes
• McGough has assumed 8-12 week lead time for aluminum windows in the project schedule.
• McGough has assumed a phased install and punch list for the windows. McGough to clarify what this entails for the warranty and request of retainage in the Addendum.
2.3 1 Site Rules Open
Description
• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.
• Contractors shall provide daily logs for each day they are on site.
• Construction progress meeting will be established once construction starts.
• It is of the utmost importance to show respect and courtesy to all staff at all times.
• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.
• No smoking, vaping or smokeless tobacco use onsite.
Site Specific Rules
• Temporary facilities - MPCF to advise
• Tool control
• Cell phones
• Background Checks / PREA Training - Will be required for all contractors that come on site
• Work hours - MPCF to advise
• View Specification 01 1200 - Contract Summary for more information.
Official Documented Meeting Minutes
• Project location is outside of the secure perimeter - this will allow for easier access for the contractor.
• Contractor will have plenty of space near the project site for laydown of material and equipment.
RFB Overview
3.1 1 Bid Submission Open
Description
• Bids are due 2:00 pm, Thursday, May 1, 2025
• The Bid shall be submitted to the Issuing Officer through the IMPACS Electronic Procurement System.
o Link and information is in the project manual
State of Iowa - Department of Administrative Services Page 3 of 5 Printed On: Apr 18, 2025 09:54 AM CDT o Contractors will need to register prior to bidding o Bidders will need to register regardless of whether it has already done business with the State of Iowa.
o Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
• Bid Opening will be held via conference call on 3:00 pm, Thursday, May 1, 2025
• Contractor shall reference section 00 0116 for the bid submittal checklist o Bid Proposal Information o Non Discrimination Clause Information o Contractor Targeted Small Business Enterprise Pre-Bid Contract Information o Bid Security – 5% of total Bid amount
• Apparent low bidder will be required to submit subcontractor/supplier list 48hrs after the bid opening
Official Documented Meeting Minutes
• N/A
3.2 1 Bid Schedule Open
Description
• Questions/Substitutions Due in Writing to Construction.Procurement@iowa.gov: 3:00 pm, Tuesday, April 22, 2025
• Addendum Issued: On or before Tuesday, April 29
• Bids Due: 2:00 pm, Thursday, May 1, 2025
• Tentative NOI Issued: Monday, May 5, 2025
3.3 1 Administrative Details Open
Description
• Contractors will sign a modified ConsensusDocs 802. Example is provided in the project manual.
• Project-specific Certificate of Insurance must be provided prior to contract execution. Follow example in the project manual and limits in the 802.
• Project-specific P&P bonds must be provided prior to contract execution.
• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours of the bid.
• DAS will provide tax exempt certificates upon request.
• Procore will be used for all project management, at no cost to the trade contractor.
o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign
• Contractor Schedule of Values shall be broken out as specified in the project manual.
o SOV must contain a closeout line item for at least 1% of the total contract value.
o This line item can only be invoiced once the certificate of final completion has been signed by all parties.
State of Iowa - Department of Administrative Services Page 4 of 5 Printed On: Apr 18, 2025 09:54 AM CDT mailto:Construction.Procurement@iowa.gov:
3.4 1 Pre-Bid Site Visits Open
Description
• Any?
• Any additional site visits to be coordinated by calling Tony Kempker at (319) 931-9460.
Questions
4.1 1 Questions Open
Description Submit all questions in writing to construction.procurement@iowa.gov.
Official Documented Meeting Minutes
• All questions that were asked during the walkthrough will be answered via addendum.
These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.
Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.
State of Iowa - Department of Administrative Services Page 5 of 5 Printed On: Apr 18, 2025 09:54 AM CDT
File details come from the government source that posted it. Updated .