This document is an addendum to a Request for Bid (RFB) for the DOC ISP Perimeter Fence Deterrent System Replacement project at the Iowa State Penitentiary in Fort Madison, Iowa. The project is managed by the Iowa Department of Administrative Services. Addendum No. 3 revises the Bid Form and Contract Summary sections, including adding an allowance for controls programming, deleting Alternate #2, and moving the allowance into Bid Package #01. Bids are due on May 21, 2024. The project has a target substantial completion date of September 27, 2024.
The bid package includes all work related to the perimeter fence deterrent system replacement, including material, labor, and equipment. Bidders must identify all subcontractors and suppliers within 48 hours of the bid due date. The contract includes rules and restrictions for construction workers on the secure state penitentiary site.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project #9370.00 Addendum #01 Page 1 of 3
ADDENDUM NO. 3
Date: 05/15/2024
Project Name: DOC ISP Perimeter Fence Deterrent System Replacement
DAS RFB #: 937000-01
DAS Project #: 9370.00
BIDS DUE: 05/21/2024
The original Project Manual and Drawings for the project noted above are amended as noted in this
Addendum. Included in this Addendum are Specification, Architectural, & Engineering items.
Please review all sheets and incorporate them into your set of Contract Documents.
The receipt of this Addendum shall be acknowledged by inserting its number and date in the space provided on the Bid Form.
This Addendum consists of:
General Items:
1. Section 00 4116, Bid Form – Revised (Added allowance) (4 page)
2. Section 01 1200, Contract Summary – Revised (Deleted Alternate #2 and moved allowance into
Bid Package #01) (3 pages)
Drawings and Specifications:
1. Replace Sheet E03 Electrical Details with the attached (1page)
PROJECT 9370.00 BID FORM 00 4116 - 1
SECTION 00 4116
BID FORM
The Bid Form must be submitted online through the State’s IMPACS Electronic Procurement System.
RFB #937000-01
BID FORM for CONSTRUCTION CONTRACT for
Iowa State Penitentiary 2111 330th Ave. Fort Madison, Iowa 52627
Project 9370.00
Iowa Department of Administrative Services Hoover State Office Building, Level 3 1305 East Walnut Street Des Moines, Iowa 50319-0105
The following information is to be completed and submitted with your bid.
1. Bid Form - Completed and Signed (to be uploaded with bid submission)
2. Non-Discrimination Clause Information
3. Contractor Targeted Small Business Enterprise Pre-Bid Contract Information
4. Bid Security – 5% of total Bid amount (to be uploaded with bid submission)
Authorized Representative:
The undersigned Bidder, in response to your Request for Bid for construction of the above project, having examined the Drawings, Specifications, and other Bidding Documents dated March 22, 2024, and Addenda issued and acknowledged below as received and being familiar with all the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment and supplies to perform all work to construct the project in strict accordance with the proposed Contract Documents, within the time and at the prices stated below. Prices are to cover all expenses incurred in performing the work required under the proposed Contract Documents, of which this bid is a part.
Bidder acknowledges receipt of the following Addenda which are a part of the Bidding Documents and for which any effect on cost of the Work is included in the bid amounts indicated:
Number ________ ________ ________ ________ ________
Dated ________ ________ ________ ________ ________
Note that the State of Iowa is exempt from State and Local sales and use taxes (including local option and school option) for this project. Taxes on construction materials shall NOT be included in the bid amounts.
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa
PROJECT 9370.00 BID FORM 00 4116 - 2
Amounts shall be indicated in both words and figures. In case of discrepancy, the amount indicated in words shall govern.
BID PACKAGES:
Bid Package #01
Perimeter Fence Deterrent System Replacement: Trade Contractor shall include all of the following, but not limited to, as part of the contract:
1. All work on the contract documents and specifications complete; material, labor and equipment including all freight, unloading and installation for a complete scope.
2. Includes specification: 01 1200.
3. Includes allowance for controls programming: $3,850.00.
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum of:
Dollars
ALTERNATES:
ALTERNATE #01
(ADD) State the lump sum pricing for additional Gallagher F32 controller or approved equal to each zone:
Trade Contractor shall include all of the following, but not limited to, as part of the contract:
1. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
2. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
3. Execute accepted alternates under the same conditions as other work of the Contract.
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum of:
Dollars
Bidder hereby certifies that:
1. This bid is genuine and is not made in the interest of or on behalf of any undisclosed person, firm or corporation;
2. Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding;
and Bidder has not sought by collusion to obtain any advantage over any other bidder or over the Owner.
3. Bidder hereby certifies that the Bidder is registered with the Iowa Labor Commissioner as a Contractor as required by Chapter 91C, Code of Iowa.
PROJECT 9370.00 BID FORM 00 4116 - 3
4. Bidder agrees to comply with all Federal and State Affirmative Action/Equal Employment Opportunity requirements concerning fair employment and will not discriminate between or among them by reason of race, color, religion, sex, national origin or physical handicap.
5. All construction under this Contract shall conform to the requirements of the Iowa State Building Code.
6. Bidder agrees that this bid shall remain valid and shall not be withdrawn for a period of thirty (30) calendar days after the date for receipt of bids.
7. Bidder agrees that if written notice of acceptance of this bid is mailed, emailed, or delivered to the undersigned within thirty (30) days after the date in which bids are due, or at any time thereafter before it is withdrawn, the undersigned will sign and return the Contract Agreement, prepared in accord with the Bidding Documents and this bid as accepted; and will also provide proof of insurance coverage and required surety bonds.
8. Bidder understands that the Owner reserves the right to reject any and all bids, and to waive irregularities or informalities and enter into a contract for the work, as the Owner deems to be in the best interest of the State.
9. Bidder understands that the Owner reserves the right to accept any, or no, Alternate Bid, if requested, and that the Alternate Bids may be considered in any order or combination, and the low Bidder shall be determined on the basis of the sum of the base bid and any Alternate(s) accepted.
Subcontractors:
The Trade Contractor must identify all Subcontractors and Suppliers within 48 hours of the published date and time for which bids must be submitted, in accordance with Iowa Code Section 8A311, as amended by House File 646 in 2011. Subcontractors and suppliers may not be changed without the approval of the Owner. Requests for changing a Subcontractor or supplier must identify the reason for the proposed change, the name of the new Subcontractor or supplier, and the change in the subcontractor or supplier price as a result of the change. Any reduction in subcontractor or supplier price as a result of the change, if the change is approved by the Owner, shall be deducted from the Trade Contract Price via a deductive Change Order. Any such changes, if approved by the Owner, which result in an increase in the Trade Contract Price shall be borne by the Trade Contractor.
Enforcement of Reciprocal Resident Bidder Preference, per Iowa Code 73A.21.
All bidders shall either check the box next to “Resident Bidder” or check the box next to “Nonresident Bidder” and by doing so and signing thereafter certifies and attests to the same. All information requested must be provided. Seek out the advice of an attorney if you have questions.
“Resident Bidder” means a person or entity authorized to transact business in of the State of Iowa and having a place of business for transacting business within the State of Iowa at which it is conducting and has conducted business for at least three years prior to the date of the first advertisement for the public improvement. Note, however, that if a nonresident bidder’s state or foreign country has a more stringent definition of a resident bidder, the more stringent definition is applicable as to bidders from that state or foreign country.
Resident Bidder
Name of Resident Bidder: ___________________________
By: _____________________________________ Authorized Agent and Signatory of Resident Bidder
OR:
PROJECT 9370.00 BID FORM 00 4116 - 4
Nonresident Bidder
Name of Nonresident Bidder: ___________________________
Name of State or Foreign Country of Nonresident Bidder: ___________________________
Particularly identify and describe any preference, labor preference, or any other type of preferential treatment, in effect in the nonresident bidder’s state or foreign country at the time of this bid:
NOTICE: Nonresident Bidders domiciled in a state or country with a resident labor force preference shall make and keep, for a period of not less than three years, accurate records of all workers employed on the public improvement. The records shall include each worker’s name, address, telephone number when available, social security number, trade classification, and the starting ending time of employment.
By: ________________________________________ Authorized Agent and Signatory of Nonresident Bidder
Bid Form shall be signed by an officer of the company with authority to bind in a contract.
Notice of acceptance of this bid, or request for additional information by the Department of Administrative Services, may be addressed to the undersigned at the address set forth below:
Legal Name of Firm: ____________________________________________________________
Date: _________________________________________________
Signature of Bidder: ____________________________________________________
Title: ______________________________________________________
Typed Name of Signatory: _____________________________________________________
Email: _______________________________________
Business Address:
Telephone Number: ____________________ Fax Number: ____________________
Federal Tax Identification Number: ____________________
Iowa Contractor Registration Number: _________________________
Bidder Safety Manager Name:_______________________________
For an out-of-state Bidder, Bidder certifies that the Resident Preference given by the State or
Foreign Country of Bidder’s residence, _________________________, is _______ %.
END OF SECTION
PROJECT 9370.00 CONTRACT SUMMARY 01 1200 - 1
SECTION 01 1200
CONTRACT SUMMARY
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Project Information B. Project Summary C. Bid Scope Summary D. Work Hour Restrictions E. Access to Site F. Coordination with Occupants G. Rules for Construction Workers H. Bid Package Instructions
1.02 PROJECT INFORMATION
A. Facility Name/Location: Iowa State Penitentiary 2111 330th Ave. Fort Madison, Iowa 52627 B. DAS Project #: 9370.00 C. Owner: State of Iowa, Department of Administrative Services, Hoover State Office Building, Level 3, 1305 East Walnut Street, Des Moines, IA 50319 D. Owner’s Representative: Brandon Adams, Iowa Department of Administrative Services, 109 SE
13th Street, Des Moines, IA 50319 E. Construction Manager: Jarrad Boever, Boyd Jones, 11204 Aurora Ave. Urbandale, IA 50322
1.03 PROJECT SUMMARY
A. The project includes perimeter fence deterrent system replacement.
B. Target date to provide substantial completion is September 27, 2024.
1.04 BID SCOPE SUMMARY
A. Scope Applicable to All Bid Packages:
1. The Contractor’s Work includes all labor, supervision, materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractor’s Work shall be performed in accordance with the Drawings, Specification Divisions 00 and 01, and Specification sections applicable to each Contractor’s scope.
2. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything so stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement.
3. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place.
4. Provide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task lighting for work, etc. as determined necessary by Contractor. Coordinate location of
PROJECT 9370.00 CONTRACT SUMMARY 01 1200 - 2
trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager.
5. Contractor shall provide all equipment and tools for Contractor’s own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner’s operations, and at the discretion of the Construction Manager.
6. All turf, landscaping, and subgrade disturbances caused by equipment traffic or other activities related to the Contractor’s scope shall be repaired or restored to proper conditions by the Contractor.
7. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractor’s Scope of work.
8. Contractor shall maintain an accurate set of As-Built Drawings throughout the duration of the project and submit to the Construction Manager at the completion of the project.
1.05 WORK HOUR RESTRICTIONS
A. Work hours are from 8:00 AM to 5:00 PM, Monday through Friday unless arrangements are made in advance.
B. Razor wire above the weather heads may be relocated by the facility if needed but must be back in place at the end of each day. Plan for 30 minutes at the beginning and end of each day for razor wire relocation.
1.06 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to areas noted on Drawings.
B. Provide access to and from site as required by law and Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permission of Owner and permit if required.
C. Facility will be occupied at all times during duration of work. Contractor personnel shall conduct themselves in an agreeable manner at all times. Failure to do so may result in removal from the work site.
1.07 OWNER OCCUPANCY
A. Owner intends to occupy the Project upon Substantial Completion.
B. Cooperate with Owner to minimize conflict and to facilitate Owner’s operations.
C. Schedule the Work to accommodate Owner occupancy.
1.08 RULES FOR CONSTRUCTION WORKERS
A. The staff of the State of Iowa has a responsibility to protect the public by providing a secure environment. All work site rules must be followed to the letter, at all times.
B. All construction workers must have a background check completed prior to entering the campus to perform work.
C. Hot Work Permit Processes and Fire Watch, when necessary, will be adhered to for this project.
D. All State properties are tobacco free. No smoking will be permitted or tolerated on campus unless in designated areas.
E. You are permitted access only to the work site and no other area of the institution.
F. No drugs, alcohol, or firearms are allowed on the work site.
G. Do not leave money, drugs, alcohol, or firearms in your personal vehicle.
H. Company and personal vehicles are to be parked and locked in designated or authorized area of the work.
PROJECT 9370.00 CONTRACT SUMMARY 01 1200 - 3
I. Secure all tools at the end of the day.
J. Maintain control of all tools, supplies, and debris at all times during the work.
K. Never leave keys in any vehicle. If a security officer finds keys in a vehicle, they are under orders to turn them in to a security supervisor.
L. Do not give anything to residents or take anything from residents; if they offer, inform your supervisor.
M. Secure all tools at the end of each day. Never leave tools unattended. All tools shall be checked in at the beginning of the day and checked out at the end of the day. If security officers find loose tools, they are under orders to turn them in to their supervisor.
N. All delivery vehicles must go directly to the job site. Extra time should be anticipated for all deliveries. Provide 24-hour notice to the facility of deliveries.
O. During an emergency, follow the instructions of the security staff.
P. Contractor shall wear clothing of a different color, pattern, fashion, etc. as to distinguish themselves from inmates.
Q. All contractors working onsite at Iowa State Penitentiary must complete PREA Training and have background checks done prior to the commencement of any work. This will be coordinated through the construction manager (Boyd Jones).
1.09 BID PACKAGE INSTRUCTIONS
A. Bid Package #01 – Perimeter Fence Deterrent System Replacement: Trade Contractor shall include all of the following, but not limited to, as part of the contract:
1. All work on the contract documents and specifications complete; material, labor and equipment including all freight, unloading and installation for a complete scope.
2. Includes specification: 01 1200.
3. Includes allowance for controls programming: $3,850.00.
B. Alternate #01 – (ADD) State the lump sum pricing for additional Gallagher F32 controller or approved equal to each zone: Trade Contractor shall include all of the following, but not limited to, as part of the contract:
1. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
2. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
3. Execute accepted alternates under the same conditions as other work of the Contract.
PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION – NOT USED
END OF SECTION
M A
R K
D A
T E
D
E S
C R
I P
T I O
N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
101320
MAH
3/22/2024
2871 Heinz Rd. Suite B, Iowa City, IA 52240 T 319.855.4115 I F 319.351.0070 www.InnovativeEngineersInc.com
MEP ENGINEER
INNOVATIVE ENGINEERS, INC.
O U
T
F
O R
B
I D
IO
W
A D
EP
A
RT
. O
F A
D M
IN
IS
TR
A
TIV
E
SE
RV
IC
ES
C
EN
TR
A
L
PR
O C
UR
EM
EN
T
EN
TE
RP
RI
SE
S
(C
PE
HO
O V
ER
S
TA
TE
O
FF
IC
E
BU
IL
D
IN
G , L
EV
EL
E
A
ST
W A
LN
UT
D
ES
M O
IN
ES
, I A
-0
.0
DO
C
IS
P
PE
RI
M
ET
ER
FE
N C
E
DE
TE
RR
EN
T
SY
ST
EM
RE
PL
A
C
EM
EN
T
T H
V E
F T
M
A D
I S
O N
I O
W
E03
ELECTRICAL
DETAILS
EXISTING FENCE CONTROLLER CABINETS
NOT TO SCALE
E03
Project #9370.00 Addendum #01 Page 3 of 3
END OF ADDENDUM NO. 3