This document contains the drawings and specifications for the DVA IVH Courtyard Sun Shades project, which is being managed by the Iowa Department of Administrative Services and the State Design and Construction Resources Bureau. The project involves the construction of new sunshades in the courtyard of the Iowa Veterans Home in Marshalltown, Iowa. The design includes two locations for sun shade structures, one with a square configuration and the other with a custom cantilever design. An alternate bid item is also included for a single column 15'x15' cantilever sun shade. The contractor will be responsible for excavating and locating utility lines, demolition, site restoration, and all other work required to complete the project. Bids for this project are due on a date to be determined, and the successful contractor will be awarded the contract for an unspecified term.
The document provides detailed technical specifications for the concrete, reinforcing steel, demolition, traffic control, landscaping, and other aspects of the project. It also includes general notes regarding utility locates, contractor responsibilities, and other project requirements. Pricing terms, funding sources, and other commercial details are not included in this document.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E41
E35
E29
0 0.1
A B C D E F
A B C D E F
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
DVA IVH COURTYARD SUN SHADES
PROJECT NO. 9355.00
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
My License Renewal Date is: DECEMBER 31, Printed or typed name:
License Number:
Signature: Date
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED
BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF IOWA.
ALL SHEETS
CHRISTOPHER R. BAUER
19737
CIVIL ENGINEER
12/04/2023
CHRISTOPHER
ROBERT
BAUER
19737
MARSHALLTOWN, IA 50158
PROJECT MAPVICINITY MAP
1301 SUMMIT ST.
IOWA VETERANS HOME
GENERAL NOTES
1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS PLOTTED ON THESE
DRAWINGS ARE APPROXIMATE ONLY AND WERE OBTAINED FROM RECORDS MADE AVAILABLE TO
SHIVE-HATTERY, INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT SHOWN ON THESE DRAWINGS. THE VERIFICATION OF EXISTENCE OF, AND THE DETERMINATION OF THE EXACT LOCATION OF, UTILITY
MAINS, STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE
CONSTRUCTION CONTRACTOR(S).
2. CONTRACTOR SHOULD ANTICIPATE THAT ADDITIONAL UTILITIES THAT ARE NOT SHOWN WILL BE ENCOUNTERED. CONTRACTOR TO WORK WITH CONSTRUCTION MANAGER AND FACILITY AS REQUIRED
TO MAKE FIELD ADJUSTMENTS.
3. IOWA CODE UNDERGROUND FACILITIES INFORMATION, REQUIRES VERBAL NOTICE TO IOWA ONE-CALL
1-800-292-8989, NOT LESS THAN 48 HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND
HOLIDAYS.
4. NOTIFY UTILITY COMPANIES WHOSE FACILITIES ARE SHOWN ON THE PLANS OR KNOWN TO BE WITHIN
THE CONSTRUCTION LIMITS OF THE SCHEDULE PRIOR TO EACH STAGE OF CONSTRUCTION.
5. CONTRACTOR SHALL VERIFY AND COORDINATE WITH OWNER TO LOCATE ALL PRIVATE UTILITIES
WHICH WILL BE IMPACTED BY CONSTRUCTION.
6. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S EMPLOYEES ARE SOLELY THE
RESPONSIBILITY OF THE CONTRACTOR.
7. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT PRIOR AUTHORIZATION
FROM THE OWNER'S REPRESENTATIVE.
8. UNLESS OTHERWISE SPECIFIED, ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN SPECIFICATIONS FOR PUBLIC
IMPROVEMENTS.
9. PROTECT EXISTING UTILITIES AND STRUCTURES TO REMAIN DURING CONSTRUCTION.
10. MAINTAIN POSITIVE DRAINAGE ON THE SITE THROUGHOUT THE PROJECT DURATION.
11. SITE CLEANUP SHALL BE PERFORMED ON A DAILY BASIS. DRIVES, ROADWAYS, ETC. SHALL BE KEPT
CLEAN AT ALL TIMES.
12. ALL OPEN EXCAVATIONS SHALL BE PROTECTED.
13. CONTROL DUST SPREADING FROM ALL WORK AND STAGING AREAS.
14. ANY WORK REQUIRED TO COMPLETE THE SCOPE OF THIS PROJECT, BUT NOT SPECIFICALLY CALLED OUT, SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. NO ADDITIONAL COMPENSATION SHALL
BE ALLOWED FOR THE COMPLETION OF THIS WORK.
15. REPAIR OR REPLACE DAMAGED FACILITIES (WALLS, PAVEMENT, UTILITIES, FENCES, ETC.) TO REMAIN
AT NO ADDITIONAL EXPENSE TO THE OWNER.
16. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE CONTRACT WILL BE CONSIDERED
UNACCEPTABLE. UNACCEPTABLE WORK, WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF
DEFECTIVE MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE FOUND TO EXIST
PRIOR TO THE FINAL ACCEPTANCE OF THE WORK SHALL BE REMOVED AND REPLACED IN AN
ACCEPTABLE MANNER AS REQUIRED BY OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S
EXPENSE. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNER'S REPRESENTATIVE, WORK
DONE BEYOND THE LINES SHOWN ON THE PLANS OR ANY EXTRA WORK DONE WITHOUT WRITTEN
AUTHORIZATION WILL NOT BE PAID FOR.
17. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY/COUNTY/STATE REGULATIONS/CODES AND
OSHA STANDARDS.
18. CONTRACTOR TO REPAIR AND REPLACE ANY DAMAGE TO EXISTING ROADS AND SIDEWALKS CAUSED
BY CONSTRUCTION ACTIVITIES.
19. CONTRACTOR SHALL PROVIDE ALL TRAFFIC AND PEDESTRIAN CONTROL ACCORDING TO MUTCD AND AS REQUESTED BY OWNER. CONTRACTOR SHALL ASSUME PEDESTRIAN TRAFFIC WILL BE OCCUPYING
THE COURTYARD AREA THROUGHOUT CONSTRUCTION AND SHALL WORK WITH CONSTRUCTION
MANAGER TO FENCE OFF CONSTRUCTION AREAS.
20. CONTRACTOR SHALL PROVIDE ALL SURVEY STAKING REQUIRED TO COMPLETE THE PROJECT.
CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING PROJECT CONTROL AND LAYOUT AS REQUIRED.
21. CONTRACTOR SHALL FIELD LOCATE AND ADJUST SUN SHADE STRUCTURES AND FOUNDATIONS AS REQUIRED BASED ON ACTUAL FIELD CONDITIONS AND UTILITY LOCATES. NO ADDITIONAL PAYMENT
FOR FIELD ADJUSTMENTS TO AVOID EXISTING UTILITIES WILL BE MADE.
PROJECT
LOCATION
PROJECT
LOCATION
US-30
IOWA
VETERANS
HOMEMARSHALLTOWN, IA
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C000
CO
VE
R
SH
EE
T
ED
R
CR
B
CO
NS
TR
UC
TI
O
N
/4
/2
D
VA
IV
H
C O
U R
TY
AR
D S
U N
SH
AD
ES
IO
W
A
VE
TE
RA
NS
H
O M
E
S
UM
M
IT
S T, M
AR
SH
AL
LT
O
W N, IO
W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
CO
VE
R
SH
EE
T.
dw g
/1 /2
2:
:4
PM
CONTACT INFORMATION
OWNERENGINEER
IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES
STATE DESIGN AND CONSTRUCTION RESOURCES BUREAU
ATTN: BRAD TONYAN
BRAD.TONYAN@IOWA.GOV
109 SE 13TH STREET
DES MOINES, IOWA 50319
PHONE: 515-360-7718
SHIVE-HATTERY, INC.
ATTN: CHRIS BAUER
CBAUER@SHIVE-HATTERY.COM
4125 WESTOWN PKWY, SUITE 100
WEST DES MOINES, IOWA 50266
PHONE: (515) 223-8104
SITE ADDRESS
IOWA VETERANS HOME
1301 SUMMIT STREET
MARSHALLTOWN, IA 50158
CONSTRUCTION MANAGER
DCI GROUP
ATTN: MICHAEL STEEN
MICHAELS@DCIGROUP-US.COM
220 SE 6TH ST, SUITE 200
DES MOINES, IOWA 50309
PHONE: (515) 975-8348
LIGHT POST
FIRE HYDRANT
VALVE
CLEANOUT
DRAINAGE MANHOLE
SANITARY MANHOLE
CURB INTAKE
GAS MAIN
SANITARY SEWER
MINOR CONTOUR
STORM SEWER
FIBER OPTIC
WATER MAIN
TREE
TREE REMOVAL
CURB AND GUTTER (PCC)
MAJOR CONTOUR
STORM INTAKE
BOLLARD
BUILDING
909 909
PROPOSEDDESCRIPTIONEXISTING
SUBDRAIN
FLARED END SECTION
TRANSFORMER
LEGEND
Sheet List Table Sheet Number Sheet Title
C000 COVER SHEET
C001 GENERAL NOTES AND LEGEND
C101 OVERALL SITE PLAN
C102 SUN SHADE PLAN
C103 SUN SHADE PLAN
A B C D E F
A B C D E F
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN
SPECIFICATIONS FOR PUBLIC IMPROVEMENTS SHALL APPLY TO ALL
WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN.
TRAFFIC AND PEDESTRIAN CONTROL NOTES
1. CONTRACTOR MUST MAINTAIN EMERGENCY EGRESS ACCESS TO BUILDINGS THROUGHOUT CONSTRUCTION, UNLESS OTHERWISE APPROVED BY OWNER.
2. CONTRACTOR MUST MAINTAIN FIRE DEPARTMENT ACCESS TO COURTYARD THROUGHOUT CONSTRUCTION.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL VEHICULAR AND PEDESTRIAN TRAFFIC DURING
CONSTRUCTION AND PROVIDE ADEQUATE TRAFFIC AND PEDESTRIAN CONTROL AND SIGNAGE.
4. CONTRACTOR TO INSTALL AND MAINTAIN ORANGE CONSTRUCTION FENCE AROUND ALL AREAS OF ACTIVE CONSTRUCTION. CONTRACTOR SHALL ASSUME PEDESTRIAN TRAFFIC WILL BE IN THE AREA THROUGHOUT THE
PROJECT DURATION.
EROSION CONTROL NOTES
1. AN NPDES PERMIT WILL NOT BE REQUIRED FOR THE PROJECT AS IT WILL HAVE A TOTAL DISTURBED AREA OF
LESS THAN ONE ACRE.
2. USE ALL AVAILABLE MEANS TO MINIMIZE THE AMOUNT OF SOIL EROSION CAUSED BY THE WORK OF THE PROJECT. REPAIRS TO SOIL EROSION CONTROL DEVICES SHALL BE COMPLETED WITHIN 2 DAYS FROM
NOTIFICATION.
3. CONTRACTOR SHALL STILL COMPLY WITH APPLICABLE IOWA DNR, US EPA AND LOCAL REGULATIONS DEALING WITH STORMWATER RUNOFF AND EROSION CONTROL. AT A MINIMUM, CONTRACTOR SHALL INSTALL ALL
STORMWATER CONTROL STRUCTURES AS INDICATED ON THE DRAWINGS AND AS REQUIRED.
4. PROVIDE CONCRETE WASHOUT FACILITIES AS NEEDED.
DEMOLITION NOTES
1. REMOVAL REQUIREMENTS SHOWN ON THE PLANS SHOULD BE CONSIDERED MINIMUM REMOVAL AND REPLACEMENT REQUIREMENTS. CONTRACTORS SHALL ADJUST REMOVAL LIMITS AND DIMENSIONS AS REQUIRED BY CONSTRUCTION MEANS AND METHODS AND ACTUAL SITE CONDITIONS. CONTRACTORS SHOULD FACTOR ADDITIONAL ANTICIPATED REMOVAL AND REPLACEMENT REQUIREMENTS INTO THEIR BIDS AS ADDITIONAL COMPENSATION REQUESTS FOR ADJUSTED OR EXPANDED REMOVAL LIMITS WILL NOT BE APPROVED.
2. CONTRACTOR SHALL REPLACE AT NO COST TO THE OWNER ALL STREETS, DRIVES, SIDEWALKS, CURB AND GUTTER, SIGNS, PAVEMENT MARKINGS, LIGHTS, FENCES AND ALL OTHER SURFACE STRUCTURES NOT SCHEDULED TO BE REMOVED DURING THE COURSE OF THE WORK THAT ARE DAMAGED BY THE CONTRACTOR.
3. WHERE A SECTION OF PAVEMENT, CURB AND GUTTER, OR SIDEWALK IS CUT OR OTHERWISE DAMAGED BY THE CONTRACTOR, THE ENTIRE SECTION SHALL BE REMOVED AND REPLACED. PAVEMENT, CURBS, GUTTERS, AND SIDEWALKS SHALL BE REMOVED TO THE NEAREST JOINT A MINIMUM OF TWO FEET BEYOND THE EDGE OF ALL EXCAVATIONS. CONTRACTOR SHALL DOCUMENT (OR PHOTO) ALL CRACKED PCC PAVEMENT OR DAMAGED HMA PAVEMENT PRIOR TO CONSTRUCTION. IF NEW CRACKS IN PCC PAVEMENT DEVELOP OR HMA PAVEMENT IS DAMAGED DUE TO THE CONSTRUCTION TRAFFIC (EXTENDS BEYOND CONSTRUCTION LIMITS), CONTRACTOR SHALL
REPLACE DAMAGED AREA AT NO ADDITIONAL COST TO OWNER.
4. ALL LANDSCAPING AND TREES CALLED OUT TO BE REMOVED SHOULD BE REMOVED IN THEIR ENTIRETY, INCLUDING STUMPS AND ROOTS LARGER THAN 2". PROVIDE COMPACTED SOIL BACKFILL FOR ALL VOIDS CREATED.
5. ALL LANDSCAPING INCLUDING TREES, SHRUBS, PERENNIALS NOT CALLED OUT TO BE REMOVED OR APPROVED FOR REMOVAL BY CONSTRUCTION MANAGER SHALL BE PROTECTED AND REPLACED AT NO COST TO THE OWNER
IF DAMAGED DURING CONSTRUCTION.
EXCAVATION NOTES
1. STRIP, STOCKPILE, AND RESPREAD A MINIMUM OF 6” OF TOPSOIL IN ALL SOD AREAS DISTURBED BY CONSTRUCTION. DISTURBED AREAS SHALL BE LEFT IN SMOOTH CONDITION READY FOR FINAL SEEDBED PREPARATION. GRADE ALL DISTURBED ARES TO DRAIN AS PONDING OF WATER WILL NOT BE ACCEPTABLE.
2. CONTRACTOR IS RESPONSIBLE FOR ALL TRENCH AND FILL SETTLEMENT FOR THE PROJECT'S ONE YEAR WARRANTY PERIOD. CONTRACTOR SHALL PROVIDE ADDITIONAL FILL MATERIAL AND IS RESPONSIBLE FOR
RESEEDING OF ALL SETTLEMENT AREAS AFTER SITE RESTORATION HAS BEEN COMPLETED.
3. CONTRACTOR IS RESPONSIBLE FOR IDENTIFICATION AND LOCATION OF EXISTING UTILITIES, INCLUDING THE NEED FOR POT HOLING OR HAND EXCAVATION AS REQUIRED BY THE CONTRACTORS MEANS AND METHODS.
SURFACE RESTORATION NOTES
1. ALL DISTURBED AREAS NOT PAVED ON THE SITE SHALL RECEIVE 6" TOPSOIL PRIOR TO SODDING. SCARIFY AREAS TO RECEIVE TOPSOIL TO A MINIMUM DEPTH OF 4". REMOVE ALL STONES, WOOD AND OTHER DEBRIS
LARGER THAN 2" FROM AREAS TO RECEIVE TOPSOIL. DO NOT COMPACT TOPSOIL.
2. ALL DISTURBED AREAS NOT PAVED OR IN LANDSCAPE BEDS ON THE SITE SHALL BE SODDED.
3. ANY SODDING LIMITS SHOWN SHOULD BE CONSIDERED MINIMUMS AS CONTRACTOR IS RESPONSIBLE FOR ALL SURFACE RESTORATION REQUIRED FOR AREAS DISTRIBUTED BY CONSTRUCTION. ADDITIONAL PAYMENT WILL NOT BE MADE FOR SODDING/SEEDING BEYOND MINIMUM LIMITS SHOWN ON THE DRAWINGS.
4. CONTRACTOR TO RESTORE ALL LANDSCAPE BED AREAS DISTURBED BY CONSTRUCTION. REPLACE ROCK
MULCH AREAS TO MATCH EXISTING MATERIALS.
CONTRACTOR STAGING
1. COORDINATE ALL REQUIRED STAGING AREAS WITH FACILITY AND CONSTRUCTION MANAGER.
2. CONTRACTOR IS RESPONSIBLE FOR ALL SURFACE RESTORATION REQUIRED FOR STAGING AND ACCESS
ROUTES, IF DISTURBED BY CONSTRUCTION.
SPECIFICATIONS
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) SHALL APPLY TO ALL
SITE WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN.
A. CONCRETE PAVING:
CONCRETE: MATERIALS AND MIXING FOR ALL CONCRETE WORK, UNLESS OTHERWISE SPECIFIED, SHALL CONFORM TO
IOWA DOT SPECIFICATIONS FOR AIR-ENTRAINED TYPE C-4 MIX WITH TYPE I CEMENT
FLY ASH (CONTRACTOR'S OPTION AS ADDITIONAL PAYMENT WILL NOT BE PROVIDED IF FLY ASH IS NOT AVAILABLE) - ASTM
C618, TYPE C, NOT TO EXCEED 15% OF CEMENTITIOUS MATERIAL.
COARSE AGGREGATE DURABILITY SHALL BE CLASS III, 3/4" MAX.
COMPRESSIVE STRENGTH 2800 PSI @ 7 DAYS AND 4000 PSI @ 28 DAYS
SLUMP: 3" ± 1" or 8" MAXIMUM WITH SUPER PLASTICIZER.
AIR CONTENT: 7.0% ± 1.0%
WATER/CEMENT RATIO: NOT TO EXCEED 0.53
FINISH: HEAVY BROOM FINISH
TESTING - ONE SET OF TEST CYLINDERS REQUIRED FOR EACH 100 C.Y. OR PORTION THEREOF, OF CONCRETE POURED PER WORK LOCATION. CONCRETE TESTING TO BE DONE AND PAID FOR BY OWNER. CONTRACTOR SHALL COORDINATE
AND SCHEDULE ALL REQUIRED TESTING AND GEOTECHNICAL WORK.
SURFACE CURING: CONTRACTOR SHALL APPLY WHITE PIGMENT LIQUID CURING COMPOUND IN A FINE SPRAY TO FORM CONTINUOUS UNIFORM FILM AFTER FINISHING AND SURFACE MOISTURE HAS DISAPPEARED, OR WITHIN 30 MINUTES
AFTER FORMS ARE REQUIRED.
COLD-WEATHER PLACEMENT: COMPLY WITH ACI 306.1 AND AS FOLLOWS. PROTECT CONCRETE WORK FROM PHYSICAL DAMAGE OR REDUCED STRENGTH THAT COULD BE CAUSED BY FROST, FREEZING ACTIONS, OR LOW TEMPERATURES.
1. WHEN AVERAGE HIGH AND LOW TEMPERATURE IS EXPECTED TO FALL BELOW 40 DEG F FOR THREE SUCCESSIVE
DAYS, MAINTAIN DELIVERED CONCRETE MIXTURE TEMPERATURE WITHIN THE TEMPERATURE RANGE REQUIRED BY
ACI 301.
2. DO NOT USE FROZEN MATERIALS OR MATERIALS CONTAINING ICE OR SNOW. DO NOT PLACE CONCRETE ON FROZEN
SUBGRADE OR ON SUBGRADE CONTAINING FROZEN MATERIALS.
3. DO NOT USE CALCIUM CHLORIDE, SALT, OR OTHER MATERIALS CONTAINING ANTIFREEZE AGENTS OR CHEMICAL
ACCELERATORS UNLESS OTHERWISE SPECIFIED AND APPROVED IN MIXTURE DESIGNS.
PROVIDE OWNERS REPRESENTATIVE WITH CONCRETE MIX DESIGN FOR APPROVAL.
B. REINFORCING STEEL:
PAVING REINFORCEMENT SHALL BE ASTM A615 GRADE 60, AND SHALL HAVE A PROTECTIVE COATING OF EPOXY APPLIED
BY ELECTROSTATIC SPRAY METHOD IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A775.
C. DEMOLITION:
REMOVE OBSTRUCTIONS TO PERMIT INSTALLATION OF NEW CONSTRUCTION. REMOVE AND DISPOSE OF OBSTRUCTIONS TO A MINIMUM DEPTH OF 12 INCHES BELOW EXPOSED SUBGRADE OR PROPOSED SUBGRADE ELEVATION, WHICHEVER IS LOWER. FILL DEPRESSIONS CAUSED BY DEMOLITION OPERATIONS WITH SATISFACTORY SOIL MATERIAL. PLACE FILL MATERIAL IN HORIZONTAL LAYERS NOT EXCEEDING A LOOSE DEPTH OF 8 INCHES, AND COMPACT EACH LAYER TO A
DENSITY EQUAL TO ADJACENT ORIGINAL GROUND OR SPECIFIED FILL REQUIREMENTS.
D. TRAFFIC AND PEDESTRIAN CONTROL:
PROVIDE BARRICADES, FENCING, AND OTHER DEVICES TO KEEP UNAUTHORIZED PERSONNEL FROM PROJECT SITE.
PROTECT THE CONCRETE PAVEMENT DURING INITIAL CURE, AND PROTECT OR DELINEATE THE WORK AREA AS DIRECTED
BY THE OWNER.
KEEP INTERFERENCE WITH TRAFFIC TO A MINIMUM. DO NOT BLOCK EXISTING SITE ROADWAYS UNLESS APPROVED BY
OWNER.
K. SODDING:
SOD MATERIALS AND INSTALLATION SHALL MEET SUDAS SODDING SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR SODBED PREPARATION AND FIRST AND SECOND APPLICATIONS OF FERTILIZER. CONTRACTOR RESPONSIBLE FOR 2 WEEKS OF WATERING FOLLOWING SOD INSTALLATION. OWNER IS RESPONSIBLE FOR ALL WATERING AND MAINTENANCE FOLLOWING 2 WEEKS POST INSTALLATION. CONTRACTOR SHALL COORDINATE WITH AND PROVIDE DIRECTION TO OWNER ON RECOMMENDED WATERING AND MAINTENANCE. ACCEPTANCE WILL BE COMPLETED A MINIMUM OF 60 DAYS AFTER
INSTALLATION.
L. TOPSOIL:
STRIP, STOCKPILE, AND RESPREAD TOPSOIL IN ALL AREAS TO BE SODDED AND LANDSCAPE BEDS DISTURBED BY THE PROJECT. THE DEPTH OF TOPSOIL SHALL BE A MINIMUM OF 6" AFTER NATURAL SETTLEMENT AND SHALL CONFORM SMOOTHLY TO THE ADJACENT LINES, GRADES, AND ELEVATIONS. PROVIDE ADDITIONAL TOPSOIL AS REQUIRED.
M. MULCH:
LANDSCAPE PLANTING BEDS THAT HAVE BEEN DISTURBED BY THE PROJECT SHALL BE RESTORED WITH ROCK MULCH TO MATCH EXISTING SURFACE CONDITION. PLACE WEED BARRIER UNDER ALL NEW ROCK WITH A MINIMUM THICKNESS OF 4".
TOP OF ROCK MULCH SHALL BE 1/2" BELOW TOP OF ADJACENT PCC PAVING.
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C001
G
EN
ER
AL
N O
TE
S
AN
D
LE
G
EN
D
ED
R
CR
B
CO
NS
TR
UC
TI
O
N
/4
/2
D
VA
IV
H
C O
U R
TY
AR
D S
U N
SH
AD
ES
IO
W
A
VE
TE
RA
NS
H
O M
E
S
UM
M
IT
S T, M
AR
SH
AL
LT
O
W N, IO
W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
G
EN
ER
AL
N
O
TE
S
AN
D
LE
G
EN
D.
dw g
/1 /2
2:
:4
PM
C4 DESIGN INTENT FOR SQUARE SUN SHADE - FOR REFERENCE ONLY E4 DESIGN INTENT FOR ALTERNATE 1 SUN SHADE - FOR REFERENCE ONLY
MALLOY
BUILDING
BUILDING
DACK
BUILDING
SHEELER
BUILDING
LOFTUS
BUILDING
BUILDING
STORM INTAKE
RIM=929.44
IE=928.44
STORM INTAKE
RIM=928.49
IE=927.59
STORM INTAKE
RIM=929.24
IE=926.74
STORM INTAKE
RIM=930.07
IE=927.77
STORM INTAKE
RIM=926.48
IE=924.93
CHILLED
WATER RETURN
(PER RECORD)
CHILLED
WATER SUPPLY
(PER RECORD)
(PER RECORD)
(PER RECORD)
(PER RECORD)
(PER RECORD)
(P
ER R
ECORD)
(PER RECORD)
(PER RECORD)(P
ER R
ECORD)
(PER RECORD)
(PER RECORD)
(P
ER
R
EC
O
RD
(PER RECORD)
(P
ER
R
EC
O
RD
(P
ER
R
EC
O
RD
24" OAK
24" HL
24" HL
3" JAP LILAC
3" JAP LILAC
3" JAP LILAC
36" OAK
12" MAPLE
5" REDBUD
30"
CURB INTAKE
RIM=925.14
INV (8")=921.64
FF = 934.12
FF = 934.17
FF = 930.63
FF = 930.56
40" OAK
SANITARY MH
RIM=930.49
FF = 930.62
STORM INTAKE
RIM=930.08
10" MAPLE
22" OAK
12" MAPLE
FF = 932.64
FF = 934.21
5" MAPLE
FF = 934.13
5" 4" 2
6" PVC
6" P
VC
6" DIP
6" R
C
P 6" DIP
6"
PVC
ABANDONED
18" MAPLE
SECURITY CAMERA
LOUDSPEAKER
LOUDSPEAKER
LOUDSPEAKER
HOSE
HOSE
HOSE
HOSE
HOSE
SECURITY CAMERA
4"
PVC
TRENCH
EL:930.55
4" PVC
FL: 929.61
TRENCH
EL:930.55
STORM INTAKE
RIM=933.92
BOTTOM WELL EL=931.39
FL (E)=932.01
FL (W)=931.91
STORM INTAKE
RIM=933.68
BOTTOM WELL EL=931.72
CURB INTAKE
RIM=925.40
INV=922.19 (N)
INV=921.94 (SE)
10 OFF
10 OFF
SUN SHADE LOCATION 1
SEE SHEET C102
SUN SHADE LOCATION 2
SEE SHEET C103
ALTERNATE 1 SUN SHADE
SEE SHEET C103
POTENTIAL MATERIAL
STAGING AREA -
COORDINATE EXACT
LOCATION AND SIZE WITH
CONSTRUCTION
MANAGER AND OWNER.
A B C D E F
A B C D E F
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C101
O
VE
RA
LL
S
IT
E
PL
AN
ED
R
CR
B
CO
NS
TR
UC
TI
O
N
/4
/2
D
VA
IV
H
C O
U R
TY
AR
D S
U N
SH
AD
ES
IO
W
A
VE
TE
RA
NS
H
O M
E
S
UM
M
IT
S T, M
AR
SH
AL
LT
O
W N, IO
W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
SI
TE
P
LA
N.
dw g
/1
/2
2:
:5
PM
NORTH
FF = 934.17
35.00'
.0
0'
FOOTING FOR SUN SHADE
SUPPORT COLUMN. CONTRACTOR
TO EXCAVATE OR POT HOLE
FOOTINGS TO LOCATE AND AVOID
UTILITIES, TYP.
FOOTING FOR SUN SHADE
SUPPORT COLUMN. CONTRACTOR
TO EXCAVATE OR POT HOLE
FOOTINGS TO LOCATE AND AVOID
UTILITIES, TYP.
FOOTING FOR SUN SHADE
SUPPORT COLUMN. CONTRACTOR
TO EXCAVATE OR POT HOLE
FOOTINGS TO LOCATE AND AVOID
UTILITIES, TYP.
FOOTING FOR SUN SHADE
SUPPORT COLUMN. CONTRACTOR
TO EXCAVATE OR POT HOLE
FOOTINGS TO LOCATE AND AVOID
UTILITIES, TYP.
0.
4.
2.71'
2.29'
SUN SHADE LOCATION 1: SQUARE SUN SHADE
WITH 4 SUPPORT COLUMNS AND 4 EQUAL SIZED
TRIANGULAR SHADE SAILS, BY SHADE SYSTEMS
OR APPROVED EQUAL.
SEE SPECIFICATION.
A B C D E F
A B C D E F
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C102
SU
N
SH
AD
E
PL
AN
ED
R
CR
B
CO
NS
TR
UC
TI
O
N
/4
/2
D
VA
IV
H
C O
U R
TY
AR
D S
U N
SH
AD
ES
IO
W
A
VE
TE
RA
NS
H
O M
E
S
UM
M
IT
S T, M
AR
SH
AL
LT
O
W N, IO
W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
SI
TE
P
LA
N.
dw g
/1
/2
2:
:0
PM
NORTH
1 SUN SHADE LOCATION 1
GENERAL NOTES:
1. THE LOCATIONS OF PLANTS AND TREES SHOWN ARE APPROXIMATE, BASED OFF OF CONSTRUCTION DRAWINGS, AND WERE NOT FIELD LOCATED. CONTRACTOR SHALL MARK ALL TREES AND PLANTS THAT WILL BE IMPACTED BY THE PROPOSED PROJECT IMPROVEMENTS AND COORDINATE WITH THE CONSTRUCTION MANAGER AND OWNER
PRIOR TO REMOVAL/RELOCATION.
2. THE CONTRACTOR SHALL COORDINATE AND PROVIDE THE OWNER THE ABILITY TO RELOCATE OR TRIM PLANTS
AND TREES PRIOR TO CONSTRUCTION AT THEIR DISCRETION.
3. CONTRACTOR SHALL REMOVE AND DISPOSE OF ANY PLANTS AND MATERIALS THAT THE OWNER CHOOSES NOT TO
RELOCATE.
4. CONTRACTOR TO LAYOUT PROPOSED SUN SHADE LOCATIONS AND CONFIRM EXACT LOCATIONS WITH
CONSTRUCTION MANAGER AND OWNER.
CP22 CX
6" PVC
HOSE
4"
PVC
FOOTING FOR SUN SHADE
SUPPORT COLUMN. CONTRACTOR
TO EXCAVATE OR POT HOLE
FOOTINGS TO LOCATE AND AVOID
UTILITIES, TYP.
FOOTING FOR SUN SHADE
SUPPORT COLUMN. CONTRACTOR
TO EXCAVATE OR POT HOLE
FOOTINGS TO LOCATE AND AVOID
UTILITIES, TYP.
FOOTING FOR SUN SHADE
SUPPORT COLUMN. CONTRACTOR
TO EXCAVATE OR POT HOLE
FOOTINGS TO LOCATE AND AVOID
UTILITIES, TYP.
FOOTING FOR SUN SHADE
SUPPORT COLUMN. CONTRACTOR
TO EXCAVATE OR POT HOLE
FOOTINGS TO LOCATE AND AVOID
UTILITIES, TYP.
SUN SHADE LOCATION 2: CUSTOM SUN SHADE
WITH 4 SUPPORT COLUMNS AND 1 SHADE SAIL, BY
SHADE SYSTEMS OR APPROVED EQUAL. SEE
SPECIFICATION.
EXISTING UTILITY TUNNELL
3.
15.00'
ALTERNATE 1: SINGLE COLUMN 15'X15'
CANTILEVER SUN SHADE, BY SHADE
SYSTEMS OR APPROVED EQUAL. SEE
SPECIFICATION.
FOOTING FOR SUN SHADE
SUPPORT COLUMN. CONTRACTOR
TO EXCAVATE OR POT HOLE
FOOTINGS TO LOCATE AND AVOID
UTILITIES, TYP.
31.15'
27.78'
40.09'
.5
1'
.0
0'
4.00'
4.00'
A B C D E F
A B C D E F
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C103
SU
N
SH
AD
E
PL
AN
ED
R
CR
B
CO
NS
TR
UC
TI
O
N
/4
/2
D
VA
IV
H
C O
U R
TY
AR
D S
U N
SH
AD
ES
IO
W
A
VE
TE
RA
NS
H
O M
E
S
UM
M
IT
S T, M
AR
SH
AL
LT
O
W N, IO
W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
SI
TE
P
LA
N.
dw g
/1
/2
2:
:1
PM
NORTH
1 SUN SHADE LOCATION 2 AND ALTERNATE 1 SUN SHADE