This document is Addendum Number 002 issued by Farnsworth Group, Inc. on January 13, 2023, for the NCF IPI Homes for Iowa Warehouse project for the Department of Corrections, with the Request for Bid (RFB) number 923901-01. The addendum provides a clarification regarding the electrical site plan, specifically noting that the "Underground Primary" from the existing power pole to the existing utility transformer has been installed by the Utility Company (Alliant Energy) and has been abandoned in place. Bids are due on January 18, 2023, at 2:00 PM local time, to be submitted online through IMPACS Electronic Procurement Systems.

The addendum amends the original contract documents and requires bidders to acknowledge receipt in the bid form, with a warning that failure to do so may result in disqualification. The document is part of a project with multiple identification numbers, including A/E Project No. 0220983.00, Owner Project No. 9239.01, and CM Project No. 7427. The addendum contains one page and is specifically related to the electrical drawing E1.1, Site Plan - Electrical, providing critical information about the existing underground electrical infrastructure for potential bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum

14225 University Avenue, Suite 110 | Waukee, IA 50263 | p 515.225.3469 | www.f-w.com

ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS

Addendum Number: 002

Addendum Issue Date: January 13, 2023 Owner: Department of Corrections

Project Name: NCF IPI Homes for Iowa Warehouse

A/E Project No.: 0220983.00

Owner Project No.: 9239.01 Owner Request for Bid No.: RFB 923901-01 CM Project No. 7427

Containing: 1 Pages; 0 Documents; 0 Drawings; 0 Specifications

This addendum amends the drawings and specifications of the above reference project and is hereby incorporated into the contract documents as part thereof. Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION.

Drawings:

Electrical

Drawing E1.1, Site Plan - Electrical Item No. 1 “Underground Primary” from existing power pole to existing utility transformer has been installed by owner/Utility Company (Alliant Energy).

CLARIFICATIONS

A. The “Underground Primary” from existing power pole to existing utility transformer has been installed by the

Utility Company (Alliant Energy). The existing Underground Primary has been abandoned in place by the Utility

Company. See attachment.

Bids are Due: January 18, 2023 / 2:00 PM local time online only through IMPACS Electronic Procurement Systems. See specifications for additional information.

END OF ADDENDUM 002

Issued By:

FARNSWORTH GROUP, INC.

Leona J. Sears, AIA Project Architect

Attachments:

Underground Primary Clarification (1 page)

D O

C N

C F

I P

I H o m e s F o r

Io w a

W a re h o u s e

N e w to n Io w a

D

A S

.0

R F

B

-0

P R

O J E

C T

.0

A d d e n d u m

A tt a c h m e n t

U n d e rg ro u n d

P ri m a ry

-1

-2

U nd er gr ou nd p at hw ay a nd p rim ar y in st al le d by o w ne r/ ut ili ty

U nd er gr ou nd p rim ar y ab an do ne d in p la ce b y ut ili ty c om pa ny

File details come from the government source that posted it. Updated .