Revised Spec 00 01 15.pdf

PDF 114 KB Posted

Attached to
Y1DZ--Expand Mental Health Clinic Building 90, Tucson AZ
Solicitation number
36E77620B0008_0003
Issued by

About this file

This document is a list of drawings for the Expand Mental Health Clinic Building 90 project in Tucson, Arizona. The project involves expanding the existing mental health clinic located at the Southern Arizona VA Health Care System Medical Center. The drawings cover site plans, demolition plans, structural plans, architectural plans, fire protection, plumbing, mechanical, electrical, and landscaping work. Key areas of construction include renovating approximately 7,000 square feet of the existing building and constructing a new two-story, 14,000 square foot addition. The solicitation number for the project is 36E77620B0008_0003 and was issued by the Department of Veterans Affairs Headquarters. The bid opening date has passed and the contract award date is pending.

View the file

Other files

File Type Posted
Drawing 90-E-210.pdf PDF
Submittal 08950 and 08524 from Original B90.pdf PDF
Drawing 90-ED-109.pdf PDF
FINAL TQ Tracking Sheet Mental Health 11-24-2020.pdf PDF
Drawing 90-GI-002.pdf PDF
Drawing 90-E-209.pdf PDF
Spec 28 13 00.pdf PDF
Drawing 90-GI-001.pdf PDF
Spec 27 05 11.pdf PDF
Revised Spec 00 01 10.pdf PDF
Revised Spec 27 15 00.pdf PDF
36E77620B0008 0003.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAVAHCS VA Medical Center VA Project: #678-329 Tucson, AZ Expand Mental Health Clinic, B90

LIST OF DRAWINGS

00 01 15 - 1

REVISED-11/23/2020

SECTION 00 01 15

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

90-GI-001 TITLE SHEET

90-GI-002 DRAWING SHEET INDEX

90-GI-003 GENERAL NOTES, ARCHITECTURAL SYMBOLS, AND

ABBREVIATIONS

90-GI-004 ACCESSIBILITY STANDARDS AND TYPICAL MOUNTING

HEIGHTS

90-GI-005 FIRE LIFE SAFETY PLAN

90-GC-100 OVERALL PHASING PLAN

90-GC-101 PHASING PLANS – PHASE 1 DEMOLITION

90-GC-102 PHASING PLANS – PHASE 1 NEW WORK

90-GC-103 PHASING PLANS – PHASE 2

CIVIL

90-C-000 NOTES, ABBREVIATIONS AND LEGEND

90-C-100 TOPOGRAPHY

90-C-200 DEMOLITION

90-C-300 GRADING

90-C-400 EROSION CONTROL PLAN

90-C-401 EROSION CONTROL DETAILS

90-C-500 UTILITIES

90-C-501 SEWER PLAN AND PROFILE

90-C-502 SEWER DETAILS

95-C-000 NOTES AND LEGEND

95-C-100 TOPOGRAPHY

95-C-200 DEMOLITION PLAN

95-C-300 SITE PLAN

95-C-400 GRADING

95-C-500 EROSION CONTROL

95-C-600 DETAILS

00 01 15 - 2

STRUCTURAL

90-S-001 GENERAL NOTES

90-S-101 TYPICAL DETAILS

90-S-102 TYPICAL DETAILS

90-S-103 TYPICAL DETAILS

90-S-201 FOUNDATION PLAN

90-S-202 ROOF FRAMING PLAN

90-S-301 SECTIONS & DETAILS

90-S-302 SECTIONS & DETAILS

90-S-303 SECTIONS & DETAILS

90-S-304 SECTIONS & DETAILS

90-S-401 MOMENT FRAME ELEVATIONS

ARCHITECTURAL

90-AD-101 DEMOLITION PLAN

90-AD-102 CEILING DEMOLITION PLAN

90-AS-100 SITE PLAN

90-AE-101 FLOOR PLAN

90-AE-102 FURNITURE AND EQUIPMENT PLAN

90-AE-103 REFLECTED CEILING PLAN

90-AE-104 ROOF PLAN

90-AE-201 EXTERIOR ELEVATIONS

90-AE-301 BUILDING SECTIONS

90-AE-302 BUILDING SECTIONS

90-AE-303 BUILDING SECTIONS

90-AE-304 WALL SECTIONS

90-AE-305 WALL SECTIONS

90-AE-401 ENLARGED FLOOR PLANS

90-AE-402 INTERIOR ELEVATIONS

90-AE-403 INTERIOR ELEVATIONS

90-AE-501 DETAILS

90-AE-502 DETAILS

90-AE-503 DETAILS

90-AE-504 DETAILS

90-AE-505 DETAILS

00 01 15 - 3

90-AE-601 DOOR AND WINDOW SCHEDULES

90-AE-602 FURNITURE AND EQUIPMENT SCHEDULES

90-AF-101 FINISH FLOOR PLAN

90-AF-601 INTERIOR FINISH LEGEND

90-AF-602 ROOM FINISH SCHEDULE

FIRE PROTECTION

90-FP-001 FIRE PROTECTION GENERAL NOTES AND DETAILS

90-FP-002 FIRE PROTECTION SITE PLAN

90-FD-101 FIRE PROTECTION PIPING DEMO PLAN

90-FP-102 FIRE PROTECTION PIPING NEW PLAN

PLUMBING

90-P-001 PLUMBING FRONT SHEET

90-P-002 PLUMBING SCHEDULES AND WATER CALCULATIONS

90-PD-100 PLUMBING DEMOLITION SITE PLAN

90-PD-101 PLUMBING DEMOLITION CW, HW, & HWR FLOOR PLAN

90-PD-102 PLUMBING DEMOLITION WASTE AND VENT FLOOR PLAN

90-PD-103 PLUMBING DEMOLITION STORM DRAIN FLOOR PLAN

90-PD-104 PLUMBING DEMOLITION ROOF PLAN

90-PP-101 PLUMBING NEW CW, HW, & HWR FLOOR PLAN

90-PP-102 PLUMBING NEW WASTE & VENT FLOOR PLAN

90-PP-103 PLUMBING NEW STORM DRAIN FLOOR PLAN

90-PP-104 PLUMBING NEW WORK ROOF PLAN

90-PP-105 PLUMBING DETAILS

90-PP-106 DEMOLITION AND NEW CW, HW, & HWR RISER DIAGRAMS

90-PP-107 DEMOLITION AND NEW WASTE & VENT RISER DIAGRAMS

90-PP-108 DEMOLITION AND NEW STORM RISER DIAGRAMS

MECHANICAL

90-M-001 MECHANICAL FRONT SHEET

90-MD-101 MECHANICAL DEMOLITION FLOOR PLAN

90-MH-102 MECHANICAL NEW WORK FLOOR PLAN

90-MH-103 MECHANICAL NEW WORK ZONING PLAN

90-MH-104 MECHANICAL NEW WORK ROOF PLAN

90-MP-105 MECHANICAL NEW PIPING FLOOR PLAN

00 01 15 - 4

90-MP-106 MECHANICAL HOT WATER SINGLE LINE PIPING DIAGRAM

90-MH-107 MECHANICAL PHASING PLAN PHASE 1

90-MH-108 MECHANICAL PHASING PLAN PHASE 2A

90-MH-109 MECHANICAL PHASING PLAN PHASE 2B

90-MI-501 MECHANICAL DETAILS

90-MI-502 MECHANICAL DETAILS

90-MI-503 MECHANICAL DETAILS

90-MI-504 MECHANICAL DETAILS

90-MI-601 MECHANICAL SCHEDULES

90-MI-602 MECHANICAL CONTROLS

90-MI-603 MECHANICAL CONTROLS

ELECTRICAL

90-E-001 ELECTRICAL FRONT SHEET

90-E-002 ELECTRICAL SYMBOLS, ABBREVIATIONS AND LEGENDS

90-ED-101 ELECTRICAL DEMO LIGHTING PLAN

90-ED-102 ELECTRICAL DEMO POWER PLAN

90-ED-105 ELECTRICAL DEMO PLAN DATA/COMM & FIRE ALARM PLAN

90-ED-106 ELECTRICAL DEMO AUXILIARY SYSTEM PLAN

90-ED-107 LIGHTNING PROTECTION DEMO PLAN

90-ED-108 ELECTRICAL DEMO SITE PLAN

90-EL-201 ELECTRICAL NEW LIGHTING PLAN

90-EP-202 ELECTRICAL NEW POWER PLAN

90-EP-203 MECHANICAL EQUIPMENT ELECTRICAL NEW POWER PLAN

90-EP-204 ELECTRICAL NEW HVAC TERMINAL UNITS PLAN

90-ET-205 ELECTRICAL NEW DATA/COMM PLAN

90-ET-206 ELECTRICAL NEW FIRE ALARM PLAN

90-EY-207 ELECTRICAL NEW AUXILIARY SYSTEM PLAN

90-EY-208 LIGHTNING PROTECTION NEW WORK PLAN

90-E-209 ELECTRICAL NEW SITE PLAN

90-E-210 ONE LINE DIAGRAM FOR VOICE/DATA SYSTEM

90-E-501 SINGLE LINE DIAGRAM

90-E-502 PANEL SCHEDULES

90-E-503 NEW NURSE CALL SYSTEM

95-ED-101 ELECTRICAL DEMO B95 LIGHTING PLAN

95-EL-201 ELECTRICAL NEW B95 LIGHTING PLAN

Rajesh Polygon

00 01 15 - 5

- - - E N D - - -

File details come from the government source that posted it. Updated .