The document contains drawings and specifications for an electrical site plan for the expansion of the mental health clinic at Building 90 in Tucson, Arizona. Key details include running new conduits and cabling between Building 90 and 38 to connect the network systems, installing line interface units for fiber and copper cable terminations, and performing splicing of existing and new cables in manholes during off hours to avoid service disruptions. The related federal contract opportunity is a solicitation to provide construction services for the Expand Mental Health Clinic project at the Tucson facility, with a bid opening date of January 15, 2021. The solicitation was issued by the Department of Veterans Affairs Headquarters.

View the file

Other files

File Type Posted
Revised Spec 00 01 15.pdf PDF
Drawing 90-E-210.pdf PDF
Submittal 08950 and 08524 from Original B90.pdf PDF
Drawing 90-ED-109.pdf PDF
FINAL TQ Tracking Sheet Mental Health 11-24-2020.pdf PDF
Drawing 90-GI-002.pdf PDF
Spec 28 13 00.pdf PDF
Drawing 90-GI-001.pdf PDF
Spec 27 05 11.pdf PDF
Revised Spec 00 01 10.pdf PDF
Revised Spec 27 15 00.pdf PDF
36E77620B0008 0003.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25 30 36 31

LO

T

H O

R S

E S

H O

E

T E

N N

IS

/ V

O

LLE

Y B

A

LL

P

LO

T

N

G R

A V

E

L LO

T

M

R

L

L

S

A

B

C

H E

LIP

A

D

SHUFFLEBOARD

BASKETBALL

UG

F

UG

F

UGF

UGF

UGF

UGF

UGF

UGF

UGF

UGF

UGF

UGF

UGF

U G

F

UGF

UGF

UGF

UGF

UGF

SPARE 1"C FROM

ROOM 1239

TO BLDG 67

BASEMENT TELECOM

ROOM

B57

B67

BUILDING 90

B2 B38

B2

B2

B58

B74

30B73 B72 B69 B68

U G

F U

G F

U G

F U

G F

U G

F U

G F

U G

F U

G F

U G

F

UG

F

UGF

U G

F U

G F

U G

F U

G F

UG

F

UG

F

UG

F

UG

F

UG

F

UG

F

UG

F

UG

F

UG

F

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGF

UGF

UGF

UGF

EXISTING PULL BOX

(E)MH-13

(E)COMMUNICATION

ROOM # 1239

EXISTING MH-5

UGF

UGF UGF

OUTLINE OF BUILDING 90

SHOWING THE EXTENDED

PORTION OF BUILDING TO BE

CONSTRUCTED. 15

NEW MH

5b

E

E E

N

E

E1

17 UGS UGS

5a

INTERCEPTION

POINT 5

UGF

U G

F

B6

(E)MH-4

(E)ROOM #0A01 IN

BLDG.38

(E)

1. DURING DEMOLITION, CONTRACTOR TO MAINTAIN CONTINUITY OF THE CIRCUITS

FOR THE OUTLETS NOT BEING IMPACTED BY THE DEMOLITION.

2. ALL THE POWER SERVING THE EQUIPMENT TO BE REPLACED SHALL BE

REMOVED. ANY OTHER OUTLETS WITHIN THE VICINITY OF SCOPE OF WORK BUT

NOT FEEDING THE EQUIPMENT BEING REPLACED SHALL REMAIN AS-IS.

KEY NOTES

KEY PLAN

EXISTING UNDERGROUND (2) 4" CONDUITS AND CABLING TO BE REMOVED

AFTER NEW ROUTING OF FIBER AND COPPER BETWEEN BLDG #90 AND BLDG

#38.

EXISTING UNDERGROUND FIBER ROUTE CONDUIT TO BE PROTECTED DURING

CONSTRUCTION AND TO REMAIN.

EXISTING UNDERGROUND POWER CONDUIT TO REMAIN.

CCTV POLE MOUNTED CAMERA TO BE REMOVED AND PROTECTED IN SAFE

PLACE FOR REINSTALLATION. CAMERA TO BE MOUNTED BACK AND INITIALIZED

AFTER COMPLETION OF CONSTRUCTION.

a) EXISTING UNDERGROUND CONDUIT FOR CCTV TO BE PROTECTED FROM

ROOM #1239 UPTO INTERCEPTION POINT.

b) RUN NEW CONDUIT FROM INTERCEPTION POINT TO THE CCTV POLE

ADJACENT TO PARKING LOT.

EXISTING MANHOLE TO REMAIN. ALSO SEE KEY NOTE #6 ON SHEET 90-ED-109.

ADD NEW LID LABELED COMMUNICATION".

EXISTING (1)4" C WITH (1) SINGLE MODE 144 STRAND FIBER, (1) MULTIMODE 48

STRAND FIBER AND (1) 600 PAIR COPPER CABLE. FROM MH-13 TO EXISTING

MANHOLE MH-5 PER SITE PLANS. CONDUIT IS SUPPORTED BY I-BEAM

UNDERNEATH THE BRIDGE.

FIBER AND COPPER CABLE FROM MH-13 TO BUILDING 67 AND TERMINATING IN

BLDG 38,ROOM 0A01 TO REMAIN TILL THE INSTALLATION OF NEW CONDUIT RUN

WITH WIRING IS COMPLETED. REFER TO SHEET 90-ED-210, DETAIL #2.

CONDUIT FROM (E) PULL BOX IN BLDG.67 WITH FIBER AND COPPER CABLE RUNS

IN THE BASEMENT TO THE COMM.CLOSET ON FIRST FLOOR AND COMES BACK

TO THE BASEMENT AND ROUTES TO ROOM #0A01 IN BLDG.#38. (E) CONDUIT HAS

CAPACITY FOR PULLING NEW FIBER AND COPPER.

NEW PULL BOX 18" W X6" D NEXT TO P-TUBE PULL BOX ON THE OUTSIDE WALL

OF THE MECHANICAL ROOM. FIELD VERIFY EXACT LOCATION.

PROVIDE CABLING PER ONE LINE DIAGRAM ON DETAIL # 2, SHEET 90-E-210.

NEW (2) 4" C CONDUIT CROSSING BRIDGE CAN BE SUPPORTED OVER EXISTING

UNISTRUT ACROSS BRIDGE.

NEW UNDERGROUND MAN HOLE/PULL BOX 3'-0"W X 4'-0"L X 3'-6" H WITH

"COMMUNICATION" ENGRAVED ON THE COVER. COORDINATE WITH COR FOR

MAN-HOLE NUMBER.

EXISTING MANHOLE ,"MH-13" HAS THREE (3) INNER DUCTS AS FOLLOWS:

a) RED INNER DUCT WITH 25 PAIR DIRECT BURIAL COPPER (PE-89) ALSO FEDS

BLDG #90 THRU (E) MANHOLE REFERRED IN NOTE #6.

b) ORANGE INNER DUCT WITH (1) SINGLE MODE 12 STRAND AND 24 STRAND MULTIMODE 62.5 μm TO BE ABANDONED.

c) WHITE INNER DUCT WITH 6 PAIR COPPER CABLE TO REMAIN.

FUSION SPLICING OF ALL FIBER CABLES SERVING BLDG #90 TO BE IN

MANHOLE,MH-5 PERFORMED DURING WEEKEND.

SPLICING OF 600 PAIR COPPER CABLE ALSO TO BE IN MH-5 PERFORMED DURING

WEEKEND.

ALL NEW COPPER FIBER FROM MH-5 TO BE TERMINATED ON THE LINE

INTERFACE UNITS (LIU'S) TO BE RACK IN BLDG #38, ROOM 0A01.

(2) 4" C WITH COPPER AND FIBER CABLE FROM THE PULL BOX (NOTE #10) TO

COMMUNICATION ROOM 1239 THRU MECHANICAL ROOM AND RUNNING IN THE

CEILING SPACE TO TERMINATE IN COMMUNICATION ROOM #1239. CONTRACTOR

TO FIELD VERIFY THE ROUTING AND PERFORM THE WORK DURING OFF-HOURS

OR WEEKENDS TO AVOID DISTURBANCE TO THE OCCUPANTS DURING REGULAR

WORKING HOURS.

REFER TO ONE LINE DIAGRAM ON SHEET 90-E-210, DETAIL #2 FOR ROUTING OF

CONDUIT PATHWAY AND WIRING.

GOVERNMENT WILL PROVIDE 800'-0" OF 4" CONDUIT AND MANHOLE/PULL BOX OF

3'-0"W X 4'-0"L X 3'-6" H FOR CONTRACTOR'S USE.

EXISTING MANHOLE "MH-4" CLOSE TO BLDG. B4

ELECTRICAL NEW SITE PLAN

1/64" = 1'-0"1

N

8-

EX

PA

N D

M

EN

TA

L

H

EA

LT

H

C

LI

N

IC

, B

BI

D S

ET

STAMP

SAVAHCS, TUCSON, AZ 85723

678-329

12-06-2019

315 ARDEN AVE, SUITE 26, GLENDALE, CA 91203

www.schwabeng.com Project No.: S60204180.00

U.S. Department of Veterans Affairs

Bid Set

ELECTRICAL NEW SITE PLAN

VB RS 90-E-209

115 120

NEW ADDITION

RENOVATIONEXISTING

BUILDING

MECH. BLDG. N

1. TRENCH THE DIRT AREA FROM THE EXISTING MANHOLE (NOTE #6 ON SHEET

90-E-209) UP TO THE BOUNDARY WALL OF THE MECHANICAL ROOM OF

BUILDING #90 FOLLOWING THE ROUTE SHOWN ON THE PLANS.

2. INSTALL NEW MANHOLE/PULL BOX PROVIDED BY VA (KEY NOTE #13,) PER SITE

PLAN.

3. RUN (2) 4”C FROM EXISTING MANHOLE LABELED AS MH-6(KEY NOTE #6) TO

B90 MECHANICAL ROOM. TERMINATE THE CONDUITS AT THE PULL BOX ( 24”H

X 18”W X 6”D) TO BE PROVIDED ON THE EXTERIOR WALL OF THE MECHANICAL

ROOM.

4. RUN (2) 4”C FROM THE PULL BOX INTO THE MECHANICAL ROOM AND

CONTINUE THRU THE CEILING SPACE INTO COMMUNICATION ROOM #1239.

5. RUN FIBER AND COPPER WIRES FROM COMMUNICATION ROOM #1239 THRU

THE NEW RACEWAY UP TO THE EXISTING MANHOLE (NOTE #6).

6. CONTINUE PULLING THE FIBER AND COPPER WIRES FROM THE EXISTING

MANHOLE MH-6 TO THE MANHOLE MH-5 THRU NEW 4”CONDUITS.

7. PULL FIBER AND COPPER PER PLANS FROM MH-5 TO MH-13 THRU EXISTING (1)

4”C WHICH HAS SPACE TO PULL THE NEW CABLES AND CONTINUE UP TO ROOM

#0A01 IN B38 THRU THE PULL BOX IN THE BASEMENT OF B67. THE EXISTING

CONDUIT RUNS FROM THE BASEMENT OF B67 UP TO THE COMMUNICATION

CLOSET ON THE FIRST FLOOR AND COMES BACK TO THE BASEMENT BEFORE

ENDING IN ROOM #0A01 IN B38. CONTRACTOR TO FIELD VERIFY THE EXACT

ROUTING.

8. ADD THE LINE INTERFACE UNITS (LIU'S) ON TO THE EXISTING RACKS IN THE

COMMUNICATION ROOM #1239 IN B90 AND ROOM #0A01 IN B38 FOR

TERMINATIONS.

9. FUSION SPLICING OF EXISTING FIBER WITH NEW FIBER CABLES WILL BE DONE IN

MH-5. SIMILARLY, SPLICING OF 600 PAIR COPPER WILL ALSO BE DONE IN MH-5.

10. PULL THE OLD EXISTING FIBER & COPPER CABLES FROM MH-13 TO B90

COMMUNICATION ROOM AND REMOVE THE EXISTING CONDUIT.

GENERAL NOTESSTEP BY STEP PROCEDURES TO BE

FOLLOWED FOR CONNECTING THE

EXISTING NETWORK SYSTEM WITH NEW

EXPANSION OF BUILDING 90:

RFI - 17 11/20/2020

AutoCAD SHX Text

AutoCAD SHX Text

LP

AutoCAD SHX Text

EL=2450.60

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

TPED

AutoCAD SHX Text

EL=2450.71

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

EL=2450.13

AutoCAD SHX Text

AutoCAD SHX Text

BORE

AutoCAD SHX Text

EL=2449.55

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.42

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.45

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.43

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.44

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.43

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.45

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.40

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.42

AutoCAD SHX Text

AutoCAD SHX Text

SCUPPER

AutoCAD SHX Text

EL=2453.91

AutoCAD SHX Text

AutoCAD SHX Text

SCUPPER

AutoCAD SHX Text

EL=2453.95

AutoCAD SHX Text

AutoCAD SHX Text

SCUPPER

AutoCAD SHX Text

EL=2453.85

AutoCAD SHX Text

AutoCAD SHX Text

SCUPPER

AutoCAD SHX Text

EL=2454.01

AutoCAD SHX Text

AutoCAD SHX Text

SCUPPER

AutoCAD SHX Text

EL=2454.08

AutoCAD SHX Text

AutoCAD SHX Text

SCUPPER

AutoCAD SHX Text

EL=2454.03

AutoCAD SHX Text

AutoCAD SHX Text

SCUPPER

AutoCAD SHX Text

EL=2454.05

AutoCAD SHX Text

AutoCAD SHX Text

SCUPPER

AutoCAD SHX Text

EL=2454.07

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.97

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.87

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.95

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.91

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.82

AutoCAD SHX Text

AutoCAD SHX Text

HR

AutoCAD SHX Text

EL=2454.77

AutoCAD SHX Text

AutoCAD SHX Text

SMH

AutoCAD SHX Text

EL=2453.39

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

EBOX

AutoCAD SHX Text

EL=2452.53

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

EBOX

AutoCAD SHX Text

EL=2452.62

AutoCAD SHX Text

AutoCAD SHX Text

INV

AutoCAD SHX Text

EL=2450.71

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

EBOX

AutoCAD SHX Text

EL=2455.24

AutoCAD SHX Text

AutoCAD SHX Text

VAULT

AutoCAD SHX Text

EL=2453.75

AutoCAD SHX Text

AutoCAD SHX Text

VAULT

AutoCAD SHX Text

EL=2453.83

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

EBOX

AutoCAD SHX Text

EL=2453.36

AutoCAD SHX Text

AutoCAD SHX Text

LP

AutoCAD SHX Text

EL=2453.03

AutoCAD SHX Text

AutoCAD SHX Text

LP

AutoCAD SHX Text

EL=2452.39

AutoCAD SHX Text

AutoCAD SHX Text

LP

AutoCAD SHX Text

EL=2454.52

AutoCAD SHX Text

AutoCAD SHX Text

LP

AutoCAD SHX Text

EL=2454.49

AutoCAD SHX Text

AutoCAD SHX Text

EP

AutoCAD SHX Text

EL=2455.73

AutoCAD SHX Text

AutoCAD SHX Text

BRK

AutoCAD SHX Text

EL=2455.67

AutoCAD SHX Text o

AutoCAD SHX Text

CATV

AutoCAD SHX Text

AutoCAD SHX Text

CATV

AutoCAD SHX Text

EL=2452.79

AutoCAD SHX Text

AutoCAD SHX Text

TSP

AutoCAD SHX Text

EL=2452.82

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

CMH

AutoCAD SHX Text

EL=2452.97

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text

SCUPPER

AutoCAD SHX Text

JULIAN WASH

AutoCAD SHX Text

AJO WAY

AutoCAD SHX Text

LOT Q

AutoCAD SHX Text

BIKE PATH

AutoCAD SHX Text

SOUTH SIXTH AVENUE

AutoCAD SHX Text

JULIAN WASH

AutoCAD SHX Text

JULIAN WASH

AutoCAD SHX Text

JULIAN WASH

AutoCAD SHX Text

VETERAN'S BOULEVARD

AutoCAD SHX Text

MARINE CORPS TRAIL

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

TPED

AutoCAD SHX Text

EL=50.45

AutoCAD SHX Text

RAMP

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of

AutoCAD SHX Text Facilities

AutoCAD SHX Text Management

AutoCAD SHX Text F

AutoCAD SHX Text Building Number

AutoCAD SHX Text Approved: Chief of Staff

AutoCAD SHX Text Approved: Assistant Director

AutoCAD SHX Text Approved: Chief, Facilities Management

AutoCAD SHX Text Approved: Associate Director - Patient Care Services

AutoCAD SHX Text Location

AutoCAD SHX Text Approved: Director

AutoCAD SHX Text Approved: Associate Director

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Checked

AutoCAD SHX Text Project Title

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Drawn

AutoCAD SHX Text Date

AutoCAD SHX Text

EXPAND MENTAL HEALTH

AutoCAD SHX Text

CLINIC, B90

AutoCAD SHX Text

ARCHITECT/ENGINEERS/CONSULTANTS:

Sheets and Views
90-E-209

File details come from the government source that posted it. Updated .