The document is a Bid Tabulation for the Roaring Fork Transportation Authority's (RFTA) Glenwood Maintenance Facility (GMF) Fuel Tank Replacement project located in Colorado. The comprehensive bid document details a substantial infrastructure replacement initiative involving underground fuel tanks, used and new oil tanks, fuel dispensers, and associated site improvements. The project scope includes removing existing infrastructure, excavating and preparing site areas, installing new underground storage tanks of varying capacities (1k, 3k, 6k, and 8k), adding new fueling equipment, implementing electrical and communication systems, and reconstructing site pavements and access points. The bid tabulation provides an itemized breakdown of project components across multiple divisions, including earthwork, concrete, electrical, utilities, and site improvements.
The bid documentation includes a detailed quantitative and cost breakdown for each project element, with line items covering everything from mobilization and site protection to specific infrastructure components like conduits, tank slabs, and underground storage tanks. While specific total project cost is not clearly delineated, the document indicates a comprehensive approach to budgeting, including line items for general conditions, bonds and insurance, contractor's fees, and a 10% construction contingency allowance. The project appears to be competitively bid, with the documentation suggesting a structured procurement process that allows for precise cost tracking and comprehensive project management across multiple technical and infrastructural domains.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID TABULATION |
| RFTA GMF Fuel Tank Replacement |
| BID FORM | ||
| DIV | Description | Value |
| 01 | General Requirements | $ |
| 02 | Existing Conditions | $ |
| 03 | Concrete | $ |
| 05 | Metals | $ |
| 07 | Thermal and Moisture Protections | $ |
| 26 | Electrical | $ |
| 27 | Communications | $ |
| 31 | Earthwork | $ |
| 32 | Exterior Improvements | $ |
| 33 | Utilities (incl. Fueling Equipment) | $ |
| Mobilization | $ | |
| General Conditions | $ | |
| Bonds and Insurance | $ | |
| Contractors Fee | $ | |
| Construction Contingency Allowance 10% | $ | |
| Total Construction Bid | $ |
Date
Signature
RFTA GMF Fuel Tank Replacement Bid Tabulation
Sheet2
| DIV | Description | Quantity | Unit | Unit Cost | Value |
| 01 | Mobilization | 1 | ls | $ | |
| 02 | Sawcut pavement | 432 | lf | $ | |
| 02 | Remove Sanitary Sewer | 136 | lf | $ | |
| 02 | Remove Sanitary Manhole | 1 | ea | $ | |
| 02 | Remove Concrete Pavement | 4280 | sf | $ | |
| 02 | Remove Cleanout | 1 | ea | $ | |
| 02 | Remove Bollards | 2 | ea | $ | |
| 02 | Remove Asphalt Pavement | 3595 | sf | $ | |
| 02 | Site Protection | 1 | ls | $ | |
| 03 | Concrete tank slab | 39 | cy | $ | |
| 03 | Tank slab reinforcement | 1826 | lbs | $ | |
| 03 | Tank slab Vapor Barrier | 1367 | sf | $ | |
| 03 | Concrete pavement | 4305 | sf | $ | |
| 03 | Geotextile under concrete pavement | 4305 | sf | $ | |
| 26 | Electrical | 1 | ls | $ | |
| 27 | Conduit 1" PVC | 400 | lf | $ | |
| 27 | Conduit 1" EMT | 587 | lf | $ | |
| 27 | Cat-6 4 pair 23 AWG, OSP | 1604 | lf | $ | |
| 31 | Erosion Control | 1 | ls | $ | |
| 31 | Fuel Tank Excavation - Removals | 1 | ls | $ | |
| 31 | Fuel Tank Excavation - New | 1 | ls | $ | |
| 31 | Shoring | 1 | ls | $ | |
| 31 | Over ex and recompact 36" | 478 | CY | $ | |
| 31 | Grouted piers | 2340 | lf | $ | |
| 32 | Asphalt paving | 3683 | sf | $ | |
| 32 | Asphalt patching | 2192 | SF | $ | |
| 32 | Asphalt base course | 7988 | sf | $ | |
| 32 | Fuel Tank Pea gravel | 810 | CY | $ | |
| 32 | Bollards | 2 | ea | $ | |
| 32 | Tank slab compacted 36" subgrade | 1367 | sf | $ | |
| 32 | Tank slab sand base 4" | 1367 | sf | $ | |
| 33 | Demolition and haul off of existing tank | 5 | ea | $ | |
| 33 | Removal of existing Dispenser | 2 | ea | $ | |
| 33 | Removal of existing piping | 1 | ls | $ | |
| 33 | Underground Storage tank 8k | 2 | ea | $ | |
| 33 | Underground Storage tank 6k | 1 | ea | $ | |
| 33 | Underground Storage tank 3k | 1 | ea | $ | |
| 33 | Underground Storage tank 1k | 1 | ea | $ | |
| 33 | Fueling Equipment | 1 | ls | $ | |
| 33 | Fueling Equipment Freight | 1 | ls | $ | |
| 33 | Access Manhole | 15 | ea | $ | |
| 33 | Manhole with composite cover | 5 | ea | $ | |
| 01 | General Conditions | 1 | ls | $ | |
| Bonds and Insurance | 1 | ls | $ | ||
| Contractors Fee | 1 | ls | $ | ||
| Construction Contingency Allowance 10% | 1 | ls | $ | ||
| Total | $ |