Summary
This is a Cast-In-Place Concrete and Reinforcement specification document (Section 03300, Job No. MA25-04) supplementing the Standard Specifications for Public Works Construction and incorporated into the Lahaina Small Boat Harbor Front Row Piers and Dinghy Dock Repair project solicitation issued by the State of Hawaii Department of Land and Natural Resources, Division of Boating and Ocean Recreation. The specification covers concrete materials, reinforcement, formwork, mixing, placement, and curing for concrete curbs, gutters, cut-off walls, walkways, and other repairs identified by the Officer-in-Charge. The project requires adherence to ACI 318 Building Code Requirements for Reinforced Concrete, ACI 301 Specifications for Structural Concrete for Buildings, and ACI 347R Guide to Formwork for Concrete. Key requirements include 4,000 psi compressive strength concrete at 28 days with minimum 25 percent fly ash content by weight of cementitious material, a maximum water-cementitious materials ratio of 0.45, and slump limits of 9 inches (plus or minus 1 inch) for tremie concrete and 5 inches (plus or minus 1 inch) for cast-in-place concrete. Bidders must submit design mixes, material certificates, reinforcing steel shop drawings, and installation procedures prior to work commencement. The specification mandates continuous curing for a minimum of seven days using moisture curing, moisture-retaining covers, or curing compounds and requires an independent testing agency to conduct compressive strength testing at 7 and 28 days with a minimum of one composite sample per day for concrete pours exceeding 5 cubic yards.
All costs for furnishing and placing concrete, rebar, dowels, formwork, bracing, surface finishing, curing, mixing, and related incidental work are to be included in the bid items established in the contract offer with no separate payment for demolition, removal of debris, or trench support. The overall project budget is estimated at $6,000,000 with a 270-calendar-day completion timeline from the notice to proceed and liquidated damages assessed at $100 per calendar day for schedule delays. Proposals are due by May 26, 2026, with electronic submission through the State of Hawaii e-Procurement System (HIePRO), and attendance at a mandatory pre-bid conference is required. The successful bidder must possess a valid State Contractor's License Classification "A," provide performance and payment bonds equal to 100 percent of contract price, maintain comprehensive insurance with minimum limits of $1,000,000 per occurrence, and perform at least 20 percent of work value with their own organization. Bid evaluation includes a 10 percent price reduction for Hawaii products or 15 percent for Class II products, a 10 percent preference for recycled products, and a 5 percent preference for bidders with state-registered apprenticeship program certifications. The award will be made to the lowest responsive and responsible bidder as determined by the Board of Land and Natural Resources, which reserves the right to reject any or all bids or negotiate adjustments if bids exceed available funding.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Job No. MA25-04 Cast-in-Place Concrete and Reinforcement
03300 - 1
DIVISION 3 - CONCRETE
SECTION 03300 – CAST-IN-PLACE CONCRETE AND REINFORCEMENT
PART 1 – GENERAL
1.01 SUMMARY
A. This section supplements SECTION 39 - PORTLAND CEMENT CONCRETE and SECTION 40 - CONCRETE STRUCTURES of the Standard Specifications for Public Works Construction (September 1986).
B. This section covers concrete used for concrete curbs, gutters, cut-off walls, walkways, shower tree slab and post base, street light bases and any other repairs identified by the Officer-in-charge.
1.03 DEFINITIONS
A. Cementitious Materials
Portland Cement in combination with one or more of fly ash and other pozzolans.
1.04 SUBMITTALS
A. Submit in accordance with SECTION 01300 – SUBMITTALS.
B. Design Mixes: For each concrete mix. Include alternate mix designs when characteristics of materials, project conditions, weather, test results, or other circumstances warrant adjustments.
1. Indicate amounts of mix water to be withheld for later addition at Project site.
2. Submit copies of fiber manufacturers printed batching and mixing instructions.
C. Material Certificates: Signed by manufacturers certifying that each of the following items complies with requirements:
1. Curing materials
2. Bonding agents
3. Repair materials
4. Joint-filler
5. Cementitious Materials
6. Admixtures including anti-washout
7. Steel reinforcement and accessories
8. Form materials and form-release agents
D. Installation Procedures: Contractor’s installation procedures for the following:
1. Concrete Form Liner
2. Tremie Concrete
03300 - 2
E. Reinforcing Steel Shop Drawings: Placing drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement.
F. Qualification Data: For testing agency.
G. Field quality-control reports.
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products complying with ASTM C 94 requirements for production facilities and equipment.
B. Testing Agency Qualifications: An independent testing agency, acceptable to authorities having jurisdiction, qualified according to ASTM C 1077 and ASTM E 329 to conduct the testing indicated, as documented according to ASTM E 548.
1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing
Technician, Grade 1, according to ACI CP-1 or an equivalent certification program.
C. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, each aggregate from one source, and each admixture from the same manufacturer.
D. All concrete construction shall conform to the "Building Code Requirements for
Reinforced Concrete" (ACI 318) with modification as noted in the drawings. Other ACI specifications that apply are:
1. ACI 117, "Specifications for Tolerances for Concrete Construction and
Materials."
2. ACI 347R "Guide to Formwork for Concrete."
1.06 DELIVERY, STORAGE, AND HANDLING
A. Do not deliver concrete until forms, reinforcement, embedded items, chamfer strips, and reveal strips are in place and ready for concrete placement. Protect materials from contaminants such as grease, oil and dirt. Ensure materials can be accurately identified after bundles are broken and tags removed.
PART 2 – PRODUCTS
2.01 FORM-FACING MATERIALS
A. Smooth-Formed Finished Concrete: Comply with ACI 347R. Provide new or good finish form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.
03300 - 3
1. Plywood, metal, or other ACI 347R approved panel materials.
2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:
a. High-density overlay, Class 1, or better.
b. Medium-density overlay, Class 1, or better, mill-release agent treated and edge sealed.
c. Structural 1, B-B, or better, mill oiled and edge sealed.
d. B-B (Concrete Form), Class 1, or better, mill oiled and edge sealed.
B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit.
C. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces. Form oils or waxes shall not be used for concrete surfaces intended to be painted.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
D. Form Ties: Factory-fabricated, removable or snap-off stainless steel or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1. Furnish units that will leave no corrodible metal closer than 1 inch to the plane of the exposed concrete surface.
2. Furnish ties that, when removed, will leave holes not larger than 1 inch in diameter in concrete surface.
2.02 REINFORCEMENT
All reinforcing steel shall be detailed and placed in conformance with the "Specifications for Structural Concrete for Buildings" (ACI 301), the CRSI "Manual of Standard Practice", and the "ACI Detailing Manual-1994."
B. Tie Wire shall be stainless steel, Type 304 or Type 316, 18 gage minimum.
C. Reinforcing bars shall conform to ASTM 1035, ChromX 4100 or approved equal.
D. Anchor bolts, dowels and other embedded items are to be securely tied in place before concrete is poured.
E. All reinforcing bar bends shall be made cold.
F. Reinforcing splices shall be made only where indicated on the drawings.
G. Dowels between footing and wall or columns shall be the same grade, size, spacing, and number as the vertical reinforcing respectively, unless otherwise noted.
03300 - 4
H. Welding of reinforcing steel is not permitted unless otherwise shown on the drawings.
I. Contractor shall submit reinforcing bar layouts and details for the Engineer’s review prior to fabrication. Fabricate from reviewed drawings only.
J. Reinforcing bars shall be as long as practicable and as detailed and shall be lapped at splices and corners not less than 32 bar diameter (24" minimum), unless otherwise shown. Stagger horizontal wall bar splices. In general, bar splices shall be made at points of minimum stress. In beams and slabs, splice top bars at mid-span, bottom bars over supports, unless otherwise shown.
K. Embedded metal components made up of alloys that are dissimilar to that of the reinforcing steel shall not be attached directly to reinforcing. Measures shall be taken to electrically isolate said components from any reinforcing to prevent cathodic effects.
2.03 CONCRETE MATERIALS
A. Portland Cement: ASTM C 150, Type II.
1. Blended Hydraulic Cement: ASTM C 595, Type IL.
B. Pozzolans: Fly Ash: ASTM C 618, Class F.
C. Normal-Weight Aggregate: ASTM C 33, uniformly graded, and as follows:
1. Class: Moderate weathering region, but not less than 3M.
2. Aggregate Size: No. 57 (1 inch to No.4).
3. Aggregate Size: No. 67 (3/4 inch to No.4).
D. Size of Coarse Aggregate: Except when otherwise specified or permitted, maximum size of coarse aggregate shall not exceed three-fourths of the minimum clear spacing between reinforcing bars (or bundled bars), one-fifth of the narrowest dimension between the sides of forms, or one-third of the thickness of slabs or toppings.
E. Water: Potable and complying with ASTM C 94.
2.04 ADMIXTURES
A. General: Admixtures certified by manufacturer to contain no more than 0.1 percent water-soluble chloride ions by mass of cementitious material and to be compatible with other admixtures and cementitious materials. Do not use admixtures containing calcium chloride.
B. Water-Reducing Admixture: ASTM C494, Type A.
C. Water-Reducing and Retarding Admixture: ASTM C494, Type D
D. High-Range, Water-Reducing Admixture: ASTM C494, Type F.
03300 - 5
E. High-Range Water-Reducing and Retarding Admixture: ASTM C494, Type G.
F. Corrosion Inhibitor: Master Builders – MasterLife CI 30 or approved equal calcium nitrite corrosion inhibitor at 3 gal/CY
G. Anti-Washout Admixture: Anti-Washout Admixture: ASTM C1882, ASTM C494 Type
S.
2.05 CURING MATERIALS AND EVAPORATION RETARDERS
A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.
B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. dry.
C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.
D. Water: Potable.
E. Clear, Solvent-Borne, Membrane-Forming Curing Compound: ASTM C309, Type 1, Class B, 18 to 22 percent solids.
F. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C309, Type 1, Class B, 18 to 22 percent solids.
G. Clear, Solvent-Borne, Membrane-Forming Curing and Sealing Compound: ASTM
C1315, Type 1, Class A.
H. Clear, Waterborne, Membrane-Forming Curing and Sealing Compound: ASTM C
1315, Type 1, Class A.
2.06 RELATED MATERIALS
A. Joint-Fillers: ASTM D 1751, asphalt-saturated cellulose fiber or ASTM D 1752, cork or self-expanding cork.
B. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene.
C. Epoxy-Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class and grade to suit requirements, Type IV and V.
D. Cementitious Coatings: Cement based polymer modified concrete finish materials.
Available Products subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following:
1. ProFinish by Bonded Materials
03300 - 6
2. Polycoat by Tremcrete Systems Incorporated
3. Durus by Durus High Tech Cement
4. MBT RS-1150 by Master Builders Technologies
2.07 CONCRETE MIXES
A. Prepare design mixes for each type and strength of concrete determined by either laboratory trial mix or field test data bases, as follows:
1. Proportion normal-weight concrete according to ACI 211.1 and ACI 301.
B. Proportion normal-weight concrete mix as follows:
Compressive Strength (28 Days): 4,000 psi.
C. Cementitious Materials:
1. Fly Ash: Add with cement. Fly ash content must be a minimum of 25 percent by weight of cementitious material.
D. Maximum Water-Cementitious Materials Ratio: 0.45.
E. Limit water-soluble, chloride-ion content in hardened concrete per ACI 318-14
Chapter 19.
F. Admixtures: Use admixtures according to manufacturer's written instructions.
1. Use water-reducing admixture or high-range water-reducing admixture (superplasticizer) in concrete, as required, for placement and workability.
2. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
3. Use water-reducing admixture in pumped concrete, concrete required to be watertight, and concrete with a water-cementitious materials ratio below 0.45.
G. Slump Limit:
1. Tremie Concrete: 9 inches, plus or minus 1 inch.
2. Cast-in-Place: 5 inches, plus or minus 1 inch.
2.10 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94, and ASTM C 1116 and furnish batch ticket information. Batch ticket information shall include design mix reference, water that can be added at the jobsite, and admixtures. For transit mixing, complete not less than 70 revolutions of the drum at the manufacturer's rated mixing speed. Discharge concrete into its final position within 90 minutes after introduction of batch water to the cement. If a retarder admixture is used, the discharge time limit of 90 minutes may be increased by the time specified for retardation by the admixture manufacturer or the concrete
03300 - 7 supplier. Mix concrete a minimum of one minute at mixing speed immediately prior to discharge.
B. Project-Site Mixing: Project-Site mixing with the approval of the Officer-In-Charge.
Measure, batch, and mix concrete materials according to ASTM C 94. Mix concrete materials in appropriate drum-type batch machine mixer.
1. For mixer capacity of 1 cu. yd. or less, continue mixing at least one and one-half minutes, but not more than five minutes after all ingredients are in mixer, before any part of batch is released.
2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd.
3. Provide batch ticket for each batch discharged and used in the work, indicating Project identification name and number, date, mix type, mix time, quantity, and amount of water added. Record approximate location of concrete placement in structure.
4. Hand mixed concrete will not be allowed, except to make up shortages for thresholds, curbs and gutters, thrust blocks and utility trench encasements.
PART 3 – EXECUTION
3.01 FORMWORK
A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until concrete structure can support such loads.
B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.
C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows:
1. Class A, 1/8"
2. Class S, 1/4"
3. Class C, 1/2"
4. Class D, 1"
D. Construct forms to prevent loss of concrete mortar.
E. Fabricate forms for easy removal without hammering or prying against concrete surfaces. Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical. Kerf wood inserts for forming keyways, reglets, recesses, and the like, for easy removal.
1. Do not use rust-stained steel form-facing material.
03300 - 8
F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds.
Maintain the integrity of the vapor retarder membrane.
G. Provide openings for weep holes and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations.
H. Chamfer exterior corners and edges of permanently exposed concrete unless otherwise indicated on the construction drawings.
I. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the work. Determine sizes and locations from trades providing such items.
J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
L. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
3.02 EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use Setting Drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
1. Install anchor bolts, stainless steel plates and rebar, accurately located, to elevations required.
2. Install inserts, hangers, metal ties, nailing strips, blocking, grounds and other fastening devices needed for attachment of other work.
3.03 REMOVING AND REUSING FORMS
A. Leave formwork, for structural elements, that supports weight of concrete in place until concrete has achieved the following:
1. 28-day design compressive strength or 14 days after placing concrete, whichever is longer.
2. Determine compressive strength of in-place concrete by testing representative field or laboratory-cured test specimens according to ACI 301.
3. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.
03300 - 9
B. Clean and repair surfaces of forms to be reused in the work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-release agent.
C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by the Officer-In-Charge.
3.04 SHORES AND RESHORES
A. Comply with ACI 318, ACI 301, and recommendations in ACI 347R for design, installation, and removal of shoring and reshoring.
B. Plan sequence of removal of shores and reshores to avoid damage to concrete.
Locate and provide adequate reshoring to support construction without excessive stress or deflection.
C. Due to the reinforcing’s very low specific gravity, it may tend to float in concrete during vibration. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover.
D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
3.05 JOINTS
A. General: Construction joints should be true to line with faces perpendicular to surface plane of concrete.
B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Officer-In-Charge.
1. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints, unless otherwise indicated. Do not continue reinforcement through sides of strip placements of floors and slabs.
2. Locate horizontal joints in walls at underside of slabs and beams, and at the top of footings.
3. Space vertical joints in walls as indicated. Locate joints beside piers integral with walls, near comers, and in concealed locations where possible.
4. Use a bonding agent or epoxy adhesive scrubbed into the surface at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces. Bond agent or epoxy adhesive should be wet or tacky when new concrete is placed on it. If bonding agent or epoxy adhesive is dry, completely remove and reapply.
03300 - 10
3.06 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items are complete and that required inspections have been performed.
Provide two day notification to Officer-In-Charge for each scheduled pour.
B. Do not add water to concrete during delivery, at Project site, or during placement, unless approved by Officer-In-Charge.
1. Do not add water to concrete after adding high-range water reducing admixtures to mix.
C. Convey concrete from mixer to the place of final deposit rapidly by methods that prevent segregation or loss of ingredients and will insure the required quality of concrete. Use conveying equipment, conveyors, hoppers, baffles, chutes, pumps that are sized and designed to prevent cold joints from occurring and prevent segregation in discharged concrete. Clean conveying equipment before each placement.
D. Deposit concrete continuously or in layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as specified. Deposit concrete to avoid segregation.
E. Deposit concrete in forms in horizontal layers with proper consolidation into previous layers and in a manner to avoid inclined construction joints. Place each layer while preceding layer is still plastic, to avoid cold joints.
1. Consolidate placed concrete with mechanical vibrating equipment. Use equipment and procedures for consolidating concrete recommended by ACI 309R.
2. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations no farther than the visible effectiveness of the vibrator. Place vibrators to rapidly penetrate placed layers and at least 6 inches into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mix constituents to segregate.
3. Make construction joints only where located on Drawings unless otherwise approved by the Officer-In-Charge. Plan pours to continuously place concrete from one construction joint to another.
F. Deposit and consolidate concrete for mass structure on land side of seawall in a continuous operation, until placement of a section is complete.
1. Consolidate concrete during placement operations so concrete is thoroughly worked around embedded items and into corners.
2. Maintain reinforcement in position on chairs during concrete placement.
03300 - 11
3. Screed slab surfaces with a straightedge and strike off to correct elevations.
4. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, free of humps or hollows, before excess moisture or bleed-water appears on the surface. Do not further disturb slab surfaces before starting finishing operations.
G. Hot-Weather Placement: Place concrete according to recommendations in ACI 305R and as follows, when hot-weather conditions exist:
1. Cool ingredients before mixing to maintain concrete temperature below 90 degrees F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.
2. Fog-spray forms, reinforcement, and subgrade just before placing concrete.
Keep subgrade moisture uniform without standing water, soft spots, or dry areas.
H. Lean Concrete shall be used for concrete cut-off walls to provide a uniform and level surface that supports the 0-Face Concrete Curbs.
Grade of concrete: M5: 1:5:10 or M7.5: 1:4:8 (Cement: Sand: Aggregates)
3.07 TREMIE CONCRETE PLACEMENT
A. General Requirements:
1. Place concrete continuously until completion of pour
2. Avoid interruptions exceeding 10 minutes.
3. Do not vibrate concrete placed underwater unless approved by the Engineer.
4. Free fall of concrete is prohibited.
B. Installation:
1. Initially charge tremie with sufficient concrete to displace water or slurry completely.
2. Always maintain positive pressure head within tremie.
3. Always maintain tremie discharge end in freshly placed concrete.
4. Do not lift tremie tip above concrete surface.
5. Avoid lateral movement causing segregation or disturbance.
3.08 CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive hot temperatures. Comply with recommendations in ACI 305R for hot weather protection during curing. Cure concrete for at least 7 days.
B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces before and during finishing operations. Apply according to manufacturer's written
03300 - 12 instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.
C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, continue curing by one or a combination of the curing methods listed in paragraph
3.10 D.
D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including concrete poured on land side of seawall and other repaired surfaces, by one or a combination of the following methods:
1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials:
a. Water.
b. Continuous water-fog spray.
c. Absorptive cover, water saturated, and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers.
2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive.
Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape.
a. Moist cure or use moisture-retaining covers to cure concrete surfaces to receive floor coverings.
b. Moist cure or use moisture-retaining covers to cure concrete surfaces to receive penetrating liquid floor treatments.
c. Cure concrete surfaces to receive floor coverings with either a moisture-retaining cover or a curing compound that the manufacturer recommends for use with floor coverings.
3. Curing Compound: Apply uniformly in continuous operation by spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.
4. Curing and Sealing Compound: Apply uniformly to top slab of wall and concrete poured on land side of seawall in a continuous operation by spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application where recommended by the manufacturer. Repeat process 24 hours later and apply a second coat.
Maintain continuity of coating and repair damage during curing period.
03300 - 13
3.09 JOINT FILLING
A. Prepare, clean, and install joint-filler according to manufacturer's written instructions.
Defer joint filling as long as possible. Do not fill joints until construction traffic has permanently ceased.
B. Remove dirt, debris, saw cuttings, curing compounds, and sealers from joints; leave contact faces of joint clean and dry.
3.10 CONCRETE SURFACE REPAIRS
A. Defective Concrete: Repair and patch defective areas. Remove and replace concrete that cannot be repaired and patched to Officer-in-Charge's approval.
B. Patching Mortar: Mix dry-pack patching mortar, consisting of one part Portland cement to two and one-half parts fine aggregate passing a No. 16 (1.2-mm) sieve, using only enough water for handling and placing. Compressive strength at 28 days shall be not less than 4,000 psi.
C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock rockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning.
1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch in any dimension in solid concrete but not less than 1 inch in depth. Make edges of cuts perpendicular to concrete surface. Clean, dampen with water, and brush-coat holes and voids with bonding agent. Fill and compact with patching mortar before bonding agent has dried. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.
2. Repair defects on surfaces exposed to view by blending white portland cement and standard portland cement so that, when dry patching mortar will match surrounding color. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching. Compact mortar in place and strike off slightly higher than surrounding surface.
3. Repair defects on concealed formed surfaces that affect concrete's durability and structural performance as determined by Officer-in-Charge.
D. Repairing Unformed Surfaces: Test unformed surfaces for finish and verify surface tolerances specified for each surface. Correct low and high areas. Test surface sloped to drain for trueness of slope and smoothness; use a sloped template.
1. Repair finished surfaces containing defects. Surface defects include spalls, popouts, honeycombs, rock pockets, crazing and cracks in excess of 0.01 inch wide or that penetrate to reinforcement or completely through unreinforced sections regardless of width, and other objectionable conditions.
2. After concrete has cured at least 14 days, correct high areas by grinding.
03300 - 14
3. Correct localized low areas during or immediately after completing surface finishing operations by cutting out low areas and replacing with patching mortar.
Finish repaired areas to blend into adjacent concrete.
4. Correct other low areas scheduled to remain exposed with a repair topping. Cut out low areas to ensure a minimum repair topping depth of 1/4 inch to match adjacent elevations. Prepare, mix, and apply repair topping and primer according to manufacturer's written instructions to produce a smooth, uniform, plane, and level surface.
5. Repair defective areas, except random cracks and single holes 1-inch or less in diameter, by cutting out and replacing with fresh concrete. Remove defective areas with clean, square cuts and exposed reinforcement with at least 3/4-inch clearance all around. Dampen concrete surfaces in contact with patching concrete and apply bonding agent. Mix patching concrete of same materials and mix as original concrete except without coarse aggregate. Place, compact, and finish to blend with adjacent finished concrete. Cure in same manner as adjacent concrete.
6. Repair random cracks and single holes 1-inch or less in diameter with patching mortar. Groove top of cracks and cut out holes to sound concrete and clean off dust, dirt, and loose particles. Dampen cleaned concrete surfaces and apply bonding agent. Place patching mortar before bonding agent has dried. Compact patching mortar and finish to match adjacent concrete. Keep patched area continuously moist for at least 72 hours.
E. Perform structural repairs of concrete, subject to Officer-in-Charge's approval, using epoxy adhesive and patching mortar.
F. Repair materials and installation not specified above may be used, subject to Officer-in-Charge's approval.
3.11 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified independent testing and inspecting agency to sample materials, perform tests, and submit test reports during concrete placement according to requirements specified in this Article.
B. Testing Services: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements:
1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mix exceeding 5 cu. yd., but less than 25 cu. yd., plus one set for each additional 50 cu. yd. or fraction thereof.
2. Slump: ASTM C 143; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mix. Perform additional tests when concrete consistency appears to change.
3. Concrete Temperature: ASTM C 1064; one test hourly when air temperature is
40 degrees F4.4 degrees C and below and when 80 degrees F (27 degrees Centigrade) and above, and one test for each composite sample.
03300 - 15
4. Compression Test Specimens: ASTM C 31; cast and laboratory cure one set of four standard cylinder specimens for each composite sample.
a. Cast and field cure one set of four standard cylinder specimens for each composite sample.
5. Compressive-Strength Tests: ASTM C 39; test two laboratory cured specimens at
7 days and two at 28 days.
a. Test two field-cured specimens at 7 days and two at 28 days.
b. A compressive-strength test shall be the average compressive strength from two specimens obtained from same composite sample and tested at age indicated.
C. Strength of each concrete mix will be satisfactory if every average of any three-consecutive compressive-strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi.
D. Test results shall be reported in writing to Officer-In-Charge, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mix proportions and materials, compressive breaking strength, and type of break for both 7- and 28-day tests.
E. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Officer-In-Charge but will not be used as sole basis for approval or rejection of concrete.
F. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Officer-In- Charge. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C 42 or by other methods as directed by Officer-In-Charge.
PART 4 – PAYMENT
A. Payment for furnishing and placement of concrete, rebar and dowels to form concrete curbs, gutters, cut-off walls, grade adjustment walls, fence post footings, base and walkway for shower, and other repairs identified by the Officer-in-charge shall be included in the various items established in the Offer. Such payment will be full compensation for all labor, materials, equipment, transportation, tools, bracing, and all other items necessary and incidental to the completion of the work, except items listed for payment elsewhere in the contract.
B. Demolition and removal of unusable concrete, debris, excavated material, forms, trench support, tie wires, bracings, straps, structural struts, surface finishing, curing, 03300 - 16 mixing, hauling, furnishing and placing reinforcing and all other incidentals necessary to complete the work shall also be included in the items established in the Offer.
END OF SECTION