This document is a technical engineering drawing (Sheet 11) related to the CCSWDC Phase I and II Landfill Gas System Expansion project in Florida, specifically detailing valve and well installation technical specifications. The drawing provides comprehensive technical details for four specific engineering configurations: Header Isolation Valve Detail, Airline Isolation Valve Detail, Condensate Discharge Line Isolation Valve Detail, and Tie-into Well to Be Abandoned in Capped Area Detail. These technical schematics outline precise installation requirements for landfill gas system infrastructure, including pipe connections, valve placements, underground configurations, and specific installation notes for each configuration.
The technical drawing includes multiple critical engineering notes addressing installation procedures, material specifications, and technical requirements for each valve and well detail. The drawings are marked as "Issued for Bid" in March 2024, indicating this is a current engineering specification for bidding purposes. The detailed schematics provide contractors with exact technical specifications for installing high-density polyethylene (HDPE) pipes, valves, and well components, ensuring precise implementation of the landfill gas system expansion project's technical requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .