Plans.pdf
PDF 36 MB Posted
- Solicitation number
- 242587MN
- Issued by
- Sarasota County, Siesta Key CDP, Florida
About this file
These engineering plans for the Sarasota County Solid Waste Department document the Gas Collection and Control System (GCCS) Expansions for Phases I and II at the Central County Solid Waste Disposal Complex in Nokomis, Florida. The project involves comprehensive landfill gas infrastructure improvements, including installing below-grade high-density polyethylene (HDPE) gas headers and laterals, air supply lines, dewatering discharge lines, and associated appurtenances. The plans, dated March 2024 and prepared by SCS Engineers, detail the expansion across multiple sheets covering existing conditions, proposed systems, base grades, and technical details for well installations, valve configurations, and condensate management systems.
The project scope encompasses installing vertical gas extraction wells, pneumatic pumps in condensate sumps, airline isolation valves, and blow-off valves, with specific attention to tie-ins with existing landfill gas systems. Technical specifications include precise requirements for pipe materials (primarily HDPE), geomembrane liner systems, well construction details, and installation methodologies. The comprehensive set of drawings provides detailed engineering specifications for each component, including well riser configurations, header and lateral pipe installations, and specific technical requirements for various system elements. The project appears to be funded through Sarasota County's solid waste management budget, with a focus on improving gas collection and control infrastructure to enhance environmental management and potential methane capture capabilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS ta m -fs
\T am pa
\F ile s\
PR
O
JE
CT
\0
3.
\D ra w in gs
\E ng in ee rin g
Dr aw in gs
\0
- C O
VE
R.
dw g
M ar
6,
- 1
0:
am L ay ou t N am e:
C
O
VE
R By
: 5
2k gb
LOCATION MAP
CCSWDC
N
SCALE FEET
01000 1000 2000
SCS ENGINEERS
SCS PROJECT NO. 09216113.16
3922 COCONUT PALM DRIVE, SUITE 102
TAMPA, FL 33619
PH. (813) 621-0080 FAX. (813) 623-6757
FLORIDA FIRM REGISTRATION: RY-4892
WWW.SCSENGINEERS.COM
STEARNS, CONRAD AND SCHMIDT
CONSULTING ENGINEERS, INC.
PROJECT LOCATION
SOLID WASTE DEPARTMENT
CENTRAL COUNTY SOLID WASTE
DISPOSAL COMPLEX
2024 PHASES I AND II GAS COLLECTION
AND CONTROL SYSTEM EXPANSIONS
SARASOTA COUNTY
MARCH 2024
NOKOMIS, FLORIDA
KNIGHTS TRAIL ROAD
ISSUED FOR BID
3/4/2024
INDEX OF SHEETS
SHEET NUMBER SHEET TITLE
01 COVER
02 EXISTING GCCS PHASE I
03 EXISTING GCCS PHASE II
04 BORROW AREA MAP
05 BASEGRADES GCCS PHASE I
06 BASEGRADES GCCS PHASE II
07 PROPOSED GCCS PHASE I
08 PROPOSED GCCS PHASE II
09 DETAILS - 1
10 DETAILS - 2
11 DETAILS - 3
12 DETAILS - 4
DANIEL R. COOPER, P.E.
LICENSE NO. 39388
3/6/2024
90 90
0 95 90 85 80 75 70 65 60
55 50 45 40 35 30 25
110105
11010510
10510511
25 25
LCO-2S
EW-1 EW-2 EW-3 EW-4 EW-5 EW-6 EW-7
EW-8
EW-9 EW-10
EW-11
EW-12
EW-13
EW-14
EW-15
EW-16
EW-17
EW-19
EW-20EW-21
EW-22EW-23EW-24EW-25EW-26
EW-88
EW-107
EW-124
EW-148
EW-147
CT-3
CT-2
CT-1
LCO-1NLCO-2N
LCO-3NLCO-4N
LCO-5N
CW-8A
MW-8A
CW-9
MW-10R
AR-5
AR-4
AR-1
AR-2
AR-3
RW-57
RW-56
RW-70
RW-68RW-68
LCR-2S
LCR-1S
LCR-2N
MW-2R
MW-1RMW-4R
CV-5
HV-5
LCR-3N
LCR-3S
CS-3
AV-3
AV-2
CS-5
HV-3
HV-2
AV-4
CV-4
HV-4
CV-3
CV-2
AR-6
LCR-4N
LCR-4S
LCR-5N
LCR-1N
CS-6
EW-49 EW-48
EW-47
EW-46
EW-45 EW-44
EW-42
EW-56
EW-55
EW-54EW-53
EW-52
EW-51
EW-50
EW-41
EW-57
EW-70
EW-40
EW-58
EW-39
EW-38
EW-37
EW-36
EW-35EW-34
EW-33
EW-32
EW-31
EW-30
EW-29
EW-28 EW-27
EW-63
EW-62
EW-61 EW-60 EW-59
EW-69EW-68EW-67
EW-66EW-65
EW-43
LCO-1S
LCR-6S
LCR-5S
RW-50
RW-66
RW-54
FM FM FM FM FM FM FM FM FM FM
FM
FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
EW-64
AV-5
LCO-4SLCO-5S LCO-3S
EW-18
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
N
1" = 100'
0 10050 200
E X
IS
TI
N G
G C
C S
P H
A S
E I
02 - EXISTING GCCS
LEGEND
NOTES:
1. AERIAL TOPOGRAPHY DATA PROVIDED BY: PICKETT AND ASSOCIATES, LLC.
FLIGHT DATE DECEMBER 28, 2022.
2. EXISTING LFGCCS WITHIN PHASES I AND II COMPILED FROM SET TITLED
"CCSWDC AS-BUILTS FOR LANDFILL GAS COLLECTION AND CONTROL SYSTEM"
DATED SEPTEMBER 2022 BY SCS ENGINEERS.
PHASE I
EXISTING CONTOURS20
FM
HC HC
AIR SUPPLY PIPE
BLIND FLANGE
CONDENSATE DISCHARGE PIPE
CONDENSATE SUMP
LEACHATE CLEANOUT
LEACHATE CLEANOUT RISER
LEACHATE FORCEMAIN PIPE
LFG HEADER / LATERAL PIPE
LFG HORIZONTAL COLLECTOR PIPE
LFG TARGET
PHASE BOUNDARY
WELL - CASSION
WELL - GAS EXTRACTION
WELL - HORIZONTAL
WELL - REMOTE
FORCEMAIN HEADER CLEANOUT
AR-## ACCESS RISER
T
AV-## VALVE - AIR SUPPLY
HV-## VALVE - HEADER/LATERAL
CV-## VALVE - CONDENSATE DISCHARGE
H.P.
L.P. LOW POINT
HIGH POINT
APPROXIMATE TPO GEOMEMBRANE LIMITS
EW-##
RW-##
HC-##
EW-##
CS-##
T-##
LCO-##
LCR-##
FLC-##
3/ 6/
10095 9085807570656055504540
353025
115110
125120115
105 110
454035302520
50 55 60 65 70
22 23
22 23 24
CV-10
T T-98R
CS-8
EW-92
EW-72
EW-71
EW-87
EW-89
EW-88
EW-106
EW-107
EW-124
EW-148
EW-146
EW-147
EW-145
EW-144
EW-126
EW-123
EW-122
EW-109
EW-105
EW-90
EW-104
EW-91
EW-110
EW-142
EW-121
6"
6"
6"
6"6"
6"
12"
6" 6"
12"
6"
6"
6"
6" 6"
6"
6"
6"
12"
12"6"
CS-7
LCR-7S
AR-8
MW-10R
MW-18
MW-19
MW-20
AR-12
LCO-8S
LCR-8S
LCO-7SLCO-9SLCO-10S
LCO-11S
LCO-8N
LCO-10N
LCR-7NC
LCR-7ND
LCR-6N
AR-7
LCR-8NC
LCR-8NDLCR-9N
LCR-10N
LCR-3A
EW-86
CS-9
CV-5
HV-5
CV-8
AV-8
AR-10
AV-7
AV-9
AV-10
HV-9
HV-7
HV-10 CV-7
CV-9
6"
EW-85
EW-127
CS-10
RW-142
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
CS-11
HV-12
AV-12
CV-12
HV-8
CV-13
AV-6
HV-6
CV-6
AV-4
CV-4
HV-4
T T-97
T
T-100
T T-118
T
T-115
LCO-6N
FM FM FM
FM FM FMFM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM
FM
LCO-7N
LCO-9N
L.P.
L.P.
L.P.
L.P.
H.P.
H.P.
H.P.
AR-9
AR-13
EW-128
HC
HC
HC
HC
HC
HC
HC
HC-2B
L.P.
L.P.
L.P.
L.P.
H.P.
HC-2A
H.P.
H.P.
HV-13
HC
HC HC
HC
HC HC HC HC HC HC HC HC
CS-12
LCR-9S
LCR-10S
LCR-11S
LCR-12E
CS-13
HC-3A
CW-10R
HC-1B
AR-15
HC-1A
EW-102
EW-120
FLC - 06
FLC - 05
FLC - 04
FLC - 03 FLC - 01
FLC - 02
HV-13
HC-3B
AV-13
HV-14
AV-14
18"
18"
18" 6"
6"
AR-11
LCR-6S
AR-14
EW-111
EW-29A
AV-5
LCO-6S
EW-125
EW-108
EW-103
LCO-2W
LCO-3W
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
E X
IS
TI
N G
G C
C S
P H
A S
E
II
02 - EXISTING GCCS
N
1" = 100'
0 10050 200
PHASE II
PHASE III
LEGEND
EXISTING CONTOURS20
FM
HC HC
AIR SUPPLY PIPE
BLIND FLANGE
CONDENSATE DISCHARGE PIPE
CONDENSATE SUMP
LEACHATE CLEANOUT
LEACHATE CLEANOUT RISER
LEACHATE FORCEMAIN PIPE
LFG HEADER / LATERAL PIPE
LFG HORIZONTAL COLLECTOR PIPE
LFG TARGET
PHASE BOUNDARY
WELL - CASSION
WELL - GAS EXTRACTION
WELL - HORIZONTAL
WELL - REMOTE
FLC-## FORCEMAIN HEADER CLEANOUT
AR-## ACCESS RISER
LCR-##
LCO-##
T-##
CS-##
EW-##
HC-##
RW-##
T
EW-##
AV-## VALVE - AIR SUPPLY
HV-## VALVE - HEADER/LATERAL
CV-## VALVE - CONDENSATE DISCHARGE
H.P.
L.P. LOW POINT
HIGH POINT
NOTES:
1. AERIAL TOPOGRAPHY DATA PROVIDED BY: PICKETT AND ASSOCIATES, LLC.
FLIGHT DATE DECEMBER 28, 2022.
2. EXISTING LFGCCS WITHIN PHASES I AND II COMPILED FROM SET TITLED
"CCSWDC AS-BUILTS FOR LANDFILL GAS COLLECTION AND CONTROL SYSTEM"
DATED SEPTEMBER 2022 BY SCS ENGINEERS.
APPROXIMATE TPO GEOMEMBRANE LIMITS
3/ 6/
606570
303540
5560657075
3540455055606570 75808590 90858075
95100105110
7065605545
95 90 8580 75 70 65 60 55 5
0 45 40 35 30 2
110105
4550 55606570 75 808590 95 100 105 110
25 303540 4550 55606570 75 80859095100 105
8580 757065 6055 50454035 3025
120 115 110 105 100 9590 8580 757065 6055 504540 253035
959085807570656055 50454035 3025 25
115110105
30 25 2525
130125120115
120115110
105 110
656055
20 25 4035302520
50 55 60 65 70
3035405050556065707580 8590
100105110115120125
25 252525
25 25 2525
20 25
25 20
25 30
30 30 30
253030
2530 25
25 25
25 25
252520
30 2525
25 20
20 20
20 20
15 20
20 20
2020 2020
15 15
15 1520
20202020
202020
15 15
1515151515
20 20
25 55 50 45 40 35 30 25 20
20 20
20 20 1515 20152015152020
15 15 15 15 15 2020
10010595
27 28
26 27
26 27 28
22 23
22 23 24
26 27 28 2930
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
B O
R R
O W
A R
E A
M A
P
02 - EXISTING GCCS
N
1" = 100'
0 10050 200BURROW PIT
NOTES:
1. AERIAL TOPOGRAPHY DATA PROVIDED BY: PICKETT AND ASSOCIATES, LLC.
FLIGHT DATE DECEMBER 28, 2022.
2. EXISTING LFGCCS WITHIN PHASES I AND II COMPILED FROM SET TITLED
"CCSWDC AS-BUILTS FOR LANDFILL GAS COLLECTION AND CONTROL SYSTEM"
DATED SEPTEMBER 2022 BY SCS ENGINEERS.
PHASE II PHASE I
PHASE III
3/ 6/
SW Ditch Cleanings Soil
70 65
EW-66A
EW-54A
EW-29A
EW-30A
EW-64A
EW-31A
EW-65A
EW-51A
EW-49A EW-48A
EW-45A
EW-36A
EW-50A
29 29
28 28
2727272727
26262626
26 26
26 26
25252525
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
N
1" = 100'
0 10050 200
B A
S E
G R
A D
E S
G C
C S
P H
A S
E I
06 - BASEGRADES GCCS
LEGEND
PHASE I
NOTES:
1. AERIAL TOPOGRAPHY DATA PROVIDED BY: PICKETT AND ASSOCIATES, LLC.
FLIGHT DATE DECEMBER 28, 2022.
2. BASEGRADES SHOWN WERE PROVIDED BY THE COUNTY IN AUTOCAD DRAWING
NAMED "00 C-UT01100".
EXISTING CONTOURS20
PHASE BOUNDARY
PROPOSED WELL - GAS EXTRACTIONEW-##
3/ 6/
EW-111A
EW - 142A
EW-29A
TW-97
TW-115
EW-152
EW-154
EW-153
EW-150
EW-149
TW-98R
EW-155
EW-151
28 27
303030
35 35
40 40
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
B A
S E
G R
A D
E S
G C
C S
P H
A S
E
II
06 - BASEGRADES GCCS
N
1" = 100'
0 10050 200
PHASE II
PHASE III
LEGEND
NOTES:
1. AERIAL TOPOGRAPHY DATA PROVIDED BY: PICKETT AND ASSOCIATES, LLC.
FLIGHT DATE DECEMBER 28, 2022.
2. BASEGRADES SHOWN WERE PROVIDED BY THE COUNTY IN AUTOCAD DRAWING
NAMED "BASEGRADES PHASE I AND II".
EXISTING CONTOURS20
PHASE BOUNDARY
PROPOSED WELL - GAS EXTRACTION
PROPOSED TARGET WELLTW-##
EW-##
3/ 6/
90 90
0 95 90 85 80 75 70 65 60
55 50 45 40 35 30 25
110105
11010510
10510511
25 25
LCO-2S
EW-1 EW-2 EW-3 EW-4 EW-5 EW-6 EW-7
EW-8
EW-9 EW-10
EW-11
EW-12
EW-13
EW-14
EW-15
EW-16
EW-17
EW-19
EW-20EW-21
EW-22EW-23EW-24EW-25EW-26
EW-88
EW-107
EW-124
EW-148
EW-147
CT-3
CT-2
CT-1
LCO-1NLCO-2N
LCO-3NLCO-4N
LCO-5N
AR-5
AR-4
AR-1
AR-2
AR-3
RW-57
RW-56
RW-70
RW-68RW-68
LCR-2S
LCR-1S
LCR-2N
24"
4"
4"
4"
4"
4"
4"
4" 4"
4"
4"
4"4"
4"
4"
4"
4"
4"
4"
4"
4" 4"
4" 4"4"
4"
4"
4"
4"
4"4"
4"
4"
4"
4"
6"
6"
6"
6" 6"
6"
6"
6" 6"
6"
6"
6"
6"
6"
6"
6"
6" 6"
6"
6" 6"
6"
6"
6"
6"
6"
6"
8"
8" 18"
18" 18" 18"
18" 18"
18"
24"
24"
24"
24"
6"
6"
18"
18"
18"
18"
18"
18"
18"
CV-5
HV-5
8"
8" 8"
6"
4"
8"
30"
4"
LCR-3N
LCR-3S
CS-3
AV-3
AV-2
CS-5
HV-3
HV-2
AV-4
CV-4
HV-4
CV-3
CV-2
AR-6
LCR-4N
LCR-4S
LCR-5N
LCR-1N
CS-6
EW-49 EW-48
EW-47
EW-46
EW-45 EW-44
EW-42
EW-56
EW-55
EW-54EW-53
EW-52
EW-51
EW-50
EW-41
EW-57
EW-70
EW-40
EW-58
EW-39
EW-38
EW-37
EW-36
EW-35EW-34
EW-33
EW-32
EW-31
EW-30
EW-29
EW-28 EW-27
EW-63
EW-62
EW-61 EW-60 EW-59
EW-69EW-68EW-67
EW-66EW-65
EW-43
LCO-1S
LCR-6S
LCR-5S
EW-66A
EW-54A
EW-29A
EW-30A
EW-64A
EW-31A
EW-65A
EW-51A
EW-49A EW-48A
EW-45A
EW-36A
EW-50A
RW-50
RW-66
RW-54
FM FM FM FM FM FM FM FM FM FM
FM
FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
EW-64
AV-5
LCO-4SLCO-5S LCO-3S
EW-18
6"
6"
6" 6"
4"
6"
4"
6"
4" 6"
4"
6"4"
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
N
1" = 100'
0 10050 200
P R
O P
O S
E D
G C
C S
P H
A S
E I
03 - PROPOSED GCCS
LEGEND
PHASE I
PROPOSED ABANDONED WELL
NOTES:
1. AERIAL TOPOGRAPHY DATA PROVIDED BY: PICKETT AND ASSOCIATES, LLC.
FLIGHT DATE DECEMBER 28, 2022.
2. EXISTING LFGCCS WITHIN PHASES I AND II COMPILED FROM SET TITLED
"CCSWDC AS-BUILTS FOR LANDFILL GAS COLLECTION AND CONTROL SYSTEM:
DATED SEPTEMBER 2022 BY SCS ENGINEERS.
3. ALL STORMWATER THAT COMES IN CONTACT WITH WASTE SHALL BE
MANAGED AS LEACHATE AND SHALL BE DIRECTED TO THE LEACHATE
COLLECTION SYSTEM.
EW-##
APPROXIMATE TPO GEOMEMBRANE LIMITS
EXISTING CONTOURS20
FM
HC HC
AIR SUPPLY PIPE
BLIND FLANGE
CONDENSATE DISCHARGE PIPE
CONDENSATE SUMP
LEACHATE CLEANOUT
LEACHATE CLEANOUT RISER
LEACHATE FORCEMAIN PIPE
LFG HEADER / LATERAL PIPE
LFG HORIZONTAL COLLECTOR PIPE
PHASE BOUNDARY
WELL - CASSION
WELL - GAS EXTRACTION
WELL - HORIZONTAL
WELL - REMOTE
FORCEMAIN HEADER CLEANOUT
AR-## ACCESS RISER
AV-## VALVE - AIR SUPPLY
HV-## VALVE - HEADER/LATERAL
CV-## VALVE - CONDENSATE DISCHARGE
H.P.
L.P. LOW POINT
HIGH POINT
PROPOSED AIR SUPPLY PIPE
PROPOSED CONDENSATE DISCHARGE PIPE
PROPOSED LFG HEADER / LATERAL PIPE
PROPOSED WELL - GAS EXTRACTION
EW-##
EW-##
RW-##
HC-##
CS-##
LCO-##
LCR-##
FLC-##
EW-##
SEE DETAIL
LFG EXTRACTION WELL DETAIL
SEE DETAIL
REMOTE WELL IN CAPPED AREA
SEE DETAIL
HEADER AND LATERAL PIPE
TRENCH IN CAPPED AREA
SEE DETAIL
TIE-INTO WELL TO BE
ABANDONED IN
CAPPED AREA
3/ 6/
LCR-10N
HV-12
AV-12
CV-12
6"
AR-15
10095 9085807570656055504540
353025
115110
125120115
105 110
454035302520
50 55 60 65 70
22 23
22 23 24
CV-10
T T-98R
CS-8
EW-92
EW-72
EW-71
EW-87
EW-89
EW-88
EW-106
EW-107
EW-124
EW-148
EW-146
EW-147
EW-145
EW-144
EW-126
EW-123
EW-122
EW-109
EW-105
EW-90
EW-104
EW-91
EW-110
EW-142
EW-121
6"
6"
6"
6"6"
6"
12"
6"
6" 6"
6"
12"
6"
6"
12"
12"
6"
6"
6"
6"
18"
6"
12"
6"
12"
6"
6"
6"
12"
12"
6"
6"
6"
6"
6"
6"
12"
6"
12"6"
4" CS-7
LCR-7S
AR-8AR-12
LCO-8S
LCR-8S
LCO-7SLCO-9SLCO-10S
LCO-11S
LCO-8N
LCO-10N
LCR-7NC
LCR-7ND
LCR-6N
AR-7
LCR-8NC
LCR-8NDLCR-9N
LCR-10N
LCR-3A
EW-86
CS-9
CV-5
HV-5
CV-8
AV-8
AR-10
AV-7
AV-9
AV-10
HV-9
HV-7
HV-10 CV-7
CV-9
6"
EW-85
EW-127
CS-10
RW-142
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
CS-11
HV-12
AV-12
CV-12
HV-8
CV-13
AV-6
HV-6
CV-6
AV-4
CV-4
HV-4
T T-97
T
T-100
T T-118
T
T-115
LCO-6N
FM FM FM
FM FM FMFM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM
FM
LCO-7N
LCO-9N
L.P.
L.P.
L.P.
L.P.
H.P.
H.P.
H.P.
AR-9
AR-13
18"
6"
6"
6" 6"
18"
6"
6"
EW-128
HC
HC
HC
HC
HC
HC
HC
HC-2B
L.P.
L.P.
L.P.
L.P.
H.P.
HC-2A
H.P.
H.P.
HV-13
HC
HC HC
HC
HC HC HC HC HC HC HC HC
CS-12
LCR-9S
LCR-10S
LCR-11S
LCR-12E
CS-13
HC-3A
HC-1B
AR-15
HC-1A
EW-102
EW-120
FLC - 06
FLC - 05
FLC - 04
FLC - 03 FLC - 01
FLC - 02
HV-13
HC-3B
AV-13
HV-14
AV-14
18"
18"
8"
18" 6"
6"
6"
18"
AR-11
LCR-6S
AR-14
EW-111
EW-111A
EW - 142A
EW-29A
AV-5
LCO-6S
TW-97
TW-115
CS-15
CS-16
EW-152
EW-154
EW-153
AV-14
CV-13
HV-14
EW-150
EW-149
TW-98R
H P
H P
H P
EW-155 EW-125
EW-10818"
18"
AR
EW-103
AR
AR
EW-151
HC-3B
LCO-2W
LCO-3W
18"
18"
18"
8"
8" 6"
6"
6"
6"
8"
8"
6"
8"
6"
18"
6"18"
6"
6"
6"
SEE NOTE 4
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
P R
O P
O S
E D
G C
C S
P H
A S
E
II
03 - PROPOSED GCCS
N
1" = 100'
0 10050 200
PHASE II
PHASE III
LEGEND
NOTES:
1. AERIAL TOPOGRAPHY DATA PROVIDED BY: PICKETT AND ASSOCIATES, LLC.
FLIGHT DATE DECEMBER 28, 2022.
2. ALL HEADER/LATERAL PIPING TO BE INSTALLED AT 5% MIN. SLOPE UNLESS
OTHERWISE SPECIFIED.
3. CONTRACTOR TO INSTALL AIR AND FORCEMAIN TO EW-142A FROM AR-13.
4. CONTRACTOR TO EXCAVATE NEAR LCR-11S VACUUM RISER FOR
ELECTROFUSION CONNECTION TO THE EXISTING HEADER.
5. CONTRACTOR TO REPAIR STORMWATER DOWN CHUTES ON THE WEST SLOPE
OF PHASE II AS NECESSARY FOR HEADER INSTALLATION.
PROPOSED ABANDONED WELL
APPROXIMATE TPO GEOMEMBRANE LIMITS
CS-## PROPOSED CONDENSATE SUMP
HV-##
AV-##
CV-##
PROPOSED VALVE
PROPOSED VALVE - AIR SUPPLY
PROPOSED VALVE - CONDENSATE DISCHARGE
PROPOSED BLIND FLANGE
EXISTING CONTOURS20
FM
HC HC
AIR SUPPLY PIPE
BLIND FLANGE
CONDENSATE DISCHARGE PIPE
CONDENSATE SUMP
LEACHATE CLEANOUT
LEACHATE CLEANOUT RISER
LEACHATE FORCEMAIN PIPE
LFG HEADER / LATERAL PIPE
LFG HORIZONTAL COLLECTOR PIPE
LFG TARGET
PHASE BOUNDARY
WELL - CASSION
WELL - GAS EXTRACTION
WELL - HORIZONTAL
WELL - REMOTE
FORCEMAIN HEADER CLEANOUT
AR-## ACCESS RISER
T
AV-## VALVE - AIR SUPPLY
HV-## VALVE - HEADER/LATERAL
CV-## VALVE - CONDENSATE DISCHARGE
H.P.
L.P. LOW POINT
HIGH POINT
PROPOSED AIR SUPPLY PIPE
PROPOSED CONDENSATE DISCHARGE PIPE
PROPOSED LFG HEADER / LATERAL PIPE
PROPOSED WELL - GAS EXTRACTION
PROPOSED TARGET WELLTW-##
EW-##
FLC-##
LCR-##
LCO-##
T-##
CS-##
HC-##
RW-##
EW-##
EW-##
EW-##
AR-## PROPOSED ACCESS RISER
H P PROPOSED HIGH POINT
SEE DETAIL
LFG EXTRACTION WELL DETAIL
SEE DETAIL
BURIED BLIND FLANGE FOR FUTURE EXPANSION
SEE DETAIL
HEADER AND LATERAL PIPE TRENCH IN UNCAPPED AREA
SEE DETAIL
HEADER ISOLATION VALVE
SEE DETAIL
CONDENSATE DISCHARGE
LINE ISOLATION VALVE
SEE DETAIL
24 INCH CONDENSATE SUMP CS-15 AND CS-16
SEE DETAIL
AIRLINE ISOLATION VALVE
SEE DETAIL
LFG LATERAL TIE-IN WITH TEE
PROPOSED DUAL CLEANOUTLC-##
SEE DETAIL
4-INCH DUAL CLEANOUT
SEE DETAIL
TIE-INTO WELL TO BE ABANDONED
SEE DETAIL
HEADER ACCESS RISER
1" = 30'
0 3015 60
3/ 6/
NOTES:
1. NO. 57 STONE PAD TO EXTEND 36 INCHES BEYOND THE WELL RISER PIPE IN ALL DIRECTIONS AND 4 INCH THICK WEED BARRIER TO BE
INSTALLED TO SEPARATE GRAVEL AND CLEAN BACKFILL.
2. LATERAL RISER NOT SHOWN FOR CLARITY.
3. 60-MIL HDPE TEXTURED GEOMEMBRANE FLAP TO EXTEND 5 FEET BEYOND THE RISER PIPE IN ALL DIRECTIONS.
4. EASY LEVEL INDICATOR TUBE SET TO BE 1/3 LENGTH OF THE SLOTTED PIPE FROM THE BOTTOM OF THE WELL FOR WELLS WITHOUT
PUMP.
5. WELLS TO HAVE TWO LABELS, 180 DEGREES APART. EACH LABEL TO BE HIGH VISIBILITY SAFETY YELLOW WITH BLACK LETTERING.
LABEL TO BE OUTDOOR, UV RESISTANT, WATERPROOF, AND PERMANENTLY ADHERED CONSISTING OF 2 INCH LETTERING.
6. GEOMEMBRANE BOOTS ARE ONLY REQUIRED AT PENETRATIONS AT FINAL GRADE. EXTRACTION WELLS EW-111A, EW142A, EW -153, EW-154, AND EW-155 WILL NOT REQUIRE A GEOMEMBRANE BOOT.
7. TARGET WELLS (TW-97, TW-98R, AND TW-115) WILL BE DRILLED TO EXISTING ROCK TARGETS WITH A COLORED GEOTEXTILE ON THE TOP OF THE TARGET. DRILLING AT TARGET WELLS TO CONTINUE UNTIL DEPTH ON THE WELL SCHEDULE IS REACHED AND/OR
GEOTEXTILE AND NO. 57 STONE IS OBSERVED IN DRILL CUTTINGS.
800-624-2026 www.qedenv.com
SAMPLE PORT
QED SOLAR GUARD FLEXHOSE WITH
STAINLESS STEEL BANDING KITS
QED PRECISION QUICK-CHANGE ORIFICE
PLATE WELLHEAD
2" OR 3" PRECISION FINE TUNE CONTROL
VALVE
TEMPERATURE PORT
SAMPLE PORT
REFLECTIVE TAPE
QED QUICK CHANGE ORIFICE PLATE,
ORIFICE PLATE KIT TO BE STAINLESS STEEL
QED WELL CAP, 2" WELLHEAD FOR
8" DIAMETER WELL
HDPE SDR 11 PIPE
1/2" HOLES, 2 PER ROW,
ALTERNATE ROWS BY 45°
4"
2"
4"
1/2"
90°
NOTES:
1. STUB-UP CONNECTIONS TO BE INSTALLED AT EACH LANDFILL GAS AND TARGET WELL.
2. ALL 2 INCH AND 4 INCH PIPE AND FITTINGS TO BE BUTT WELDED.
3. NO. 57 STONE PAD TO BE INSTALLED 36 INCH BEYOND THE RISER PIPE IN ALL DIRECTIONS AND 4 INCH THICK WEED BARRIER
TO BE INSTALLED TO SEPARATE GRAVEL AND CLEAN BACKFILL.
4. 1/2 INCH PVC CAP TO BE ADDED ON ALL STUB-UPS NOT RECEIVING PUMPS.
5. 60-MIL HDPE TEXTURED GEOMEMBRANE FLAP TO EXTEND 5 FEET BEYOND THE RISER PIPE IN ALL DIRECTIONS
6. GEOMEMBRANE BOOTS ARE ONLY REQUIRED AT PENETRATIONS AT FINAL GRADE. EXTRACTION WELLS EW-111A, EW -142A, EW-153, EW-154, AND EW-155 WILL NOT REQUIRE A GEOMEMBRANE BOOT.
3/8" MPT x STAINLESS STEEL SKT QUICK
CONNECTION FITTING OR PVC CAP (SEE NOTE 4)
1" STAINLESS STEEL BALL VALVE
2" x 1" HDPE REDUCER
2" HDPE SDR 9 AIR SUPPLY LINE STUB-UP
NO. 57 STONE PAD WITH WEED BARRIER
(SEE NOTE 3)
60-MIL HDPE TEXTURED
GEOMEMBRANE FLAP
(SEE NOTES 5 AND 6)
CLEAN SOIL BACKFILL
4" HDPE SDR 11 CONDENSATE
DISCHARGE LINE
2" HDPE SDR 9 TEE
2" HDPE SDR 9 AIR SUPPLY LINE
2' - 0"
(MIN.)
1' - 6"
4"
1' - 6"
3/4" STAINLESS STEEL BAND CLAMP (TYP.)
NOTES:
1. REINFORCEMENT GRATE TO BE 100% WELDED AND CONFIGURED WITH 3/8 INCH REBAR
WITH 6 INCH BY 6 INCH SPACING. GRATE TO HAVE A 12 INCH BY 12 INCH SQUARE CENTER
SPACED CUTOUT FOR WELL CASING.
5' - 0"
1' - 0 " 6"
6"
2' - 6"
2' - 6"3/8" REBAR SPACED 6" x 6"
1' - 0 "
1" HDPE TO 1" NPT TRANSITION FITTING
1' - 0"
1" STAINLESS STEEL BALL VALVE
4" TO 1" CONSECUTIVE REDUCERS
4" HDPE SDR 11 CONDENSATE
DISCHARGE LINE STUB-UP
NOTES:
1. PERFORATIONS SPACED 90 DEGREES APART HORIZONTALLY.
2. PERFORATIONS SPACED 4 INCHES APART VERTICALLY.
3. 90 AND 270 DEGREE ROWS STAGGERED 2 INCHES BELOW 0 AND 180 DEGREE ROWS.
EW-#
3' - 0"
3' - 0"
2' - 0"
800-624-2026 www.qedenv.com
1' - 6"
MARK WELL RISER WITH
IDENTIFICATION NO. (SEE NOTE 5)
REFLECTIVE TAPE
NO. 57 STONE PAD WITH WEED BARRIER (SEE NOTE 1)
CLEAN SOIL BACKFILL
4" 60-MIL HDPE TEXURED
GEOMEMBRANE FLAP (SEE NOTE 3)
8" HDPE SDR 11 PIPE
24" THICK BENTONITE PLUG HYDATED PER
MANUFACTURER'S INSTRUCTIONS (TYP.)
GEOCOMPOSITE "DONUT" OVER STONE BACKFILL
NO. 4 FDOT STONE BACKFILL
8" HDPE PERFORATED HDPE SDR 11 BUTT
CAP TO BE WELDED AND PERFORATED
36" BOREHOLE MIN.15'
(MIN.)
1' - 0"
(MIN.)
PERFORATED
LENGTH VARIES
2' - 0"
1' - 0"
2' - 0"
SOLID PIPE
LENGTH VARIES
NEOPRENE GASKET (TYP.)
1' - 0"
2' - 0"
SEE NOTE 2
NOTES:
1. THE ABOVE WELL SCHEDULE OR OTHER SIMILAR SCHEDULES ARE NOT INTENDED FOR CONSTRUCTION UNTIL ACTUAL PRE-CONSTRUCTION SURVEY DATA FOR ALL WELLS ARE OBTAINED AND THE WELL COMPLETION OR OTHER SIMILAR SCHEDULES
ARE REVISED BY THE DESIGN ENGINEER.
2. BASEGRADES BASED ON AUTOCAD DRAWINGS "CONTOURS" FOR PHASE I "TOP OF SAND SUBCELL 1-4 BASE GRADES" FOR PHASE II
AND "22-SSM-1747-TOPO-SURV" FOR PHASE III.
3. GROUND SURFACE ELEVATIONS, NORTHINGS, AND EASTINGS BASED ON TOPOGRAPHIC SURVEY FROM PICKETT FLIGHT DATED DECEMBER 28, 2022 FOR PHASE I AND PROPOSED COTNOURS COMPILED FROM "CCSWDC PHASE II AND III LANDFILL STAGING
PLANS" DATED JUNE 2021 FOR PHASE II.
4. EXISTING TARGET WELLS (TW-97, TW-98R, TW-115) BASEGRADE ELEVATIONS ARE TOP OF GABION TARGETS ABOVE BOTTOM
GEOMEMBRANE.
TOP OF BOTTOM GEOMEMBRANE PROTECTIVE SAND LAYER
NEOPRENE GASKET (TYP.)
This item has been digitally signed and sealed by [Engineer] on the date indicted on the cover page.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
D E
TA
IL
S
DETAILS - I
WELL SCHEDULE
07,08
LFG EXTRACTION WELL DETAIL
NOT TO SCALE
09 09
QED PRECISION QUICK CHANGE
ORIFICE PLATE WELLHEAD DETAIL
NOT TO SCALE
09,11
REINFORCEMENT GRATE DETAIL
NOT TO SCALE
09,12
PERFORATED PIPE DETAIL
NOT TO SCALE
09,10
STUB-UP DETAIL
NOT TO SCALE
SEE DETAIL
QED PRECISION QUICK CHANGE
ORIFICE PLATE WELLHEAD
SEE DETAIL
REINFORCEMENT GRATE
SEE DETAIL
PERFORATED PIPE
SEE DETAIL
STUB-UP
3/ 6/
1. NO. 57 STONE PAD TO BE INSTALLED 36 INCHES BEYOND THE RISER PIPE IN ALL DIRECTIONS AND 4 INCH THICK WEED BARRIER TO BE
INSTALLED TO SEPARATE GRAVEL AND CLEAN BACKFILL.
2. AS SLOPE ALLOWS, CONTRACTOR TO TIE-IN TO EXISTING LATERAL, AIR SUPPLY, AND CONDENSATE DISCHARGE PIPING ABOVE EXISTING 40-MIL GEOMEMBRANE. CONTRACTOR TO REPAIR EXISTINIG 40-MIL GEOMEMBRANE, STONE PAD, WEED BARRIER AND EXISTING LINER
BOOTS IF DAMAGED.
3. WELLS TO HAVE TWO LABELS, 180 DEGREES APART. EACH LABEL TO BE HIGH VISIBILITY SAFETY YELLOW WITH BLACK LETTERING. LABEL TO BE OUTDOOR, UV RESISTANT, WATERPROOF, AND PERMANENTLY ADHERED CONSISTING OF 2 INCH LETTERING.
4. THE EXISTING TPO AND 40-MIL LLDPE GEOMEMBRANE TO BE PRESERVED TO THE EXTENT POSSIBLE AND "FLAPPED BACK" WHILE WORK IS BEING CONDUCTED. ANY REPAIRS TO THE 60-MIL TPO AND 40-MIL LLDPE GEOMEMBRANES TO BE PERFORMED IN ACCORDANCE WITH ALL
APPLICABLE SPECIFICATIONS AND CQA PLAN.
5. VALVE FITTINGS FOR PUMP OPERATION AT PROPOSED ABANDONED WELL TO BE REUSED AND INSTALLED AT NEW WELL AS NECESSARY.
1 - 1/2 " POLYPROPYLENE CAM-LOCK ACCESS
PORT THREADED INTO BLIND FLANGE
NOTES:
1. NO. 57 STONE PAD TO BE INSTALLED 36 INCHES BEYOND THE RISER PIPE IN ALL DIRECTIONS AND 4 INCH THICK WEED BARRIER TO BE
INSTALLED TO SEPARATE GRAVEL AND CLEAN BACKFILL.
2. 60-MIL HDPE TEXTURED GEOMEMBRANE FLAP TO EXTEND 5 FEET BEYOND THE RISER PIPE IN ALL DIRECTIONS.
3. GEOMEMBRANE BOOTS ARE ONLY REQUIRED AT PENETRATIONS AT FINAL GRADE.
4. WARNING TAPE TO BE MIN. 3 INCH WIDE AND IMPRINTED WITH "GAS LINE BURIED BELOW" AND A METALLIC LAYER FOR DETECTION
ABOVE GRADE.
5. RISERS TO HAVE TWO LABELS, 180 DEGREES APART. EACH LABEL TO BE HIGH VISIBILITY SAFETY YELLOW WITH BLACK LETTERING LABEL TO BE OUTDOOR, UV RESISTANT, WATERPROOF, AND PERMANENTLY ADHERED CONSISTING OF 2 INCH LETTERING.
2" STAINLESS STEEL EXTENSION
HDPE BLIND FLANGE WITH NEOPRENE GASKET
HDPE FLANGE ADAPTER WITH DUCTILE
IRON BACKUP RING (DIAMETER VARIES)
3/4" STAINLESS STEEL
BAND CLAMP (TYP.)
EXISTING GRADE
WARNING TAPE
(SEE NOTE 4)
60-MIL HDPE
TEXTURED
GEOMEMBRANE FLAP
(SEE NOTE 2 AND 3)
HDPE SDR 17 LFG
HEADER / LATERAL
(DIAMETER VARIES)
OPEN END OF STAINLESS STEEL TUBING FOR
LFG SAMPLING. LENGTH OF TUBING TO BE
DETERMINED BY ENGINEER BASED ON DEPTH
OF HEADER AND HEIGHT OF ACCESS RISER AS
MEASURED BY CONTRACTOR.
HDPE SDR 17 TEE (DIA. VARIES)
CLEAN SOIL BACKFILL
4"
2' - 0"
MIN.
3' - 0"
1' - 0"
(SEE NOTE 4)
NOTES:
1. CONSECUTIVE SIZE REDUCERS TO BE USED TO TRANSITION FROM THE MOLDED TEE TO THE LANDFILL GAS LATERAL.
2. MOLDED HDPE TEES TO BE INSTALLED FOR ALL TIE-INS OF LATERALS TO HEADER SMALLER THAN 12 INCHES. TEES TO BE ANGLED TO
MAINTAIN SLOPE INTO THE HEADER AS SHOWN IN SECTION VIEW.
3. ALL HEADERS AND LATERALS NOT IN CAPPED AREA TO BE INSTALLED WITH A MIN. BURIAL DEPTH OF 2 FEET.
4. 12 INCHES MIN. OF CLEAN SOIL TO BE PLACED BELOW EACH TEE. CLEAN SOIL TO EXTEND 3 FEET MIN. IN EACH DIRECTION OF THE TEE.
CLEAN SOIL TO BE SLIGHTLY MOISTENED AND HAND-TAMPED PROVIDING SUPPORT TO ALL POINTS OF THE TEE.
MOLDED HDPE SDR 17 TEE
(DIAMETER VARIES, SEE NOTE 2) HDPE SDR 17 LFG HEADER
(DIA. VARIES)
HDPE SDR 17 REDUCER
(SEE NOTE 1)
HDPE SDR 17 LFG LATERAL
(DIAMETER VARIES)
FROM EXTRACTION WELL
2' - 0"
MIN.
HDPE SDR 17 LFG HEADER
(DIAMETER VARIES)
CLEAN SOIL BACKFILL
5% MIN. SLOPE
NOTES:
1. ALL HEADER AND LATERAL PIPES TO BE INSTALLED AT 5% MIN. SLOPE UNLESS OTHERWISE SPECIFIED IN THE
CONSTRUCTION DOCUMENTS.
2. AS SLOPE ALLOWS, CONTRACTOR TO INSTALL HEADER, LATERAL, AIR SUPPLY, AND CONDENSATE DISCHARGE
PIPING ABOVE EXISTING 40-MIL GEOMEMBRANE.
3. 2 INCH AIR SUPPLY AND 4 INCH CONDENSATE DISCHARGE LINES TO BE INSTALLED ON THE UPHILL SIDE OF THE
HEADER/ LATERAL.
4. WARNING TAPE TO BE MIN. 3 INCH WIDE AND IMPRINTED WITH "GAS LINE BURIED BELOW" AND A METALLIC
LAYER FOR DETECTION ABOVE GRADE.
5. THE NUMBER, TYPES, AND DIAMETER OF PIPES INSTALLED IN THE TRENCH MAY VARY, REFER TO SITE PLAN.
6. THE EXISTING AND 40-MIL LLDPE GEOMEMBRANE TO BE PRESERVED TO THE EXTENT POSSIBLE AND "FLAPPED BACK" WHILE WORK IS BEING CONDUCTED. ANY REPAIRS TO THE 60-MIL TPO AND 40-MIL LLDPE GEOMEBRANES
TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE SPECIFICATIONS AND CQA PLAN.
NOTES:
1. ALL HEADER AND LATERAL PIPES TO BE INSTALLED AT 5% MIN. SLOPE UNLESS OTHERWISE SPECIFIED IN THE
CONSTRUCTION DOCUMENTS.
2. 2 INCH AIR SUPPLY AND 4 INCH CONDENSATE DISCHARGE LINES TO BE INSTALLED ON THE UPHILL SIDE OF THE
HEADER/LATERAL.
3. WARNING TAPE TO BE MIN. 3 INCH WIDE AND IMPRINTED WITH "GAS LINE BURIED BELOW" AND A METALLIC
LAYER FOR DETECTION ABOVE GRADE.
4. THE NUMBER, TYPES, AND DIAMETER OF PIPES INSTALLED IN THE TRENCH MAY VARY, REFER TO SITE PLAN.
EXISTING GRADE
2" HDPE SDR 9 AIR SUPPLY LINE
4" HDPE SDR 11 CONDENSATE
DISCHARGE LINE
3" MIN.
NOTES:
1. BOLTS TO BE TIGHTENED ON FLANGE PRIOR TO THOROUGHLY COATING STAINLESS STEEL THREADED RODS, WASHERS, NUTS AND
BACKUP RINGS WITH POLYCOAT RUBBERIZED PRIMER, OR EQUAL.
2. FLANGE TO BE WRAPPED IN PLASTIC WRAP PRIOR TO BACKFILLING.
3. FLANGE TO BE INSTALLED WITH THE PROPER SLOPE FOR FUTURE CONDENSATE DRAINAGE.
4. DIAMETER OF HDPE SDR 17 HEADER PIPE BLIND FLANGE MAY VARY. CONTRACTOR TO ADJUST PIPE SIZES IN ACCORDANCE WITH
PROPOSED LANDFILL GAS SITE PLAN.
5. NO. 57 STONE PAD TO BE INSTALLED 36 INCHES BEYOND THE BOLLARD IN ALL DIRECTIONS AND 4 INCH THICK WEED BARRIER TO BE
INSTALLED TO SEPARATE GRAVEL AND CLEAN BACKFILL.
6. 60-MIL HDPE TEXTURED GEOMEMBRANE FLAP TO EXTEND 5 FEET BEYOND THE RISER PIPE IN ALL DIRECTIONS.
7. GEOMEMBRANE BOOTS ARE ONLY REQUIRED AT PENETRATIONS AT FINAL GRADE.
6" PVC BOLLARD TO BE FILLED WITH CONCRETE, PAINTED
YELLOW AND LABELED WITH 1" TALL BLACK STENCILED LETTERS:
"LFG SYSTEM - BURIED BLIND FLANGE. DEPTH TO PIPE #'"
3' - 0"
NEOPRENE GASKET
3/4" STAINLESS STEEL BAND
CLAMP (TYP.)
CLEAN SOIL BACKFILL
HDPE SDR 17 HEADER PIPE
(DIAMETER VARIES)
60-MIL HDPE TEXTURED GEOMEMBRANE FLAP
(SEE NOTE 6)
NO. 57 STONE PAD
WITH WEED BARRIER
(SEE NOTE 5 AND 7)
AIR SUPPLY AND CONDENSATE DISCHARGE LINES
TO BE TERMINATED AND BUTT CAPPED
1' - 6"
1' - 0"
HDPE SDR 17 FLANGE ADAPTER WITH DUCTILE IRON
BACKUP RING AND STAINLESS STEEL HARDWARE
(SEE NOTES 1 AND 2)
4"
HDPE SDR 17 LFG LATERAL
(DIAMETER VARIES)
FROM EXTRACTION WELL
WASTEWASTE
2' - 0" MIN.
CLEAN SOIL
HDPE SDR 17 LFG HEADER/LATERAL
(DIAMETER VARIES)
6" MIN.
2" HDPE SDR 9 AIR SUPPLY LINE
4" HDPE SDR 11 CONDENSATE DISCHARGE LINE 3" MIN.
3" MIN.
WASTEWASTE
2' - 0" MIN.
CLEAN SOIL
HDPE SDR 17 LFG HEADER/LATERAL
(DIAMETER VARIES)
6" MIN.
WARNING TAPE
(SEE NOTE 4)
CLEAN SOIL BACKFILL
40-MIL LLDPE GEOMEMBRANE
EXISTING 40-MIL LLDPE GEOMEMBRANE
WARNING TAPE (SEE NOTE 3)
CLEAN SOIL BACKFILL
3" MIN.
TEE ANGLED TO PROVIDE SLOPE
INTO HEADER; TEE NOT HORIZONTAL
AR
MARK ACCESS RISER WITH
IDENTIFICATION NO. (SEE NOTE 5)
1' - 6"
1' - 0"
LF
G
SY
ST
EM
BU
RI
ED
B
LI
N
D
FL
AN
GE
DE
PT
H
TO
P
IP
E
QED SAMPLE PORT
3' - 0"
MIN.
6"
2' - 0"
WELLHEAD TO BE REUSED FROM ORIGINAL WELL
6" x 2" FERNCO REDUCING COUPLING
MARK RISERS WITH REFLECTIVE TAPE (TYP.)
EXISTING 6" HDPE SDR 17 PIPE
NEOPRENE GASKET (TYP.)
4"
4' - 0"
MIN.
8" HDPE SDR 17 ELBOW
8" HDPE SDR 17 PIPING TO REMOTE WELL
1' - 6"
3/4" STAINLESS STEEL BAND CLAMP (TYP.)
1' - 0"
HDPE SDR 17 LATERAL RISER
(DIAMETER VARIES)
EW
-5
0A
8" HDPE
SDR 11 TEE
PROPOSED EXTRACTION WELL
EXISTING GRADE
1' - 6"
TO RW
RW-50 RW-50
MARK EACH WELL WITH
IDENTIFICATION NO. (SEE NOTE 3)
SEE NOTE 2EXISTING 6" HDPE SDR 17 BRANCH SADDLE
EXISTING 2" HDPE SDR 9 AIR SUPPLY LINE
EXISTING 4" HDPE SDR 11
CONDENSATE DISCHARGE LINE
NEOPRENE GASKET (TYP.)
SEE DETAIL
STUB-UP
NO. 57 STONE PAD WITH
WEED BARRIER (SEE NOTE 1)EXISTING GRADE
EXISTING 40-MIL
LLDPE TEXTURED GEOMEMBRANE
EW
-5
EXISTING CONDENSATE
DISCHARGE LINE TO BE CAPPED
EXISTING AIR SUPPLY
LINE TO BE CAPPED
EXISTING EXTRACTION WELL
TO BE CAPPED
SEE DETAIL
STUB-UP
10RW-50
1"
1'-0"
This item has been digitally signed and sealed by [Engineer] on the date indicted on the cover page.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
D E
TA
IL
S
DETAILS - I
10 09
A
A 09 10
SECTION
NOT TO SCALE
08 10
BURIED BLIND FLANGE FOR
FUTURE EXPANSION DETAIL
NOT TO SCALE
07 10
HEADER AND LATERAL PIPE
TRENCH IN CAPPED AREA DETAIL
NOT TO SCALE
08 10
HEADER ACCESS RISER DETAIL
NOT TO SCALE
07 10
REMOTE WELL IN CAPPED AREA DETAIL
NOT TO SCALE
08 10
HEADER AND LATERAL PIPE
TRENCH IN UNCAPPED AREA DETAIL
NOT TO SCALE
08 10
LFG LATERAL TIE-IN WITH TEE DETAIL
NOT TO SCALE
3/ 6/
V
BUTTERFLY VALVE WITH 2-PIECE STEEL EXTENSION AND
OPERATING WHEEL (WITH REMOVEABLE VALVE WHEEL)
POLYPROPYLENE QUICK CONNECT MONITORING PORT. THREAD
INTO SWAGELOK FEMALE NPT CONNECTOR AT END OF HOSE
60-MIL HDPE TEXTURED GEOMEMBRANE FLAP
(SEE NOTE 4 AND 7)
18" HDPE SDR 17 HEADER
SWAGELOK STAINLESS STEEL FLEXIBLE METAL HOSE
PART NO. SS-H04PM4PF4 (LENGTH VARIES
DEPENDING ON PIPE BURIAL DEPTH)
NEOPRENE GASKET (TYP.)
HDPE FLANGE ADAPTER WITH DUCTILE IRON
BACK-UP RING, NEOPRENE GASKET AND
STAINELESS STEEL HARDWARE (TYP. 2)
VALVE SPACERS TO BE INSTALLED
FOR PIPES LARGER THAN 6"
STAINLESS STEEL OUTER HOUSING WITH EPOXY COATING
6"
3'-0" MIN.
TAP AND THREAD 1/4" STAINLESS STEEL MALE NPT END
OF HOSE INTO HEADER (TYP.)
3/4" STAINLESS STEEL BAND CLAMP (TYP.)
NO. 57 STONE PAD AND WEED BARRIER (SEE NOTE 3)
4"
WARNING TAPE (SEE NOTE 8)
CLEAN SOIL BACKFILL
TRENCH DEPTH VARIES
(MAINTAINS 5% MIN. SLOPE)
2' - 0" MIN. 1' - 6"
NOTES:
1. NO. 57 STONE PAD TO BE INSTALLED 36 INCHES BEYOND THE RISER PIPE IN ALL DIRECTIONS AND 4 INCH THICK
WEED BARRIER TO BE INSTALLED TO SEPARATE GRAVEL AND CLEAN BACKFILL.
2. 60-MIL HDPE TEXTURED GEOMEMBRANE FLAP TO EXTEND 5 FEET BEYOND THE RISER PIPE IN ALL DIRECTIONS.
3. VALVES TO HAVE TWO LABELS, 180 DEGREES APART. EACH LABEL TO BE HIGH VISIBILITY SAFETY YELLOW WITH BLACK LETTERING. LABEL TO BE OUTDOOR, UV RESISTANT, WATERPROOF, AND PERMANENTLY ADHERED
CONSISTING OF 2 INCH LETTERING.
4. CONTRACTOR TO PLACE A NOTCHED 4 INCH PIPE BETWEEN THE 4 INCH DEWATERING PIPE RISER AND THE 2 INCH AIR SUPPLY PIPE RISER THEN WRAP WITH STAINLESS STEEL CLAMP FOR SUPPORT WHERE APPLICABLE.
5. GEOMEMBRANE BOOTS ARE ONLY REQUIRED AT PENETRATIONS AT FINAL GRADE.
A V
-2
2' - 6" MAX.
3' - 0"
2' - 0"
MIN.
1' - 6"
4"
2" STAINLESS STEEL BALL VALVE WITH
FLANGED ENDS RATED FOR 200 PSI MIN.
1/2" FEMALE x FEMALE THREADED 316 STAINLESS
STEEL BALL VALVE WITH LEVER HANDLE AND
RATED FOR 250 PSI MAX. PRESSURE
1 1/2" STAINLESS STEEL BUSHING
2" x 1" HDPE STAINLESS STEEL TRANSITION FITTING
2" FLANGE CONNECTION TO
ASSIST IN REMOVAL OF BALL
VALVE FOR MAINTENANCE (TYP.)
2" HDPE SDR 11 PIPE
3/4" STAINLESS STEEL BAND CLAMP (TYP.)
NEOPRENE GASKET (TYP.)
NO. 57 STONE PAD WITH WEED BARRIER
(SEE NOTE 1)
60-MIL HDPE TEXTURE
GEOMEMBRANE FLAP
(SEE NOTE 2 AND 5)
FROM AIR COMPRESSORTO WELLFIELD
CONCRETE FOOTERS FOR
SUPPORT POSTS (TYP.)
2" HDPE SDR 11 90°
MOLDED ELBOW (TYP.)
1' - 0"
MARK VALVE WITH IDENTIFICATION NO.
(SEE NOTE 5)
MARK VALVE WITH
IDENTIFICATION NO.
(SEE NOTE 3)
1' - 0"
18" BUTTERFLY VALVE
5% MIN. SLOPE
6" HDPE SDR 17
LATERAL WITH 90°
MOLDED ELBOW
WARNING TAPE
(SEE NOTE 7)
2" HDPE SDR 9 AIR SUPPLY LINE
AIR SUPPLY AND DEWATERING DISCHARGE LINES TO BE TIED INTO
EXISTING LINES FROM ABANDONED WELL WHERE APPLICABLE
3' - 0"
MIN.2' - 0"1' - 6" EW-#
2" OR 3" DIAMETER KANAFLEX FLEXIBLE HOSE
INSTALLED WITH SLACK FOR FUTURE SETTLEMENT POWERLOCK CLAMP (TYP.)
6" x 2" FERNCO
REFLECTIVE TAPE INSTALLED
8" HDPE SDR 11 PIPE
2" SCH 80 PVC PIPE 2' LONG INSTALLED
TO ACCOMODATE SETTLEMENT
MARK WELL WITH
IDENTIFICATION NO. (SEE NOTE 6)
EXISTING 8" WELL TO BE CAPPED
FUSE BUTT CAP FOR HDPE OR GLUE END CAP FOR PVC
(SEE NOTE 3)
LIMITS OF
EXCAVATION
CLEAN SOIL BACKFILL
60-MIL HDPE TEXTURED
GEOMEMBRANE FLAP
(SEE NOTE 5)
4" HDPE SDR 11 CONDENSATE
DISCHARGE LINE
6" MIN.
1' - 0"
EW-#
EW-#
HDPE ELBOW
(SEE NOTE 2)
6" HDPE ELBOW
(SEE NOTE 2)
EXISTING 4" CONDENSATE
DISCHARGE LINE TO BE CAPPED
EXISTING 2" AIR SUPPLY LINE TO BE CAPPED
SEE NOTE 1
TO
LEACHATE
TANK
4" HDPE SDR 11 TIME SAVER
VALVE (SEE NOTE 4)
C V
4" HDPE SDR 11 CONDENSATE
DISCHARGE LINE
3/4" STAINLESS STEEL BAND CLAMP
(TYP.)
NEOPRENE GASKET (TYP.)
CLEAN SOIL BACKFILL
60-MIL HDPE TEXTURED
GEOMEMBRANE FLAP
(SEE NOTE 2 AND 5)
4" HDPE 11 90° MOLDED
ELBOW (TYP.)
3' - 0"
MIN.
2' - 0"
MIN.
1' - 6"
1' - 0"
MARK VALVE WITH
IDENTIFICATION NO. (SEE NOTE 3)
NO. 57 STONE PAD AND WEED
BARRIER (SEE NOTE 1)
4"
TO
WELLFIELD
NOTES:
1. WELLHEAD TO BE REUSED AS NEEDED FROM ABANDONED WELL.
2. CONTRACTOR TO TIE-IN TO LATERAL RISER, AIR AND CONDENSATE DISCHARGE PIPING WITH AN ELBOW AT A MIN. OF 2 FEET BELOW GROUND SURFACE. DISPOSE
OF REMAINING PIPES AS NECESSARY.
3. CONTRACTOR TO CAP WELL, LATERAL RISER, AIR AND CONDENSATE DISCHARGE PIPING 2 FEET BELOW GRADE. BENTONITE PLUG TO BE INSTALLED STOP
ABANDONED PIPING.
4. WHILE INSTALLING LATERAL RISERS TO NEW WELLS, EXCAVATE AROUND WELL CASING AND LOWER WELL BORE REINFORCEMENT GRATE.
5. 60-MIL HDPE TEXTURED GEOMEMBRANE FLAP TO EXTEND 5 FEET BEYOND THE RISER PIPE IN ALL DIRECTIONS.
6. WELLS TO HAVE TWO LABELS, 180 DEGREES APART. EACH LABEL TO BE HIGH VISIBILITY SAFETY YELLOW WITH BLACK LETTERING. LABEL TO BE OUTDOOR, UV
RESISTANT, WATERPROOF, AND PERMANENTLY ADHERED CONSISTING OF 2 INCH LETTERING.
7. WARNING TAPE TO BE MIN. 3 INCH WIDE AND IMPRINTED WITH "GAS LINE BURIED BELOW" AND A METALLIC LAYER FOR DETECTION ABOVE GRADE.
8. NO. 57 STONE PAD TO BE INSTALLED 36 INCHES BEYOND THE RISER PIPE IN ALL DIRECTIONS AND 4 INCH THICK WEED BARRIER TO BE INSTALLED TO SEPARATE
GRAVEL AND CLEAN BACKFILL.
9. CONTRACTOR TO REPAIR EXISTING STONE PAD, WEED BARRIER AND LINER BOOT IF DAMAGED.
10. VALVE FITTINGS FOR PUMP OPERATION AT PROPOSED ABANDONED WELL TO BE REUSED AND INSTALLED AT NEW WELL AS NECESSARY.
NOTES:
1. NO. 57 STONE PAD TO BE INSTALLED 36 INCHES BEYOND THE RISER PIPE IN ALL DIRECTIONS AND 4 INCH THICK
WEED BARRIER TO BE INSTALLED TO SEPARATE GRAVEL AND CLEAN BACKFILL.
2. 60-MIL HDPE TEXTURED GEOMEMBRANE FLAP TO EXTEND 5 FEET BEYOND THE RISER PIPE IN ALL DIRECTIONS.
3. VALVES TO HAVE TWO LABELS, 180 DEGREES APART. EACH LABEL TO BE HIGH VISIBILITY SAFETY YELLOW WITH BLACK LETTERING. LABEL TO BE OUTDOOR, UV RESISTANT, WATERPROOF, AND PERMANENTLY ADHERED
CONSISTING OF 2 INCH LETTERING.
4. CONTRACTOR TO PROVIDE REMOVABLE HANDLE TO COUNTY.
5. GEOMEMBRANE BOOTS ARE ONLY REQUIRED AT PENETRATIONS AT FINAL GRADE.
6. CONTRACTOR TO PLACE A NOTCHED 4 INCH PIPE BETWEEN THE 4 INCH DEWATERING PIPE RISER AND THE 2 INCH AIR SUPPLY PIPER RISER THEN WRAP WITH STAINLEES STEEL CLAMP FOR SUPPORT WHERE APPLICABLE.
NOTES:
1. BOLTS TO BE TIGHTENED ON FLANGE PRIOR TO THOROUGHLY COATING STAINLESS STEEL THREADED RODS, WASHERS, NUTS, AND
BACKUP RINGS WITH POLYCOAT RUBBERIZED PRIMER OR EQUAL.
2. FLANGE TO BE WRAPPED IN PLASTIC PRIOR TO BACKFILLING.
3. NO. 57 STONE PAD TO BE INSTALLED 36 INCHES BEYOND THE RISER PIPE IN ALL DIRECTIONS AND 4 INCH THICK WEED BARRIER TO BE
INSTALLED TO SEPARATE GRAVEL AND CLEAN BACKFILL.
4. 60-MIL HDPE TEXTURED GEOMEMBRANE FLAP TO EXTEND 5 FEET BEYOND THE RISER PIPE IN ALL DIRECTIONS.
5. VALVES TO HAVE TWO LABELS, 180 DEGREES APART. EACH LABEL TO BE HIGH VISIBILITY SAFETY YELLOW WITH BLACK LETTERING. LABEL TO BE OUTDOOR, UV RESISTANT, WATERPROOF, AND PERMANENTLY ADHERED CONSISTING OF 2 INCH LETTERING.
6. CONTRACTOR TO PLACE SEALANT BETWEEN SAMPLING PORT HOSE AND RISER TO SEAL VOIDS.
7. GEOMEMBRANE BOOTS ARE ONLY REQUIRED AT PENETRATIONS AT FINAL GRADE.
8. WARNING TAPE TO BE MIN. 3 INCH WIDE AND IMPRINTED WITH "GAS LINE BURIED BELOW" AND A METALLIC LAYER FOR DETECTION
ABOVE GRADE.
60-MIL HDPE GEOMEMBRANE (TYP.)
5% MIN. SLOPE
6" HDPE SDR 17 LATERAL WITH 90° MOLDED ELBOW
WARNING TAPE
(SEE NOTE 7)
1' - 0"
2" HDPE SDR 9 AIR SUPPLY LINE
AIR SUPPLY AND DEWATERING DISCHARGE LINES TO BE TIED INTO
EXISTING LINES FROM ABANDONED WELL WHERE APPLICABLE
3' - 0"
MIN.2' - 0"
1' - 6"
2" OR 3" DIAMETER KANAFLEX FLEXIBLE HOSE
INSTALLED WITH SLACK FOR FUTURE SETTLEMENT POWERLOCK CLAMP (TYP.)
6" x 2" FERNCO
REFLECTIVE TAPE INSTALLED
8" HDPE SDR 11 PIPE
2" SCH 80 PVC PIPE 2' LONG INSTALLED
TO ACCOMODATE SETTLEMENT
MARK WELL WITH
IDENTIFICATION NO. (SEE NOTE 5) EXISTING 6"WELL TO BE CAPPED
FUSE BUTT CAP FOR HDPE
OR GLUE END CAP FOR PVC
(SEE NOTE 3)
LIMITS OF
EXCAVATION
CLEAN SOIL BACKFILL
NEOPRENE GASKET (TYP.)
40-MIL LLDPE GEOMEMBRANE
REPAIR AND BOOT
6" MIN.
1' - 0"
EW-45A
2' - 0"
HDPE TEE (SEE NOTE 2)
EXISTING 4" CONDENSATE
DISCHARGE LINE TO BE CAPPED
EXISTING 2" AIR SUPPLY LINE TO BE CAPPED
SEE NOTE 1
NOTES:
1. WELLHEAD TO BE REUSED AS NEEDED FROM ABANDONED WELL.
2. AS SLOPE ALLOWS CONTRACTOR TO TIE-IN TO EXISTING LATERAL, AIR SUPPLY AND CONDENSATE DISCHARGE PIPING ABOVE EXISTING 40-MIL GEOMEMBRANE.
CONTRACTOR TO REPAIR EXISTING 40-MIL GEOMEMBRANE, STONE PAD, WEED BARRIER AND EXISTING LINER BOOTS IF DAMAGED.
3. CONTRACTOR TO CAP WELL, LATERAL RISER, AIR AND CONDENSATE DISCHARGE PIPING 3 FEET ABOVE GRADE TO ALLOW FOR FUTURE USE.
4. WHILE INSTALLING LATERAL RISERS TO NEW WELLS, EXCAVATE AROUND WELL CASING AND LOWER WELL BORE REINFORCEMENT GRATE.
5. WELLS TO HAVE TWO LABELS, 180 DEGREES APART. EACH LABEL TO BE HIGH VISIBILITY SAFETY YELLOW WITH BLACK LETTERING. LABEL TO BE OUTDOOR, UV
RESISTANT, WATERPROOF, AND PERMANENTLY ADHERED CONSISTING OF 2 INCH LETTERING.
6. THE EXISTING TPO AND 40-MIL LLDPE GEOMEMBRANE TO BE PRESERVED TO THE EXTENT POSSIBLE AND "FLAPPED BACK" WHILE WORK IS BEING CONDUCTED.
ANY REPAIRS TO THE 60-MIL TPO AND 40-MIL GEOMEMBRANES TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE SPECIFICATIONS AND CQA PLAN.
7. WARNING TAPE TO BE MIN. 3 INCH WIDE AND IMPRINTED WITH "GAS LINE BURIED BELOW" AND A METALLIC LAYER FOR DETECTION ABOVE GRADE.
8. NO. 57 STONE PAD TO BE INSTALLED 36 INCHES BEYOND THE RISER PIPE IN ALL DIRECTIONS AND 4 INCH THICK WEED BARRIER TO BE INSTALLED TO SEPARATE
GRAVEL AND CLEAN BACKFILL.
9. VALVE FITTINGS FOR PUMP OPERATION AT PROPOSED ABANDONED WELL TO BE REUSED AND INSTALLED AT NEW WELL AS NECESSARY.
EW-45EW-45A
1' - 6"
4"
EW-45
SEE NOTE
4 SEE NOTE
NEOPRENE GASKET (TYP.)
1' - 6" 1' - 0"
2' - 0"
SEE NOTE 9
This item has been digitally signed and sealed by [Engineer] on the date indicted on the cover page.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
D E
TA
IL
S
DETAILS - I
08 11
HEADER ISOLATION VALVE DETAIL
NOT TO SCALE
08 11
TIE-INTO WELL TO BE ABANDONED DETAIL
NOT TO SCALE
08 11
CONDENSATE DISCHARGE
LINE ISOLATION VALVE DETAIL
NOT TO SCALE
SEE DETAIL
REINFORCEMENT GRATE
08 11
AIRLINE ISOLATION VALVE DETAIL
NOT TO SCALE
07 11
TIE-INTO WELL TO BE ABANDONED IN CAPPED AREA DETAIL
NOT TO SCALE
SEE DETAIL
REINFORCEMENT GRATE
3/ 6/
1. THIS DETAIL IS FOR WELLS/SUMPS RECEIVING A PUMP.
2. 1/2 INCH MALE PVC CAP TO BE ADDED IN ALL STUB-UPS NOT RECEIVING PUMPS.
3/8" MPT x STAINLESS STEEL SKT QUICK CONNECT
FITTING OR PVC CAP (SEE NOTE 2)
1/2" MPT x 3/8" FPT STAINLESS
STEEL BUSHING
1/2" STAINLESS STEEL BALL VALVE
1/2" x 2" LONG STAINLESS STEEL NIPPLE
1" FPT x 1/2" STAINLESS STEEL
REDUCING COUPLING
1" HDPE x STAINLESS STEEL TRANSITION FITTING
1" x 2" HDPE SDR 9 REDUCER
2" HDPE SDR 9 PIPE
QED FITTING
3/4" HEX
HDPE FLANGED LID
11/16" - 24 UNEF THREADING
DRILL THROUGH AND TAP
FLANGE FOR 1/2" NPT FITTING
POLYPROPYLENE TUBING 1/4"( INNER DIA.)
3/8" (OUTER DIA.) INTO GAS STREAM PATH
36" MIN.
C S
4' - 2"
4' - 0"
3' - 9"
20' - 0"
1' - 3"
6' - 9"
3' - 0"
1/4" I.D. AIR SUPPLY LINE
MARK SUMP WITH IDENTIFICATION NO.
(SEE NOTE 6) 2" THICK HDPE BLIND FLANGE
1" CHECK VALVE
4" BALL VALVE
3/4" BAND CLAMP
(TYP.)
NEOPRENE GASKET (TYP.)
60-MIL HDPE TEXTURED
GEOMEMBRANE FLAP (SEE
NOTE 5)
4" HDPE SDR 11 CONDENSATE
DISCHARGE LINE
4" HDPE SDR 11 MOLDED ELBOW
6" HDPE SDR 17" VACUUM BREAK PIPE
WELDED TO FLANGE LID
24" HDPE SDR 17 PIPE
QED EASY LEVEL INDICATOR
1' ABOVE TOP OF PUMP
GAS FLOW
18" HDPE FLANGE ADAPTER WITH BACKUP RING
24" x 18" HDPE SDR 17 REDUCING TEE
1" THICK HDPE FLAT STOCK WELDED BOTTOM
PLATE TO EXTEND 6" MIN. FROM EDGE OF SUMP
TOP OF BOTTOM GEOMEMBRANE PROTECTIVE SAND LAYER
15' MIN.
(SEE NOTE 3)
6"
NO. 57 FDOT STONE BACKFILL
1" HDPE FLAT STOCK GUSSETS
AROUND PIPE (4 PLACES)
PNEUMATIC PUMP (SEE NOTE 7)
24" x 18" HDPE SDR 17 REDUCING TEE (TYP.)
2" HDPE SDR 9 AIR SUPPLY
LINE WITH MOLDED ELBOW
1' - 8"
1' - 6"
NO. 57 STONE PAD WITH WEED
BARRIER (SEE NOTE 4)
4"
2" AIR SUPPLY
4" CONDENSATE DISCHARGE
4" BRACE WITH NOTCHED ENDS TO
WRAP AROUND PIPE AND SECURED
WITH STAINLESS STEEL CLAMP
STAINLESS STEEL BAND WITH CLAMP
NOTCHED ENDS OF 4"
CONDENSATE DISCHARGE RISER
4" BRACE SECURED TO PIPE
WITH STAINLESS STEEL CLAMP
NOTCHED ENDS OF
2" AIR SUPPLY RISER
STAINLESS STEEL CLAMP
EXAGGERATED FOR VIEWING
NOTES:
1. 6 INCH HDPE SDR 17 VACUUM BREAK PIPE EXTRUSION TO BE WELDED TO FLANGE LID. 1 FOOT OF PIPE TO PROTRUDE THROUGH TOP OF FLANGE.
PIPE EXTRUSION TO BE WELDED TO BOTH SIDES OF BLIND FLANGE. CENTER OF PIPE TO BE LOCATED 2 INCHES OFF CENTER OF BLIND FLANGE.
2. CONTRACTOR TO VERIFY CONDENSATE SUMP CONFIGURATION IN FIELD. ADJUSTMENTS TO BE APPROVED BY ENGINEER PRIOR TO INSTALLATION.
3. ENGINEER TO APPROVE DEPTH BASED ON GROUND SURFACE ELEVATION PRIOR TO INSTALLATION.
4. NO. 57 STONE PAD TO BE INSTALLED 36 INCHES BEYOND THE SUMP IN ALL DIRECTIONS AND 4 INCH THICK WEED BARRIER TO BE INSTALLED TO
SEPARATE GRAVEL AND CLEAN BACKFILL.
5. 60-MIL HDPE TEXTURED GEOMEMBRANE FLAT EXTEND 5 FEET BEYOND THE SUMP IN ALL DIRECTIONS.
6. SUMP TO HAVE TWO LABELS, 180 DEGREES APART. EACH LABEL TO BE HIGH VISIBILITY SAFETY YELLOW W/ BLACK LETTERING. LABEL TO BE OUTDOOR, UV RESISTANT, WATERPROOF, AND PERMANENTLY ADHERED CONSISTING OF 2 INCH LETTERING.
7. PNEUMATIC PUMP MAY BE QED MODEL AP-4+, SHORT BODY, 316 STAINLESS STEEL, BOTTOM LOADING LEACHATE OR APPROVED EQUAL.
QED FLANGE CAP WITH PASS THROUGH
FITTING FOR 1/2" AIR SUPPLY LINE, 1"
PUMP DISCHARGE LINE, AND 5/8"
PUMP EXHAUST LINE ATTACHED TO
SUMP WITH FERNCO COUPLING
STAINLESS STEEL QUICK
CLAMPS (TYP. 3)
QED EASY LEVEL INDICATOR
3/4" STAINLESS STEEL TYPE
304 90° STREET ELBOW
3/4" STAINLESS STEEL TYPE
304 90° STREET ELBOW
3/4" STAINLESS STEEL TYPE 304
HYDRAULIC QUICK DISCONNECT
8" HDPE SDR 17 PIPE
EXTRUSION WELD 6" HDPE RISER
ON TOP AND BOTTOM OF FLANGE
1' - 0"
FUSE END OF PIPE TO VACUUM
BREAK PIPE IN CONDENSATE SUMP
QED PUMP CONTROL PANEL
(SEE NOTE 1)
PUMP COUNTER
NOTES:
1. QED PUMP CONTROL PANEL TO BE MOUNTED TO VERTICAL 6 INCH DIAMETER HDPE SUPPORT PIPE.
SUPPORT PIPE TO BE WELDED TO SUMP LID AND CAPPED.
2. PNEUMATIC PUMP MAY BE QED MODEL AP-4+, SHORT BODY, 316 STAINLESS STEEL, BOTTOM LOADING
LEACHATE OR APPROVED EQUAL.
60-MIL HDPE
GEOMEMBRANE
(TYP.)
NOTES:
1. 3/8 INCH STAINLESS STEEL BALL VALVE AND GLYCOL FILLED PRESSURE GAUGE. (0-200 PSI RANGE)
3' - 0"
3" STAINLESS STEEL FEMALE CAMLOCK
FITTING WITH LOCKING LEVERS AND MALE
HOSE PLUG WITH THREADED MALE ADAPTER
FOR VACUUM TRUCK ACCESS (TYP.)
3" FNPT STAINLESS STEEL BALL
VALVE WITH FEMALE CONNECTION
TO STAINLESS STEEL TRANSITION
FITTINGS
HDPE TO STAINLESS STEEL MALE
THREADED TRANSITION FITTINGS
3" x 4" HDPE SDR 11 REDUCER (AS
NEEDED)
HDPE SDR 11 MOLDED WYE
GLYCOL FILLED PRESSURE
GAUGE (SEE NOTE 1)
HDPE TO STAINLESS STEEL MALE
THREADED TRANSITION FITTING
3" FNPT STAINLESS STEEL BALL
VALVE TO 3" STAINLESS STEEL TEE
WITH 3" STAINLESS STEEL NIPPLE
3" STAINLESS STEEL TEE WITH
3" x 3/8" STAINLESS STEEL
BUSHING AND 3/8"
STAINLESS STEEL NIPPLE
4'' HDPE SDR 11 CONDENSATE DISCHARGE LINE
SEE DETAIL
AIR SUPPLY LINE VALVE (WARM CLIMATE)
1" LINE EQUALIZER AND BALL VALVE
This item has been digitally signed and sealed by [Engineer] on the date indicted on the cover page.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
ISSUED FOR BID
3/1/2024
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
C
O C
O N
U T
P A
LM
D
R
IV
E , S
U
IT
E
, T
A M
P A
, F L
P
H
3)
-0
F
A X
N O
3)
-6
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
LIC
EN
SE
N
O.
MARCH 2024
AF
V
SM
L
TL
R
SM
L
.1
P H
A S
E I
A N
D
II
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M E
X P
A N
S
IO
N
S A
R A
S O
TA
C
O U
N
TY
G O
V E
R N
M E
N T
R
IN
G
LI
N G
B
LV
D
S A
R A
S O
TA
, F
L
DA
N
IE
L
R.
C
O O
PE
R
D E
TA
IL
S
DETAILS - I
08 12
24 INCH CONDENSATE SUMP CS-15 AND CS-16 DETAIL
NOT TO SCALE
12 12
MONITORING PORT (TYP.) DETAIL
NOT TO SCALE
12 12
FLANGED LID WITH QUICK RELEASE CAP FOR SUMP DETAIL
NOT TO SCALE
SEE DETAIL
PERFORATED PIPE
SEE DETAIL
FLANGED LID WITH QUICK RELEASE CAP FOR SUMP
SEE DETAIL
MONITORING PORT (TYP.)
12 12
B
B 12 12
SECTION
NOT TO SCALE
12 12
4-INCH DUAL CLEANOUT DETAIL
NOT TO SCALE
12 12
AIR SUPPLY LINE VALVE (WARM CLIMATE) DETAIL
NOT TO SCALE
12 12
AIRLINE ISOLATION VALVE RISER SUPPORT DETAIL
NOT TO SCALE
A 12 12
SECTION
NOT TO SCALE
A
3/ 6/
| Sheets and Views |
| 01 COVER |
| 02 EXISTING GCCS PHASE I |
| 03 EXISTING GCCS PHASE II |
| 04 BORROW AREA MAP |
| 05 BASEGRADES GCCS PHASE I |
| 06 BASEGRADES GCCS PHASE II |
| 07 PROPOSED GCCS PHASE I |
| 08 PROPOSED GCCS PHASE II |
| 09 DETAILS - 1 |
| LFG EXTRACTION WELL DETAIL |
| QED PRECISION QUICK CHANGE ORIFICE PLATE WELLHJEAD |
| REINFORCEMENT GRATE |
| PERFORATED PIPE |
| NEW STUB-UP AT EXISTING WEL |
| WELL ABANDONMENT |
| 10 DETAILS - 2 |
| BURIED BLIND FLANGE FOR FUTURE EXPANSION |
| HEADER AND LATERAL PIPE TRENCH IN CAPPED AREA |
| HEADER ACCESS RISER |
| REMOTE WELL IN CAPPED AREA |
| HEADER AND LATERAL PIPE TRENCH IN UNCAPPED AREA |
| LFG LATERAL TIE-IN WITH TEE |
| 11 DETAILS - 3 |
| HEADER ISOLATION VALVE |
| TIE-IN WELL TO BE ABANDONED |
| CONDENSATE DISCHARGE LINE ISOLATION VALVE |
| AIRLINE ISOLATION VALVE |
| TIE-INTO WELL TO BE ABANDONED IN CAPPED AREA |
| 12 DETAILS - 4 |
| 24 INCH CONDENSATE SUMP CS-8 AND CS-9 |
| MONITORING PORT (TYP.) |
| FLANGED LID WITH QUICK RELEASE CAP |
| LIQUID CONVEYANCE CLEANOUT |
| AIR SUPPLY LINE VALVE (WARM CLIMATE) |
| AIRLINE ISOLATION VALVE RISER SUPPORT |
File details come from the government source that posted it. Updated .