Request for Qualifications AEOI DEP26-012 AML-Shinnston Area Wide Drilling & Grouting Design Build.pdf
PDF 4 MB Posted
- Solicitation number
- AEOI 0313 DEP2600000012 1
- Issued by
- Hampshire County, West Virginia
About this file
This is a Request for Qualifications (RFQ) issued by the West Virginia Department of Environmental Protection (WVDEP) for design-build services on the Shinnston Area Wide Drilling & Grouting project, an abandoned mine lands reclamation initiative in Harrison County, West Virginia. The project seeks to address subsidence issues resulting from pre-law coal mining operations by providing drilling and grouting services at 34 residential and non-residential structures across a 10.8-acre area. The project will be delivered through a Progressive Design-Build approach with two phases: Phase 1 encompasses design, permitting, and development of a final price proposal, while Phase 2 involves final design and construction activities. Qualified design-build entities must submit Statements of Qualifications by April 23, 2026, at 10:30 a.m. local time, with submissions required both electronically via wvOASIS and in six hard copies to WVDEP's Charleston office. No more than three responsive firms will be short-listed to proceed to the Request for Proposal stage, which will include a mandatory site walk-through, confidential individual meetings, and proposal interviews. The project procurement schedule indicates that short-listed offerors and RFP issuance will occur at a to-be-determined date, with final award notification also to be determined.
The estimated project budget is $15 million, funded through the Bipartisan Infrastructure Law, which requires compliance with Davis-Bacon Act and Build America, Buy America Act provisions. Mandatory minimum qualifications include the ability to obtain performance and payment bonds in the amount of $15 million and evidence of insurance capability meeting specified requirements: $2 million commercial general liability per occurrence, $2 million automobile liability per accident, statutory workers' compensation, and $1 million professional liability per claim and in aggregate. Short-listed offerors who submit complete responsive proposals but do not receive the design-build contract will receive a stipend of $13,750. Burns & McDonnell Engineering Company, Inc. is prohibited from participating as a team member. All submissions and resulting contracts are public documents subject to disclosure under West Virginia public records law and the Freedom of Information Act, with the exception of organizational safety information designated as confidential. Offerors are responsible for all costs associated with preparing their responses, and communications regarding the project must be directed exclusively to the WVDEP contact person, Jessica Chambers Smith, with any unauthorized contact with other WVDEP employees potentially resulting in disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_AEOI_0313_DEP2600000012_1_WV_AEOI_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Qualifications – Shinnston Area Wide Drilling & Grouting
Request for Qualifications
This REQUEST FOR QUALIFICATIONS (“RFQ”) from the Owner named below invites the submittal of a Statement of Qualifications (“SOQ”) from firms interested in providing design-build services for the Project described below. By submitting an SOQ, the Offeror represents that it has carefully read the sections of this RFQ and all attachments and Addenda and agrees to be bound by them. This RFQ is not an offer to enter into a contract, but merely a solicitation of persons interested in submitting a SOQ to the Owner for the Project.
The Solicitation may contain mandatory provisions identified using the words “must,” “will,” and “shall.”
Failure to comply with a mandatory term in the Solicitation will result in Submittal disqualification.
OWNER:
West Virginia Department of Environmental Protection (WVDEP) 601 57th St. SE, Charleston, WV 25304
PROJECT:
Shinnston Area Wide Drilling & Grouting
WVDEP CONTACT PERSON:
Jessica Chambers Smith jessica.chamberssmith@wv.gov Cc: DEPProcurement@wv.gov 601 57th St. SE, Charleston, WV 25304
Please note: ALL QUESTIONS REGARDING THIS REQUEST FOR QUALIFICATIONS MUST BE
SUBMITTED TO THE WVDEP CONTACT PERSON ABOVE. ANSWERS WILL BE PUBLISHED VIA
ADDENDUM PRIOR TO THE DATE OUTLINED IN THE PROJECT PROCUREMENT SCHEDULE
(SECTION 2.5). SUBMITTED EMAILS MUST HAVE THE SOLICITATION NUMBER IN THE SUBJECT
LINE.
SOQ DUE DATE AND TIME
Offeror’s SOQ shall be submitted no later than: April 23, 2026, at 10:30 a.m. local time.
All SOQs must be submitted pursuant to the instructions below. It is the Offeror’s sole responsibility to ensure that the SOQ is delivered in the manner required by this RFQ by the Due Date and Time indicated above. The WVDEP has the right to reject any SOQs not properly delivered.
Submission of the SOQ will be in wvOASIS.
wvOASIS can be accessed online at https://prd311.wvoasis.gov/PRDVSS1X1ERP/Advantage4 Offerors can search for the RFQ using keywords *Shinnston*Area*Wide*Drilling*&*Grouting*
Six (6) hard copies of the SOQ must be delivered to the owner’s address, listed above, in addition to the electronic submission. These must be delivered to the Owner’s address by the due date listed above.
mailto:jessica.chamberssmith@wv.gov mailto:DEPProcurement@wv.gov https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprd311.wvoasis.gov%2FPRDVSS1X1ERP%2FAdvantage4&data=05%7C02%7Cselothman%40burnsmcd.com%7C709e9750e1044651443b08dcf77d0038%7Cbfbb9a2b6d994e78b3c795005d555c8b%7C0%7C0%7C638657363451877161%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=v0z281BLWhmdLDodvYsxgeSF8i5YkFiSbt8ATKtBDW0%3D&reserved=0
SECTION 1: OWNER DESCRIPTION
1.1 General
The West Virginia Department of Environmental Protection (WVDEP) enforces state and federal environmental laws in West Virginia to help protect the air, water, and land. WVDEP’s mission is to promote a healthy environment using over 800 employees in nine different locations. More specifically, the WVDEP’s Division of Land Restoration (DLR), whose mission is to reclaim and remediate contaminated and disturbed land to a condition protective of public health and safety and suitable for productive reuse and economic development. With respect to lands impacted by coal mining operations, WVDEP is responsible for delivering projects associated with restoration and reclamation of these lands.
In response to the passing of WV Senate Bill 439, WVDEP has established a Design-Build Pilot Program aimed at delivering projects using design-build project delivery. The pilot program encompasses abandoned mine land reclamation, stream restoration, subsidence mitigation, and related activities, and seeks to apply Design Build Institute of America (DBIA) best practices in alignment with WVDEP policies and preferences.
The Shinnston Area Wide Drilling & Grouting project will be delivered under the Abandoned Mine Lands (AML) program which oversees and facilitates the resolving of public safety issues such as mine fires & subsidence, hazardous highwalls, mining-impacted water supplies, open shafts and portals, and other dangers resulting from mining before 1977.
1.2 Funding/Authority
This project will be funded with monies from the Bipartisan Infrastructure Law, which is federal funding. This will require conformance to federal funding requirements including the Davis-Bacon Act and Build America, Buy America Act at a minimum.
1.3 Procurement Website
Procurement information can be found at https://www.wvoasis.gov/. Registration guidance is provided on the website.
SECTION 2: OVERVIEW OF PROJECT
2.1 General
2.1.1 Purpose
The West Virginia Department of Environmental Protection (WVDEP) is soliciting Statements of Qualifications (SOQs) from qualified Design-Build Entities to provide Progressive Design- Build (PDB) services for the Shinnston Area Wide Drilling & Grouting project. The Owner intends to collaborate closely with the selected Design-Builder to refine the project scope, schedule, and budget in Phase 1 (Preconstruction & Design Development) before proceeding with Phase 2 (Final Design & Construction).
2.1.2 Project Overview
The Shinnston Area Wide Drilling & Grouting project is located in and around the City of Shinnston in Harrison County, West Virginia, within the West Fork River watershed. The project area has been significantly impacted by historic underground mining activities associated with the Alsted Coal Company’s pre-law mining operations in the Pittsburgh coal https://www.wvoasis.gov/ seam, last mined in 1946. These legacy underground workings have resulted in widespread subsidence throughout residential neighborhoods including Roosevelt Street, Philli Lane, East Pike Street, East Avenue, and School Street.
Numerous emergency subsidence responses have previously been conducted within the 10.8-acre area that makes up the primary project footprint. Despite these interventions, the potential for continued subsidence remains high due to the presence of documented underground voids, variable overburden depths ranging from approximately 18 to 51 feet, and remaining uncollapsed workings beneath many structures.
WVDEP’s AML Program has identified 34 structures—including private residences and select non-residential buildings—that require drilling to assess underlying mine conditions and grouting where voids are encountered. The work will address previously unmapped or partially collapsed voids, stabilize undermined ground, and mitigate ongoing public safety risks associated with historic mining.
2.2 Project Objectives
Establish a collaborative relationship between the WVDEP and the Design-Build Team in working together to meet the project objectives.
Evaluate potential innovative approaches to enhance the value and/or reduce the risk of the work to WVDEP and Design-Build Team.
Provide holistic services, including but not limited to planning, realty, permitting, design, and construction, that results in the completion of a project that optimizes improvements within the project budget and limits the likelihood that rework may be required in the future.
Maintain a safe, injury free work site.
Minimize impacts to project stakeholders through close coordination with WVDEP.
Demonstrate the advantages and disadvantages of design-build delivery.
Regular reporting of project progress for feedback to WVDEP.
2.3 Project Description
See Attachment A.
2.4 Estimated Budget
The current available budget for the project as described in Attachment A is $15 Million.
2.5 Project Procurement Schedule
The following is the Project Procurement Schedule. This schedule is subject to change. The due dates for questions and SOQ and Proposal due dates are firm unless these dates are changed via Addendum.
Activity Date Issue RFQ March 13, 2026 Last Date to Submit Questions Regarding the RFQ March 30, 2026 by 10 a.m.
Last Date for WVDEP Responses to Questions April 13, 2026 SOQ Due Date April 23, 2026 Notification of Short-Listed Offerors and RFP Issuance To Be Determined Mandatory Pre-Proposal Meeting and Site Walk Through for Short Listed Offerors
To Be Determined
Confidential Individual Meetings To Be Determined
Proposal Due Date and Interviews with Short Listed Offerors
To Be Determined
Notification of Preferred Offeror To Be Determined
2.6 Definitions
2.6.1 Business Day: Any day on which the WVDEP is open for regularly conducted business.
2.6.2 Confidential Individual Meetings: The confidential/proprietary meeting(s) conducted individually between the WVDEP and each Short-Listed Offeror after the issuance of the RFP. All Confidential Individual Meetings will be conducted pursuant to the instructions in the RFP, and all participants may be required to enter into a confidentiality agreement before the meeting. Confidential Individual Meetings include Proprietary Meetings prior to the submission of the Technical Proposal.
2.6.3 Design-Builder: The entity with the prime design-build contract with the WVDEP. Also known as the Successful Offeror.
2.6.4 Design-Build Team: All entities listed by the Design-Builder as providing services or construction on the Project. The Design-Builder is not required to list all members of the Design-Build Team in the SOQ. Members of the Design-Build Team may also be referred to as “Team Members.”
2.6.5 Key Team Member: Individuals who will be assigned to the Project who play an important role in the design, construction, or management of the Project.
2.6.6 Offeror: An entity who submits a Statement of Qualifications for consideration for selection for this Project.
2.6.7 Procurement: WVDEP’s process for selecting a Design-Build Team for this Project.
2.6.8 Procurement Documents: All documents issued by the WVDEP in connection with the
Procurement or Project.
2.6.9 RFP: WVDEP’s Request for Proposals, which will be issued to those Short-Listed Offerors who are selected to proceed to the next phase of this Procurement.
2.6.10 RFQ: WVDEP’s Request for Qualifications, this document.
2.6.11 Statement of Qualifications (SOQ): Offerors response to the RFQ, including all required information.
SECTION 3: PROCUREMENT PROCESS
3.1 General Information
3.1.1 Compliance with Legal Requirements
This Procurement will be in accordance with WVDEP policies and procedures as well as all applicable federal, state, and local laws.
3.1.2 Conflict of Interest and Communications with WVDEP
a. The following organizations may not be part of any team and are prohibited from participating in the Project as a member of a Design-Build team.
i. Burns & McDonnell Engineering Company, Inc.
b. Offeror, its officers or members or employees, shall not presently have or acquire an interest, direct or indirect, which would conflict with or compromise the performance of its obligations hereunder. Offeror shall periodically inquire of its officers, members and employees to ensure that a conflict of interest does not arise. Any conflict of interest discovered shall be promptly presented in detail to WVDEP.
c. Offerors are required to conduct the preparation of their SOQs with professional integrity and free of lobbying activities. Communication with WVDEP regarding this Project shall be through the contact person listed. Do not communicate about the Project or the Procurement with any other WVDEP employees, representatives, or consultants. Communication with other WVDEP employees, representatives, or consultants regarding the Procurement may cause the firm involved to be disqualified from submitting under this Procurement. Any verified allegation that a responding Offeror or Team Member or an agent or consultant of the foregoing has made such contact or attempted to influence the evaluation, ranking, and/or selection of short-listed Offerors may be the cause for WVDEP to disqualify the Offeror team from submitting an SOQ or Proposal, to disqualify the Team Member from participating in the Procurement, and/or to discontinue any further consideration of such Offeror or Team Member.
d. Following WVDEP’s approval of the Short-Listed Offerors, WVDEP anticipates that certain communications and contacts will be permitted. The RFQ, RFP and/or other written communications from WVDEP will set forth the rules and parameters of such permitted contacts and communications. To the extent any Offeror intends at any time to initiate contact with the general public regarding the Project or property owners who may be impacted by the Project, the nature of such intended contact and the substance thereof must be approved in writing by WVDEP prior to the commencement of such activities.
3.1.3 Expenses of Offeror and Payment of Stipend
With the exception of the payment of the Stipend as noted below, the WVDEP accepts no liability for the costs and expenses incurred by firms in responding to this Procurement. Each Offeror that enters into the Procurement process shall prepare the required materials, the SOQ, and the Proposal at its own expense and with the express understanding that the Offeror cannot make any claims whatsoever for reimbursement from the WVDEP for the costs and expenses associated with the process, even in the event the WVDEP cancels this Project or rejects all Proposals. All proposals received will become the property of the WVDEP. The WVDEP will pay a stipend in the amount of $13,750 to the Short-Listed Offerors responsible submitting responsive and complete Proposals to the RFP that remain in competition until the point of Contract award but who are not awarded the Design-Build Contract.
3.1.4 Public Disclosure
Vendor’s response to the Solicitation and the resulting Contract are public documents.
As public documents, unless otherwise noted, they will be disclosed to the public following the award of the Project, as required by §22-34-1 et seq., and the Freedom of Information Act West Virginia Code §§ 29B-1-1 et seq.
Submission of any bid, proposal, or other document to the WVDEP constitutes your explicit consent to the subsequent public disclosure of the bid, proposal, or document without notice. Other than organizational safety information, which will be determined to be CONFIDENTIAL, DO NOT SUBMIT MATERIAL YOU CONSIDER TO BE
CONFIDENTIAL, A TRADE SECRET, OR OTHERWISE NOT SUBJECT TO PUBLIC
DISCLOSURE. The WVDEP will disclose any other information included in an Offeror-provided document regardless of labeling as “confidential,” “proprietary,” “trade secret,” “private,” or labeled with any other claims against public disclosure of the documents, to include any “trade secrets” as defined by West Virginia Code § 47-22-1 et seq.
3.1.5 Protest Procedures
The protest procedures applicable to the Procurement are set forth in 60CSR10 TITLE 60: Procedural Rule Department of Environmental Protection Secretary’s Office §60-10- 6 Protests.
3.2 Owner Rights and Procurement Conditions
3.2.1 WVDEP reserves without limitation, and may exercise at its sole discretion, the following rights and conditions with regard to this Procurement process:
a. To cancel the Procurement process and reject any and all SOQs and/or Proposals;
b. To waive any informality or irregularity;
c. To revise the Procurement Documents and Schedule via an Addendum;
d. To reject any Offeror that submits an incomplete or inadequate response or is not responsive to the requirements of this RFQ;
e. To require confirmation of information furnished by an Offeror, require additional information from an Offeror concerning its SOQ or Proposal and require additional evidence of qualifications to perform the work described in this RFQ or a subsequent
RFP;
f. To provide clarifications or conduct discussions, at any time, with one or more Offerors;
g. To contact references who are not listed in the Offeror’s SOQs and investigate statements on the SOQs and/or qualification of the Offeror and any firms or individuals identified in the SOQ;
h. To consider Alternative Technical Concepts and/or approaches identified by Offerors;
i. To take any action affecting the RFQ process, the RFP process, or the Project that is determined to be in the WVDEP’s best interests; and
j. Approve or disapprove of the use of particular Subconsultants, Subcontractors, or Key Team Members and/or substitutions and/or changes to Subconsultants, Subcontractors, or Key Team Members from those identified in the SOQ or Proposal prior to the Notice to Proceed. Such approval or disapproval shall not be unreasonably exercised.
k. To request items required by this RFQ after SOQ submission and prior to shortlisting if not provided as part of the SOQ submission, except for instances where state law mandates receipt with the SOQ.
3.3 Outline of the Procurement Process
3.3.1 Request for Qualifications (RFQ).
a. This RFQ invites firms to submit SOQs describing in detail their technical, management, and financial qualifications to design, permit, construct, commission, and close out the Project. The issuance of this RFQ is the first phase of the Procurement process.
b. Offerors will submit their SOQ and other deliverables required pursuant to this Procurement at the time and in the manner set forth in this RFQ and any Addenda.
The WVDEP will not consider SOQ or other deliverables that are submitted after the time set forth in the RFQ. Offerors are solely responsible for making sure that the WVDEP receives the SOQ in a timely fashion.
c. The WVDEP will evaluate the information submitted by each Offeror to 1) determine whether the Offeror meets the mandatory minimum requirements and 2) evaluate the SOQ provided by each Offeror pursuant to the evaluation system described below.
Any Offeror who fails to meet the mandatory minimum requirements set forth in this SOQ will be deemed non-responsive and will not be considered further by the WVDEP in this Procurement.
d. All SOQs will be evaluated in accordance solely with the criteria established in the RFQ and any Addenda issued thereto. The evaluation criteria are listed below, including the relative weight or importance given to each criterion.
e. Not more than three responsive and responsible firms will be selected as Short-Listed Offerors. Only those firms that have been short-listed will be invited to submit a Proposal in response to the RFP.
f. The results of the SOQ evaluations and scoring will not be carried forward and included in the final evaluation and selection.
g. Identified Key Team Members will be used as a basis for selection. Once shortlisted, any changes to a listed consultant, subconsultant or subcontractor, or any individual listed as a Key Team Member in the SOQ that were submitted to the WVDEP as part of the SOQ or Proposal will result in re-evaluation and may result in a change to the evaluation and ranking of the Offeror.
3.3.2 Request for Proposal (RFP), Confidential Individual Meetings & Selection Process
a. The WVDEP will issue the RFP to the Short-Listed Offerors. The RFP will further explain the evaluation criteria, Proprietary Meetings, and other elements of the RFP process.
b. Prior to the submission date for Proposals, written questions will be accepted as defined in the RFP.
c. The WVDEP will conduct a mandatory Site Walk Through with all Short-Listed Offerors.
d. The WVDEP will conduct one Confidential Proprietary Meeting with each Short- Listed Offeror as described in the RFP. The format of the Proprietary Meeting will be designed to allow the Short-Listed Offerors to ask WVDEP questions regarding the Project and WVDEP’s goals and concerns. All information from the Design-Build Teams provided in the Confidential Proprietary Meetings will remain confidential during the procurement process; however, see Section 3.1.4 with respect to the potential public disclosure of information provided during the procurement pursuant to any applicable public records act. The Confidential Proprietary Meetings will also provide an opportunity for direct interaction between the Short-Listed Offeror and the RFP Evaluation Committee.
e. A Short-Listed Offeror must submit suggested proposed changes to the Contract with their Proposal for consideration during the negotiation phase. The WVDEP, at its sole discretion, may revise the RFP, the contract provisions, and/or program documents and issue an Addendum to all Short-Listed Offerors.
f. Short-Listed Offerors will submit a Technical Proposal in accordance with the Procurement Schedule.
g. An Offeror’s pricing approach will be part of the Technical Proposal. A non-binding, total estimated project cost may be requested as part of the Technical Proposal but will not be part of the scoring evaluation.
h. The Technical Proposal, similar to the SOQ, will be submitted via the wvOASIS on-line portal.
i. Interviews with the Short-Listed Offerors are anticipated and scheduled for after the submission of the Technical and Price Proposal. The purpose of the interview is to expand upon and gain clarification of the submitted Technical and Price Proposal. At its sole discretion, the WVDEP may choose to forego the interviews and select the Preferred Offeror based directly on the Technical Proposal and Price Proposal evaluation.
j. The RFP Evaluation Committee will be the same as the RFQ Evaluation Committee.
The RFP Evaluation Committee will evaluate the Proposals in accordance with the published evaluation criteria.
k. At its sole discretion, the WVDEP may ask written questions of Offerors, seek written clarifications, and conduct discussions with Offerors on Proposals.
l. WVDEP will provide written notification to all Short-Listed Offerors of the selection decision. Debriefs may be requested by unsuccessful Offerors at the conclusion of the Procurement.
m. Offerors shortlisted for the Design-Build project are expected to fully participate in the proposal and interview process through award. Any shortlisted firm that fails to submit a complete proposal by the required deadline, or voluntarily withdraws from consideration prior to award, may be deemed noncompliant and may not be eligible for participation in future Design-Build or similar solicitations issued by the Owner for a period of up to two (2) years from the date of withdrawal, at the Owner’s discretion.
n. At WVDEP’s discretion, it will initiate negotiations with the Preferred Offeror. The “Preferred Offeror” is the Offeror that the WVDEP determines offers the Best Value to WVDEP in terms of their proposed approach to the Project. If the WVDEP is unable to execute a contract with the Preferred Offeror, negotiations with the Preferred Offeror may be terminated, and provided that such negotiations are terminated in writing, the WVDEP may proceed to negotiate with the next Preferred Offeror. The WVDEP will continue in accordance with this procedure until a contract agreement is reached or the selection process is terminated. Negotiations are at the WVDEP’s sole discretion. By submitting a Proposal pursuant to the RFP, the Offeror represents and warrants that it will enter into the contract provided by the WVDEP subject to the contractual terms set forth in its Proposal and any negotiated clarifications and/or exceptions proposed by the Offeror in their respective Technical Proposal.
3.3.3 Price Proposal
Short-Listed Offerors will submit a Price Proposal pursuant to the instructions set forth in the RFP. It is anticipated that the Price Proposal will include, at a minimum, the cost for the Offeror to complete their proposed technical approach that will provide a firm price to WVDEP for the completion of Phase 1 Services. Offerors will also provide a Phase 2 Rough Order of Magnitude cost. Other cost factors that may be requested include general condition costs, rate schedules, Design-Builder fee, overhead and profit margins, and/or mark-up on subcontractors and equipment, if any.
3.3.4 Evaluation and Ranking of Offerors
SOQs will be evaluated based on the evaluation criteria set forth herein. The scoring for the SOQ is only to determine the Short-Listed Offerors.
In the final evaluation of Offerors, the WVDEP will consider the information submitted in the Proposal as well as the Proposal phase meetings with the Offerors with respect to the evaluation criteria set forth in the RFP. The result of the evaluation will be a comparative ranking of Offerors.
Offerors who do not meet the minimum qualifications as described in 4.2.2 will not be evaluated. For the purpose of selecting and evaluating Offerors, the evaluation criteria will be given the following relative weights:
SOQ
Maximum Points: 100
Project Team organization and Personnel experience
30 points (max)
Experience with WVDEP on previous projects or working within West Virginia
5 points (max)
Design, engineering & permitting experience with similar projects
30 points (max)
Construction Experience with Similar Projects – Including OSHA 300 Logs & EMR for past 3 years (provide references
30 points (max) for contact)
References (exclude WVDEP references) 5 points (max)
Technical Proposal
Maximum Points: 100
Project Approach, including, but not limited to, permitting, design, construction, safety, risk management, project turnover, and warranty
50 points (max)
Overall schedule for design and construction with sufficient detail to demonstrate understanding of the work
10 points (max)
Approach to collaboration and transparency with WVDEP throughout the duration of the project
10 points (max)
Cost and Pricing Approach 10 points (max)
Offeror stated exclusions, assumptions, and deviations to Proposed Contract
5 points (max)
Price Proposal
Price proposal, including Phase 1 fee, Design-Builder fee, and Design-Builder Hourly Rate Schedule
15 points (max)
*Refer to Attachment E Scoring Evaluation Rubrics for criteria used for evaluating SOQs and Proposals. Please note that while these rubrics provide a standard guide, the selection committee reserves the right to consider additional relevant factors during the final selection process.
3.4 Contract Format
The WVDEP will enter into contract negotiations for the Project with the Preferred Offeror. The Design-Build Terms & Conditions are based on the Design-Build Institute of America standard documents, as amended by WVDEP and will be set forth in the RFP and provided to Short-Listed Offerors.
SECTION 4: SOQ DOCUMENTATION REQUIREMENTS
4.1. SOQ Format Requirements
The SOQs shall comply with the following format requirements:
4.1.1 SOQs shall be formatted in searchable .pdf format.
4.1.2 The body of the SOQ shall be organized in accordance with the Evaluation Criteria.
4.1.3 The body of the SOQ, when printed, shall be limited to a maximum of 20 single-sided pages
a. The following documentation is required to be submitted with the SOQ, but will not be considered as part of the page count:
i. Letter of interest or cover letter (maximum of two pages);
ii. Statement of Offeror’s Ability to Provide a Performance and Payment Bond to the anticipated value of the project.
iii. Statement of Offeror’s Ability to Meet the WVDEP’s Insurance Requirements;
iv. Corporate Structure Questionnaires;
v. OSHA 300 Logs; (past 3 years certified and current year)
vi. Resumes of Key Team Members;
vii. Divider tabs, provided that they contain no substantive content; and
viii. Cover pages, provided that they contain no substantive content.
ix. Addendum Acknowledgement Form (if applicable)
b. SOQs that exceed the page limit may be rejected. The WVDEP, at its sole discretion, reserves the right to remove pages from the sections of any non-conforming SOQ submittals to bring each non-conforming SOQ submittal within the page count requirement.
c. A “page” shall be defined as one single-sided piece of paper that has words, charts, tables, pictures, or graphics. Pages shall be considered a size of 8.5 x 11 inches.
Pages presented in 11 x 17-inch format will be counted as two pages and no more than five 11 x 17-inch pages may be included.
d. The font shall be no smaller than 10-point Arial.
e. Offeror must ensure that its submission in wvOASIS can be accessed and viewed by the Department staff immediately upon SOQ opening. The Department will consider any file that cannot be immediately accessed at the time of SOQ opening to be blank or incomplete and are therefore unacceptable.
4.2 SOQ Organization
SOQs shall consist of the following parts:
4.2.1 Letter of Interest
4.2.2 Minimum Qualifications
a. Statement of Offeror’s Ability to Provide Performance and Payment Bond. (See Section 5.2.1 and Attachment B)
b. Statement of Offeror’s Ability to Meet the WVDEP’s Insurance Requirements. (See Section 5.2.2 and Attachment C)
4.2.3 Technical & Management Qualifications
a. Project Team Organization and Personnel Experience
b. Experience with WVDEP on previous projects
c. Design, engineering & permitting experience with similar projects
d. Construction Experience with Similar Projects
e. References
4.2.4 Corporate Structure Questionnaire(s)
SECTION 5: SOQ EVALUATION CRITERIA AND SUBMITTAL INFORMATION
5.1 Letter of Interest (No points)
The SOQ must include a cover letter containing the name, address, telephone number, fax number, and e-mail address of the Offeror and the principal contact person. The Letter of Interest shall also include the following: (1) name, address, telephone number, fax number, and e-mail address for all listed consultants, subconsultants, and/or subcontractors for the Project; and (2) the type of firm or organization (corporation, partnership, joint venture, etc.) that will serve as the prime contracting party. The letter of interest may be a maximum of two (2) pages.
5.2 Minimum Qualifications
5.2.1 Statement of Offeror’s Ability to Provide Performance and Payment Bond (Pass/Fail)
As a mandatory minimum requirement, the Offeror must have the ability to obtain a performance and payment bond in the amount of the total cost of the project. To meet minimum qualifications at the SOQ stage, Offeror shall provide a letter signed by an authorized representative of Offeror’s surety company (or agent) confirming that the Offeror can meet a minimum requirement of $15 million. Any Offeror who fails to meet this mandatory minimum requirement will be considered non-responsive and will not be considered further by the WVDEP in this Procurement process. The surety shall be a company authorized to conduct business in West Virginia. Letters indicating “unlimited” bonding capability are not acceptable.
5.2.2 Statement of Offeror’s Ability to Meet the WVDEP’s Insurance Requirements.
(Pass/Fail)
As a mandatory minimum requirement, the Offeror must document that it has the ability to meet the minimum insurance requirements as set forth in the attached draft Insurance Requirements (Attachment C). Offeror shall provide a letter from Offeror’s insurance company or broker indicating that the Offeror is capable of complying with the insurance requirements specified in Attachment C. Any Offeror who fails to meet this mandatory minimum requirement will be considered to be non-responsive and will not be considered further by the WVDEP in this Procurement. The insurer shall be a company authorized to conduct business in West Virginia.
5.3 Technical and Management Qualifications
The SOQ should demonstrate the Design-Build Team’s ability to undertake the Project by providing the following technical and management qualifications of the Offeror, Team Members, and individual Key Team Members. The Offeror is responsible for ensuring that contact information contained in their referenced Project profiles is correct. The inability to contact a reference may have a detrimental impact on the evaluated qualifications.
Emphasis will be placed on past performance and expertise in performing substantive work on projects that are of Similar Scope and Complexity, as described in the definitions herein. WVDEP reserves the right to award more points to projects that have more of the characteristics set forth in the Project Description in Attachment A of Similar Scope and Complexity. WVDEP also reserves the right to award more points to successful projects in which the Offeror, Team Members, and/or individual Key Team Members had substantial responsibility for their respective scopes of work on the same projects.
The SOQ will be evaluated on the following technical and management qualifications:
5.3.1 Project Team Organization and Personnel Experience
a. Provide an organization chart (showing Key Team Members, Supporting Team Members and their firm affiliation) for all phases of the Project from design through final acceptance and the warranty period. Be certain to identify specific individuals for key functions and show interrelationships and reporting hierarchy. Note whether individuals are performing multiple functions. At a minimum, identify the Key Team Members performing the functions identified below. To the extent that the Offeror has additional Key Team Members on their team, the Offeror should include those individuals.
i. Person responsible for the overall management of the Project and design-build contract;
ii. Designer of Record;
iii. Person(s) responsible for overall construction management;
iv. Person(s) responsible for on-site field supervision and direction and construction (Superintendent);
v. Person(s) responsible for realty;
vi. Person(s) responsible for permitting;
vii. Person(s) responsible for safety;
viii. Person(s) responsible for quality assurance;
ix. Person(s) responsible for project controls;
x. Person responsible for scheduling
xi. Person responsible for cost estimating
xii. Person responsible for risk management; and
b. Provide brief bios for all personnel included and an organization chart and, in the Appendix, a resume for all Key Team Members. Resumes should be no longer than 1 page and should include the following information:
i. Description of the individual’s proposed Project role;
ii. Identification of employer and number of years employed by the firm;
iii. Home office location;
iv. Educational background and professional registrations and/or certifications that are relevant to the work associated with the Project.
v. Experience relevant to their proposed role on the Project; and
vi. Based on the information available to the Offeror, proposed percentage of time that the Offeror intends to assign this individual to the Project.
c. Describe the corporate structure of the Offeror and complete the corporate structure questionnaire for the Offeror and all Team Members in the form set forth in Attachment D. If the prime Offeror is a Joint Venture, all Joint Venture partners must have functional responsibilities for the Project. Describe the duties of each Joint Venture partner.
5.3.2 Demonstrated Past Performance with Successful Projects of Similar Scope and Complexity
a. Describe the Team’s past performance in similar projects with WVDEP. The focus should be on projects of similar scope and complexity to this Project.
b. Describe the Team’s past performance in successfully managing design-build, design, and/or construction projects of similar scope and complexity that include management and communications of an integrated team of design consultants, specialty subcontractors, and trade contractors. Include a description of any issues or problems that arose on the projects and how those issues or problems were resolved.
c. Describe the Team’s past performance in developing integrated design and construction budgets, schedules, and risk registers for projects of similar scope and complexity.
d. Describe the Team’s past performance in developing and/or managing costs within a Guaranteed Maximum Price or Lump Sum Price format.
e. Describe the Team’s past performance working together and/or describe the steps the Team has taken to promote integration and a collaborative working environment.
The Owner reserves the right to award more points to those teams who have worked together in a collaborative delivery model.
f. Provide a minimum of five (5) project examples that had notice to proceed dates within the last five (5) years and that have as many of the following characteristics as possible:
i. Projects of similar scope that include design, permitting, and/or construction that have been performed for WVDEP.
ii. Projects of a similar size and budget that include design, permitting, realty and/or construction services related to elements of the Project as described herein.
iii. Projects that utilize an integrated delivery method that require strong coordination and integration of the design and construction professionals and early involvement of the construction professionals during design;
iv. Projects where the Offeror was selected prior to the establishment of the final price and schedule and where the Offeror collaborated with the Owner to develop the final price and schedule; and/or projects where the Offeror worked closely and with an Owner and provided transparency into the Change Order process.
v. For each project example, provide the following information. The information required in this section can either be provided within the project example narrative or in a separate table in the Project Experience Section of the SOQ.
Name of Project;
Owner/Customer;
Location of Project (include address);
Description of the delivery method and integration of design and construction, identifying the firm(s) role as a prime consultant, subconsultant, contractor, subcontractor, or other;
Description of activities self-performed by each Design-Build Team Member
Project description and applicability and relevance of the referenced Project to the evaluation criteria for this Project;
Name of each Key Team Member who is proposed for this Project who played a significant role on the Project example, including a description of their Project responsibilities and functions;
The initial contract price, the final contract price, and an explanation for any difference between the two amounts;
The initial completion date, the actual completion date, and an explanation for any difference between the two dates; and
Project contact reference (including job title, role on the project, current address, e-mail, phone number) who can verify the characteristics of the submitted Project example.
5.3.3 Corporate Structure Questionnaire
Submit a completed Corporate Structure Questionnaire (Attachment D) for Offeror and each Team Member.
SECTION 6: LIST OF ATTACHMENTS
A. Project Description
B. Payment and Performance Bond Instructions
C. Insurance Requirements and Instructions
D. Corporate Structure Questionnaire
E. Scoring Evaluation Rubrics
F. Addendum Acknowledgement Form (if applicable)
Attachment A Project Description
Attachment A
Project Description
Description of Work:
Provide Design-Build services to complete the work below and in Attachment A-1
Phase 1 – The Design-Build Team (DBT) will provide design and professional services to complete abandoned mine reclamation activities at a site that has been adversely impacted by pre-law coal mining. Multiple projects have been completed under the same AML Problem Area previously. The design should include but not be limited to the following:
site access and preparation; erosion and sediment control measures; subsidence and slump features; investigation drilling and grouting; and other work necessary to meet the project objectives.
The design shall incorporate the state and federal requirements necessary to gain an Authorization to Proceed (ATP) for construction from the US Department of the Interior, Office of Surface Mining (OSM);
1. The federal requirements include but may not be limited to Title IV of the Surface Mine Coal Reclamation Act
(SMCRA) of 1977, as amended, the National Environmental Policy Act of 1969, as amended, and the Clean
Water Act, as amended.
2. The state requirements include but may not be limited to the West Virginia Water Pollution Control Act of
1994, as amended.
Phase 1 shall also meet requirements for any existing infrastructure owners, including but not limited to electrical, public water, public or private sewer, natural gas and WVDOH.
The primary deliverable is an open-book Phase 2 Price Proposal that will include a final scope, including the required drawings and specifications, and the corresponding price for any remaining professional services and all the construction required to implement the project.
Phase 2 - In accordance with the mutually agreed upon Phase 2 Price Proposal developed in Phase 1 and after gaining the ATP from OSM, the DBT will perform the agreed upon abandoned mine land reclamation activities at the site.
Construction activities may include but are not limited to the following: site access and preparation; erosion and sediment control measures; subsidence and slump features; investigation drilling and grouting; and other work necessary to meet the project objectives.
Attachments A-1. Shinnston Area Wide Drilling & Grouting OSM-51
Attachment A-1 OSM-51
Attachment A-1 Shinnston Area Wide Drilling & Grouting
OSM-51
PROJECT NARRATIVE OSM-51
PROBLEM AREA NAME: Shinnston Area Wide Drilling & Grouting PROBLEM AREA # WV-7334
PLANNING UNIT NAME: Haywood PLANNING UNIT # 202133
WCU: 05020002 PRIORITY: 2
LOCATION OF PROJECT
County: Harrison
Nearest Town: Shinnston
U.S.G.S. 7.5' Quadrangle: Shinnston
Receiving Stream: Mudlick Run / West Fork River
Watershed: West Fork
Acreage: 10.8 acres
Date Last Mined & Responsible Party: 1946, Alsted Coal Company, Alsted Mine, underground mining in the Pittsburgh coal.
SITE(S) DESCRIPTION
From the Fairmont office, Follow Nasa Blvd, Industrial Park Rd and Manley Chapel Rd to Koons Run Rd/Old Enterprise Rd. for 3.1 miles. Turn left onto Koons Run Rd/Old Enterprise Rd. for 2.4 miles. Take Co Rte 19/28 for 3.3 miles to E Pike St in Shinnston. East Pike Street will be on the left.
S x 6.7-acre 39° 23’46.7"N,80°17'8.5"W - 39° 23’46.6"N,80°17'7.3"W:
13 subsidence features near Roosevelt Street, Philli Lane & East Pike Street of Shinnston WV. These areas have been addressed utilizing various reclamation methods utilizing the AML Emergency Program. Potential subsidence could continue to occur in this area. 13 of the 22 structures, mostly private residences, have experienced some sort of subsidence issues. See table and images below for locations.
S x 4.1-acre 39° 23’40.5"N,80°11.3"W - 39° 23’41.8"N,80°17'2.5"W:
3 subsidence features near East Ave, & Clay Street of Shinnston WV. These areas have been addressed utilizing various reclamation methods utilizing the AML Emergency & traditional Program. Potential subsidence could continue to occur in this area. 10 structures, mostly private residences, are in Area 2. There have been numerous subsidence issues in this area. See table and images below for locations.
Table 1: Proposed Drilling and Grouting
Structure Location Description Overburden (ft) Footprint SF Address
1 39° 23’46.7"N,80°17'8.5"W Residence 50.0 2,828 80 Roosevelt Street
2 39° 23’48.2"N,80°17'8.0"W Residence 46.3 3,230 70 Roosevelt Street
3 39° 23’49.3"N,80°17'7.8"W Residence 41.5 1,755 60 Roosevelt Street
4 39° 23’50.6"N,80°17'7.5"W Residence 45.4 4,251 50 Roosevelt Street
5 39° 23’50.4"N,80°17'6.4"W Residence 44.1 2,293 1234 Philli Lane
6 39° 23’50.2"N,80°17'5.4"W Residence 46.8 1,954 1238 Philli Lane
7 39° 23’50.1"N,80°17'4.5"W Residence 47.1 2,200 1240 Philli Lane
8 39 °23’50.0"N,80°17'3.5"W Residence 46.8 3,450 1244 Philli Lane
9 39° 23’49.9"N,80°17'1.8"W Residence 50.9 5,458 1246 Philli Lane
10 39° 23’49.1"N,80°17'3.4"W Residence 31.7 2,282 1243 Philli Lane
11 39° 23’49.1"N,80°17'5.1"W Residence 26.8 1,738 1241 Philli Lane
12 39° 23’49.2"N,80°17'6.1"W Residence 32.3 1,933 1239 Philli Lane
13 39° 23’49.2"N,80°17'6.7"W Residence 37.6 2,322 1237 Philli Lane
14 39° 23’47.6"N,80°17'7.0"W Residence 41.0 1,539 1234 East Pike Street
15 39° 23’47.4"N,80°17'5.8"W Residence 33.1 2,080 1244 East Pike Street
16 39° 23’47.8"N,80°17'5.3"W Garage 23.8 1,939 1244 East Pike Street
17 39° 23’47.3"N,80°17'4.4"W Residence 20.8 3,493 1242 East Pike Street
18 39° 23’46.3"N,80°17'4.2"W Residence 18.0 2,406 1245 East Pike Street
19 39° 23’46.3"N,80°17'5.0"W Residence 22.3 2,172 1243 East Pike Street
20 39° 23’46.4"N,80°17'5.7"W Residence 30.9 1,631 1241 East Pike Street
21 39° 23’46.6"N,80°17'6.5"W Residence 38.4 1,220 1239 East Pike Street
22 39° 23’46.6"N,80°17'7.3"W Residence 41.4 2,208 1237 East Pike Street
23 39° 23’41.1"N,80°17'9.0"W Residence 44.0 3,626 1234 East Avenue
24 39° 23’40.8"N,80°17'8.5"W Residence 39.8 2,287 1236 East Avenue
25 39° 23’40.5"N,80°17'7.5"W Residence 38.7 5,126 1244 East Avenue
26 39° 23’39.7"N,80°17'6.6"W Residence 21.2 1,603 1248 School Street
27 39° 23’40.5"N,80°17'6.2"W Residence 29.8 2,622 1252 School Street
28 39° 23’41.6"N,80°17'5.7"W Residence 31.9 2,220 1250 School Street
29 39° 23’41.3"N,80°17'3.4"W Residence 21.8 1,981 1256 School Street
30 39° 23’40.4"N,80°17'3.4"W Garage 21.5 1,148 1262 School Street
31 39° 23’39.7"N,80°17'4.8"W Residence 20 4,036 1264 School Street
32 39° 23’42.3"N,80°17'11.0"W Residence 40 1,857 1224 East Avenue
33 39° 23’41.3"N,80°17'12.1"W Residence 20 1,608 1223 East Avenue
34 39° 23’42.5"N,80°17'12.0"W Residence 42 1,202 1222 East Avenue
35 39° 23’44.5"N,80°17'7.0"W Business 38 56,908 91 Roosevelt Street
*Note: Overburden number obtained from WV Geological Survey Website, https://www.wvgs.wvnet.edu/
ABANDONED MINE LANDS LOCAL CONCERN REPORT OSM-51 (continued)
NAME OF SITE: Shinnston Area Wide Drilling & Grouting
INFORMATION SOURCE: Steve Hincks
ADDRESS: 1000 Technology Dr.
CITY: Fairmont
TELEPHONE NUMBER: 304-993-5590
DATE: 11/5/2025
RESPONSE TO QUESTIONS BY INTERVIEWER:
This neighborhood has experienced numerous issues with subsidence along the city streets of Roosevelt Street, Philli Lane, & East Pike Street. This area includes an approximate 57,000sqft manufacturing building. This 6.7-acre neighborhood has had thirteen emergency subsidence projects completed at a total cost of more than $500,000.00. Additionally, there have also been issues with subsidence in the neighborhoods of East Ave, & School Street. This 4.1 -acre neighborhood has had 3 emergency subsidence projects completed.
This proposed project will perform drilling and grouting of the Pittsburgh coal seam in and near the Alsted and Bethlehem Coal Co., Scott Mine No. 2 mine complexes. The overburden in these areas ranges from 18.0’ to 50.9’. The average seam thickness in this area is 7.7 feet. The pre-law mining operation last took place here from 1940 - 1946. The WVGES show that the remaining coal still exists under some of the structures within the problem area. There is documentation of the mine workings and potential voids below the homes here as well.
There are 34 structures in this PAD that will be drilled and possibly grouted (if voids are found). There are also numerous storage buildings within the footprint of the project, these structures will not be drilled and grouted.
ADDITIONAL PERCEPTIONS of the PROBLEM:
The long-term plan is to continue to work in phases throughout this area of Shinnston to reclaim and stabilize additional neighborhoods from historic mining by drilling & grouting potential undermined areas.
The previous emergency subsidence projects in project area:
- East Pike Street (Pennington) Subsidence I-III, WV- 6292: 39°23’46.0"N, 80°17'6.0"W Total cost: $28,075.60.
- Shinnston (Smith) Subsidence I &II WV-7072: 39°23’46.6"N, 80°17'3.6"W Total Cost: $11,611.80.
- Watson Subsidence WV- 1288: 39°23’46.0"N, 80°17'6.9"W. This Project was not completed.
- Shinnston (Brown) Subsidence WV-5045: 39°23’46.0"N, 80°17'8.0"W Total Cost: $3,075.00.
- Shinnston (Devoli) Subsidence WV-5174: 39°23’48.0"N, 80°17'6.9"W Total Cost: $505.00
- Lantz Subsidence WV-4448: 39°23’48.0"N, 80°17'7.0"W Total Cost: $735.00
- Shinnston (Perry) Subsidence WV-7204: 39°23’48.9"N, 80°17'6.8"W Total Cost: $9,750.00
- Shinnston (Stankiewicz) VO WV-6374: 39°23’49.0"N, 80°17'7.0"W Total Cost: $6500.00
- Shinnston (Philli Lane) Subsidence WV-5860: 39°23’48.8"N, 80°17'7.3"W Total Cost: $23,253.00
ABANDONED MINE LANDS LOCAL CONCERN REPORT OSM-51 (continued)
- Philli Lane Subsidence WV-4319: 39°23’46.2"N, 80°17'7.4"W Total Cost: $453,315.00
- Shinnston (Williams) Subsidence WV-5945: 39°23’50.0"N, 80°17'6.0"W Total Cost: $4,800.00
- Bethlehem (Glass) Subsidence WV- 4532: 39°23’40.0"N, 80°17'10.1"W Total cost: $6,030.00.
- Shinnston (Costelac) Subsidence WV-5247: 39°23’40.0"N, 80°17'3.0"W Total Cost: $510.00.
- Shinnston (Moore) V.O. WV-4933 39°23’39.0"N, 80°17'5.1"W Total Cost: $1,100.00.
Map included below to show these locations.
ANTICIPATED ENVIRONMENTAL IMPROVEMENTS:
Reclaiming this area would have limited environmental improvements, however the improvements to the health and safety of the residents here would be greatly improved.
R oo se ve lt S tr ee t, S q ft
R oo se ve lt S tr ee t, S q
R oo se ve lt S tr ee t, S q
R oo se ve lt
S tr ee t, S q
P hi ll i
L an e, S q
P hi ll i
L an e
S q ft
P hi ll i
L an e
S q
P hi ll i
L an e, S q
P hi ll i
L an e, S q
P hi ll i L an e, S q ft
P hi ll i
L an e, S q
P hi ll i
L an e, S q
P hi ll i
L an e, S q
E as t
P ik e S tr ee t, S q
E as t P ik e
S tr ee t, S q
E as t
P ik e S tr ee t, S q f t.
E as t
P ik e S tr ee t, S q ft
E as t
P ik e S tr ee t, S q
E as t P ik e
S tr ee t, S q
E as t P ik e
S tr ee t, S q
E as t
A ve
S q ft
E as t A ve
S q
E as t S tr ee t, S q
S ch oo l
S tr ee t, S q
S ch oo l
S tr ee t, S q ft
S ch oo l
S tr ee t, S q
S ch oo l S tr ee t, S q
S ch oo l
S tr ee t, S q
E as t
A ve
, 1 sq
. f
E as t A ve
S q.
E as t A ve , 1 sq
Attachment B Payment and Performance Bond Instructions
Attachment B
Payment and Performance Bond Instructions
1. The selected Design-Builder will be required to provide the following bonds for this Project:
• Bid Bond in the amount of 5% of the published project budget, to be provided with Offeror’s Proposal
• Payment Bond in the amount of the total project cost (combined Phase 1 and ROM Phase 2 costs), to be provided prior to contract award, adjustable later based on accepted Phase 2 pricing.
• Performance Bond in the amount of the total project cost (combined Phase 1 and ROM Phase 2 costs), to be provided prior to contract award, adjustable later based on accepted Phase 2 pricing.
a. Offerors must submit a statement in the SOQ from their bonding company that the Offeror can meet the bonding requirements set forth above.
b. The…