This document provides details for a solicitation notice seeking a Construction Manager as Constructor service for the HVAC and Fire Alarm Replacement project at the Edward T. Gignoux Federal Courthouse in Portland, Maine. The scope of work includes design phase services and construction phase services to replace aging HVAC and fire alarm systems at the historic 3-story granite courthouse. Construction is to follow GSA guidelines for design excellence, construction excellence, operational excellence, and historic preservation. Electronic proposals are due by December 6, 2022, with award anticipated in December 2022. Design phase services will commence upon award. The solicitation is open to both large and small businesses and seeks a firm-fixed price contract. Subcontracting plans are required from large businesses. The General Services Administration Public Buildings Service Region 1 is the contracting agency.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM B 1

DOCUMENT SECURITY

NOTICE TO PROSPECTIVE BIDDERS/OFFERORS

This solicitation includes Sensitive But Unclassified (SBU) building information. SBU documents provided under this solicitation are intended for use by authorized users only. In support of this requirement, GSA requires bidders/offerors to exercise reasonable care when handling documents relating to SBU building information per the solicitation.

REASONABLE CARE:

1. Limiting dissemination to authorized users. Dissemination of information shall only be made upon determinationthat the recipient is authorized to receive it. The criterion to determine authorization is need-to-know.

Those with aneed-to-know are those who are specifically granted access for the conduct of business on behalf of or with GSA. This includes all persons or firms necessary to do work at the request of the Government, such as architects and engineers, consultants, contractors, sub-contractors, suppliers, and others that the contractor deems necessary in order to submit an offer/bid or to complete the work or contract, as well as maintenance and repair contractors and equipment service contractors.

NOTE: It is the responsibility of the person or firm disseminating the information to assure that the recipient is an authorized user and to keep records of recipients.

Authorized users shall provide identification as set forth below:

Valid identification for non-Government users. Authorized non-Government users shall provide valid identification to receive SBU building information. The identification shall be presented and verified for each dissemination. Valid identification shall be all items (a) through (c), below, and including item (d), as necessary:

(a) A copy of a valid business license or other documentation granted by the state or local jurisdiction to conduct business. The license at a minimum shall provide the name, address, phone number of the company, state of incorporation, and the name of the individual legally authorized to act for the company. The business must be of the type required to do the work. A general contractor’s license may be substituted for the business license in states that issue such licenses. In the rare cases where a business license is not available from the jurisdiction, the information shall be provided and testified to by the submitter; and

(b) Verification of a valid DUNS Number against the company name listed on the business license or certification. Verification may be obtained through http://www.fpdc.gov, or by calling Dun & Bradstreet at 703-807-5078 to set up an account; and

(c) A Valid IRS Tax ID Number of the company requesting the information; and, as necessary,

(d) A Valid picture state driver’s license shall be required of person(s) picking up SBU documents.

Phone verification must be made to a previously validated authorized user that the individual(s) picking up the documentation is authorized to do so by the company obtaining the documents. SBU documents will not be released to any individual or firm who has not, either previously or at the time of pickup, supplied the required documentation as outlined in paragraphs (a) through (c), above.

2. Retaining and destroying documents. The efforts required above shall continue throughout the entire term of the contract and for whatever specific time thereafter as may be necessary. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/or

Request for Construction Documents Exhibit __C _o_n_c _e _p_t __D _e _si _g _n _ Attachment Form A or B __B_____________

Solicitation # 47PB0022R0076 Building # ME0034ZZ Lease #

FORM B 2

physically destroying CD’s, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.

3. Term of Effectiveness. The efforts required above shall continue throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the Government. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention.

4. Written agreement of disposal. For all contracts using SBU building information, the contractor shall provide a written statement that he and his subcontractors have properly disposed of the SBU building documents, with the exception of the contractor’s record copy, at the time of Release of Claims to obtain final payment. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CDs, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.

The recipient acknowledges the requirement to use reasonable care, as outlined above, to safeguard the documents and, if not awarded, the contract (and at the completion of any protest/appeal process) will make every reasonable and prudent effort to destroy or render useless all SBU information received during the solicitation.

I agree that I will abide by this agreement and will only disseminate Sensitive But Unclassified (SBU) building information to other authorized users under the conditions set forth above.

Signature:______________________________________________

Title:__________________________________________________

Date:__________________________________________________

Copy of business license attached

DUNS Number:_________________________________________

Verified: Yes No

IRS Tax ID Number______________________________________

Solicitation # ___4 _7 __P __B __0 _0__2 _2___R0076 Building #____M __E _0__0 __3 _4 __Z __Z ____ Lease #_______________________