This notice is a solicitation for construction manager as constructor services for HVAC and fire alarm replacement at the Edward T. Gignoux Federal Courthouse in Portland, Maine. The General Services Administration Public Buildings Service Region 1 is seeking proposals for design phase services and construction phase services, with an optional construction phase, on a firm-fixed price basis. Proposals are due by December 6th, 2022 with design phase services to commence in December 2022. The scope of work involves replacing aging HVAC and fire alarm systems while preserving historic aspects and modernizing building systems. Offerors will partner with the architect-engineer, construction manager as advisor, and commissioning agent on this project. A pre-proposal conference will be scheduled. The NAICS code is 238220 and there are no set asides.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design and Construction Division (1PCM)

Design and Construction Division

Project Management Branch – 1PCM

10 Causeway Street, Boston, MA 02222

Memorandum

From: Waikit Lui, Project Manager, 1PCM

To: Michele Valenza, Contracting Officer, 1PQB

Date: 8/11/2022

Subject: VME00005 Gignoux HVAC and FA – CMc Procurement Bidding

Instructions

In the Concept Design Submission Report prepared by Rist-Frost-Shumway Engineering, P.C., there are a total of eight (8) options identified. GSA will be pursuing “Option 3A – Air-to-Water

Heat Pumps with Gas Boilers”. The Concept Design Submission Report is appendix IV.F. of the

Statement of Work.

Throughout the solicitation package there are references to “Alternative 3A”. Alternative 3A is the same as Option 3A – Air-to-Water Heat Pumps with Gas Boilers. This Option 3A in the

Concept Submission Report is not to be confused from the Contractual Option identified in the

Division 1 Specification Section that will be executed to start the Construction Phase Services.

For this procurement, the CMc Contractor shall submit proposed pricing for the Design Phase

Services (Base) and Construction Phase Services (Option) for the Option 3A/ Alternative 3A –

Air-to-Water Heat Pumps with Gas Boilers scope only. Construction Phase Services Pricing for other identified Options is also not required.