Report_Lead_Sch B_Site 2.pdf
PDF 2 MB Posted
- Attached to
- Landslide Repairs - East Region Contract 1
- Solicitation number
- 693C73-21-B-000012
About this file
This document includes a lead-based paint inspection report and details of a related federal contract opportunity. The lead-based paint inspection report documents testing conducted at a landslide site located at PR-1 Km. 61.8 in Cayey, Puerto Rico. The inspection found no lead-based paint above regulatory levels.
The related federal contract opportunity is solicitation number 693C73-21-B-000012 from the Department of Transportation Federal Highway Administration to repair landslides and washouts damaged by hurricanes in Puerto Rico. The Landslide Repairs - East Region Contract 1 project will repair locations on PR-3 Km 69.3-70.6, PR-1 km 61.8, and PR-909 km 5.55, and includes gabion basket walls, marine gabions, a mechanically stabilized earth wall, excavation, pavement, erosion control and other work. The solicitation is for small business concerns only and the total project cost is estimated between $1-5 million. The bid due date will be specified in Block 13a of the solicitation.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEAD BASED PAINT INSPECTION REPORT
FOR
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
SAMPLING CONDUCTED AT
PROJECT: LANDSLIDE AND ROAD DAMAGE EVALUATION AND
REPAIR RECOMMENDATIONS
AC-805544
PR-1 KM. 61.8 CAYEY, PR
ZEM-19122
MAY, 2019
PREPARED BY:
ZIMMETRY ENVIRONMENTAL MANAGEMENT CORP.
PO BOX 3545 BAYAMÓN, PR 00958
PHONE: 787.995.0005
WWW.ZIMMETRY.COM
INFO@ZIMMETRY.COM
Lead Based Paint Inspection
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
TABLE OF CONTENT
SECTION 1: Executive Summary
1.1 Introduction
1.2 Summary of Property Evaluation
SECTION 2: LEAD-BASED PAINT INSPECTION REPORT Summary
2.1 Overview of the Evaluation Summary
2.2 Sampling Procedure and Results Presentation
2.3 Conditions and Limitations
2.4 Environmental Assessment Report Certification
SECTION 3: APPENDICES
Appendix A: XRF Sampling Data
Appendix B: Certifications, Licenses, and Accreditations
Appendix C: XRF’s Performance Characteristics Sheet
Appendix D: Project Photograph
Appendix E: Location Plan
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
SECTION 1: EXECUTIVE SUMMARY
1.1 INTRODUCTION
A Lead-Based Paint inspection was conducted on May 22, 2019 at the landslide located at, PR-1, Km. 61.80, Cayey, Puerto Rico as part of Group-A: ER-HWY-2, Landslide and Road Damage Evaluation and Repair Recommendations project. The lead-based paint inspection was performed to identify paint that contains lead above allowable levels and to assist with the compliance of local, state and federal regulations.
1.2 SUMMARY OF PROPERTY EVALUATION
The project consisted in the evaluation of the areas of the aforementioned project. The evaluation found that no lead-based paint above the regulatory levels were present through the road on the date of the evaluation. The landslide is located in the Global Positioning System (GPS) in Lat.: 18.1031, Long.: -66.1842
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
SECTION 2: LEAD-BASED PAINT INSPECTION REPORT
2.1 OVERVIEW OF THE EVALUATION
This lead-based paint inspection is an investigation to identify all lead-based paint on a surface-by-surface basis. A lead-based paint inspection conforming to HUD guidelines was performed at the landslide.
Averages of 35 samples were taken at all identified surfaces on the day of the evaluation using X-ray fluorescence (XRF) analyzer. The evaluation found that no lead-based paint above the regulatory levels were present through the site on the date of the evaluation.
Some of the remaining XRF test locations exhibited lead-in-paint levels below the level that EPA identifies as lead-based paint, namely 1.0 mg/cm2. Such surfaces could create dust-lead or soil-lead hazards if the paint is turned into dust by abrasion, scraping, or sanding. Should these or any lead containing components or surfaces be disturbed in any manner that generates dust, care should be taken to limit its spread.
Testing was performed by Joanne Negrón, state-certified inspector 6264-0319-LI-007, using the Niton XLp-300A XRF, SN-101222. The credentials are provided in Section 3, Appendix B: Certifications, Licenses, and Accreditations. The XRF analyzer is designed to measure the lead content of surface coatings on a variety of building surfaces, substrates, and components. The measurement is rapid and nondestructive and, according to the manufacturer, is capable of detecting lead concentrations that occur within numerous layers of various surface coatings.
Please refer to the XRF Testing Results Section 3, Appendix A: XRF Sampling Data for the detailed analytical testing results for each distinct area inspected. The reports provide a complete testing data.
2.2 SAMPLING PROCEDURE AND RESULTS PRESENTATION
The Lead Based Paint Sampling Procedure was design to evaluate and document all the data obtained form the inspection in a sequential method that provided confidence at the moment of the results presentation.
The survey was performed following the methodology established in the HUD Guidelines for the Evaluation and Control of Lead Based Paint in Housing (2012 revision) and the PREQB Lead Based Paint Abatement Control Regulation. The surfaces evaluation was performed as follows:
If the lead concentration measured by the XRF Spectrum Analyzer is less than 1.0 mg/cm2 it is considered negative
If the lead concentration measured by the XRF Spectrum Analyzer is equal or greater than 1.0 mg/cm2 it is considered positive.
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
2.3 CONDITIONS AND LIMITATIONS—DISCLAIMER
Zimmetry Environmental Management Corp. has performed this lead-based paint inspection in a thorough and professional manner consistent with commonly accepted industry standards. The Preparer cannot guarantee and does not warrant that this evaluation has identified all adverse environmental factors and/or conditions affecting this property on the date of the evaluation.
The results reported and conclusions reached by the Preparer are solely for the benefit of the Owner. The results and opinions in this report, based solely on the conditions found at the property on the date of the evaluation, are valid only on that date. The Preparer assumes no obligation to advise the client of any changes in any real or potential lead-based paint hazards at this residence beyond the date of the property evaluation.
2.4 ENVIRONMENTAL ASSESSMENT REPORT CERTIFICATION
Zimmetry Environmental Management Corp. has performed this lead-based paint inspection in a thorough and professional manner consistent with commonly accepted industry standards. The inspection was conducted on May 22, 2019 by Joanne Negrón, state-certified inspector 6264-0319-LI-007, qualified by experience, education and training in the recognition of lead based paint and approved sampling techniques using the Niton XLp-300A
XRF, SN-101222.
Joanne Negron, MSEM Environmental Risk Assessor
Joanne Joanne
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
SECTION 3: APPENDICES
Appendix A: XRF Sampling Data
Appendix B: Certifications, Licenses, and Accreditations
Appendix C: XRF’s Performance Characteristics Sheet
Appendix D: Project Photograph
Appendix E: Location Plan
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
APPENDIX A: XRF SAMPLING DATA
PROJECT:
DATE: 5/22/2019 Page 1 of 1 Sample
ID.
Functional Space Location Color Subst. XRF Reading Pos/Neg Comments
1 Calibration 1.00 2 Calibration 1.00 3 Calibration 1.00 4 Km 61.80 Guardrail Yellow Metal 0.00 Negative 5 Km 61.80 Pavement Marking White Concrete 0.00 Negative 6 Km 61.80 Module 1 Yellow Concrete 0.00 Negative 7 Km 61.80 Module 1 Yellow Concrete 0.02 Negative 8 Km 61.80 Module 2 Yellow Concrete 0.01 Negative 9 Km 61.80 Module 2 Yellow Concrete 0.06 Negative
10 Km 61.80 Pavement Marking Yellow Concrete 0.01 Negative 11 Km 61.85 Pavement Marking White Concrete 0.00 Negative 12 Km 61.85 Pavement Marking White Concrete 0.00 Negative 13 Km 61.85 Module 1 Yellow Concrete 0.00 Negative 14 Km 61.85 Module 2 Yellow Concrete 0.00 Negative 15 Km 61.85 Module 3 Yellow Concrete 0.02 Negative 16 Km 61.85 Module 4 Yellow Concrete 0.01 Negative 17 Km 61.85 Module 5 Yellow Concrete 0.03 Negative 18 Km 61.85 Module 6 Yellow Concrete 0.01 Negative 19 Km 61.85 Guardrail Yellow Metal 0.00 Negative 20 Km 61.85 Guardrail White Metal 0.00 Negative 21 Km 61.85 West Side Module Yellow Concrete 0.20 Negative 22 Km 61.7 West Side Module Yellow Concrete 0.10 Negative 23 Km 61.9 Bollard 1 White Metal 0.00 Negative 24 Km 61.9 Bollard 2 White Metal 0.00 Negative 25 Km 61.9 Bollard 3 White Metal 0.00 Negative 26 Km 61.9 Bollard 4 White Metal 0.00 Negative 27 Km 61.9 Toilet Debris White Ceramic 0.00 Negative 28 Km 61.9 Floor Brown Concrete 0.00 Negative 29 Km 61.9 Debris Blue Wood 0.00 Negative 30 Km 61.9 Debris Pink Wood 0.00 Negative 31 Km 61.9 Debris White Wood 0.00 Negative 32 Km 61.9 Pavement Marking Yellow Concrete 0.00 Negative 33 Calibration 1.00 34 Calibration 1.00 35 Calibration 1.00
CLIENT: PR Highway & Transportation Authority
LBP Inspector: Joanne Negron
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
APPENDIX B: CERTIFICATIONS, LICENSES, AND
ACCREDITATIONS
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
APPENDIX B: CERTIFICATIONS, LICENSES, AND
ACCREDITATIONS
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
APPENDIX C: XRF’s PERFORMANCE CHARACTERISTICS
SHEET
Niton XLp 300, 9/24/2004, ed. 1
Performance Characteristic Sheet
EFFECTIVE DATE: September 24, 2004 EDITION NO.: 1
MANUFACTURER AND MODEL:
Make: Niton LLC Tested Model: XLp 300 Source: 109Cd Note: This PCS is also applicable to the equivalent model variations indicated below, for the Lead-in-Paint K+L variable reading time mode, in the XLi and XLp series:
XLi 300A, XLi 301A, XLi 302A and XLi 303A.
XLp 300A, XLp 301A, XLp 302A and XLp 303A.
XLi 700A, XLi 701A, XLi 702A and XLi 703A.
XLp 700A, XLp 701A, XLp 702A, and XLp 703A.
Note: The XLi and XLp versions refer to the shape of the handle part of the instrument. The differences in the model numbers reflect other modes available, in addition to Lead-in- Paint modes. The manufacturer states that specifications for these instruments are identical for the source, detector, and detector electronics relative to the Lead-in-Paint mode.
FIELD OPERATION GUIDANCE
OPERATING PARAMETERS:
Lead-in-Paint K+L variable reading time mode.
XRF CALIBRATION CHECK LIMITS:
0.8 to 1.2 mg/cm2 (inclusive)
The calibration of the XRF instrument should be checked using the paint film nearest 1.0 mg/cm2 in the NIST Standard Reference Material (SRM) used (e.g., for NIST SRM 2579, use the 1.02 mg/cm2 film).
If readings are outside the acceptable calibration check range, follow the manufacturer's instructions to bring the instruments into control before XRF testing proceeds.
SUBSTRATE CORRECTION:
For XRF results using Lead-in-Paint K+L variable reading time mode, substrate correction is not needed for:
Brick, Concrete, Drywall, Metal, Plaster, and Wood
INCONCLUSIVE RANGE OR THRESHOLD:
K+L MODE
READING DESCRIPTION
SUBSTRATE THRESHOLD
(mg/cm2)
Results not corrected for substrate bias on any substrate
Brick Concrete Drywall Metal
Plaster Wood
1.0 1.0 1.0 1.0 1.0 1.0
BACKGROUND INFORMATION
EVALUATION DATA SOURCE AND DATE:
This sheet is supplemental information to be used in conjunction with Chapter 7 of the HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing ("HUD Guidelines"). Performance parameters shown on this sheet are calculated from the EPA/HUD evaluation using archived building components. Testing was conducted in August 2004 on 133 testing combinations. The instruments that were used to perform the testing had new sources; one instrument’s was installed in November 2003 with 40 mCi initial strength, and the other’s was installed June 2004 with 40 mCi initial strength.
OPERATING PARAMETERS:
Performance parameters shown in this sheet are applicable only when properly operating the instrument using the manufacturer's instructions and procedures described in Chapter 7 of the HUD Guidelines.
SUBSTRATE CORRECTION VALUE COMPUTATION:
Substrate correction is not needed for brick, concrete, drywall, metal, plaster or wood when using Lead-in- Paint K+L variable reading time mode, the normal operating mode for these instruments. If substrate correction is desired, refer to Chapter 7 of the HUD Guidelines for guidance on correcting XRF results for substrate bias.
EVALUATING THE QUALITY OF XRF TESTING:
Randomly select ten testing combinations for retesting from each house or from two randomly selected units in multifamily housing. Use the K+L variable time mode readings.
Conduct XRF retesting at the ten testing combinations selected for retesting.
Determine if the XRF testing in the units or house passed or failed the test by applying the steps below.
Compute the Retest Tolerance Limit by the following steps:
Determine XRF results for the original and retest XRF readings. Do not correct the original or retest results for substrate bias. In single-family housing a result is defined as the average of three readings. In multifamily housing, a result is a single reading.
Therefore, there will be ten original and ten retest XRF results for each house or for the two selected units.
Calculate the average of the original XRF result and retest XRF result for each testing combination.
Square the average for each testing combination.
Add the ten squared averages together. Call this quantity C.
Multiply the number C by 0.0072. Call this quantity D.
Add the number 0.032 to D. Call this quantity E.
Take the square root of E. Call this quantity F.
Multiply F by 1.645. The result is the Retest Tolerance Limit.
Compute the average of all ten original XRF results.
Compute the average of all ten re-test XRF results.
Find the absolute difference of the two averages.
If the difference is less than the Retest Tolerance Limit, the inspection has passed the retest. If the difference of the overall averages equals or exceeds the Retest Tolerance Limit, this procedure should be repeated with ten new testing combinations. If the difference of the overall averages is equal to or greater than the Retest Tolerance Limit a second time, then the inspection should be considered deficient.
Use of this procedure is estimated to produce a spurious result approximately 1% of the time. That is, results of this procedure will call for further examination when no examination is warranted in approximately 1 out of 100 dwelling units tested.
TESTING TIMES:
For the Lead-in-Paint K+L variable reading time mode, the instrument continues to read until it is moved away from the testing surface, terminated by the user, or the instrument software indicates the reading is complete. The following table provides testing time information for this testing mode. The times have been adjusted for source decay, normalized to the initial source strengths as noted above. Source strength and type of substrate will affect actual testing times. At the time of testing, the instruments had source strengths of 26.6 and 36.6 mCi.
Testing Times Using K+L Reading Mode (Seconds)
All Data Median for laboratory-measured lead levels (mg/cm2)
Substrate 25th Percentile
Median 75th Percentile
Pb < 0.25 0.25 < Pb<1.0 1.0 < Pb
Wood Drywall
4 11 19 11 15 11
Metal
4 12 18 9 12 14
Brick Concrete Plaster
8 16 22 15 18 16
CLASSIFICATION RESULTS:
XRF results are classified as positive if they are greater than or equal to the threshold, and negative if they are less than the threshold.
DOCUMENTATION:
A document titled Methodology for XRF Performance Characteristic Sheets provides an explanation of the statistical methodology used to construct the data in the sheets, and provides empirical results from using the recommended inconclusive ranges or thresholds for specific XRF instruments. For a copy of this document call the National Lead Information Center Clearinghouse at 1-800-424-LEAD.
This XRF Performance Characteristic Sheet was developed by the Midwest Research Institute (MRI) and QuanTech, Inc., under a contract between MRI and the XRF manufacturer. HUD has determined that the information provided here is acceptable when used as guidance in conjunction with Chapter 7, Lead-Based Paint Inspection, of HUD’s Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing.
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
Photographic documentation is for reference purposes and doesn't necessarily include all the surfaces with lead based paint and/or components containing lead
APPENDIX D: PROJECT PHOTOGRAPHS
PR-1 Km.61.70 thru 61.90, Cayey, PR
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
Photographic documentation is for reference purposes and doesn't necessarily include all the surfaces with lead based paint and/or components containing lead
APPENDIX D: PROJECT PHOTOGRAPHS
ER-HWY-2 PR-1 Km.61.8 Cayey, PR
APPENDIX E: LOCATION PLAN
© 2018 Microsoft Corporation © 2018 HERE
P.R.
F I L E
N
A M
E
AC. PROJECT
PROJECT NO.
FED AID H'WAY
CODE NO.
MUNICIPALITY
ISLAND
SHEET
YEAR
FISCAL
NO.
TOTAL
SHEETS
- CAYEY 2018
8AC-805544
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I N
I T
I A
L S
S T
E P
S D
A T
E
F I N
A L
C
H E
C K
B
Y
T R
A C
D
HIGHWAY
PR-1 1
Meters
AutoCAD SHX Text
LOCATION PLAN
AutoCAD SHX Text
AUTHORITY
AutoCAD SHX Text
HIGHWAY & TRANSPORTATION
AutoCAD SHX Text
COMMONWEALTH OF PUERTO RICO
AutoCAD SHX Text
DESIGN AREA
AutoCAD SHX Text
AND PUBLIC WORKS
AutoCAD SHX Text
DEPARTMENT OF TRANSPORTATION
AutoCAD SHX Text
COMMONWEALTH OF PUERTO RICO
AutoCAD SHX Text A
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text Y
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text Y
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text
APPROVAL DATE BY PRHTA
AutoCAD SHX Text 3.
AutoCAD SHX Text 2.
AutoCAD SHX Text 1.
AutoCAD SHX Text
DESCRIBE THE EXCEPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SUBMITTED:
AutoCAD SHX Text
DIRECTOR, TRAFFIC ENGINEERING
AutoCAD SHX Text
EDUARDO F. RUIZ VELEZ
AutoCAD SHX Text
LISSETTE LUGO COLON
AutoCAD SHX Text
DIRECTOR, CONSTRUCTION AREA
AutoCAD SHX Text
JAIME LAFUENTE GONZALEZ
AutoCAD SHX Text
DIRECTOR, DESIGN AREA
AutoCAD SHX Text
AND OPERATIONS AREA
AutoCAD SHX Text
RECOMMENDED AND APPROVED:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DIRECTOR, PROGRAMMING
AutoCAD SHX Text
ALEXANDRA VELAZQUEZ DELGADO
AutoCAD SHX Text
AND SPECIAL STUDIES AREA
AutoCAD SHX Text
DATE
AutoCAD SHX Text
EXECUTIVE DIRECTOR
AutoCAD SHX Text
CARLOS M. CONTRERAS APONTE
AutoCAD SHX Text
DIRECTOR, ESTIMATES AND BIDS OFFICE
AutoCAD SHX Text
CARLOS LLOVERAS MATTEI
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE = 1:20,000
AutoCAD SHX Text
GENERAL DESIGN CRITERIA
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text "ALL WORK ON THIS PROJECT SHALL BE PERFORMED AND ALL WORK ON THIS PROJECT SHALL BE PERFORMED AND ALL WORK ON THIS PROJECT SHALL BE PERFORMED AND ALL ON THIS PROJECT SHALL BE PERFORMED AND ALL ON THIS PROJECT SHALL BE PERFORMED AND ALL THIS PROJECT SHALL BE PERFORMED AND ALL THIS PROJECT SHALL BE PERFORMED AND ALL PROJECT SHALL BE PERFORMED AND ALL PROJECT SHALL BE PERFORMED AND ALL SHALL BE PERFORMED AND ALL SHALL BE PERFORMED AND ALL BE PERFORMED AND ALL BE PERFORMED AND ALL PERFORMED AND ALL PERFORMED AND ALL AND ALL AND ALL ALL ALL MATERIALS SHALL BE IN STRICT ACCORDANCE WITH THE STANDARD SHALL BE IN STRICT ACCORDANCE WITH THE STANDARD SHALL BE IN STRICT ACCORDANCE WITH THE STANDARD BE IN STRICT ACCORDANCE WITH THE STANDARD BE IN STRICT ACCORDANCE WITH THE STANDARD IN STRICT ACCORDANCE WITH THE STANDARD IN STRICT ACCORDANCE WITH THE STANDARD STRICT ACCORDANCE WITH THE STANDARD STRICT ACCORDANCE WITH THE STANDARD ACCORDANCE WITH THE STANDARD ACCORDANCE WITH THE STANDARD WITH THE STANDARD WITH THE STANDARD THE STANDARD THE STANDARD STANDARD STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND GENERAL FOR ROAD AND BRIDGE CONSTRUCTION AND GENERAL FOR ROAD AND BRIDGE CONSTRUCTION AND GENERAL ROAD AND BRIDGE CONSTRUCTION AND GENERAL ROAD AND BRIDGE CONSTRUCTION AND GENERAL AND BRIDGE CONSTRUCTION AND GENERAL AND BRIDGE CONSTRUCTION AND GENERAL BRIDGE CONSTRUCTION AND GENERAL BRIDGE CONSTRUCTION AND GENERAL CONSTRUCTION AND GENERAL CONSTRUCTION AND GENERAL AND GENERAL AND GENERAL GENERAL GENERAL PROVISIONS APPROVED BY THE PUERTO RICO HIGHWAY AND APPROVED BY THE PUERTO RICO HIGHWAY AND APPROVED BY THE PUERTO RICO HIGHWAY AND BY THE PUERTO RICO HIGHWAY AND BY THE PUERTO RICO HIGHWAY AND THE PUERTO RICO HIGHWAY AND THE PUERTO RICO HIGHWAY AND PUERTO RICO HIGHWAY AND PUERTO RICO HIGHWAY AND RICO HIGHWAY AND RICO HIGHWAY AND HIGHWAY AND HIGHWAY AND AND AND TRANSPORTATION AUTHORITY IN 2005 AND SUBSEQUENT AMENDMENTS IN AUTHORITY IN 2005 AND SUBSEQUENT AMENDMENTS IN AUTHORITY IN 2005 AND SUBSEQUENT AMENDMENTS IN IN 2005 AND SUBSEQUENT AMENDMENTS IN IN 2005 AND SUBSEQUENT AMENDMENTS IN 2005 AND SUBSEQUENT AMENDMENTS IN 2005 AND SUBSEQUENT AMENDMENTS IN AND SUBSEQUENT AMENDMENTS IN AND SUBSEQUENT AMENDMENTS IN SUBSEQUENT AMENDMENTS IN SUBSEQUENT AMENDMENTS IN AMENDMENTS IN AMENDMENTS IN IN IN EFFECT AT THE TIME OF BIDDING, WITH THE STANDARD DRAWINGS, WITH AT THE TIME OF BIDDING, WITH THE STANDARD DRAWINGS, WITH AT THE TIME OF BIDDING, WITH THE STANDARD DRAWINGS, WITH THE TIME OF BIDDING, WITH THE STANDARD DRAWINGS, WITH THE TIME OF BIDDING, WITH THE STANDARD DRAWINGS, WITH TIME OF BIDDING, WITH THE STANDARD DRAWINGS, WITH TIME OF BIDDING, WITH THE STANDARD DRAWINGS, WITH OF BIDDING, WITH THE STANDARD DRAWINGS, WITH OF BIDDING, WITH THE STANDARD DRAWINGS, WITH BIDDING, WITH THE STANDARD DRAWINGS, WITH BIDDING, WITH THE STANDARD DRAWINGS, WITH WITH THE STANDARD DRAWINGS, WITH WITH THE STANDARD DRAWINGS, WITH THE STANDARD DRAWINGS, WITH THE STANDARD DRAWINGS, WITH STANDARD DRAWINGS, WITH STANDARD DRAWINGS, WITH DRAWINGS, WITH DRAWINGS, WITH WITH WITH THESE PLAN AND WITH ALL SPECIAL PROVISIONS AND INSTRUCTIONS PLAN AND WITH ALL SPECIAL PROVISIONS AND INSTRUCTIONS PLAN AND WITH ALL SPECIAL PROVISIONS AND INSTRUCTIONS AND WITH ALL SPECIAL PROVISIONS AND INSTRUCTIONS AND WITH ALL SPECIAL PROVISIONS AND INSTRUCTIONS WITH ALL SPECIAL PROVISIONS AND INSTRUCTIONS WITH ALL SPECIAL PROVISIONS AND INSTRUCTIONS ALL SPECIAL PROVISIONS AND INSTRUCTIONS ALL SPECIAL PROVISIONS AND INSTRUCTIONS SPECIAL PROVISIONS AND INSTRUCTIONS SPECIAL PROVISIONS AND INSTRUCTIONS SPECIAL PROVISIONS AND INSTRUCTIONS PROVISIONS AND INSTRUCTIONS PROVISIONS AND INSTRUCTIONS AND INSTRUCTIONS AND INSTRUCTIONS INSTRUCTIONS INSTRUCTIONS INCLUDED IN THE CONTRACT BOOK"
AutoCAD SHX Text
(YES OR NO)--
AutoCAD SHX Text
(LEVEL, ROLLING, MOUNTAINOUS)--
AutoCAD SHX Text
AutoCAD SHX Text (V)--
AutoCAD SHX Text (T)--
AutoCAD SHX Text (D)--
AutoCAD SHX Text
(DHV)--
AutoCAD SHX Text
(FUTURE, YEAR)--
AutoCAD SHX Text (2006)--
AutoCAD SHX Text
(FULL, PARTIAL, NONE)--
AutoCAD SHX Text
(PRHTA)--
AutoCAD SHX Text
(AASHTO)--
AutoCAD SHX Text
(PRHTA GENERAL DESIGN STANDARDS)--
AutoCAD SHX Text
AVERAGE DAILY TRAFFIC
AutoCAD SHX Text
DESIGN SPEED
AutoCAD SHX Text
MAXIMUM GRADE
AutoCAD SHX Text
TYPE OF TERRAIN
AutoCAD SHX Text
MINIMUM CURVE RADIUS--
AutoCAD SHX Text
MAXIMUM SUPERELEVATION--
AutoCAD SHX Text
DESIGN LOAD FOR STRUCTURES--
AutoCAD SHX Text
DESIGN EXCEPTION?
AutoCAD SHX Text
PERCENT OF TRUCK
AutoCAD SHX Text
DIRECTIONAL DISTRIBUTION
AutoCAD SHX Text
DESIGN HOURLY VOLUME
AutoCAD SHX Text
AVERAGE DAILY TRAFFIC
AutoCAD SHX Text
CONTROL OF ACCESS
AutoCAD SHX Text
FUNCTIONAL HIGHWAY CLASSIFICATION
AutoCAD SHX Text
FUNCTIONAL HIGHWAY CLASSIFICATION
AutoCAD SHX Text
DESIGN CLASS CODE
AutoCAD SHX Text
STRUCTURES DESIGN CODE--
AutoCAD SHX Text
HIGHWAY DESIGN CODE--
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text
PROJECT LENGTH
AutoCAD SHX Text
A C CODE NUMBER 805544
AutoCAD SHX Text
LANDSLIDE AND ROAD DAMAGE EVALUATION AND REPAIR RECOMMENDATIONS
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SCHEDULE OF DRAWINGS
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text
GR/1
AutoCAD SHX Text
GENERAL NOTES AND LEGENDS
AutoCAD SHX Text
GR/2
AutoCAD SHX Text
EXISTING CONDITIONS AND CONTROL STATIONS LOCATION
AutoCAD SHX Text
EX/1
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text
GROUP-A: ER-HWY-2, PR-1, K.M. 61.80, CAYEY, P.R.
AutoCAD SHX Text SHEET No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ENRIQUE BLANES PALMER - LIC. NO. 6416
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NET LENGTH OF PROJECT
AutoCAD SHX Text
0.075 Km. = = 0.047 Mi.
AutoCAD SHX Text G:\PROYECTOS\2018\LANDSLIDES_AC-805544\GROUP-A\ER-HWY-2-PR-1-CAYEY-KM-61.80\CIVIL\DWGSET\ALTERNATIVE #2\AC-805544-GR-1.DWG
AutoCAD SHX Text
SIGN AND GUARDRAIL DESIGN--
AutoCAD SHX Text
MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(MUTCD), 2009 EDITION, REV. 2
AutoCAD SHX Text
ACT STANDARD DRAWING "DIRECTRICES DE DISEÑO"
AutoCAD SHX Text
AASHTO ROADSIDE DESIGN GUIDE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL SECTIONS
AutoCAD SHX Text
GR/3
AutoCAD SHX Text
AutoCAD SHX Text
PP/1
AutoCAD SHX Text
GEOMETRICAL SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text
DR/1
AutoCAD SHX Text
EXISTING TOPOGRAPHY, PROPOSED GRADING AND STORM SEWER SYSTEM PLAN
AutoCAD SHX Text
AutoCAD SHX Text
RW/1
AutoCAD SHX Text
RETAINING WALL PROFILES
AutoCAD SHX Text
AutoCAD SHX Text
CS/1
AutoCAD SHX Text
CROSS SECTIONS
AutoCAD SHX Text
AutoCAD SHX Text
CAYEY
AutoCAD SHX Text
TECHNICAL REPORT - ALTERNATIVE 2
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
W
W
W
T
E
L
T
E
L
T E
L
W
W
W
W
W
T
E
L
T
E
L
W
STA-B3
STA-B1
STA-B2
EXISTING CONDITIONS AND
CONTROL STATIONS LOCATION
EX
Meters
SCALE: 1:400m
AutoCAD SHX Text
KM
AutoCAD SHX Text
KM
AutoCAD SHX Text
KM
AutoCAD SHX Text B2.2
AutoCAD SHX Text B2.1
AutoCAD SHX Text
TEL
AutoCAD SHX Text
GUARD-RAIL
AutoCAD SHX Text
ASPHALT & TRAFFIC-LINE
AutoCAD SHX Text
ASPHALT & TRAFFIC-LINE
AutoCAD SHX Text
GUARD-RAIL
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
ASPHALT & TRAFFIC-LINE
AutoCAD SHX Text
GUARD-RAIL
AutoCAD SHX Text
AT&T BOX
AutoCAD SHX Text
(2)CONCRETE BARRIER
AutoCAD SHX Text
CONCRETE WALL
AutoCAD SHX Text
EARTH SLIDE PILED AREA
AutoCAD SHX Text
GUARD RAIL
AutoCAD SHX Text
CONCRETE BARRIER
AutoCAD SHX Text
GUTTER SPILLWAY
AutoCAD SHX Text
GUARD-RAIL
AutoCAD SHX Text
ASPHALT AREA
AutoCAD SHX Text
(4)BOLLARDS
AutoCAD SHX Text
GUTTER
AutoCAD SHX Text
GUARD-RAIL
AutoCAD SHX Text
CURB
AutoCAD SHX Text
GUARD-RAIL
AutoCAD SHX Text
CURB & GUTTER
AutoCAD SHX Text
TRAFFIC LINE
AutoCAD SHX Text K.M. 61.9
AutoCAD SHX Text
GUTTER
AutoCAD SHX Text
GUTTER
AutoCAD SHX Text
GUTTER
AutoCAD SHX Text
ASPHALT SLIDE AREA
AutoCAD SHX Text
ASPHALT SLIDE AREA
AutoCAD SHX Text
GUTTER
AutoCAD SHX Text
GUTTER
AutoCAD SHX Text
GUTTER
AutoCAD SHX Text
CONCRETE BARRIER
AutoCAD SHX Text
TO CAGUAS
AutoCAD SHX Text
CONCRETE BARRIER
AutoCAD SHX Text
CONCRETE BARRIER
AutoCAD SHX Text
WATER-LINE PAINT LOCATION
AutoCAD SHX Text
WATER LINE SUE STUDY ENDS
AutoCAD SHX Text
TELEPHONE LINE PAINT LOCATION
AutoCAD SHX Text
TELEPHONE LINE PAINT LOCATION
AutoCAD SHX Text
TELEPHONE LINE SUE STUDY ENDS
AutoCAD SHX Text
WATER LINE SUE STUDY ENDS
AutoCAD SHX Text
ASPHALT EDGE & TRAFFIC-LINE
AutoCAD SHX Text K.M. 61.7
AutoCAD SHX Text
ASPHALT EDGE & TRAFFIC-LINE
AutoCAD SHX Text
ASPHALT EDGE & TRAFFIC-LINE
AutoCAD SHX Text
ASPHALT EDGE & TRAFFIC-LINE
AutoCAD SHX Text K.M. 61.8
AutoCAD SHX Text
GUY-WIRE
AutoCAD SHX Text
GUY-WIRE
AutoCAD SHX Text
TO AIBONITO
AutoCAD SHX Text
STATE ROAD PR-1
AutoCAD SHX Text
STATE ROAD PR-1
AutoCAD SHX Text E 226250
AutoCAD SHX Text E 226300
AutoCAD SHX Text E 226350
AutoCAD SHX Text E 226400
AutoCAD SHX Text E 226450
AutoCAD SHX Text N 229900
AutoCAD SHX Text N 229850
AutoCAD SHX Text E 226250
AutoCAD SHX Text N 229800
AutoCAD SHX Text N 229750
AutoCAD SHX Text E 226300
AutoCAD SHX Text E 226350
AutoCAD SHX Text E 226400
AutoCAD SHX Text E 226450
AutoCAD SHX Text N 229750
AutoCAD SHX Text N 229800
AutoCAD SHX Text N 229850
AutoCAD SHX Text N 229900
AutoCAD SHX Text
REFLECTOR AREA
AutoCAD SHX Text
REFLECTOR AREA
AutoCAD SHX Text
WATER-LINE PAINT LOCATION
AutoCAD SHX Text
DAVID RIVERA REYES
AutoCAD SHX Text
DAVID RIVERA REYES
AutoCAD SHX Text
AutoCAD SHX Text
DATE
AutoCAD SHX Text R E V I S I O N S
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
AC. PROJECT
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
FED AID H'WAY
AutoCAD SHX Text
CODE NO.
AutoCAD SHX Text
MUNICIPALITY
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
YEAR
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
NO.
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
FED CODE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text G:\PROYECTOS\2018\LANDSLIDES_AC-805544\GROUP-A\ER-HWY-2-PR-1-CAYEY-KM-61.80\CIVIL\DWGSET\AC-805544-EX-3.DWG
AutoCAD SHX Text
AC-805544
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FINAL CHECK BY
AutoCAD SHX Text
TRACED BY
AutoCAD SHX Text
PUERTO RICO HIGHWAY &
AutoCAD SHX Text
TRANSPORTATION AUTHORITY
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text P.R.
AutoCAD SHX Text
LANDSLIDE AND ROAD DAMAGE
AutoCAD SHX Text
GROUP-A: CAGUAS, CAYEY, HUMACAO, AND NAGUABO, PUERTO RICO
AutoCAD SHX Text
EVALUATION AND REPAIR RECOMMENDATIONS
AutoCAD SHX Text
CAYEY
AutoCAD SHX Text
PR-1
AutoCAD SHX Text
CONTROL STATIONS
AutoCAD SHX Text
STATION
AutoCAD SHX Text
COORDINATES
AutoCAD SHX Text
NORTHING
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
EASTING
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
STA-B1
AutoCAD SHX Text 229913.5746
AutoCAD SHX Text 473.52
AutoCAD SHX Text 226335.7114
AutoCAD SHX Text
GUN-NAIL W/WASHER
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
1. FOR GENERAL NOTES, LEGEND & ABBREVIATIONS INFORMATION, PLEASE REFER TO DWG. GR-2.
AutoCAD SHX Text
STA-B2
AutoCAD SHX Text 229867.6989
AutoCAD SHX Text 469.67
AutoCAD SHX Text 226369.7291
AutoCAD SHX Text
STA-B3
AutoCAD SHX Text 229912.7756
AutoCAD SHX Text 475.97
AutoCAD SHX Text 226293.7207
AutoCAD SHX Text
GUN-NAIL W/WASHER
GUN-NAIL W/WASHER
STA-B3
STA-B1
STA-B2
* GRAPHIC SCALE *
SCALE = 1:200
F I L
E
N
A M
E
AC. PROJECT
PROJECT NO.
FED AID H'WAY
CODE NO.
MUNICIPALITY
ISLAND
SHEET
YEAR
FISCAL
NO.
TOTAL
SHEETS
- 2018 -
AC-805544
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I N
I T
I A
L S
S T
E P
S D
A T
E
F I N
A L
C
H E
T R
A C
HIGHWAY
P.R.
PR-1 CAYEY
AutoCAD SHX Text
KM
AutoCAD SHX Text B2.2
AutoCAD SHX Text B2.1
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TO AIBONITO
AutoCAD SHX Text E 226300
AutoCAD SHX Text E 226350
AutoCAD SHX Text E 226400
AutoCAD SHX Text N O R T H
AutoCAD SHX Text
NEW CURB TO MATCH
AutoCAD SHX Text
TO EXISTING EDGE
AutoCAD SHX Text
EXISTING EDGE TO REMAIN
AutoCAD SHX Text 2.13%%%
AutoCAD SHX Text 1.40%%%
AutoCAD SHX Text 1.82%%%
AutoCAD SHX Text 1.21%%%
AutoCAD SHX Text 1.82%%%
AutoCAD SHX Text 1.40%%%
AutoCAD SHX Text
PROPOSED GUARD RAIL (BEGINS) STA.0+25.1000(1) 6.500 RT
AutoCAD SHX Text
PROPOSED GUARD RAIL (ENDS) STA.0+66.5360(1) 10.300 RT
AutoCAD SHX Text R.O.W.
AutoCAD SHX Text R.O.W.
AutoCAD SHX Text
STATE ROAD PR-1
AutoCAD SHX Text
DAVID RIVERA REYES
AutoCAD SHX Text
DAVID RIVERA REYES
AutoCAD SHX Text
STATE ROAD PR-1
AutoCAD SHX Text
PROPOSED CURB TYPE "D" (ENDS) STA.0+75.1600(1) 5.747 RT
AutoCAD SHX Text
PROPOSED CURB TYPE "D" (BEGINS) STA.0+21.2150(1) 5.747 RT
AutoCAD SHX Text
PROPOSED SIERRA ESCAPE RETAINING WALL (BEGIN) STA.0+31.8640(1)
AutoCAD SHX Text
PROPOSED CONCRETE BARRIER TYPE "B" (END) STA.0+54.3150(1) 8.0800 RT
AutoCAD SHX Text
PROPOSED CONCRETE BARRIER TYPE"B" (BEGIN) STA.0+31.8640(1) 6.5800 RT
AutoCAD SHX Text
PROPOSED SIERRA ESCAPE RETAINING WALL (END) STA.0+54.3150(1)
AutoCAD SHX Text
GEOMETRICAL SITE PLAN
AutoCAD SHX Text
PP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ALTERNATIVE 2
AutoCAD SHX Text
DATE
AutoCAD SHX Text R E V I S I O N S
AutoCAD SHX Text G:\PROYECTOS\2018\LANDSLIDES_AC-805544\GROUP-A\ER-HWY-2-PR-1-CAYEY-KM-61.80\CIVIL\DWGSET\ALTERNATIVE #2\2A-AC-805544-PP.DWG
AutoCAD SHX Text
PUERTO RICO HIGHWAY &
AutoCAD SHX Text
TRANSPORTATION AUTHORITY
AutoCAD SHX Text
EVALUATION AND REPAIR RECOMMENDATIONS
AutoCAD SHX Text
LANDSLIDE AND ROAD DAMAGE
GROUP-A: CAGUAS, CAYEY, HUMACAO AND NAGUABO, PUERTO RICO
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
W
W
W
W
W
W
W
W
W
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T
E
L
T E
L
T E
L
T E
L
W
W
W
W
W
W
W
W
W
W
W
T
E
L
T
E
L
T
E
L
T
E
L
W
W
W
F I L
E
N
A M
E
AC. PROJECT
PROJECT NO.
FED AID H'WAY
CODE NO.
MUNICIPALITY
ISLAND
SHEET
YEAR
FISCAL
NO.
TOTAL
SHEETS
- 2018 -
AC-805544
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I N
I T
I A
L S
S T
E P
S D
A T
E
F I N
A L
C
H E
T R
A C
HIGHWAY
P.R.
PR-1 CAYEY
* GRAPHIC SCALE *
SCALE = 1:200
0 10
AutoCAD SHX Text
KM
AutoCAD SHX Text B2.2
AutoCAD SHX Text B2.1
AutoCAD SHX Text
TEL
AutoCAD SHX Text E 226300
AutoCAD SHX Text E 226350
AutoCAD SHX Text E 226400
AutoCAD SHX Text E 226450
AutoCAD SHX Text N 229850
AutoCAD SHX Text N 229900
AutoCAD SHX Text 2.13%%%
AutoCAD SHX Text 1.40%%%
AutoCAD SHX Text 1.82%%%
AutoCAD SHX Text 1.21%%%
AutoCAD SHX Text 1.82%%%
AutoCAD SHX Text 1.40%%%
AutoCAD SHX Text
PROPOSED SIERRA ESCAPE RETAINING WALL (BEGIN) STA.0+31.8640(1)
AutoCAD SHX Text
PROPOSED CONCRETE BARRIER TYPE "B" (END) STA.0+54.3150(1) 8.0800 RT
AutoCAD SHX Text
PROPOSED CONCRETE BARRIER TYPE"B" (BEGIN) STA.0+31.8640(1) 6.5800 RT
AutoCAD SHX Text
PROPOSED SIERRA ESCAPE RETAINING WALL (END) STA.0+54.3150(1)
AutoCAD SHX Text
PROPOSED GUARD RAIL (BEGINS) STA.0+25.1000(1) 6.500 RT
AutoCAD SHX Text
PROPOSED GUARD RAIL (ENDS) STA.0+66.5360(1) 10.300 RT
AutoCAD SHX Text
PROPOSED CURB TYPE "D" (ENDS) STA.0+75.1600(1) 5.747 RT
AutoCAD SHX Text
PROPOSED CURB TYPE "D" (BEGINS) STA.0+21.2150(1) 5.747 RT
AutoCAD SHX Text
DATE
AutoCAD SHX Text R E V I S I O N S
AutoCAD SHX Text G:\PROYECTOS\2018\LANDSLIDES_AC-805544\GROUP-A\ER-HWY-2-PR-1-CAYEY-KM-61.80\CIVIL\DWGSET\ALTERNATIVE #2\2A-AC-805544-DS.DWG
AutoCAD SHX Text
PUERTO RICO HIGHWAY &
AutoCAD SHX Text
TRANSPORTATION AUTHORITY
AutoCAD SHX Text
EVALUATION AND REPAIR RECOMMENDATIONS
AutoCAD SHX Text
LANDSLIDE AND ROAD DAMAGE
AutoCAD SHX Text
GROUP-A: CAGUAS, CAYEY, HUMACAO AND NAGUABO, PUERTO RICO
AutoCAD SHX Text
DR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ALTERNATIVE 2
AutoCAD SHX Text
AND PROPOSED GRADING PLAN
EXISTING TOPOGRAPHY
| Cover |
| TOC |
| LBp Inspection |
| XRF Field Data |
| Appendix B |
| APPENDIX C PCS |
| Niton_XLp_300_PCS[1] |
| Appendix D Photo |
| Appendix E |
| DRAWINGS - ER-HWY-2 - PR-1,Km.61.8, Cayey_Alt 2 |
| GR-1 |
| Sheets and Views |
| GR-1 |
| EX-1 |
| Sheets and Views |
| EX-3 |
| PP-1 |
| Sheets and Views |
| Layout2 |
| DR-1 |
| Sheets and Views |
| DR |
File details come from the government source that posted it. Updated .