NEPA_Sch C_Site 463.pdf

PDF 18 MB Posted

Attached to
Landslide Repairs - East Region Contract 1
Solicitation number
693C73-21-B-000012
Issued by

About this file

This federal solicitation seeks bids from certified Small Business Concerns for landslide and washout repair work along several roads in Puerto Rico municipalities damaged by Hurricanes Irma and Maria. The project consists of constructing a gabion basket wall, marine gabions, a mechanically stabilized earth wall, excavation, pavement, erosion controls, and traffic controls. The work will be split into multiple schedules with a total expected cost between $1,000,000 and $5,000,000. Bids are due by the date specified in the solicitation to be issued on or around April 16, 2021. The contract award is contingent upon receiving Coastal Zone Management certification. Interested vendors must register on the System for Award Management website. Only registered small businesses should respond with bids by the specified due date.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMERGENCY RELIEF PROGRAM

LANDSLIDE CORRECTION PROJECT

AC-805544 ER-9999(314)

CATEGORICAL EXCLUSION

Puerto Rico Highway and Transportation Authority

Categorical Exclusion Action Classification Form

ER-HWY-463

PR-909, KM.5.55, HUMACAO, PR

Submitted to:

Environmental Studies Office

PO Box 42007

San Juan, PR 00940-2007

November 2019

Categorical Exclusion

Emergency Relief Program-Landslide Correction Project

ER-HWY-463, PR-909, km-5.55, Mariana Ward, Humacao, P.R.

Table of Contents Page

Puerto Rico Highway and Transportation Authority Categorical Exclusion Action Classification Form

I. General Information 3

II. Project Description 4

III. Purpose and Need 5

IV. Planning Consistency: 5

V. Proposed Improvements 6

VI. Environmental Issues Evaluated for the Proposed Action 10

VII. Environmental Commitments required for the proposed project 18

APPENDIXES

Appendix A Figures and Maps

Appendix B Detailed Damage Inspection Report (DDIR)

Appendix C USFWLS Coordination

Appendix D Proposed Project Plans

Appendix E SHPO Coordination

Appendix F Categorical Exclusion Checklist

Categorical Exclusion Action Classification Form

I. General Information

State Project No.: AC-805544 Federal Project: ER-9999 (314)

Project Name:

Emergency Relief Program- Landslide Correction Project

Route No: PR-909

From Milepost: 5.55

To Milepost: 5.6

Municipality: Humacao Length: 80 mts.

ROW Cost N/A Construction Cost: $234,509.55

Existing Facility

ROW Width: 15.00 mts.

No. Lanes & Width:

2 lanes (varies. ea) average 2.9 mts.

approx.

Shoulder Width: 0.0 mts.

Median: N/A

Overall Roadway Width Width:

5.39 mts. @ 6.04 mts.

mts.

Proposed Facility

ROW Width: 15.00 mts

No. Lanes & Width:

2 lanes (varies. ea) average 2.9 mts.

approx.

Shoulder Width: 0.0 mts.

Median: N/A

Overall Roadway Width: 6.97 mts.

II. Project Description (Included project scope and location and refer to the attached project location map)

The proposed Emergency Relief Program for Landslide project takes place at the kilometers 5.55 of the PR-909 in the Municipality of Humacao. (See in Appendix A, Figures 1: Location Map and Figure 2:

Proposed Project Aerial Photo). PR-909 is a collector road that goes from the intersection with PR-PR- 30/PR-3 in the Municipality of Humacao to the intersection with PR-908 at Humacao and Yabucoa municipal limits and has an estimated length of 6.60 kms. The road is a two-lane country road (one in each direction) with no median and shoulder. (See Figure3 – Proposed Project Typical Sections in Appendix A).

Site ER-463 presents one landslide located at the kilometers 5.55 affecting the road in an approximate 640 square meters. The areas were showed sliding of the roadside slope material reaching the pavement edge and taking the guardrails with it. The landslide at site ER-HWY-463 was prompted by the heavy rains associated with Hurricanes Irma and Maria. A Detailed Damage Inspection Report was prepared and approved by FHWA. Copy of the DDIR is included in Appendix B.

The proposed project works includes the followings activities:

1. Construction of a reinforced earth wall

2. Installation of a Rip-Rap Class III

3. Construction of new concrete curb Type F

4. Installation of a 18-inch reinforced concrete pipe Class III

5. Pavement rehabilitation (cold milling)

6. Replacement and installation of guardrails

7. Installation of safety concrete barriers

8. Construction of drainage features

9. Installation of new pavement markings (yellow and white)

10. Other miscellaneous works

Photos of the Proposed Project Area are included in Appendix A. These emergency relief works were determined by engineering evaluations based on field inspections and current PRHTA standards (PRHTA plans and specifications, MUTCD 2009, Roadside Design Guide 2011, and others). Copy of the Proposed Project Plans area included in Appendix D. The reconstruction of road PR-909 at kilometers 5.55 will not extend outside the existing operational right of way of the road. No relocation of families or businesses are required.

III. Purpose and Need

On September 6 and 20, 2017 hurricanes Irma and María passed over Puerto Rico and impacted many areas and structures including highways, roads and bridges under the jurisdiction of the Puerto Rico Highway and Transportation Authority (PRHTA). As consequence of the damages that resulted from these hurricanes the Governor of Puerto Rico and the President of the United States declared a state of emergency in the Island.

Considering the effects of this major nature phenomenon and the consequences in the conditions and safety of the Puerto Rico’s highways, the Puerto Rico and Transportation Authority (PRHTA) has been working in their Emergency Relief Program for Landslide since the middle of last year. The program consists of the evaluation and reconstruction of landslides; i.e., slope instability, washouts and rock fall on several highway segments due to the impacts associated with Hurricanes Irma and María. Those highway segments are located within the Puerto Rico’s Federal Aid Highway System.

The PRHTA proposes the reconstruction of a segment of state road PR-909, specifically a segment at km 5.55, at the Mariana Ward in the municipality of Humacao. A landslide of 604 square meters was identified in that segment of the road.

The purpose of the project is to solve the problem of unstable soil due to different factors, including poor management of surface runoff during or after a significant rain event, where the soil can reach its maximum saturation capacity and fail. The emergency repair works would be performed to restore essential travel, enough to permit traffic to travel over it safely, minimize the extent of damage, and / or protect the remaining facilities.

IV. Planning Consistency:

Estimated Construction Time: 180 days (6 months)

Estimated Construction Cost: $234,509.55

Estimated Date for ROW:

For Negative ROW Certificate-

First Semester of 2020

Estimated Date for PS&E: First semester of 2020

Estimated Date Construction Phase Begins: First semester of 2020

Project STIP Consistency:

This Project will be financed with funds from the Emergency Relief Program associated to Hurricanes Irma and María. Enclosed is the DDIR document (Appendix – B).

V. Proposed Improvements

• 771.115 Classes of Actions

(b) Class II (CEs) - Actions that do not individually or cumulatively have a significant environmental effect are excluded from the requirement to prepare an EA or EIS. A specific list of CEs normally not requiring NEPA documentation is set forth in §771.117(c) for FHWA actions or pursuant to §771.118(c) for FTA actions. When appropriately documented, additional projects may also qualify as CEs pursuant to §771.117(d) for FHWA actions or pursuant to §771.118(d) for FTA actions.

• 771.117 FHWA Categorical Exclusions

(a) Categorical exclusions (CEs) are actions which meet the definition contained in 40 CFR 1508.4, and, based on past experience with similar actions; do not involve significant environmental impacts. They are actions which: do not induce significant impacts to planned growth or land use for the area; do not require the relocation of significant numbers of people; do not have a significant impact on any natural, cultural, recreational, historic or other resource; do not involve significant air, noise, or water quality impacts; do not have significant impacts on travel patterns; or do not otherwise, either individually or cumulatively, have any significant environmental impacts.

(b) The following actions meet the criteria for CEs in the CEQ regulations (40 CFR 1508.4) and 771.117(a) and normally do not require any further NEPA approvals by the FHWA:

Check one or more of the following improvements which apply to the project:

☐ (1) Activities which do not involve or lead directly to construction, such as planning and research activities; grants for training; engineering to define the elements of a proposed action or alternatives so that social, economic, and environmental effects can be assessed;

and Federal-aid system revisions which establish classes of highways on the Federal-aid highway system.

☐ (2) Approval of utility installations along or across a transportation facility.

☐ (3) Construction of bicycle and pedestrian lanes, paths, and facilities.

☐ (4) Activities included in the State's highway safety plan under 23 U.S.C. 402.

☐ (5) Transfer of Federal lands pursuant to 23 U.S.C. 107(d) and/or 23 U.S.C. 317 when the land transfer is in support of an action that is not otherwise subject to FHWA review under

NEPA.

☐ (6) The installation of noise barriers or alterations to existing publicly owned buildings to provide for noise reduction.

☐ (7) Landscaping.

☐ (8) Installation of fencing, signs, pavement markings, small passenger shelters, traffic signals, and railroad warning devices where no substantial land acquisition or traffic disruption would occur.

☒ (9) The following actions for transportation facilities damaged by an incident resulting in an emergency declared by the Governor of the State and concurred in by the Secretary, or a disaster or emergency declared by the President pursuant to the Robert T. Stafford Act (42

USC 5121):

☒ (i) Emergency repairs under 23 U.S.C. 125; and

☒ (ii) The repair, reconstruction, restoration, retrofitting, or replacement of any road, highway, bridge, tunnel, or transit facility (such as a ferry dock or bus transfer station), including ancillary transportation facilities (such as pedestrian/bicycle paths and bike lanes), that is in operation or under construction when damaged and the action:

☒ (A) Occurs within the existing right-of-way and in a manner, that substantially conforms to the preexisting design, function, and location as the original (which may include upgrades to meet existing codes and standards as well as upgrades warranted to address conditions that have changed since the original construction); and

☐ (B) Is commenced within a 2-year period beginning on the date of the declaration.

☐ (10) Acquisition of scenic easements.

☐ (11) Determination of payback under 23 U.S.C. 156 for property previously acquired with Federal-aid participation.

☐ (12) Improvements to existing rest areas and truck weigh stations.

☐ (13) Ridesharing activities.

☐ (14) Bus and rail car rehabilitation.

☐ (15) Alterations to facilities or vehicles in order to make them accessible for elderly and handicapped persons.

☐ (16) Program administration, technical assistance activities, and operating assistance to transit authorities to continue existing service or increase service to meet routine changes in demand.

☐ (17) The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by new facilities which themselves are within a CE.

☐ (18) Track and rail bed maintenance and improvements when carried out within the existing right-of-way.

☐ (19) Purchase and installation of operating or maintenance equipment to be located within the transit facility and with no significant impacts off the site.

☐ (20) Promulgation of rules, regulations, and directives.

☐ (21) Deployment of electronics, photonics, communications, or information processing used singly or in combination, or as components of a fully integrated system, to improve the efficiency or safety of a surface transportation system or to enhance security or passenger convenience. Examples include, but are not limited to, traffic control and detector devices, lane management systems, electronic payment equipment, automatic vehicle locaters, automated passenger counters, computer-aided dispatching systems, radio communications systems, dynamic message signs, and security equipment including surveillance and detection cameras on roadways and in transit facilities and on buses.

☐ (22) Projects, as defined in 23 U.S.C. 101, that would take place entirely within the existing operational right-of-way. Existing operational right-of-way refers to right-of-way that has been disturbed for an existing transportation facility or is maintained for a transportation purpose. This area includes the features associated with the physical footprint of the transportation facility (including the roadway, bridges, interchanges, culverts, drainage, fixed guideways, mitigation areas, etc.) and other areas maintained for transportation purposes such as clear zone, traffic control signage, landscaping, any rest areas with direct access to a controlled access highway, areas maintained for safety and security of a transportation facility, parking facilities with direct access to an existing transportation facility, transit power substations, transit venting structures, and transit maintenance facilities. Portions of the right-of-way that have not been disturbed or that are not maintained for transportation purposes are not in the existing operational right-of-way.

☐ (23) Federally-funded projects:

☐ (i) That receive less than $5,000,000 of Federal funds; or

☐ (ii) With a total estimated cost of not more than $30,000,000 and Federal funds comprising less than 15 percent of the total estimated project cost.

☐ (24) Localized geotechnical and other investigation to provide information for preliminary design and for environmental analyses and permitting purposes, such as drilling test bores for soil sampling; archeological investigations for archeology resources assessment or similar survey; and wetland surveys.

☐ (25) Environmental restoration and pollution abatement actions to minimize or mitigate the impacts of any existing transportation facility (including retrofitting and construction of stormwater treatment systems to meet Federal and State requirements under sections 401 and 402 of the Federal Water Pollution Control Act (33 U.S.C. 1341; 1342)) carried out to address water pollution or environmental degradation.

☐ (26) Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (including parking, weaving, turning, and climbing lanes), if the action meets the constraints in paragraph (e) of this section.

☐ (27) Highway safety or traffic operations improvement projects, including the installation of ramp metering control devices and lighting, if the project meets the constraints in paragraph (e) of this section.

☐ (28) Bridge rehabilitation, reconstruction, or replacement or the construction of grade separation to replace existing at-grade railroad crossings, if the actions meet the constraints in paragraph (e) of this section.

☐ (29) Purchase, construction, replacement, or rehabilitation of ferry vessels (including improvements to ferry vessel safety, navigation, and security systems) that would not require a change in the function of the ferry terminals and can be accommodated by existing facilities or by new facilities which themselves are within a CE.

☐ (30) Rehabilitation or reconstruction of existing ferry facilities that occupy substantially the same geographic footprint, do not result in a change in their functional use, and do not result in a substantial increase in the existing facility’s capacity. Example actions include work on pedestrian and vehicle transfer structures and associated utilities, buildings, and terminals.

(e) Actions described in (c)(26), (c)(27), and (c)(28) of this section may not be processed as CEs under paragraph (c) if they involve:

(1) An acquisition of more than a minor amount of right-of-way or that would result in any residential or nonresidential displacements;

(2) An action that needs a bridge permit from the U.S. Coast Guard, or an action that does not meet the terms and conditions of a U.S. Army Corps of Engineers nationwide or general permit under section 404 of the Clean Water Act and/or section 10 of the Rivers and Harbors Act of 1899;

(3) A finding of "adverse effect" to historic properties under the National Historic Preservation Act, the use of a resource protected under 23 U.S.C. 138 or 49 U.S.C. 303 (section 4(f)) except for actions resulting in de minimis impacts, or a finding of "may affect, likely to adversely affect" threatened or endangered species or critical habitat under the Endangered Species Act;

(4) Construction of temporary access, or the closure of existing road, bridge, or ramps, that would result in major traffic disruptions;

(5) Changes in access control;

(6) A floodplain encroachment other than functionally dependent uses (e.g., bridges, wetlands) or actions that facilitate open space use (e.g., recreational trails, bicycle and pedestrian paths); or construction activities in, across or adjacent to a river component designated or proposed for inclusion in the National System of Wild and Scenic Rivers.

VI. Environmental Issues Evaluated for the Proposed Action

Ecological

1. Would the project have a substantial impact on any unique or important natural resource?

☐ YES ☒ NO

Additional Comments:

The project’s proposed repairs and reconstruction works will not have a substantial impact on any unique or important natural resource.

2. Does the project involve habitat where federally listed endangered or threatened species may occur?

☐ YES ☒ NO

Additional Comments:

To comply with Section 7 of the Endangered Species Act, the USFWS IPaC website was used to obtain an Official Species List (see Appendix C) identifying the federally protected species which could occur within the environmental study area and to make an anticipated Effects Determination for each species, for the site. The USFWS IPaC Official Species List identified the following species as potentially occurring within the project area:

ER- HWY 463 Epicrates inornatus and E. Cooki. However, no critical habitat has been affected by the proposed action.

3. Does the project qualify as a minor action that may be conducted within a blanket clearance (Self- Certification Endangered Species Act Certification) without adversely affecting the recovery and survival of listed endangered or threatened species?

☒ YES ☐ NO

Additional Comments:

A consultation letter was submitted to USFWS for their concurrence on July 9, 2019. The FWLS in their letter of July 11, 2019 determined that the proposed project is not likely to adversely affect federally-listed species or their critical habitats. This determination is conditioned to the implementation of the Best Management Practices (BMP’s) previously provided for the species prior and during the road damage repairs to avoid or minimize impacts to federally-listed species. See copy of FWLS coordination in Appendix C.

4. The project affects USACE jurisdictional areas?

☐ YES ☒ NO

Additional Comments:

The projects will not affect jurisdictional water of the USACE.

5. If the project involves wetlands, is the amount of permanent and/or temporary wetland taking less than one-tenth (1/10) of an acre and have all practicable measures to avoid and minimize wetland takings been evaluated?

☐ YES ☒ NO

Additional Comments:

The projects will not affect jurisdictional water of the USACE including wetlands.

6. Does the project affect areas covered under Section 404 of the Clean Water Act?

☐ YES ☒ NO

Additional Comments:

No USACE jurisdictional areas will be affected by the proposed projects.

7. Does the project involve any known underground storage tanks (UST’s) or hazardous material sites?

☐ YES ☒ NO

Additional Comments:

The projects do not involve any UST’s or hazardous materials were observed within the project’s limits.

8. Would a US Coast Guard Permit be required?

☐ YES ☒ NO

Additional Comments:

The proposed action is a rural upland road project. No Coast Guard permit is required.

9. Is the project located within a floodplain zone?

☐ YES ☒ NO

Additional Comments:

The project is located outside a floodplain zone. According with the FEMA Maps. See Figure 4, FEMA Map in Appendix A.

10. Would the project affect water bodies?

☐ YES ☒ NO

Additional Comments:

Based on GIS spatial data and EPA geospatial water data, water resources such as rivers, springs, lakes, lagoons, creeks, reservoirs, sinkholes, or wetlands are not located near the project’s areas. (see Figure 5 in Appendix A). The closest stream from PR-909, km-5.55 at a distance of approximately 53 meters. No water bodies could be affected in the proposed project area. Proper erosion and sediment controls will be installed to reduce the possibility that sediments related to the project’s construction reach any water body (including any storm water inlets).

11. Would the project require the preparation of a Hydrologic-Hydraulic Study?

☐ YES ☒ NO

Additional Comments:

The proposed project does not require the preparation of an H-H study.

12. Would the project affect Wild and Scenic Rivers?

☐ YES ☒ NO

Additional Comments:

The proposed projects will not affect any designated Wild and Scenic Rivers of Puerto Rico.

13. Would the project may adversely affect Essential Fish Habitat?

☐ YES ☒ NO

Additional Comments:

The proposed project will not affect Essential Fish Habitat.

14. Does the project affect coastal municipalities?

☐ YES ☒ NO

Additional Comments:

The project is located outside of Coastal or maritime zones.

15. Would the project result in the modification of any existing floodway?

☐ YES ☒ NO

Additional Comments:

The proposed projects will not affect the existing floodplain levels.

16. Would the project require any stream relocations or channel changes?

☐ YES ☒ NO

Additional Comments:

The proposed project will not require any stream relocation or channel changes.

17. Would the project affect trees?

☒ YES ☐ NO

Additional Comments:

The proposed projects may require the cut of trees. According to the “Reglamento Conjunto para la Evaluación y Expedición de Permisos Relacionados al Desarrollo, Uso de Terrenos y Operación de Negocios” issued on June 7, 2019”, a mitigation plan will be necessary to mitigate the tree impacts. Nevertheless, an Administrative Order Number 2019-01 was issued by Permit Management Office on January 8, 2019 to extend the streamline permit process for the projects related to the emergency. The Order authorize the cut of trees without the request of a permit. The Administrative Order is effective until the declaration of state of emergency by the Governor of PR is valid.

Social, Economic and Cultural Resources

18. Would the project induce substantial impacts to planned growth or land use of the area?

☐ YES ☒ NO

Additional Comments:

The proposed projects will not induce substantial impacts to planned growth or land use for the area.

19. Would the project require the relocation of any family or business?

☐ YES ☒ NO

Additional Comments:

The projects of PR-909 km-5.55 in Mariana Ward of the Municipality of Humacao not require the relocation of any family or business.

20. Would the project have a disproportionately high and adverse human health and environmental effect on any minority or low-income population?

☐ YES ☒ NO

Additional Comments:

The proposed projects will not have a disproportionately high and adverse human health and environmental effect on any minority or low-income population.

21. If the project involves the acquisition of a right-of-way, is the amount of right-of-way acquisition considered minor?

☐ YES ☒ NO

Additional Comments:

The reconstruction of road PR-909 at kilometer 5.55 will be performed within the existing

ROW.

22. Does the project have any impact in the community cohesion of the adjacent project’s neighborhoods?

☐ YES ☒ NO

Additional Comments:

The proposed project will not have any impact in the community cohesion of the adjacent project’s neighborhoods.

23. Would the project affect community services?

☐ YES ☒ NO

Additional Comments:

The proposed project would not affect the community’s services.

24. Does the project consider non-discrimination issues?

☐ YES ☒ NO

Additional Comments:

The proposed project considers the non-discrimination considerations.

25. Would the project have any impacts on existing noise levels?

☐ YES ☒ NO

Additional Comments:

No effects on noise levels are expected. A temporary minimal increase of the existing noise levels would be expected during the construction phase of the project.

26. Does the project comply with attaining air quality standards (NAAQS)?

☐ YES ☒ NO

Additional Comments:

The proposed project complies with the national air quality standards (NAAQS)._

27. Would the project have any impacts in existing air quality levels?

☐ YES ☒ NO

Additional Comments:

The repairs and reconstruction works will not impact the existing air quality levels since the scope of the projects is to re-establish the existing conditions. A temporary increase of the existing air quality levels would be expected during the construction phase of the projects.

28. Would the project affect farmland areas?

☐ YES ☒ NO

Additional Comments:

The proposed projects will not affect farmlands areas.

29. Would the project entail any significant aesthetic effects?

☐ YES ☒ NO

The project will not have any significant aesthetic effects.

30. Would the project affect recreational areas?

☐ YES ☒ NO

Additional Comments:

The proposed project will not affect recreational areas.

31. Would the project involve any changes in access control?

☐ YES ☒ NO

Additional Comments:

The proposed project will not involve any changes in access control.

32. Would the project have an adverse effect on permanent local traffic patterns or community cohesiveness?

☐ YES ☒ NO

Additional Comments:

The proposed projects will not have an adverse effect on permanent local traffic patterns or community cohesiveness.

33. Would traffic be maintained during construction using existing roads, staged construction, or on-site detours?

☒ YES ☐ NO

Additional Comments:

The traffic would be maintained during construction in both directions. A MOT would be prepared specific for the affected area of the project.

34. If the project is a bridge replacement project, would the bridge be replaced at this existing location (along the existing facility) and, would all construction proposed in association with the bridge replacement project be contained within the existing facility?

☐ YES ☒ NO

Additional Comments:

The proposed project does not require a bridge replacement.

35. Would the project affect a bridge or a culvert?

☐ YES ☒ NO

Additional Comments:

The proposed projects will not affect any bridge or culvert.

36. Is the bridge or culvert considered a historical structure?

☐ YES ☒ NO

No historic structure would be affected by the proposed project.

37. Is there substantial controversy on social, economic, or environmental grounds concerning the project?

☐ YES ☒ NO

Additional Comments:

No substantial controversy is expected related with the proposed projects.

38. Would the project have an effect on social, economic, or environmental grounds concerning the project?

☐ YES ☒ NO

Additional Comments:

The proposed projects will not have an adverse effect on social, economic or environmental grounds.

39. Would the project affect any archaeological remains which are important to history or pre-history?

☐ YES ☒ NO

Additional Comments:

An Identification of Historic Properties and Assessment of Effects Report (refers to Appendix E) was performed by the Archeologists Anabel Arana Lanzas and Marisol Martinez Garayalde for the site with the objective of identifying the presence or absence of cultural resources in the proposed action area of potential effects (APE). According with the reports no archaeological sites are located within or adjacent to the projects area. SHPO on letter dated July 16, 2019 concurred with the determination of no historic properties affected for the proposed project.

See Appendix E, SHPO Coordination. If unexpected cultural resources are encountered at any time within the project area, work should cease in the immediate vicinity of such discoveries.

SHPO would be notified. Project activities should not resume without authorization from SHPO.

No historical structure will be affected by the proposed projects.

40. Would the project affect any historic property?

☐ YES ☒ NO

Additional Comments:

As part of the damages and possible solutions evaluation for the landslide problem, an identification of historic properties and evaluation of effects was conducted. The site was evaluated by a qualified archaeologist. The study had a determination of no effect on historic properties due to the undertaking and no further studies were recommended. SHPO on letter dated July 16, 2019 concurred with the determination of no historic properties affected for the proposed project. See Appendix E, SHPO Coordination. If unexpected cultural resources are encountered at any time within the project area, work should cease in the immediate vicinity of such discoveries. SHPO would be notified. Project activities should not resume without authorization from SHPO. No historical structure will be affected by the proposed projects.

41. Would the project require the use of resources from Section 6(f) of the Land and Water Conservation Fund Act?

☐ YES ☒ NO

Additional Comments:

The projects will not cause impacts to recreational properties acquired with LWCFA Funds.

42. Would the project require the use of Section 4 (f) resources (public, parks, recreation lands, wildlife, historic sites, or historic bridges) as defined in Section 4 (f) of the U.S. Department of Transportation Act of 1966?

☐ YES ☒ NO

Additional Comments:

The proposed projects will not affect any publicly owned parks, recreational area, wildlife and waterfowl refuges, or public and private historical sites.

43. Would the project require the relocation of utilities or construction of new facilities?

☒ YES ☐ NO

Additional Comments:

The relocation of utilities or construction of new facilities of PRASA is expected for the project.

A note in the project final plans would be included to indicate that the contractor shall perform an exploratory excavation. A consultation with PRASA, PREPA and the JRTC would be performed.

44. Would the project affect any airport clearance?

☐ YES ☒ NO

Additional Comments:

The project will not affect the airport clearance.

45. Would the project consider the accommodation of pedestrian and bicycle facilities as part of its scope?

☐ YES ☒ NO

Additional Comments:

The accommodation of pedestrian and bicycle facilities are not part of the project’s scope. The road geometry will not be modified since is not part of the proposed repair and reconstruction works and no bicycle facilities or pedestrian facilities exist within the project limits.

46. Would the project require public involvement activities?

☐ YES ☒ NO

Additional Comments:

The public would be informed the proposed works using message boards and public announcements through social medias and newspapers, as well as other methods prior the commencement of the construction phase.

47. Would the project have any potential for controversy?

☐ YES ☒ NO

No potential of controversy is expected for the proposed project.

VII. Environmental Commitments required for the proposed project

1. The proposed works would be constructed within the existing right of way. This project would not cause effect on historic properties, wetlands or any special habitat areas.

2. If unexpected cultural resources are encountered at any time within the project area, work should cease in the immediate vicinity of such discoveries and SHPO would be notified.

3. For the erosion and sedimentation control in the project area, our Agency would the project’s contractor to prepare and implement an Erosion and Sedimentation Control Plan, the Solid Wastes

Generated Permit (DS-3), and a permit for atmospheric emission source and National Pollution

Discharge Elimination System (NPDES) permit (if required). Also, we would request the contractor to comply with any other applicable regulations.

4. During the construction within the project limits would remain open to traffic in both directions. A

TMP/MOT would be prepared specific for this project.

5. A note in the project final plans would be included to indicate that before any excavation works begins the contractor shall perform an exploratory excavation, in areas where PREPA and PRASA pipelines are close to excavation works to obtain the exact location of the pipes.

6. The proposed project requires the implementation of the Best Management Practices (BMP’s) for the

Epicrates inornatus and E. Cooki. prior and during the road damage repairs to avoid or minimize impacts to federally-listed species.

7. Any impact to trees will be mitigated in compliance with applicable local regulations. According to the

“Reglamento Conjunto para la Evaluación y Expedición de Permisos Relacionados al Desarrollo, Uso de Terrenos y Operación de Negocios” issued on June 7, 2019”, a mitigation plan will be necessary to mitigate the tree impacts. Nevertheless, an Administrative Order Number 2019-01 was issued by

Permit Management Office on January 8, 2019 to extend the streamline permit process for the projects related to the emergency. The Order authorize the cut of trees without the request of a permit. The Administrative Order is effective until the declaration of state of emergency by the

Governor of PR is valid.

APPENDIX A

FIGURES, PHOTOS AND MAPS

Photo 1: Landslide at PR-909 km 5.55

Photo 2: Landslide and suspended guardrail at PR-909 km-5.55

Photo 3: Landslide at PR-909 km-5.55

PR-909 km-5.55 Mariana Ward of the Municipality of Humacao- (ER-HWY 463)

Figure 1: Location Map (PR-909)

PR-909 km-5.55 Mariana Ward of the Municipality of Humacao- (ER-HWY 463)

Figure 2: Aerial Photo (PR-909)

Figures 3: Typical Section

Figures 3.1: Typical Section

Figures 3.2: Typical Section

Figures 3.3: Typical Section

Figure 4: FIRM Map Source: FEMA FIRM 75000C1805 J

Figure 5: GIS Spatial Data Source: MIPR

Figure 6: EPA Geospatial Water Data Source: https://epa.maps.arcgis.com/ https://epa.maps.arcgis.com/

APPENDIX B

DETAILED DAMAGE INSPECTION REPORT (DDIR)

APPENDIX C

USFWLS COORDINATION

APPENDIX D

PROPOSED PROJECT PLANS

P.R.

F I L

E

N

A M

E

AC. PROJECT

PROJECT NO.

FED AID H'WAY

CODE NO.

MUNICIPALITY

ISLAND

SHEET

YEAR

FISCAL

NO.

TOTAL

SHEETS

- HUMACAO 2019 134

BCN0114017

AC-805544

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

I N

I T

I A

L S

S T

E P

S D

A T

E

F I N

A L

C

H E

C K

B

Y

T R

A C

E D

HIGHWAY

PR-909

GR-C

KEY MAP PLAN

SCALE = 1:1000

ER-HWY-463, HIGHWAY PR-909 KM.5.55

STATE ROAD PR-909

STATE ROAD PR-909

PROJECT BEGINS

STA.0+00.00

PROJECT ENDS

STA.0+80.00

Meters

" CAMINO VIDAL RODRIGUEZ "

" CAMINO DOLORES ORTIZ "

AutoCAD SHX Text

DATE

AutoCAD SHX Text R E V I S I O N S

AutoCAD SHX Text G:\PROYECTOS\2018\LANDSLIDES_AC-805544\GROUP-A\PRELIMINARY SUBMISSION\DWGSET\097-GR-C-4.DWG

AutoCAD SHX Text

PUERTO RICO HIGHWAY &

AutoCAD SHX Text

TRANSPORTATION AUTHORITY

AutoCAD SHX Text

LANDSLIDE AND ROAD DAMAGE EVALUATION

AutoCAD SHX Text

ER-HWY-463, HIGHWAY PR-909 KM.5.55

AutoCAD SHX Text

HUMACAO, PUERTO RICO

P.R.

F I L

E

N

A M

E

AC. PROJECT

PROJECT NO.

FED AID H'WAY

CODE NO.

MUNICIPALITY

ISLAND

SHEET

YEAR

FISCAL

NO.

TOTAL

SHEETS

- HUMACAO 2019 134

BCN0114017

AC-805544

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

I N

I T

I A

L S

S T

E P

S D

A T

E

F I N

A L

C

H E

T R

A C

HIGHWAY

PR-909

GR-C

TYPICAL SECTIONS

SCALE = 1:75

Meters

2.25

4.5

AutoCAD SHX Text

STA. 0+78.5329 TO 0+80.0000 (LINE 1)

AutoCAD SHX Text

TYPICAL SECTION

AutoCAD SHX Text

SCALE = 1:75

AutoCAD SHX Text

EXIST. 15.00 MTS. RIGHT-OF-WAY TO REMAIN

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

PROPOSED CORRUGATED STEEL BEAM GUARD RAIL, SINGLE FACE (WHERE

AutoCAD SHX Text

PROPOSED 0.05 MTS. HOT PLANT MIX BITUMINOUS PAVEMENT MIX TYPE S-1 (75)

AutoCAD SHX Text

PROPOSED 0.10 MTS. HOT PLANT MIX BITUMINOUS PAVEMENT MIX TYPE B-1 (75)

AutoCAD SHX Text

CALLED FOR ON PLANS) (SEE DET. SHEET SS-)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TYPICAL LEGEND:

AutoCAD SHX Text

EXISTING CURB AND GUTTER TO REMAIN

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING BITUMINOUS PAVEMENT TO REMAIN UNLESS OTHERWISES INDICATED

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING GUARD RAIL TO REMAIN

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING RETAINING WALL TO REMAIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED DRAINAGE CURB TYPE-F

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED 0.05 MTS. OF COLD MILLING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED REINFORCED SOIL WALL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED 0.15 MTS. LEAN CONCRETE

AutoCAD SHX Text

PROPOSED 0.63 MTS. AGGREGATE BASE COURSE

AutoCAD SHX Text

PROPOSED 24" AGGREGATE SUB-BASE COURSE

AutoCAD SHX Text

PROPOSED RIP RAP PROTECTION

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED DRAINAGE INLET TYPE 1

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

1. FOR GENERAL NOTES, LEGEND & ABBREVIATIONS

AutoCAD SHX Text

INFORMATION, PLEASE REFER TO DWG. GR-3.

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED 18"%%C R.C.P. CLASS III

AutoCAD SHX Text

STA. 0+59.5849 TO 0+73.5329 (LINE 1)

AutoCAD SHX Text

TYPICAL SECTION

AutoCAD SHX Text

SCALE = 1:75

AutoCAD SHX Text

EXIST. 15.00 MTS. RIGHT-OF-WAY TO REMAIN

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WIDTH 6.04 TO 5.39

AutoCAD SHX Text

EXISTING PAVEMENT

AutoCAD SHX Text

WIDTH 5.39 TO 5.57

AutoCAD SHX Text

EXISTING PAVEMENT

AutoCAD SHX Text

AutoCAD SHX Text

STA. 0+47.6400 TO 0+59.5849 (LINE 1)

AutoCAD SHX Text

TYPICAL SECTION

AutoCAD SHX Text

SCALE = 1:75

AutoCAD SHX Text

EXIST. 15.00 MTS. RIGHT-OF-WAY TO REMAIN

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WIDTH 5.57 TO 5.85

AutoCAD SHX Text

EXISTING PAVEMENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WIDENING

AutoCAD SHX Text 0.365

AutoCAD SHX Text

STA. 0+38.7800 TO 0+47.6400 (LINE 1)

AutoCAD SHX Text

TYPICAL SECTION

AutoCAD SHX Text

SCALE = 1:75

AutoCAD SHX Text

EXIST. 15.00 MTS. RIGHT-OF-WAY TO REMAIN

AutoCAD SHX Text 0.80

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WIDTH 5.85 TO 6.97

AutoCAD SHX Text

EXISTING PAVEMENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 0.80

AutoCAD SHX Text 1.50

AutoCAD SHX Text

AutoCAD SHX Text

WIDENING

AutoCAD SHX Text 0.330

AutoCAD SHX Text

STA. 0+26.7900 TO 0+38.7800 (LINE 1)

AutoCAD SHX Text

TYPICAL SECTION

AutoCAD SHX Text

SCALE = 1:75

AutoCAD SHX Text

EXIST. 15.00 MTS. RIGHT-OF-WAY TO REMAIN

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

AutoCAD SHX Text

PROPERTY

AutoCAD SHX Text

WIDTH 6.97 TO 4.93

AutoCAD SHX Text

EXISTING PAVEMENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1.50

AutoCAD SHX Text

AutoCAD SHX Text

WIDENING

AutoCAD SHX Text 0.572

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WIDENING

AutoCAD SHX Text

0.0 @ 0.77

AutoCAD SHX Text

STA. 0+00.0000 TO 0+26.7900 (LINE 1)

AutoCAD SHX Text

TYPICAL SECTION

AutoCAD SHX Text

SCALE = 1:75

AutoCAD SHX Text

EXIST. 15.00 MTS. RIGHT-OF-WAY TO REMAIN

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

WIDTH 4.93

AutoCAD SHX Text

EXISTING PAVEMENT

AutoCAD SHX Text

WIDENING

AutoCAD SHX Text

0.0 @ 1.52

AutoCAD SHX Text

WIDENING

AutoCAD SHX Text

0.0 @ 0.726

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING CURB AND GUTTER TO BE DEMOLISHED

AutoCAD SHX Text

EXISTING GUARD RAIL TO BE DEMOLISHED

AutoCAD SHX Text

PROPOSED 0.05 MTS. HOT PLANT MIX BITUMINOUS PAVEMENT MIX TYPE B-1 (75)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED 0.15 MTS. AGGREGATE BASE COURSE CLASS (A)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED BENCH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WALL TO

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

REMAIN

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

GUTTER TO

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

REMAIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PROPERTY

AutoCAD SHX Text

WALL TO

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

REMAIN

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

GUTTER TO

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

REMAIN

AutoCAD SHX Text (A-1-a PER AASHTO CLASSIFICATION SYST.)

AutoCAD SHX Text

(A-2-4 OR BETTER PER AASHTO CLASSIFICATION SYST.)

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

(SEE GEOTECHNICAL REPORT)

AutoCAD SHX Text

(SEE DETAILS ON SHEET DR-C/2)

AutoCAD SHX Text

(DR 7 OF 40)

AutoCAD SHX Text

PROPOSED FILL

AutoCAD SHX Text

AutoCAD SHX Text

(A-2-4 OR BETTER PER AASHTO CLASSIFICATION SYST.)

AutoCAD SHX Text

(SEE DETAILS ON PRHTA "STANDARD DRAWINGS VOLUME 1")

AutoCAD SHX Text

AutoCAD SHX Text

PROPOSED EMBANKMENT H=2.0, V=1.00

AutoCAD SHX Text

(SEE GEOTECHNICAL REPORT)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1.00

AutoCAD SHX Text 1.00

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text P.R.#909

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text P.R.#909

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text P.R.#909

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text P.R.#909

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text P.R.#909

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text P.R.#909

AutoCAD SHX Text

(SEE DETAILS ON SHEET RW-C/1,2,&3)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1.15

AutoCAD SHX Text 0.80

AutoCAD SHX Text 0.95

AutoCAD SHX Text 1.00

AutoCAD SHX Text

DATE

AutoCAD SHX Text R E V I S I O N S

AutoCAD SHX Text G:\PROYECTOS\2018\LANDSLIDES_AC-805544\GROUP-A\PRELIMINARY SUBMISSION\DWGSET\091-GR-C-5.DWG

AutoCAD SHX Text

PUERTO RICO HIGHWAY &

AutoCAD SHX Text

TRANSPORTATION AUTHORITY

AutoCAD SHX Text

LANDSLIDE AND ROAD DAMAGE EVALUATION

AutoCAD SHX Text

ER-HWY-463, HIGHWAY PR-909 KM.5.55

W

W

W

W

W

W

W

W

W

S

T

A

B

STA-B1

S

T

A

B

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

P.R.

F I L

E

N

A M

E

AC. PROJECT

PROJECT NO.

FED AID H'WAY

CODE NO.

MUNICIPALITY

ISLAND

SHEET

YEAR

FISCAL

NO.

TOTAL

SHEETS

- HUMACAO 2019 134

BCN0114017

AC-805544

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

I N

I T

I A

L S

S T

E P

S D

A T

E

F I N

A L

C

H E

T R

A C

HIGHWAY

PR-909

EX-C

EXISTING CONDITIONS PLAN

SCALE = 1:400

Meters

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WM

AutoCAD SHX Text

TEL

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WM

AutoCAD SHX Text

WM

AutoCAD SHX Text

WM

AutoCAD SHX Text

WM

AutoCAD SHX Text

TEL

AutoCAD SHX Text

WM

AutoCAD SHX Text

WM

AutoCAD SHX Text

TEL

AutoCAD SHX Text

WM

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TEL

AutoCAD SHX Text

WM

AutoCAD SHX Text

WM

AutoCAD SHX Text

WM

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TEL

AutoCAD SHX Text

TEL

AutoCAD SHX Text

TEL

AutoCAD SHX Text

GUY-WIRE

AutoCAD SHX Text

GUY-WIRE

AutoCAD SHX Text

GUY-WIRE

AutoCAD SHX Text K.M. 5.4

AutoCAD SHX Text K.M. 5.5

AutoCAD SHX Text K.M. 5.6

AutoCAD SHX Text K.M. 5.7

AutoCAD SHX Text

ASPHALT EDGE

AutoCAD SHX Text

ASPHALT EDGE

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

ASPHALT EDGE

AutoCAD SHX Text

CHAIN-LINK W/LOW-WALL

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

ASPHALT EDGE

AutoCAD SHX Text

CURB

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

CURB

AutoCAD SHX Text

ASPHALT EDGE

AutoCAD SHX Text

CURB

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text W.M.

AutoCAD SHX Text W.M.

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

CONC. WALL

AutoCAD SHX Text

TREE TRUNK

AutoCAD SHX Text

PALM TREE

AutoCAD SHX Text

(2) TREES

AutoCAD SHX Text

TREE TRUNK

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text W.M.

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

CONC. LOW WALL

AutoCAD SHX Text

ABANDONED POLE

AutoCAD SHX Text (2)W.M.

AutoCAD SHX Text

CONC. WALL

AutoCAD SHX Text

CONC. WALL

AutoCAD SHX Text

TREE

AutoCAD SHX Text

CONC. LOW WALL

AutoCAD SHX Text

CONC. WALL

AutoCAD SHX Text

STATE ROAD PR-909

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

CONC. WALL

AutoCAD SHX Text

GATE

AutoCAD SHX Text

CONC. SLAB

AutoCAD SHX Text

(2) W.M.

AutoCAD SHX Text W.M.

AutoCAD SHX Text N 231200

AutoCAD SHX Text N 231250

AutoCAD SHX Text N 231300

AutoCAD SHX Text N 231350

AutoCAD SHX Text N 231400

AutoCAD SHX Text E 260600

AutoCAD SHX Text E 260600

AutoCAD SHX Text E 260650

AutoCAD SHX Text E 260700

AutoCAD SHX Text E 260750

AutoCAD SHX Text E 260800

AutoCAD SHX Text E 260600

AutoCAD SHX Text E 260650

AutoCAD SHX Text E 260700

AutoCAD SHX Text E 260750

AutoCAD SHX Text E 260800

AutoCAD SHX Text N 231200

AutoCAD SHX Text N 231250

AutoCAD SHX Text N 231300

AutoCAD SHX Text N 231350

AutoCAD SHX Text N 231400

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

CONC. WALL

AutoCAD SHX Text

W.VALVE

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

GUARD RAIL

AutoCAD SHX Text

CURB & GUTTER

AutoCAD SHX Text

TRAFFIC SIGN

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

CONC. WALL

AutoCAD SHX Text

BG 463-1

AutoCAD SHX Text

BG 463-2

AutoCAD SHX Text

STORM SEWER BOX INLET I.E.=263.41

AutoCAD SHX Text

CONC. LOW WALL

AutoCAD SHX Text

CONC. LOW WALL

AutoCAD SHX Text

CONC. LOW WALL

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text W.M.

AutoCAD SHX Text W.M.

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

CONC.SLAB

AutoCAD SHX Text

PR-909

AutoCAD SHX Text

SLIDE AFFECTED AREA

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

GUARD-RAIL

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

CHAIN-LINK W/LOW-WALL

AutoCAD SHX Text

CONC.-WALL

AutoCAD SHX Text

CHAIN-LINK W/LOW-WALL

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

GATE

AutoCAD SHX Text

SUE WATER LINE MARK ENDS

AutoCAD SHX Text

SUE WATER LINE MARK ENDS

AutoCAD SHX Text

SUE WATER LINE MARK ENDS

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

GUARD RAIL

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

BROKEN CURB

AutoCAD SHX Text

BG 463-3

AutoCAD SHX Text

CONC. CROSS

AutoCAD SHX Text

TO HUMACAO

AutoCAD SHX Text

TO YAUCOA

AutoCAD SHX Text

MATEO ORTIZ RODRIGUEZ

AutoCAD SHX Text

ALBERTO LOPEZ RODRIGUEZ

AutoCAD SHX Text

CADASTER: 329-023-494-48

AutoCAD SHX Text

WILLIAM MALDONADO

AutoCAD SHX Text

DUCOS

AutoCAD SHX Text

ANGEL L. ADAMES

AutoCAD SHX Text

ORTIZ

AutoCAD SHX Text

CADASTER: 329-023-494-52

AutoCAD SHX Text

CADASTER: 329-023-494-52

AutoCAD SHX Text

MATEO ORTIZ RODRIGUEZ

AutoCAD SHX Text

SOTO

AutoCAD SHX Text

CARMEN V. RODRIGUEZ

AutoCAD SHX Text

CURB

AutoCAD SHX Text

DATE

AutoCAD SHX Text R E V I S I O N S

AutoCAD SHX Text G:\PROYECTOS\2018\LANDSLIDES_AC-805544\GROUP-A\PRELIMINARY SUBMISSION\DWGSET\095-EX-C-1.DWG

AutoCAD SHX Text

PUERTO RICO HIGHWAY &

AutoCAD SHX Text

TRANSPORTATION AUTHORITY

AutoCAD SHX Text

LANDSLIDE AND ROAD DAMAGE EVALUATION

AutoCAD SHX Text

ER-HWY-463, HIGHWAY PR-909 KM.5.55

244.21

244.19

244.15

243.91

243.82

243.92

243.95

244.05

244.10

244.07

243.95

243.97

243.67

243.05

242.67 242.63

242.53

242.67

242.81

243.54

243.49

243.48

248.47

244.52

244.61

244.48

244.55

244.53

244.74

245.03

245.30

246.24

246.08

247.04

247.15

248.03

247.85

247.93

248.31

248.47

248.48

248.49

248.25

247.86

247.68

247.55

P.R.

F I L

E

N

A M

E

AC. PROJECT

PROJECT NO.

FED AID H'WAY

CODE NO.

MUNICIPALITY

ISLAND

SHEET

YEAR

FISCAL

NO.

TOTAL

SHEETS

- HUMACAO 2019 134

BCN0114017

AC-805544

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

I N

I T

I A

L S

S T

E P

S D

A T

E

F I N

A L

C

H E

T R

A C

HIGHWAY

PR-909

DM-C

DEMOLITION PLAN

SCALE = 1:400

Meters

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

STATE ROAD PR-909

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ROAD

AutoCAD SHX Text N 231200

AutoCAD SHX Text N 231250

AutoCAD SHX Text N 231300

AutoCAD SHX Text N 231350

AutoCAD SHX Text N 231400

AutoCAD SHX Text E 260600

AutoCAD SHX Text E 260600

AutoCAD SHX Text E 260650

AutoCAD SHX Text E 260700

AutoCAD SHX Text E 260750

AutoCAD SHX Text E 260800

AutoCAD SHX Text E 260600

AutoCAD SHX Text E 260650

AutoCAD SHX Text E 260700

AutoCAD SHX Text E 260750

AutoCAD SHX Text E 260800

AutoCAD SHX Text N 231200

AutoCAD SHX Text N 231250

AutoCAD SHX Text N 231300

AutoCAD SHX Text N 231350

AutoCAD SHX Text N 231400

AutoCAD SHX Text

PR-909

AutoCAD SHX Text

TO HUMACAO

AutoCAD SHX Text

TO YAUCOA

AutoCAD SHX Text

MATEO ORTIZ RODRIGUEZ

AutoCAD SHX Text

ALBERTO LOPEZ RODRIGUEZ

AutoCAD SHX Text

CADASTER: 329-023-494-48

AutoCAD SHX Text

WILLIAM MALDONADO

AutoCAD SHX Text

DUCOS

AutoCAD SHX Text

ANGEL L. ADAMES

AutoCAD SHX Text

ORTIZ

AutoCAD SHX Text

CADASTER: 329-023-494-52

AutoCAD SHX Text

CADASTER: 329-023-494-52

AutoCAD SHX Text

MATEO ORTIZ RODRIGUEZ

AutoCAD SHX Text

SOTO

AutoCAD SHX Text

CARMEN V. RODRIGUEZ

AutoCAD SHX Text

2" COLD MILLING AND REPAVING

AutoCAD SHX Text

2" COLD MILLING AND REPAVING

AutoCAD SHX Text

EXISTING GUARD RAIL TO BE REMOVED

AutoCAD SHX Text

REMOVAL OF EXISTING GUARDRAIL ENDS STA. 0+64.0000

AutoCAD SHX Text

REMOVAL OF EXISTING GUARDRAIL ENDS STA. 0-05.33770-05.3377

AutoCAD SHX Text

PROJECT LIMIT

AutoCAD SHX Text

DATE

AutoCAD SHX Text R E V I S I O N S

AutoCAD SHX Text G:\PROYECTOS\2018\LANDSLIDES_AC-805544\GROUP-A\PRELIMINARY SUBMISSION\DWGSET\096-DM-C-1.DWG

AutoCAD SHX Text

PUERTO RICO HIGHWAY &

AutoCAD SHX Text

TRANSPORTATION AUTHORITY

AutoCAD SHX Text

LANDSLIDE AND ROAD DAMAGE EVALUATION

AutoCAD SHX Text

ER-HWY-463, HIGHWAY PR-909 KM.5.55

244.15

243.91

243.82

243.92

243.95

244.05

244.10

244.07

243.95

243.97

243.67

243.05

242.67 242.63

242.53

242.6…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .