Report Example.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Testing and Inspection of Fire Suppression Systems for USAG-Italy Vicenza and Poggio Renatico (FE)
- Solicitation number
- W912PF24Q0080
About this file
This document appears to be a report from a fire alarm and fire extinguisher inspection conducted under Contract W912PF-15-C-0006 at Ederle Building 3 in the USAG-Italy Vicenza area.
The report details the results of various tests and inspections performed on the fire alarm system, including testing smoke/heat detectors, voltage levels, device connectivity, and functionality of the fire alarm and mass notification systems. It also lists the specific fire alarm equipment such as the fire alarm control panel, number of detectors and pull stations, and indicates the mass notification system is connected to the fire department. The report notes several deficiencies that require remediation, such as a missing smoke detector, malfunctioning heat detector, and broken strobe light, as well as issues with the mass notification system battery.
The report also documents the fire extinguisher inspection, including the serial numbers, locations, and service history (inspection, recharge) for the 6kg powder fire extinguishers located throughout the building.
This inspection and report appear to be related to the upcoming federal contract opportunity W912PF24Q0080 for "Testing and Inspection of Fire Suppression Systems for USAG-Italy Vicenza and Poggio Renatico (FE)".
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE ALARM
| ACME | FIRE ALARM SYSTEM | Contract: | W912PF-15-C-0006 | |
| Page: | 1 of 1 | |||
| Date: | 21-Nov-16 | |||
| Area: Ederle | BLDG: 3 | Name/lastname: | Mario Rossi |
ACTIVITY DESCRIPTION Result
| 1 | Test and clean the smoke/heat detector | Pass | Not Pass |
| 2 | Test voltage level FACP | Pass | Not Pass |
| 3 | Test voltage level auxiliary external batteries of the FACP | Pass | Not Pass |
| 4 | Test all the devices connected to the Fire Alarm System | Pass | Not Pass |
| 5 | Test functional fire alarm | Pass | Not Pass |
| 6 | Test functional mass notification | Pass | Not Pass |
| 7 | Test UPS of mass notification | Pass | Not Pass |
| 8 | Fault test FACP | Pass | Not Pass |
| 9 | Test other devices | Pass | Not Pass |
| 10 | Test the connection with Fire department | Pass | Not Pass |
| Fire Alarm Panel: NOTIFIER AM 2000N | |||
| Number of detectors: 41 | |||
| Number of pull station: 32 | |||
| Mass Notification system: Yes | |||
| Connection with Fire Department: Yes | |||
| Description of the deficiencies: The smoke detector N. L01 M 23 (Model, Type) located in the room 96 is missing, the heat detector N. L01 M 29 (Model, Type) located in the room 105 | |||
| not working properly need to be replace, the strobe N L01 M 27 (Model, Type) located in the room 1040 is broken need to be replace, the mass notification battery (Model, Type) | |||
| not working need to be replace |
FIRE EXTINGUISHER
| ACME | FIRE EXTINGUISHER | Contract: | W912PF-15-C-0006 | TYPE OF SERVICE | |
| Page: | 1 of 1 | ||||
| Date: | 21-Nov-16 | ||||
| Area: Ederle | BLDG: 3 | Name/lastname: | Mario Rossi |
| TYPE OF FIRE EXTINGUISHER | SERIAL NUMBER | LOCATION | Revisione | Collaudo | Ricarica | |
| 1 | Estintore a polvere da 6KG | SN 124260 | Piano terra, corridoio lato destro vicino Room 12 | 2017 | 2019 | NO |
| 2 | Estintore a polvere da 6KG | SN 124261 | Piano terra, stanza elettrica Room 52 | YES | 2018 | NO |
| 3 | Estintore a polvere da 6KG | SN 124262 | Primo piano, Room 12 Bagno | 2018 | 2020 | YES |
Note: fatto servizio di revisione per 1 estintore e una ricarica, tutti gli estintori risultano essere funzionanti ed in buone condizioni
TOT LIST
EDERLE
| BLDG Number | Semester | Issue Description | Location | QTY | Item |
| 1 | A | rilevatore di fumo | stanza 11- 2 piano | 2 | Notifire NFXI-SMT2 |
| 1 | A | Luce di emergenza | corridoio 1 piano | 8 | Disano 615 safety |
| 2 | A | Pressostato | stanza sprinkler | 1 | Tyco PS-10-2 |
| 2 | A | Batteria FAP | Entrata piano terra | 2 | XX Volt XX Amp |
File details come from the government source that posted it. Updated .